Permit GraphShortlistSan Francisco building permits since 2000

Sft Construction Corp

Contractor license
1009086
State license record
Based in
San Francisco
On San Francisco permits
Jun 2015 to Oct 2026
Last 24 months
22 permits filed

453 permits since 2000: 398 completed, 14 in progress, 25 never finaled, 16 expired or cancelled.

Of the 25 never-finaled permits, 2 are 3 to 5 years old, 23 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Kitchen remodel permits

AllRoof deck 2Deck 2Stairs 7Kitchen remodel 10Bathroom remodel 25

10 kitchen remodel permits: 6 completed, 1 in progress, 3 never finaled. Typically 28 days from filing to permit and 487 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 29, 2026In progress
issued Oct 2026
2246 26th Avremodel on both floors. remodel (e) kitchen and bathroom on 2/f and close (e) lightwell at the north side. convert ground floor into living space and add a new master bedroom and bathroom. lower slab approx 12 inches. replace (e) furnace and wh. add new retaining wall. add new skylight and 1-hr wall
Details
Permit
202606294154
Status
issued
Filed
Jun 29, 2026
Permit issued
Oct 5, 2026
Declared cost
$380,000
Address
2246 26th Av

remodel on both floors. remodel (e) kitchen and bathroom on 2/f and close (e) lightwell at the north side. convert ground floor into living space and add a new master bedroom and bathroom. lower slab approx 12 inches. replace (e) furnace and wh. add new retaining wall. add new skylight and 1-hr wall

Open the permit page

$380,000
Jul 12, 2023Completed
final sign-off Dec 2025
24 Retiro Wyinter remodel of all 3 (e) flrs: unit 24 1/f-convert (e)unconditioned areas to new conditioned areas to inc den, full bath & closet. new tradesman alley dr, enlarge & relocate e garage dr. 2/f- remodel kitchen & full bath, add n half bath, enlarge e wall opnings new kitchen windows. unit 26 remodel
Details
Permit
202307121967
Status
complete
Filed
Jul 12, 2023
Permit issued
Aug 16, 2023
Final sign-off
Dec 9, 2025
Declared cost
$350,000
Address
24 Retiro Wy

inter remodel of all 3 (e) flrs: unit 24 1/f-convert (e)unconditioned areas to new conditioned areas to inc den, full bath & closet. new tradesman alley dr, enlarge & relocate e garage dr. 2/f- remodel kitchen & full bath, add n half bath, enlarge e wall opnings new kitchen windows. unit 26 remodel

Open the permit page

$350,000
Mar 9, 2023Completed
final sign-off May 2023
425 Lake Strevision to (202301300962) removal of structural load bearing wall at 1st fl between kitchen and dining room. new beam,posats, and concrete footings.modifications to crawl space retrofit per existing field conditions
Details
Permit
202303093315
Status
complete
Filed
Mar 9, 2023
Permit issued
Mar 9, 2023
Final sign-off
May 2, 2023
Declared cost
$19,500
Address
425 Lake St

revision to (202301300962) removal of structural load bearing wall at 1st fl between kitchen and dining room. new beam,posats, and concrete footings.modifications to crawl space retrofit per existing field conditions

Open the permit page

$19,500
Jul 27, 2022Completed
final sign-off Dec 2024
3819 23rd Stconvert crawlspace into habitable space and garage through approx 200 cu yds excavation,add interior stair, 1 bedroom, 1 full bath, sitting area.1st fl add 1 bath, enlarge kitchen,remove wall between kitchen and lr. 2nd fl add 1 bath,enlarge kitche,remove wall betwn kitchen and lr, convert attic
Details
Permit
202207279420
Status
complete
Filed
Jul 27, 2022
Permit issued
Jan 19, 2023
Final sign-off
Dec 30, 2024
Declared cost
$320,000
Address
3819 23rd St

convert crawlspace into habitable space and garage through approx 200 cu yds excavation,add interior stair, 1 bedroom, 1 full bath, sitting area.1st fl add 1 bath, enlarge kitchen,remove wall between kitchen and lr. 2nd fl add 1 bath,enlarge kitche,remove wall betwn kitchen and lr, convert attic

Open the permit page

$320,000
May 19, 2021Never finaled
issued Jul 2021, no final
24 Linda Strevision to bpa 202010196888. open 2nd fl kitchen to adj. rooms. add new garage level bedrooms and bathrooms. add laundry closets to each unit. replace (e) water heaters. sprinkler under deferred submittal.
Details
Permit
202105190610
Status
issued
Filed
May 19, 2021
Permit issued
Jul 2, 2021
Declared cost
$150,000
Address
24 Linda St

revision to bpa 202010196888. open 2nd fl kitchen to adj. rooms. add new garage level bedrooms and bathrooms. add laundry closets to each unit. replace (e) water heaters. sprinkler under deferred submittal.

Open the permit page

$150,000
May 29, 2019Never finaled
issued Jun 2019, no final
2430 Steiner Stremodel e kitchen in unit 11. remove non load bearing wall. no structural work.
Details
Permit
201905291913
Status
issued
Filed
May 29, 2019
Permit issued
Jun 5, 2019
Declared cost
$15,000
Address
2430 Steiner St

remodel e kitchen in unit 11. remove non load bearing wall. no structural work.

Open the permit page

$15,000
Feb 28, 2019Completed
final sign-off Jul 2020
2045 Taylor Stunit 2045 - 3rd fl renovation of bahtrooms, kitchens, laundry; open kitchen space at back. no exterior work
Details
Permit
201902284021
Status
complete
Filed
Feb 28, 2019
Permit issued
Mar 5, 2019
Final sign-off
Jul 7, 2020
Declared cost
$50,000
Address
2045 Taylor St

unit 2045 - 3rd fl renovation of bahtrooms, kitchens, laundry; open kitchen space at back. no exterior work

Open the permit page

$50,000
Nov 7, 2018Never finaled
issued Nov 2018, no final
2125 Hyde Strevision to permit 201703010409. floor plan revision to kitchen and bath
Details
Permit
201811075258
Status
issued
Filed
Nov 7, 2018
Permit issued
Nov 16, 2018
Address
2125 Hyde St

revision to permit 201703010409. floor plan revision to kitchen and bath

Open the permit page

Sep 17, 2018Completed
final sign-off Mar 2020
1142 Treat Avremodel existing kitchen & bathroom in each unit. add half bath to 1144 unit & full bath to 1142 unit. (n) conditioned space for unit 1142 treat at ground fl.
Details
Permit
201809170457
Status
complete
Filed
Sep 17, 2018
Permit issued
Nov 14, 2018
Final sign-off
Mar 12, 2020
Declared cost
$90,000
Address
1142 Treat Av

remodel existing kitchen & bathroom in each unit. add half bath to 1144 unit & full bath to 1142 unit. (n) conditioned space for unit 1142 treat at ground fl.

Open the permit page

$90,000
Oct 11, 2016Completed
final sign-off Aug 2017
1060 Pine Stremodel unit 7, 3rd floor - remodel (e) kitchen, (e) bathroom, add washer & dryer
Details
Permit
201610119896
Status
complete
Filed
Oct 11, 2016
Permit issued
Nov 1, 2016
Final sign-off
Aug 24, 2017
Declared cost
$23,000
Address
1060 Pine St

remodel unit 7, 3rd floor - remodel (e) kitchen, (e) bathroom, add washer & dryer

Open the permit page