Back to kitchen remodel contractors
Ultra Construction
- Based in
- South San Francisco
- On San Francisco permits
- Jun 2011 to Apr 2025
- Last 24 months
- 2 permits filed
33 permits since 2000: 13 completed, 2 in progress, 11 never finaled, 7 expired or cancelled.
Of the 11 never-finaled permits, 7 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 1 completed, 3 never finaled. Typically 14 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2017 | Completed final sign-off Feb 2019 | 1920 48th Av | per unit legalization ordinance# 43-14. legalization of dwelling unit installed without permit. legalize (e) kitchen all work @ ground floor. studio unit.Details
per unit legalization ordinance# 43-14. legalization of dwelling unit installed without permit. legalize (e) kitchen all work @ ground floor. studio unit. | $10,000 |
| Jul 14, 2014 | Never finaled issued Jul 2014, no final | 166 Albion St | remodel kitchen, bath and living room at 3/f- 166 albion street. revision to pa#201210232666 to add additional address for inspection - 166 albion st.Details
remodel kitchen, bath and living room at 3/f- 166 albion street. revision to pa#201210232666 to add additional address for inspection - 166 albion st. | |
| Oct 23, 2012 | Never finaled issued Nov 2012, no final | 168 Albion St | 3rd floor kitchen and bath remodel. new lighting entire 3rd floor.Details
3rd floor kitchen and bath remodel. new lighting entire 3rd floor. | $18,000 |
| Oct 3, 2012 | Never finaled issued Oct 2012, no final | 168 Albion St | 1st floor:add bath and stairs to 2nd floor(interior). add fire place. add hot tub, remove extg concrete slab and replace with new slab to get 8' ht. add new door and windows. 2nd floor: remodel kitchen and bath. add new bath, new laundry closet and new window at rear.Details
1st floor:add bath and stairs to 2nd floor(interior). add fire place. add hot tub, remove extg concrete slab and replace with new slab to get 8' ht. add new door and windows. 2nd floor: remodel kitchen and bath. add new bath, new laundry closet and new window at rear. | $150,000 |