Ultra Construction
- Based in
- South San Francisco
- On San Francisco permits
- Jun 2011 to Apr 2025
- Last 24 months
- 2 permits filed
33 permits since 2000: 13 completed, 2 in progress, 11 never finaled, 7 expired or cancelled.
Of the 11 never-finaled permits, 7 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2025 | In progress issued Apr 2025 | 1382 Oakdale Av | revision to pa #202402025195. to document 50 ft wide lot & to document 5 ft side yard (setback for rear yard adu driveway under separate permit)Details
revision to pa #202402025195. to document 50 ft wide lot & to document 5 ft side yard (setback for rear yard adu driveway under separate permit) | |
| Nov 12, 2024 | Completed final sign-off Dec 2024 | 930 Alabama St | to obtain final inspection for work approved under pa# 201603253117. all work is complete.Details
to obtain final inspection for work approved under pa# 201603253117. all work is complete. | |
| May 13, 2024 | Completed final sign-off May 2025 | 1448 Willard St | revision to 202202017052: moving master closet wall on 3rd fl. bedroom horizontal extension on 3rd floorDetails
revision to 202202017052: moving master closet wall on 3rd fl. bedroom horizontal extension on 3rd floor | $1,000 |
| Apr 2, 2024 | In progress issued Jan 2025 | 1382 Oakdale Av | install new 933 sq ft detached manufactured adu. no change to existingDetails
install new 933 sq ft detached manufactured adu. no change to existing | $289,000 |
| Sep 28, 2021 | Completed final sign-off Aug 2023 | 3060 19th Av | replace (e) stucco. (ref reroofing bpa#202109017561)Details
replace (e) stucco. (ref reroofing bpa#202109017561) | $16,000 |
| Sep 1, 2021 | Never finaled issued Sep 2021, no final | 3060 19th Av | reroofing. replace (e) stucco & (e) shinglesDetails
reroofing. replace (e) stucco & (e) shingles | $16,000 |
| Aug 11, 2021 | Never finaled issued Aug 2021, no final | 165 Marina Bl | remodel 2 full bathroom and set plumbing to laundry box with utitily sink. all work in-kind. set new outlet for washer/ dryer. light per cebc 150.0 (k). dryer shall comply with cmc504.4 & 502.2.1.Details
remodel 2 full bathroom and set plumbing to laundry box with utitily sink. all work in-kind. set new outlet for washer/ dryer. light per cebc 150.0 (k). dryer shall comply with cmc504.4 & 502.2.1. | $6,800 |
| Dec 11, 2018 | Expired or cancelled expired Jan 2020 | 930 Alabama St | for final inspection only, bpa#8513613Details
for final inspection only, bpa#8513613 | |
| Nov 16, 2018 | Expired or cancelled cancelled Jan 2026 | 930 Alabama St | for final inspection only. 8513613. eliminate rear stair and mezzanine; convert stair to ramp; eliminate wall off on mezzanine.Details
for final inspection only. 8513613. eliminate rear stair and mezzanine; convert stair to ramp; eliminate wall off on mezzanine. | |
| Oct 16, 2018 | Never finaled issued Feb 2021, no final | 185 Bay Shore Bl | installation of premanufactured paint booth in existing repair shop. ** maher: n/a **Details
installation of premanufactured paint booth in existing repair shop. ** maher: n/a ** | $25,000 |
| Oct 4, 2018 | Expired or cancelled expired Jan 2020 | 930 Alabama St | revision to 201603253117 & 201805169322. no work on (e) stairs. no new work on this permitDetails
revision to 201603253117 & 201805169322. no work on (e) stairs. no new work on this permit | |
| Jul 10, 2018 | Never finaled issued Jul 2018, no final | 950 Bay St | partially replace existing concrete slab approx 7'x21' w/3.5 min thick; w/#4 rebar @16"o.c each way; epoxy into existing slab, location @ rear yard; slab on grade.Details
partially replace existing concrete slab approx 7'x21' w/3.5 min thick; w/#4 rebar @16"o.c each way; epoxy into existing slab, location @ rear yard; slab on grade. | $4,600 |
| Jun 20, 2018 | Never finaled issued Jul 2018, no final | 1455 Folsom St | install new spray booth and prep deckDetails
install new spray booth and prep deck | $40,000 |
| May 16, 2018 | Expired or cancelled expired Jan 2020 | 930 Alabama St | to obtain a final inspection for work approved under pa#201603253117. all work is complete.Details
to obtain a final inspection for work approved under pa#201603253117. all work is complete. | |
| May 16, 2018 | Completed final sign-off Nov 2018 | 430 Beach St | new food commisary to support food truck vendors operating on premise. combine rear 10' portion of two b/m - retail spaces into single b/m - food commisary with new accessible entry from rear of the bldg. install new commisary plumbing fixtures & appliances. new floor, wall & ceiling finishes, newDetails
new food commisary to support food truck vendors operating on premise. combine rear 10' portion of two b/m - retail spaces into single b/m - food commisary with new accessible entry from rear of the bldg. install new commisary plumbing fixtures & appliances. new floor, wall & ceiling finishes, new | $50,000 |
| Mar 1, 2018 | Completed final sign-off Nov 2018 | 430 Beach St | move (3) comp sink, handwash sink, bathroom fan & various equipment upgrades. addition of restroom, change of frontage. maher naDetails
move (3) comp sink, handwash sink, bathroom fan & various equipment upgrades. addition of restroom, change of frontage. maher na | $100,000 |
| Dec 26, 2017 | Completed final sign-off Apr 2018 | 430 Beach St | replace (e) roll up door with new storefront for accessible entrance, new accessible single-user restroom, new sales/food prep counter & cabinets to fit (e) appliances, new plumbing, fixtures in food prep areas, replace (e) lighting with new. maher naDetails
replace (e) roll up door with new storefront for accessible entrance, new accessible single-user restroom, new sales/food prep counter & cabinets to fit (e) appliances, new plumbing, fixtures in food prep areas, replace (e) lighting with new. maher na | $25,000 |
| Dec 21, 2017 | Expired or cancelled expired Jan 2020 | 930 Alabama St | to obtain a final inspection for work approved under pa# 201603253117, all work is completeDetails
to obtain a final inspection for work approved under pa# 201603253117, all work is complete | |
| Dec 1, 2017 | Completed final sign-off Dec 2017 | 2650 Franklin St | replace 53x27 concrete slab @middle secton of garage area level, (e) footing to remain, no elevation change, concrete to be 2500 psi or more, no structural work reinforcement #4 at 16"oc each wayDetails
replace 53x27 concrete slab @middle secton of garage area level, (e) footing to remain, no elevation change, concrete to be 2500 psi or more, no structural work reinforcement #4 at 16"oc each way | $10,000 |
| Oct 5, 2017 | Completed final sign-off Feb 2019 | 1920 48th Av | per unit legalization ordinance# 43-14. legalization of dwelling unit installed without permit. legalize (e) kitchen all work @ ground floor. studio unit.Details
per unit legalization ordinance# 43-14. legalization of dwelling unit installed without permit. legalize (e) kitchen all work @ ground floor. studio unit. | $10,000 |
| Feb 21, 2017 | Never finaled issued Feb 2017, no final | 938 Alabama St | reroofingDetails
reroofing | $8,000 |
| Feb 21, 2017 | Never finaled issued Feb 2017, no final | 938 Alabama St | replacement of 2 toilets & 2 interior doors.Details
replacement of 2 toilets & 2 interior doors. | $2,500 |
| Feb 21, 2017 | Expired or cancelled expired Jan 2020 | 930 Alabama St | reroofing flat roofDetails
reroofing flat roof | $10,000 |
| Jan 10, 2017 | Completed final sign-off Feb 2017 | 938 Alabama St | to comply complaint #201621862 #2. repair stairs less than 40%.Details
to comply complaint #201621862 #2. repair stairs less than 40%. | $500 |
| Mar 25, 2016 | Expired or cancelled expired Sep 2017 | 930 Alabama St | concrete slab replacement and existing stairs to storage mezzanine replacement, upgrade bathroom to be ada accessible.Details
concrete slab replacement and existing stairs to storage mezzanine replacement, upgrade bathroom to be ada accessible. | $12,000 |
| Nov 3, 2015 | Never finaled issued Nov 2015, no final | 166 Albion St | to obtain final inspection for work approved under pa#2012-1003-1224 & 2014-0714-1240. all work is complete.Details
to obtain final inspection for work approved under pa#2012-1003-1224 & 2014-0714-1240. all work is complete. | |
| Aug 14, 2015 | Completed final sign-off Dec 2016 | 15 Castenada Av | work only for patio per pa# 201507030635.Details
work only for patio per pa# 201507030635. | $8,000 |
| Jul 3, 2015 | Completed final sign-off Dec 2016 | 15 Castenada Av | slope repair at rear yardDetails
slope repair at rear yard | $12,000 |
| Nov 13, 2014 | Completed final sign-off Mar 2016 | 358 Ocean Av | remove and replace existing north and west side foundation in kind. see permit no. 201410038085Details
remove and replace existing north and west side foundation in kind. see permit no. 201410038085 | $15,000 |
| Jul 14, 2014 | Never finaled issued Jul 2014, no final | 166 Albion St | remodel kitchen, bath and living room at 3/f- 166 albion street. revision to pa#201210232666 to add additional address for inspection - 166 albion st.Details
remodel kitchen, bath and living room at 3/f- 166 albion street. revision to pa#201210232666 to add additional address for inspection - 166 albion st. | |
| Oct 23, 2012 | Never finaled issued Nov 2012, no final | 168 Albion St | 3rd floor kitchen and bath remodel. new lighting entire 3rd floor.Details
3rd floor kitchen and bath remodel. new lighting entire 3rd floor. | $18,000 |
| Oct 3, 2012 | Never finaled issued Oct 2012, no final | 168 Albion St | 1st floor:add bath and stairs to 2nd floor(interior). add fire place. add hot tub, remove extg concrete slab and replace with new slab to get 8' ht. add new door and windows. 2nd floor: remodel kitchen and bath. add new bath, new laundry closet and new window at rear.Details
1st floor:add bath and stairs to 2nd floor(interior). add fire place. add hot tub, remove extg concrete slab and replace with new slab to get 8' ht. add new door and windows. 2nd floor: remodel kitchen and bath. add new bath, new laundry closet and new window at rear. | $150,000 |
| Jun 24, 2011 | Completed final sign-off Jul 2011 | 179 Crestmont Dr | comply with nov 201115201. demo illegal dwelling at gr floor. legal full bath and storage room at gr flDetails
comply with nov 201115201. demo illegal dwelling at gr floor. legal full bath and storage room at gr fl | $8,000 |