Permit GraphShortlistSan Francisco building permits since 2000

Sft Construction Corp

Contractor license
1009086
State license record
Based in
San Francisco
On San Francisco permits
Jun 2015 to Oct 2026
Last 24 months
22 permits filed

453 permits since 2000: 398 completed, 14 in progress, 25 never finaled, 16 expired or cancelled.

Of the 25 never-finaled permits, 2 are 3 to 5 years old, 23 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Bathroom remodel permits

AllRoof deck 2Deck 2Stairs 7Kitchen remodel 10Bathroom remodel 25

25 bathroom remodel permits: 19 completed, 1 in progress, 3 never finaled, 2 expired or cancelled. Typically 35 days from filing to permit and 320 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 29, 2026In progress
issued Oct 2026
2246 26th Avremodel on both floors. remodel (e) kitchen and bathroom on 2/f and close (e) lightwell at the north side. convert ground floor into living space and add a new master bedroom and bathroom. lower slab approx 12 inches. replace (e) furnace and wh. add new retaining wall. add new skylight and 1-hr wall
Details
Permit
202606294154
Status
issued
Filed
Jun 29, 2026
Permit issued
Oct 5, 2026
Declared cost
$380,000
Address
2246 26th Av

remodel on both floors. remodel (e) kitchen and bathroom on 2/f and close (e) lightwell at the north side. convert ground floor into living space and add a new master bedroom and bathroom. lower slab approx 12 inches. replace (e) furnace and wh. add new retaining wall. add new skylight and 1-hr wall

Open the permit page

$380,000
Oct 26, 2023Completed
final sign-off Apr 2025
1515 Fillmore Stto comply w/ accessible business entrance program- abe# 202310118882, ada entry/ bathroom upgrades for commercial restaurant, required by structural work at 1730 ofarrell st .(same bldg).
Details
Permit
202310269528
Status
complete
Filed
Oct 26, 2023
Permit issued
Mar 8, 2024
Final sign-off
Apr 11, 2025
Declared cost
$35,000
Address
1515 Fillmore St

to comply w/ accessible business entrance program- abe# 202310118882, ada entry/ bathroom upgrades for commercial restaurant, required by structural work at 1730 ofarrell st .(same bldg).

Open the permit page

$35,000
Oct 18, 2023Completed
final sign-off Jun 2025
3819 23rd Strevision to pa# 202207279420: reconfigure basement foundation wall to job around entry stair. reconfigure proposed master bath on 2nd fl & change proposed window type. reconfigure proposed stair from 2nd to 3rd fl. remove 1 proposed bathroom & 1 proposed dormer window on 3rd fl. several dimensional.
Details
Permit
202310188928
Status
complete
Filed
Oct 18, 2023
Permit issued
Oct 27, 2023
Final sign-off
Jun 9, 2025
Address
3819 23rd St

revision to pa# 202207279420: reconfigure basement foundation wall to job around entry stair. reconfigure proposed master bath on 2nd fl & change proposed window type. reconfigure proposed stair from 2nd to 3rd fl. remove 1 proposed bathroom & 1 proposed dormer window on 3rd fl. several dimensional.

Open the permit page

Sep 28, 2023Completed
final sign-off May 2025
326 Lawton Stenlarge 3rd floor bedroom & add bathroom by raising (e) roofline. new construction to cover (e) lightwell at 2nd floor. no change in building footprint of overall building height.
Details
Permit
202309287573
Status
complete
Filed
Sep 28, 2023
Permit issued
Jul 3, 2024
Final sign-off
May 19, 2025
Declared cost
$90,000
Address
326 Lawton St

enlarge 3rd floor bedroom & add bathroom by raising (e) roofline. new construction to cover (e) lightwell at 2nd floor. no change in building footprint of overall building height.

Open the permit page

$90,000
Jul 12, 2023Completed
final sign-off Dec 2025
24 Retiro Wyinter remodel of all 3 (e) flrs: unit 24 1/f-convert (e)unconditioned areas to new conditioned areas to inc den, full bath & closet. new tradesman alley dr, enlarge & relocate e garage dr. 2/f- remodel kitchen & full bath, add n half bath, enlarge e wall opnings new kitchen windows. unit 26 remodel
Details
Permit
202307121967
Status
complete
Filed
Jul 12, 2023
Permit issued
Aug 16, 2023
Final sign-off
Dec 9, 2025
Declared cost
$350,000
Address
24 Retiro Wy

inter remodel of all 3 (e) flrs: unit 24 1/f-convert (e)unconditioned areas to new conditioned areas to inc den, full bath & closet. new tradesman alley dr, enlarge & relocate e garage dr. 2/f- remodel kitchen & full bath, add n half bath, enlarge e wall opnings new kitchen windows. unit 26 remodel

Open the permit page

$350,000
Jul 27, 2022Completed
final sign-off Dec 2024
3819 23rd Stconvert crawlspace into habitable space and garage through approx 200 cu yds excavation,add interior stair, 1 bedroom, 1 full bath, sitting area.1st fl add 1 bath, enlarge kitchen,remove wall between kitchen and lr. 2nd fl add 1 bath,enlarge kitche,remove wall betwn kitchen and lr, convert attic
Details
Permit
202207279420
Status
complete
Filed
Jul 27, 2022
Permit issued
Jan 19, 2023
Final sign-off
Dec 30, 2024
Declared cost
$320,000
Address
3819 23rd St

convert crawlspace into habitable space and garage through approx 200 cu yds excavation,add interior stair, 1 bedroom, 1 full bath, sitting area.1st fl add 1 bath, enlarge kitchen,remove wall between kitchen and lr. 2nd fl add 1 bath,enlarge kitche,remove wall betwn kitchen and lr, convert attic

Open the permit page

$320,000
Jun 28, 2022Completed
final sign-off Oct 2023
936 Geary Stvoluntary ground floor lateral retrofit of (e) type 3 structure with steel ordinary moment frame & (n) concrete foundation at front & rear of structure. accessible upgrades to (e) commercial bathroom.
Details
Permit
202206287283
Status
complete
Filed
Jun 28, 2022
Permit issued
Jun 29, 2022
Final sign-off
Oct 23, 2023
Declared cost
$65,000
Address
936 Geary St

voluntary ground floor lateral retrofit of (e) type 3 structure with steel ordinary moment frame & (n) concrete foundation at front & rear of structure. accessible upgrades to (e) commercial bathroom.

Open the permit page

$65,000
Mar 15, 2022Completed
final sign-off Dec 2022
274 Staples Avremodel on the ground floor only. convert storage into habitable space. add a bedroom, office room and 2 full bathrooms. add new beams, posts and foundation.
Details
Permit
202203150067
Status
complete
Filed
Mar 15, 2022
Permit issued
Apr 12, 2022
Final sign-off
Dec 15, 2022
Declared cost
$95,000
Address
274 Staples Av

remodel on the ground floor only. convert storage into habitable space. add a bedroom, office room and 2 full bathrooms. add new beams, posts and foundation.

Open the permit page

$95,000
Feb 17, 2022Completed
final sign-off Nov 2025
1751 Fulton Stconvert an (e) vacant commercial bldg to a gymnasium. the scope of work includes facade renovation, new interior partitions, new flooring, new bathrooms, and new skylights. there is no expansion in bldg envelope.
Details
Permit
202202178203
Status
complete
Filed
Feb 17, 2022
Permit issued
Dec 9, 2022
Final sign-off
Nov 17, 2025
Declared cost
$250,000
Address
1751 Fulton St

convert an (e) vacant commercial bldg to a gymnasium. the scope of work includes facade renovation, new interior partitions, new flooring, new bathrooms, and new skylights. there is no expansion in bldg envelope.

Open the permit page

$250,000
May 19, 2021Never finaled
issued Jul 2021, no final
24 Linda Strevision to bpa 202010196888. open 2nd fl kitchen to adj. rooms. add new garage level bedrooms and bathrooms. add laundry closets to each unit. replace (e) water heaters. sprinkler under deferred submittal.
Details
Permit
202105190610
Status
issued
Filed
May 19, 2021
Permit issued
Jul 2, 2021
Declared cost
$150,000
Address
24 Linda St

revision to bpa 202010196888. open 2nd fl kitchen to adj. rooms. add new garage level bedrooms and bathrooms. add laundry closets to each unit. replace (e) water heaters. sprinkler under deferred submittal.

Open the permit page

$150,000
Jan 29, 2021Completed
final sign-off Dec 2021
26 Eagle Stremodel & structural repair. convert basement & ground floor into habitable space (959 sf total). add 2 full bathrooms. rebuild interior stairs from ground fl to basement. replace (e) pad concrete footings with new concrete grade beam.
Details
Permit
202101293585
Status
complete
Filed
Jan 29, 2021
Permit issued
Apr 21, 2021
Final sign-off
Dec 17, 2021
Declared cost
$75,000
Address
26 Eagle St

remodel & structural repair. convert basement & ground floor into habitable space (959 sf total). add 2 full bathrooms. rebuild interior stairs from ground fl to basement. replace (e) pad concrete footings with new concrete grade beam.

Open the permit page

$75,000
Aug 4, 2020Completed
final sign-off Aug 2020
1434 Grant Avrevision "4" to manadtory softstory retrofit with pa# 201904016816; (commerical) remove ada entrance from scope of work. ada entrance under seperat permit under ordinance 51-16. add new ada doors to bathrooms. n/a maher
Details
Permit
202008041017
Status
complete
Filed
Aug 4, 2020
Permit issued
Aug 14, 2020
Final sign-off
Aug 26, 2020
Declared cost
$2,000
Address
1434 Grant Av

revision "4" to manadtory softstory retrofit with pa# 201904016816; (commerical) remove ada entrance from scope of work. ada entrance under seperat permit under ordinance 51-16. add new ada doors to bathrooms. n/a maher

Open the permit page

$2,000
Jul 14, 2020Completed
final sign-off Aug 2020
1434 Grant Avrevision "3" to mandatory soft story retrofit with pa 2019-0401-6816 (commercial). revise ada work due to (e) field conditions. do ada upgrade in bathroom
Details
Permit
202007140163
Status
complete
Filed
Jul 14, 2020
Permit issued
Jul 16, 2020
Final sign-off
Aug 27, 2020
Address
1434 Grant Av

revision "3" to mandatory soft story retrofit with pa 2019-0401-6816 (commercial). revise ada work due to (e) field conditions. do ada upgrade in bathroom

Open the permit page

Nov 25, 2019Completed
final sign-off Oct 2020
82 Putnam Stadd 1 bedroom and 2 bathroom. change all existing windows with same size & style. no changes to front facing windows or garage door per this permit. add 1 window in the backside. add 1 fireplace, 2 sun tunnels, new electrical wire and new furnace. replace deteriorated foundation
Details
Permit
201911258110
Status
complete
Filed
Nov 25, 2019
Permit issued
Jan 6, 2020
Final sign-off
Oct 20, 2020
Declared cost
$80,000
Address
82 Putnam St

add 1 bedroom and 2 bathroom. change all existing windows with same size & style. no changes to front facing windows or garage door per this permit. add 1 window in the backside. add 1 fireplace, 2 sun tunnels, new electrical wire and new furnace. replace deteriorated foundation

Open the permit page

$80,000
Feb 19, 2019Completed
final sign-off Jan 2020
1854 Vallejo Stremodel subject unit. remodel two (e) bathrooms. add new bathroom., add w/d inside the unit. no structural work
Details
Permit
201902193252
Status
complete
Filed
Feb 19, 2019
Permit issued
Feb 26, 2019
Final sign-off
Jan 13, 2020
Declared cost
$60,000
Address
1854 Vallejo St

remodel subject unit. remodel two (e) bathrooms. add new bathroom., add w/d inside the unit. no structural work

Open the permit page

$60,000
Nov 7, 2018Never finaled
issued Nov 2018, no final
2125 Hyde Strevision to permit 201703010409. floor plan revision to kitchen and bath
Details
Permit
201811075258
Status
issued
Filed
Nov 7, 2018
Permit issued
Nov 16, 2018
Address
2125 Hyde St

revision to permit 201703010409. floor plan revision to kitchen and bath

Open the permit page

Oct 16, 2018Expired or cancelled
expired Mar 2023
1395 Union Strevision to pa #201808107107, addition of new ada bathroom in southwest commercial space.
Details
Permit
201810163337
Status
expired
Filed
Oct 16, 2018
Permit issued
Oct 18, 2018
Declared cost
$15,000
Address
1395 Union St

revision to pa #201808107107, addition of new ada bathroom in southwest commercial space.

Open the permit page

$15,000
Oct 10, 2018Completed
final sign-off Jun 2019
491 Frederick Stsoft story retrofit (for commercial). ada entry and ada bathroom at gr fl restaurant
Details
Permit
201810102720
Status
complete
Filed
Oct 10, 2018
Permit issued
Oct 16, 2018
Final sign-off
Jun 3, 2019
Declared cost
$40,000
Address
491 Frederick St

soft story retrofit (for commercial). ada entry and ada bathroom at gr fl restaurant

Open the permit page

$40,000
Sep 17, 2018Completed
final sign-off Mar 2020
1142 Treat Avremodel existing kitchen & bathroom in each unit. add half bath to 1144 unit & full bath to 1142 unit. (n) conditioned space for unit 1142 treat at ground fl.
Details
Permit
201809170457
Status
complete
Filed
Sep 17, 2018
Permit issued
Nov 14, 2018
Final sign-off
Mar 12, 2020
Declared cost
$90,000
Address
1142 Treat Av

remodel existing kitchen & bathroom in each unit. add half bath to 1144 unit & full bath to 1142 unit. (n) conditioned space for unit 1142 treat at ground fl.

Open the permit page

$90,000
Aug 10, 2018Expired or cancelled
expired Mar 2023
1395 Union Stcommercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. addition of (n) ada bathroom. residential pa #201808107103.
Details
Permit
201808107107
Status
expired
Filed
Aug 10, 2018
Permit issued
Sep 26, 2018
Declared cost
$40,000
Address
1395 Union St

commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. addition of (n) ada bathroom. residential pa #201808107103.

Open the permit page

$40,000
Jun 4, 2018Completed
final sign-off Oct 2019
154 Bonview Strevision to 201802060501 reduction in scope: remove media room @ basement, relocate stair to 1st flr. remove bath at 1st flr. remove skylight @ 2nd flr
Details
Permit
201806040900
Status
complete
Filed
Jun 4, 2018
Permit issued
Jul 25, 2018
Final sign-off
Oct 29, 2019
Address
154 Bonview St

revision to 201802060501 reduction in scope: remove media room @ basement, relocate stair to 1st flr. remove bath at 1st flr. remove skylight @ 2nd flr

Open the permit page

May 30, 2018Never finaled
issued Jun 2018, no final
3801 24th Strev to pa# 201707071261; upgrade (e) bathroom to ada compliance in 3813 24th st. instead of (n) bathroom in 3809 24th st.
Details
Permit
201805300421
Status
issued
Filed
May 30, 2018
Permit issued
Jun 1, 2018
Address
3801 24th St

rev to pa# 201707071261; upgrade (e) bathroom to ada compliance in 3813 24th st. instead of (n) bathroom in 3809 24th st.

Open the permit page

Apr 10, 2018Completed
final sign-off Jun 2018
3258 23rd Strevision to pa 2016-0229-0721 (soft story retrofit) and pa 2016-0229-0731 (ada upgrades). memorialize structural modifications based on (e) site conditions. new ada doors instead of ada bathroom
Details
Permit
201804105898
Status
complete
Filed
Apr 10, 2018
Permit issued
Apr 16, 2018
Final sign-off
Jun 7, 2018
Address
3258 23rd St

revision to pa 2016-0229-0721 (soft story retrofit) and pa 2016-0229-0731 (ada upgrades). memorialize structural modifications based on (e) site conditions. new ada doors instead of ada bathroom

Open the permit page

Oct 11, 2016Completed
final sign-off Aug 2017
1060 Pine Stremodel unit 7, 3rd floor - remodel (e) kitchen, (e) bathroom, add washer & dryer
Details
Permit
201610119896
Status
complete
Filed
Oct 11, 2016
Permit issued
Nov 1, 2016
Final sign-off
Aug 24, 2017
Declared cost
$23,000
Address
1060 Pine St

remodel unit 7, 3rd floor - remodel (e) kitchen, (e) bathroom, add washer & dryer

Open the permit page

$23,000
Feb 29, 2016Completed
final sign-off Jun 2018
3258 23rd Stmandatory ada accessibility upgrades to ground level, commercial including new bathroom, work required due to mandatory soft story upgrade linked to app #201602290721
Details
Permit
201602290731
Status
complete
Filed
Feb 29, 2016
Permit issued
Jan 23, 2018
Final sign-off
Jun 8, 2018
Declared cost
$29,000
Address
3258 23rd St

mandatory ada accessibility upgrades to ground level, commercial including new bathroom, work required due to mandatory soft story upgrade linked to app #201602290721

Open the permit page

$29,000