Allied Bay Contractors
- Based in
- San Bruno
- On San Francisco permits
- Sep 2022 to Jul 2025
- Last 24 months
- 3 permits filed
20 permits since 2000: 15 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 25, 2025 | Completed final sign-off Feb 2026 | 45 Lucerne St | 1st floor: add office room. convert half bath to full bath with shower.Details
1st floor: add office room. convert half bath to full bath with shower. | $50,000 |
| Jul 8, 2025 | Completed final sign-off Jul 2025 | 490 Colon Av | revision to permit # 202501228784: in kind window replacement for bathroom window @ top floor.Details
revision to permit # 202501228784: in kind window replacement for bathroom window @ top floor. | $3,000 |
| Jan 22, 2025 | Completed final sign-off Jul 2025 | 490 Colon Av | 2 bathrooms remodel (upstairs) one bathroom will be bathtub and the other one bathroom walk-in shower.Details
2 bathrooms remodel (upstairs) one bathroom will be bathtub and the other one bathroom walk-in shower. | $30,000 |
| Jun 17, 2024 | Completed final sign-off Jan 2025 | 1547 Oakdale Av | add 1 full bath on 2nd flDetails
add 1 full bath on 2nd fl | $20,000 |
| Jun 10, 2024 | Completed final sign-off Sep 2024 | 4127 Irving St | unit #1: kitchen remodel, bath remodel. electrical upgrade. unit #4: bath remodel.Details
unit #1: kitchen remodel, bath remodel. electrical upgrade. unit #4: bath remodel. | $23,000 |
| Nov 30, 2023 | Completed final sign-off Jan 2024 | 2609 Judah St | unit #8: revision to pa #202309146554 to correct old unit #10 to new unit #8. replace drywall and install new slab in bathroom. work is in unit 8 only.Details
unit #8: revision to pa #202309146554 to correct old unit #10 to new unit #8. replace drywall and install new slab in bathroom. work is in unit 8 only. | |
| Nov 30, 2023 | Completed final sign-off Jan 2024 | 2650 Franklin St | unit #24: kitchen and bath remodel; no layout changesDetails
unit #24: kitchen and bath remodel; no layout changes | $13,000 |
| Oct 26, 2023 | Completed final sign-off Dec 2023 | 1945 Clay St | shower panel in one bathroom and toilet install.Details
shower panel in one bathroom and toilet install. | $3,000 |
| Sep 14, 2023 | Completed final sign-off Jan 2024 | 2609 Judah St | replace tile, repair/ replace drywall@bathroom, no remodel of toilet, no electrical work at unit #10Details
replace tile, repair/ replace drywall@bathroom, no remodel of toilet, no electrical work at unit #10 | $3,500 |
| Sep 1, 2023 | Never finaled issued Sep 2023, no final | 1895 Jackson St | in kind replacement of cabinets kitchen.Details
in kind replacement of cabinets kitchen. | $8,300 |
| Aug 18, 2023 | Completed final sign-off Oct 2023 | 3523 Sacramento St | in kind replacement of cabinets (kitchen).Details
in kind replacement of cabinets (kitchen). | $13,700 |
| Aug 9, 2023 | Never finaled issued Aug 2023, no final | 222 Willard North St | unit #104: replacement of 3 windows, not facing street, in kind u=.30maxDetails
unit #104: replacement of 3 windows, not facing street, in kind u=.30max | $1,500 |
| Jul 17, 2023 | Completed final sign-off Sep 2023 | 4211 Moraga St | unit 6: rip tile out - replace damaged drywall- install new tile-bathroom areaDetails
unit 6: rip tile out - replace damaged drywall- install new tile-bathroom area | $1,000 |
| Jun 5, 2023 | Never finaled issued Jun 2023, no final | 1945 Broadway | unit# 602: replace kitchen cabinet in kind. no structural work. no floor plan layout change. no wall layout change.Details
unit# 602: replace kitchen cabinet in kind. no structural work. no floor plan layout change. no wall layout change. | $3,500 |
| May 4, 2023 | Never finaled issued May 2023, no final | 490 Colon Av | kitchen remodel @ 2nd fl. remove partition wall btw kitchen & dining. infill existing opening at attic. (framing)Details
kitchen remodel @ 2nd fl. remove partition wall btw kitchen & dining. infill existing opening at attic. (framing) | $1,000 |
| May 2, 2023 | Completed final sign-off Mar 2024 | 490 Colon Av | in-kind remodeling of 1 kitchen(s) in 1st fl installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 1st fl installing gas line. | $13,000 |
| Apr 6, 2023 | Completed final sign-off Jun 2023 | 4211 Moraga St | unit #5. kitchen and bath remodel and paint interior of unit 5aDetails
unit #5. kitchen and bath remodel and paint interior of unit 5a | $16,000 |
| Jan 23, 2023 | Completed final sign-off May 2023 | 1215 Greenwich St | (2) non structural bathroom remodels.Details
(2) non structural bathroom remodels. | $30,000 |
| Oct 2, 2022 | Never finaled issued Oct 2022, no final | 1701 Noe St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). need a "green tag" for electrical service equipment. | $45,000 |
| Sep 9, 2022 | Completed final sign-off May 2023 | 1701 Noe St | tile install- waterproof membrane install (showerpan & flooring for kitchen & bathroom), plumbing fixtures to be install. kitchen and two half half bathrooms remodel in-kind. no structural workk.Details
tile install- waterproof membrane install (showerpan & flooring for kitchen & bathroom), plumbing fixtures to be install. kitchen and two half half bathrooms remodel in-kind. no structural workk. | $15,450 |