Block 0092, lot 003
2045 Taylor St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 3
- Units
- 3
- Rooms
- 9 bedrooms, 3 bathrooms
- Building
- 4,608 sq ft
- Lot
- 1,907 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 18, 2019 | Never finaled issued Jun 2019, no final | 2045 Taylor St | street spaceDetails
street space | ||
| Jun 10, 2019 | Completed final sign-off Jun 2020 | 2045 Taylor St | Sft Construction Corp | replacement of water heater in same location, for tankless water heater will be installed on the exterior.Details
replacement of water heater in same location, for tankless water heater will be installed on the exterior. | $5,000 |
| Mar 25, 2019 | Completed final sign-off Jun 2020 | 2045 Taylor St | Sft Construction Corp | replace 6 front facing windows at 3rd floor with in-kind like-for-like replacements (wood, hung, with ogee lugs, curved glass on round bay projection). replace 8 rear- and lightwell-facing windows (non visible from row) at same level with vinyl or carbon fiber windows in same opening.Details
replace 6 front facing windows at 3rd floor with in-kind like-for-like replacements (wood, hung, with ogee lugs, curved glass on round bay projection). replace 8 rear- and lightwell-facing windows (non visible from row) at same level with vinyl or carbon fiber windows in same opening. | $3,400 |
| Mar 19, 2019 | Expired or cancelled cancelled Apr 2019 | 2045 Taylor St | Sft Construction Corp | revision to bpa# 2019-0228-4021. fill in window in shower of existing bahtroom.Details
revision to bpa# 2019-0228-4021. fill in window in shower of existing bahtroom. | $100 |
| Mar 5, 2019 | Never finaled issued Mar 2019, no final | 2043 Taylor St | street space onlyDetails
street space only | ||
| Mar 5, 2019 | Completed final sign-off Jun 2020 | 2043 Taylor St | Sft Construction Corp | rev to pa201901140291: driveway grading according to plans for minor sidewalk encrocementDetails
rev to pa201901140291: driveway grading according to plans for minor sidewalk encrocement | |
| Feb 28, 2019 | Completed final sign-off Jul 2020 | 2045 Taylor St | Sft Construction Corp | unit 2045 - 3rd fl renovation of bahtrooms, kitchens, laundry; open kitchen space at back. no exterior workDetails
unit 2045 - 3rd fl renovation of bahtrooms, kitchens, laundry; open kitchen space at back. no exterior work | $50,000 |
| Jan 14, 2019 | Completed final sign-off Jul 2020 | 2043 Taylor St | Sft Construction Corp | widen garage door. open garage space. enclose garage light wells. provide new (elective) rated corridor access way.Details
widen garage door. open garage space. enclose garage light wells. provide new (elective) rated corridor access way. | $89,000 |
| Jun 25, 2010 | Completed final sign-off Jul 2010 | 2047 Taylor St | New City Construction Group Inc | reroofingDetails
reroofing | $6,500 |
| Apr 21, 2005 | Completed final sign-off Apr 2005 | 2043 Taylor St | repair (e) back stair (in kind) less than 50 percentDetails
repair (e) back stair (in kind) less than 50 percent | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sft Construction Corp (6), New City Construction Group Inc
- Architects
- Ryan Francis Knock (2)
- Engineers
- Ryan Francis Knock
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.