Back to kitchen remodel contractors
Sft Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Oct 2026
- Last 24 months
- 22 permits filed
453 permits since 2000: 398 completed, 14 in progress, 25 never finaled, 16 expired or cancelled.
Of the 25 never-finaled permits, 2 are 3 to 5 years old, 23 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 6 completed, 1 in progress, 3 never finaled. Typically 28 days from filing to permit and 487 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Oct 2026 | 2246 26th Av | remodel on both floors. remodel (e) kitchen and bathroom on 2/f and close (e) lightwell at the north side. convert ground floor into living space and add a new master bedroom and bathroom. lower slab approx 12 inches. replace (e) furnace and wh. add new retaining wall. add new skylight and 1-hr wallDetails
remodel on both floors. remodel (e) kitchen and bathroom on 2/f and close (e) lightwell at the north side. convert ground floor into living space and add a new master bedroom and bathroom. lower slab approx 12 inches. replace (e) furnace and wh. add new retaining wall. add new skylight and 1-hr wall | $380,000 |
| Jul 12, 2023 | Completed final sign-off Dec 2025 | 24 Retiro Wy | inter remodel of all 3 (e) flrs: unit 24 1/f-convert (e)unconditioned areas to new conditioned areas to inc den, full bath & closet. new tradesman alley dr, enlarge & relocate e garage dr. 2/f- remodel kitchen & full bath, add n half bath, enlarge e wall opnings new kitchen windows. unit 26 remodelDetails
inter remodel of all 3 (e) flrs: unit 24 1/f-convert (e)unconditioned areas to new conditioned areas to inc den, full bath & closet. new tradesman alley dr, enlarge & relocate e garage dr. 2/f- remodel kitchen & full bath, add n half bath, enlarge e wall opnings new kitchen windows. unit 26 remodel | $350,000 |
| Mar 9, 2023 | Completed final sign-off May 2023 | 425 Lake St | revision to (202301300962) removal of structural load bearing wall at 1st fl between kitchen and dining room. new beam,posats, and concrete footings.modifications to crawl space retrofit per existing field conditionsDetails
revision to (202301300962) removal of structural load bearing wall at 1st fl between kitchen and dining room. new beam,posats, and concrete footings.modifications to crawl space retrofit per existing field conditions | $19,500 |
| Jul 27, 2022 | Completed final sign-off Dec 2024 | 3819 23rd St | convert crawlspace into habitable space and garage through approx 200 cu yds excavation,add interior stair, 1 bedroom, 1 full bath, sitting area.1st fl add 1 bath, enlarge kitchen,remove wall between kitchen and lr. 2nd fl add 1 bath,enlarge kitche,remove wall betwn kitchen and lr, convert atticDetails
convert crawlspace into habitable space and garage through approx 200 cu yds excavation,add interior stair, 1 bedroom, 1 full bath, sitting area.1st fl add 1 bath, enlarge kitchen,remove wall between kitchen and lr. 2nd fl add 1 bath,enlarge kitche,remove wall betwn kitchen and lr, convert attic | $320,000 |
| May 19, 2021 | Never finaled issued Jul 2021, no final | 24 Linda St | revision to bpa 202010196888. open 2nd fl kitchen to adj. rooms. add new garage level bedrooms and bathrooms. add laundry closets to each unit. replace (e) water heaters. sprinkler under deferred submittal.Details
revision to bpa 202010196888. open 2nd fl kitchen to adj. rooms. add new garage level bedrooms and bathrooms. add laundry closets to each unit. replace (e) water heaters. sprinkler under deferred submittal. | $150,000 |
| May 29, 2019 | Never finaled issued Jun 2019, no final | 2430 Steiner St | remodel e kitchen in unit 11. remove non load bearing wall. no structural work.Details
remodel e kitchen in unit 11. remove non load bearing wall. no structural work. | $15,000 |
| Feb 28, 2019 | Completed final sign-off Jul 2020 | 2045 Taylor St | unit 2045 - 3rd fl renovation of bahtrooms, kitchens, laundry; open kitchen space at back. no exterior workDetails
unit 2045 - 3rd fl renovation of bahtrooms, kitchens, laundry; open kitchen space at back. no exterior work | $50,000 |
| Nov 7, 2018 | Never finaled issued Nov 2018, no final | 2125 Hyde St | revision to permit 201703010409. floor plan revision to kitchen and bathDetails
revision to permit 201703010409. floor plan revision to kitchen and bath | |
| Sep 17, 2018 | Completed final sign-off Mar 2020 | 1142 Treat Av | remodel existing kitchen & bathroom in each unit. add half bath to 1144 unit & full bath to 1142 unit. (n) conditioned space for unit 1142 treat at ground fl.Details
remodel existing kitchen & bathroom in each unit. add half bath to 1144 unit & full bath to 1142 unit. (n) conditioned space for unit 1142 treat at ground fl. | $90,000 |
| Oct 11, 2016 | Completed final sign-off Aug 2017 | 1060 Pine St | remodel unit 7, 3rd floor - remodel (e) kitchen, (e) bathroom, add washer & dryerDetails
remodel unit 7, 3rd floor - remodel (e) kitchen, (e) bathroom, add washer & dryer | $23,000 |