Block 0935, lot 003
2530 Lombard St
- City’s use
- Commercial Hotel
- Built
- 1913
- Stories
- 2
- Units
- 47
- Building
- 19,250 sq ft
- Lot
- 10,312 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
35 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 17, 2024 | Completed final sign-off Aug 2024 | 2530 Lombard St | Sft Construction Corp | revision to 202401254622 (nov 202417769) bid framing modifications to 1st fl structural repair,beams and joistsDetails
revision to 202401254622 (nov 202417769) bid framing modifications to 1st fl structural repair,beams and joists | |
| Mar 27, 2024 | Completed final sign-off Sep 2024 | 2524 Lombard St | comply w/ nov #202315792, item #6.rm# 31: window by staircase- replace (2) (e) window not facing street. same size and locationDetails
comply w/ nov #202315792, item #6.rm# 31: window by staircase- replace (2) (e) window not facing street. same size and location | $800 | |
| Feb 9, 2024 | Expired or cancelled cancelled Oct 2024 | 2524 Lombard St | to comply with nov#200868173 #1: replace two existing windows- street visible u=.30maxDetails
to comply with nov#200868173 #1: replace two existing windows- street visible u=.30max | $800 | |
| Jan 25, 2024 | Completed final sign-off Aug 2024 | 2530 Lombard St | Sft Construction Corp | to comply w nov 202417769 repair partially collapsed gr floor. structural girder bends, framing joists, floorDetails
to comply w nov 202417769 repair partially collapsed gr floor. structural girder bends, framing joists, floor | $42,000 |
| Jan 25, 2024 | Completed final sign-off Aug 2024 | 2524 Lombard St | Sft Construction Corp | structural revision 202311291599 (soft story retrofit) update foundation anchorage and floor connection of steel moment frames at front/rear of structure (gl a/e)Details
structural revision 202311291599 (soft story retrofit) update foundation anchorage and floor connection of steel moment frames at front/rear of structure (gl a/e) | |
| Nov 29, 2023 | Completed final sign-off Dec 2024 | 2524 Lombard St | W N G S Construction | replace floor tile with ceramic tile in bathrooms, repaint all bathrooms, replace sink cabinets in all bathrooms, replace toilets. ( 5 bathrooms all on the second floor)Details
replace floor tile with ceramic tile in bathrooms, repaint all bathrooms, replace sink cabinets in all bathrooms, replace toilets. ( 5 bathrooms all on the second floor) | $3,000 |
| Aug 3, 2023 | Completed final sign-off Aug 2024 | 2530 Lombard St | Sft Construction Corp | commercial - soft story retrofit per sfebc chaper 4d 2022 cebc appendix a-4. residential soft story under pa 202308033616Details
commercial - soft story retrofit per sfebc chaper 4d 2022 cebc appendix a-4. residential soft story under pa 202308033616 | $60,000 |
| Aug 3, 2023 | Completed final sign-off Aug 2024 | 2524 Lombard St | Sft Construction Corp | residential - soft story retrofit per sfebc chaper 4d 2022 cebc appendix a-4. new steel moment frames @ front/rear. interior plywood shearwalls. retrofit to extend to basment level. commercial soft story under pa 202308033613Details
residential - soft story retrofit per sfebc chaper 4d 2022 cebc appendix a-4. new steel moment frames @ front/rear. interior plywood shearwalls. retrofit to extend to basment level. commercial soft story under pa 202308033613 | $50,000 |
| Aug 3, 2023 | Completed final sign-off Aug 2024 | 2530 Lombard St | Sft Construction Corp | comply with abe 202205271052. accessibility upgrade t o (e) entry for commercial space. new accessible door w/power door operator. install (2) push buttons on interior/exterior entry.Details
comply with abe 202205271052. accessibility upgrade t o (e) entry for commercial space. new accessible door w/power door operator. install (2) push buttons on interior/exterior entry. | $5,000 |
| Sep 13, 2018 | Expired or cancelled withdrawn Aug 2023 | 2524 Lombard St | mandatory soft story seismic retrofit per sfbc 2016 oridance '66-13" 2016 cebc appendix (a-4) (residential portion)Details
mandatory soft story seismic retrofit per sfbc 2016 oridance '66-13" 2016 cebc appendix (a-4) (residential portion) | $190,000 | |
| Mar 27, 2017 | Never finaled issued Mar 2017, no final | 2524 Lombard St | W N G S Construction | clear violation complaint #s201621382, 201766261 & 200868173. plumbing leaks, debris removed, painting, smoke detectorsDetails
clear violation complaint #s201621382, 201766261 & 200868173. plumbing leaks, debris removed, painting, smoke detectors | $8,000 |
| Mar 27, 2017 | Completed final sign-off Apr 2017 | 2524 Lombard St | W N G S Construction | to clear notice of violation #201621582, regarding subfloor repair.Details
to clear notice of violation #201621582, regarding subfloor repair. | $3,000 |
| Sep 1, 2016 | Never finaled issued Sep 2016, no final | 2524 Lombard St | Paulo De Souza Jr. | to comply with complaint # 201621382 and 201621582, patch walls & seal repair doorDetails
to comply with complaint # 201621382 and 201621582, patch walls & seal repair door | $9,000 |
| Apr 13, 2016 | Completed final sign-off May 2016 | 2524 Lombard St | W N G S Construction | work is to clear violation/complaint no:201605321 dated 3/21/2016 for repair of exterior egress stair less than 10% in-kind located at side of building, not facing street.Details
work is to clear violation/complaint no:201605321 dated 3/21/2016 for repair of exterior egress stair less than 10% in-kind located at side of building, not facing street. | $500 |
| Jun 23, 2015 | Completed final sign-off Jul 2015 | 2524 Lombard St | Aaa Restaurant Fire Control/Dba Aaa Fire | to obtain final inspection for work approved under pa#200305023655. all work is complete. compliance with maher ordinance no 155-13 not required.Details
to obtain final inspection for work approved under pa#200305023655. all work is complete. compliance with maher ordinance no 155-13 not required. | |
| Jun 23, 2015 | Completed final sign-off Jul 2015 | 2524 Lombard St | Paulo De Souza Jr. | to comply with nov#201548951 by h.i.d. and install grab bars in shower and new toilet. to comply with grab bar #1029-13sfhc. n/a maher ord. # 155-13Details
to comply with nov#201548951 by h.i.d. and install grab bars in shower and new toilet. to comply with grab bar #1029-13sfhc. n/a maher ord. # 155-13 | $500 |
| Dec 22, 2014 | Completed final sign-off May 2015 | 2524 Lombard St | Paulo De Souza Jr. | to comply with nov#201407721 dated 11/19/2014: item #2 replaced guestrooms entry doors - 15 min rated; item #8 repair walls, replace damaged bathroom tiles. u-factor for window replacement 0.32. compliance with maher ordinance no 155-13 not required.Details
to comply with nov#201407721 dated 11/19/2014: item #2 replaced guestrooms entry doors - 15 min rated; item #8 repair walls, replace damaged bathroom tiles. u-factor for window replacement 0.32. compliance with maher ordinance no 155-13 not required. | $6,000 |
| Jan 15, 2014 | Never finaled issued Jan 2014, no final | 2524 Lombard St | street spaceDetails
street space | ||
| May 30, 2013 | Never finaled issued May 2013, no final | 2524 Lombard St | install grab bars in all bathrooms. per 029-13 only.Details
install grab bars in all bathrooms. per 029-13 only. | $1,000 | |
| Aug 1, 2012 | Completed final sign-off Aug 2012 | 2524 Lombard St | to obtain final inspection for work approved under pa# 200307280497. all work is complete.Details
to obtain final inspection for work approved under pa# 200307280497. all work is complete. | ||
| Aug 1, 2012 | Completed final sign-off Jan 2013 | 2524 Lombard St | to obtain final inspection for work approved under pa# 200307280497. all work is complete.Details
to obtain final inspection for work approved under pa# 200307280497. all work is complete. | ||
| Oct 3, 2011 | Never finaled issued Oct 2011, no final | 2524 Lombard St | to complete work and obtain final inspection for work approved under pa#201004090006Details
to complete work and obtain final inspection for work approved under pa#201004090006 | $1,500 | |
| Apr 9, 2010 | Never finaled issued Apr 2010, no final | 2524 Lombard St | to comply with his notice of violation #200925706 and replacing floor tiles in hallway bathrooms and painting (4) bathrooms.Details
to comply with his notice of violation #200925706 and replacing floor tiles in hallway bathrooms and painting (4) bathrooms. | $2,000 | |
| Apr 20, 2009 | Completed final sign-off May 2009 | 2524 Lombard St | Aquamatic Fire Protection | 1st floor-install 2 sprinklers to (e) trash chute from (e) sprinklered. comply with nov# 200669997. disconnect (e) piping from domestic plumbingDetails
1st floor-install 2 sprinklers to (e) trash chute from (e) sprinklered. comply with nov# 200669997. disconnect (e) piping from domestic plumbing | $2,500 |
| Nov 18, 2008 | Completed final sign-off Feb 2009 | 2524 Lombard St | K K Electric & Alarm Company | to obtain final inspection for work approved under pa200712271433 - all work completed. to provide final inspection to work done completed under issued permit (pa 200712271433)Details
to obtain final inspection for work approved under pa200712271433 - all work completed. to provide final inspection to work done completed under issued permit (pa 200712271433) | $100 |
| Jul 22, 2008 | Completed final sign-off Nov 2008 | 2524 Lombard St | renew pa# 2006/07/27/7859 for final inspection only.Details
renew pa# 2006/07/27/7859 for final inspection only. | ||
| Dec 27, 2007 | Never finaled issued Dec 2007, no final | 2524 Lombard St | Metro Security Services | upgrade existing fire alarm to comply with new code.Details
upgrade existing fire alarm to comply with new code. | $2,800 |
| Sep 28, 2007 | Never finaled issued Sep 2007, no final | 2524 Lombard St | Occidental Express | renew 200305023655 for final inspectionDetails
renew 200305023655 for final inspection | |
| May 23, 2007 | Never finaled issued May 2007, no final | 2524 Lombard St | Occidental Express | renew pa3200607277859 to comply with nov#200670149 for final inspeciton.Details
renew pa3200607277859 to comply with nov#200670149 for final inspeciton. | $1,500 |
| Jul 27, 2006 | Never finaled issued Jul 2006, no final | 2524 Lombard St | W C L Construction | comply complaint #200670149. repair skylight in commercial space.replace broken glass above exit stairs. replace missing handrail on side exit stairs. repair main support beam & posts at ground floor commercial space. repair 1 hr ceiling throughout ground floor commercial space.Details
comply complaint #200670149. repair skylight in commercial space.replace broken glass above exit stairs. replace missing handrail on side exit stairs. repair main support beam & posts at ground floor commercial space. repair 1 hr ceiling throughout ground floor commercial space. | $4,000 |
| Apr 27, 2005 | Expired or cancelled expired Jan 2006 | 2524 Lombard St | Innovative Technologies | monitoring of fire alarm sprinkler system for sprinkler. installed under sro ordinance. adding dialeDetails
monitoring of fire alarm sprinkler system for sprinkler. installed under sro ordinance. adding diale | $900 |
| Mar 4, 2005 | Never finaled issued Mar 2005, no final | 2524 Lombard St | Aaa Restaurant Fire Control/Dba Aaa Fire | plan revisions for fire sprinkler installation.renew & revise appl#200305023655Details
plan revisions for fire sprinkler installation.renew & revise appl#200305023655 | $2,500 |
| Jul 28, 2003 | Expired or cancelled expired Jun 2005 | 2524 Lombard St | W C L Construction | replace fire damage siding windows & sheetrock(rear of bldg).Details
replace fire damage siding windows & sheetrock(rear of bldg). | $7,000 |
| May 2, 2003 | Expired or cancelled expired Jan 2006 | 2524 Lombard St | Aaa Restaurant Fire Control/Dba Aaa Fire | install fire sprinkler system per sro ordinance 170-02Details
install fire sprinkler system per sro ordinance 170-02 | $42,460 |
| Jul 24, 2000 | Completed final sign-off Sep 2000 | 2524 Lombard St | repair ext. second egress stairway, treads, landing boards, stringers and handrailsDetails
repair ext. second egress stairway, treads, landing boards, stringers and handrails | $400 |