Block 1282, lot 015
252 Alma St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 9,780 sq ft
- Lot
- 3,223 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 27, 2023 | Completed final sign-off Jan 2024 | 252 Alma St | Sft Construction Corp | mandatory soft story retrofit per 2022 sfebc, chapter a3, add plywood shear walls & new concreete foundations in basement. to comply ces w/nov #202173677 9/23/2022Details
mandatory soft story retrofit per 2022 sfebc, chapter a3, add plywood shear walls & new concreete foundations in basement. to comply ces w/nov #202173677 9/23/2022 | $100,000 |
| Sep 8, 2017 | Expired or cancelled cancelled Jul 2025 | 252 Alma St | per ordinance 162-16: soft story per 201708296182. add (2) units: (1) studio, (1) bedroom unit, (1) kitchen & bath for each unit.Details
per ordinance 162-16: soft story per 201708296182. add (2) units: (1) studio, (1) bedroom unit, (1) kitchen & bath for each unit. | $100,000 | |
| Aug 29, 2017 | Expired or cancelled cancelled Jun 2023 | 252 Alma St | soft story retrofit per sfebc ch 4d engineering criteria 2016 cebc appendix a4Details
soft story retrofit per sfebc ch 4d engineering criteria 2016 cebc appendix a4 | $85,000 | |
| Sep 25, 2014 | Completed final sign-off Jan 2015 | 1172 Stanyan St | The Garza Company | remodel the kitchen. replace the cabinets, counter top, sink, hood range and install ceramic floor tile on the floor. no walls removed, moved or added in kitchen or bathroom. all layouts to remain the same. remodel bathroom: replace tub, vanity, floor and install new ceiling exhaust fan.Details
remodel the kitchen. replace the cabinets, counter top, sink, hood range and install ceramic floor tile on the floor. no walls removed, moved or added in kitchen or bathroom. all layouts to remain the same. remodel bathroom: replace tub, vanity, floor and install new ceiling exhaust fan. | $16,000 |
| Aug 29, 2014 | Never finaled issued Aug 2014, no final | 1168 Stanyan St | street space permitDetails
street space permit | ||
| May 22, 2012 | Never finaled issued May 2012, no final | 256 Alma St | The Garza Company | replace (e) kitchen cabinets, sink, faucets & dishwasher, replace (e) bath tub and shower valves, repl existing sink & faucets, add gfci outlets over the counter top, relocate (e) drain line for washing machine (exposed dwv line); verify in field (e)bathrm bath fan,high efficacy light @ bathrm/ktcnDetails
replace (e) kitchen cabinets, sink, faucets & dishwasher, replace (e) bath tub and shower valves, repl existing sink & faucets, add gfci outlets over the counter top, relocate (e) drain line for washing machine (exposed dwv line); verify in field (e)bathrm bath fan,high efficacy light @ bathrm/ktcn | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- The Garza Company (2), Sft Construction Corp
- Architects
- John T. Hood
- Engineers
- Engin Yagmur
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.