Block 5425, lot 001
2512 Quint St
- City’s use
- Multi-Family Residential
- Built
- 1963
- Stories
- 2
- Units
- 8
- Rooms
- 8 bathrooms
- Building
- 10,788 sq ft
- Lot
- 6,738 sq ft
- Zoning
- NC1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 19, 2026 | In progress issued Sep 2026 | 2512 Quint St | Sft Construction Corp | revision to approved pa#201909060953: structural soft story retrofit due to site conditions.Details
revision to approved pa#201909060953: structural soft story retrofit due to site conditions. | $10,000 |
| Jul 14, 2026 | In progress issued Jul 2026 | 2512 Quint St | Sft Construction Corp | recommencement and completion of work approved under pa#201909060953Details
recommencement and completion of work approved under pa#201909060953 | $27,500 |
| Jun 8, 2026 | In progress issued Jun 2026 | 2512 Quint St | Sft Construction Corp | to obtain final inspection for work approved under pa# 201909060953. all work is complete.Details
to obtain final inspection for work approved under pa# 201909060953. all work is complete. | |
| Jun 1, 2021 | Never finaled issued Jun 2021, no final | 2520 Quint St | Cullinane Plastering | replace dry rotted wood to comply with nob # 201993851. repair of front exterior balcony at 2nd fl. interior remodeling of 2nd fl units. to relocate (e) kitchen, bedrm, & bath. to add 1 master bathroom to each unit. all work to be performanced within hte existing boundary of the bldg.Details
replace dry rotted wood to comply with nob # 201993851. repair of front exterior balcony at 2nd fl. interior remodeling of 2nd fl units. to relocate (e) kitchen, bedrm, & bath. to add 1 master bathroom to each unit. all work to be performanced within hte existing boundary of the bldg. | $35,000 |
| Oct 29, 2020 | Never finaled issued Oct 2020, no final | 2522 Quint St | Cullinane Plastering | kitchen and bath remodel. replace e windows in kind, sheet roof with plywood 1 1/8 on high roof 1 /1/8 low roof ad dry rot repair. aluminum windowsDetails
kitchen and bath remodel. replace e windows in kind, sheet roof with plywood 1 1/8 on high roof 1 /1/8 low roof ad dry rot repair. aluminum windows | $80,000 |
| Sep 23, 2020 | In progress issued Jun 2026 | 2520 Quint St | Sft Construction Corp | creation of 6 adu units by eliminating of (e) 6 parking spots on g/f. 2x studio units, 3x 1-bedroom, 1x-2 bedroom per oridinance 162-16.Details
creation of 6 adu units by eliminating of (e) 6 parking spots on g/f. 2x studio units, 3x 1-bedroom, 1x-2 bedroom per oridinance 162-16. | $175,000 |
| Jul 22, 2020 | Never finaled issued Aug 2020, no final | 2512 Quint St | North Star Plumbing & Fire Protection | tenant improvements existing fire sprinkler system. 109 sprinklers. app#201910164605Details
tenant improvements existing fire sprinkler system. 109 sprinklers. app#201910164605 | $54,500 |
| Mar 3, 2020 | Never finaled issued Mar 2020, no final | 2512 Quint St | Ace Drilling & Excavation | remodel kitchen & bathroom in-kindDetails
remodel kitchen & bathroom in-kind | $15,000 |
| Oct 16, 2019 | Never finaled filed Oct 2019, never issued | 2512 Quint St | Cullinane Plastering, Ace Drilling & Excavation | adding (2) adu at ground floor. includes (2) studio units per ord #162-16 **maher n/a**Details
adding (2) adu at ground floor. includes (2) studio units per ord #162-16 **maher n/a** | $75,000 |
| Sep 6, 2019 | Never finaled issued Apr 2020, no final | 2512 Quint St | Cullinane Plastering | structurall soft story retrofit per sfebc chapter 4d. engineering criteria, 2016 cebc appendix a-4. ** maher: n/a **Details
structurall soft story retrofit per sfebc chapter 4d. engineering criteria, 2016 cebc appendix a-4. ** maher: n/a ** | $120,000 |
| May 22, 2019 | Completed final sign-off May 2020 | 735 Thornton Av | Cullinane Plastering | demolish partition walls at warehouse on ground fl, no unit removal ab-017 applies.Details
demolish partition walls at warehouse on ground fl, no unit removal ab-017 applies. | $5,000 |
| Aug 9, 2018 | Expired or cancelled cancelled Jan 2026 | 2512 Quint St | to comply with san francisco wood frame seismic retrofit program (soft story), sfbc chapter 4d, per 2016 cebc, appendix a-4. maher n/a.Details
to comply with san francisco wood frame seismic retrofit program (soft story), sfbc chapter 4d, per 2016 cebc, appendix a-4. maher n/a. | $70,000 | |
| May 6, 2004 | Completed final sign-off May 2004 | 2522 Quint St | Meneses Construction (Ck Id) | change window and replace tile in bathroom windows not visible from streetDetails
change window and replace tile in bathroom windows not visible from street | $3,000 |
| Jul 30, 2002 | Completed final sign-off Aug 2002 | 2520 Quint St | Meneses Construction (Ck Id) | reroofingDetails
reroofing | $6,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cullinane Plastering (5), Sft Construction Corp (4), Ace Drilling & Excavation (2), Meneses Construction (Ck Id) (2), North Star Plumbing & Fire Protection
- Engineers
- Pezhaman Motevaselli (3), Giussepe Sircana (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.