Block 2444, lot 008
2595 43rd Ave
- City’s use
- Multi-Family Residential
- Built
- 1958
- Stories
- 2
- Units
- 8
- Rooms
- 8 bathrooms
- Building
- 4,723 sq ft
- Lot
- 3,249 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 10, 2022 | Completed final sign-off Apr 2023 | 2595 43rd Av | Sft Construction Corp | soft story retrofit per sfebc chapter 4d engineering criteria cebc appendix a-4. add new plywood shear walls to comply with nov 201812931Details
soft story retrofit per sfebc chapter 4d engineering criteria cebc appendix a-4. add new plywood shear walls to comply with nov 201812931 | $90,000 |
| Aug 25, 2022 | Completed final sign-off Feb 2023 | 2595 43rd Av | replace kitchen window not visible to street. to comply with complaint 202293177.Details
replace kitchen window not visible to street. to comply with complaint 202293177. | $200 | |
| Feb 17, 2021 | Never finaled issued Feb 2021, no final | 2595 43rd Av | repair or replace kitchen countertop, cabinet. bath, toilet, tub, sink, painting. no plan change. 1/2 remodels.Details
repair or replace kitchen countertop, cabinet. bath, toilet, tub, sink, painting. no plan change. 1/2 remodels. | $7,000 | |
| Dec 17, 2018 | Never finaled filed Dec 2018, never issued | 2595 43rd Av | ref to complaint 201885072 to legalize storage areas, 1 full bathroom and wetbar at gr flDetails
ref to complaint 201885072 to legalize storage areas, 1 full bathroom and wetbar at gr fl | $2,000 | |
| Sep 5, 2018 | Completed final sign-off Oct 2018 | 2595 43rd Av | unit 3: revision to application # 2018-0816-7509. no layout change. change out bath, sink, and shower. bathroom approx 4' x 7'. remodel of bathroom. new tile on wall and floor.Details
unit 3: revision to application # 2018-0816-7509. no layout change. change out bath, sink, and shower. bathroom approx 4' x 7'. remodel of bathroom. new tile on wall and floor. | $500 | |
| Aug 16, 2018 | Completed final sign-off Oct 2018 | 2595 43rd Av | unit #3. no layout change, no plan change. change kitchen cabinet, 6"x11" size. kitchen size remodeling.Details
unit #3. no layout change, no plan change. change kitchen cabinet, 6"x11" size. kitchen size remodeling. | $500 | |
| Jul 19, 2018 | Never finaled issued Jul 2018, no final | 2595 43rd Av | All Four Season's Roofing | reroofingDetails
reroofing | $9,000 |
| Jan 22, 2016 | Completed final sign-off Apr 2016 | 2595 43rd Av | dry rot repair approx. 5x8 area under the bedroom window visible from the streetDetails
dry rot repair approx. 5x8 area under the bedroom window visible from the street | $2,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- All Four Season's Roofing, Sft Construction Corp
- Engineers
- Engin Yagmur
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.