Block 2885, lot 007
530 Dewey Blvd
- City’s use
- Single Family Residential
- Built
- 1924
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 2,342 sq ft
- Lot
- 4,277 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 17, 2026 | In progress issued Jul 2026 | 530 Dewey Bl | replace front stair in kind. new brick to match existing. all other scope shown on the plan is under separate permit #202512292882Details
replace front stair in kind. new brick to match existing. all other scope shown on the plan is under separate permit #202512292882 | $8,000 | |
| Jun 26, 2026 | In progress issued Jun 2026 | 530 Dewey Bl | reroof- torch downDetails
reroof- torch down | $15,000 | |
| Jun 11, 2026 | In progress issued Jun 2026 | 530 Dewey Bl | revision to 202605292183: increase estimated cost to $125,000.Details
revision to 202605292183: increase estimated cost to $125,000. | $35,000 | |
| May 29, 2026 | In progress issued Jun 2026 | 530 Dewey Bl | revision 202512292882- replace (e) swing door in kind on 2nd floor. replace and repair damaged studs and joists as needed, update (e) balcony guardrail to current code height, remove and repair interior plaster with (n) sheetrock, add (n) ev charging station in garage, replace windows in kind asDetails
revision 202512292882- replace (e) swing door in kind on 2nd floor. replace and repair damaged studs and joists as needed, update (e) balcony guardrail to current code height, remove and repair interior plaster with (n) sheetrock, add (n) ev charging station in garage, replace windows in kind as | $35,000 | |
| May 4, 2026 | Expired or cancelled withdrawn Jun 2026 | 530 Dewey Bl | revision to bpa 202512292882: replace windows withing the same opening in kind. remove and replace (e) french door to (n) 60" x80" sliding door @ balcony on 2nd floor. replace stucco w/ new sheetrock. roof replace. new stucco outside. add 30in to balcony deck.Details
revision to bpa 202512292882: replace windows withing the same opening in kind. remove and replace (e) french door to (n) 60" x80" sliding door @ balcony on 2nd floor. replace stucco w/ new sheetrock. roof replace. new stucco outside. add 30in to balcony deck. | $56,000 | |
| Dec 29, 2025 | In progress issued Jan 2026 | 530 Dewey Bl | Dreamsky Construction | interior remodel. new bathroom at 2nd floor. alter kitchen and bathroom at 1st floor. new bathroiom at ground floor/basement. windows replacement in kind.Details
interior remodel. new bathroom at 2nd floor. alter kitchen and bathroom at 1st floor. new bathroiom at ground floor/basement. windows replacement in kind. | $120,000 |
| Nov 19, 2025 | Completed final sign-off Mar 2026 | 530 Dewey Bl | Sft Construction Corp | revision to pa #202510147322. revsion due to existing field conditions. replace existing foundation in the storage room with new concrete with new concrete foundation instead of underpinning.Details
revision to pa #202510147322. revsion due to existing field conditions. replace existing foundation in the storage room with new concrete with new concrete foundation instead of underpinning. | $20,000 |
| Oct 14, 2025 | Completed final sign-off Mar 2026 | 530 Dewey Bl | Sft Construction Corp | structural work only. replace and underpin portions of the existing foundation. replace concrete slab 2 new 6" slab. add perimeter drain. no plumbing fixtures.Details
structural work only. replace and underpin portions of the existing foundation. replace concrete slab 2 new 6" slab. add perimeter drain. no plumbing fixtures. | $150,000 |
| Feb 11, 2021 | Completed final sign-off Jun 2021 | 530 Dewey Bl | Hargens Inc. | master bedroom, new insulation, sheetrock, trim, paint and carpet, living room, new sheetrock, paint.Details
master bedroom, new insulation, sheetrock, trim, paint and carpet, living room, new sheetrock, paint. | $40,000 |
| Jan 5, 2011 | Never finaled issued Jan 2011, no final | 530 Dewey Bl | Standardconstr/Standardroof | reroofingDetails
reroofing | $12,850 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sft Construction Corp (2), Dreamsky Construction, Hargens Inc., Standardconstr/Standardroof
- Engineers
- Engin Yagmur, Engin Yagmur
- Authorized agent-otherss
- Steven Chan
- Pmt consultant/expediters
- Engin Yagmur
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.