Maxg Construction Inc (Maxwell M Ghobadi
- Based in
- San Francisco
- On San Francisco permits
- Jul 2020 to Aug 2026
- Last 24 months
- 13 permits filed
27 permits since 2000: 17 completed, 9 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2026 | In progress issued Sep 2026 | 2575 Mission St | change double door to single door with sidelight and metal gate, new seperation wall between kitchen and dining area. relocate ada table.Details
change double door to single door with sidelight and metal gate, new seperation wall between kitchen and dining area. relocate ada table. | $10,000 |
| Jun 26, 2026 | In progress issued Jun 2026 | 3532 17th St | interior remodel, 3532 17th st,2nd floor unit. work include interior alternations w/ adding three new bathrooms & kitchen relocation.Details
interior remodel, 3532 17th st,2nd floor unit. work include interior alternations w/ adding three new bathrooms & kitchen relocation. | $180,000 |
| May 14, 2026 | Completed final sign-off Sep 2026 | 444 04th Av | revision to 202602105675. widen the existing garage door, ceiling joist frame modification per site visit.Details
revision to 202602105675. widen the existing garage door, ceiling joist frame modification per site visit. | |
| Feb 10, 2026 | Completed final sign-off Sep 2026 | 444 04th Av | to comply with nov 202538488- remove sheetrock at the main level as required to expose work for inspection. expose or resume (n) structural members as required for inspection. obtain permits and complete requiredinsepctions for (e) decks, stairs, concerte work. revision 202407106218 to remove (e)Details
to comply with nov 202538488- remove sheetrock at the main level as required to expose work for inspection. expose or resume (n) structural members as required for inspection. obtain permits and complete requiredinsepctions for (e) decks, stairs, concerte work. revision 202407106218 to remove (e) | $50,000 |
| Dec 5, 2025 | Completed final sign-off Dec 2025 | 584 02nd Av | revision to pa's# 202502190633 and 202509089818: adding (2) windows, (2) doors, (3) sliding doors. updating scope to reflect correct number of windows from 18 to 20 per inspector comments in the field.Details
revision to pa's# 202502190633 and 202509089818: adding (2) windows, (2) doors, (3) sliding doors. updating scope to reflect correct number of windows from 18 to 20 per inspector comments in the field. | $1,800 |
| Nov 26, 2025 | Completed final sign-off Jun 2026 | 471 Faxon Av | proposed expansion of condition space at ground floor to add: bathroom, bedroom, office and tv room.Details
proposed expansion of condition space at ground floor to add: bathroom, bedroom, office and tv room. | $75,000 |
| Nov 4, 2025 | In progress issued Nov 2025 | 2536 Ocean Av | ref to complaint 202544902, install new power door operator, correct door swing to be inward. change of use from retail to officeDetails
ref to complaint 202544902, install new power door operator, correct door swing to be inward. change of use from retail to office | $10,000 |
| Nov 4, 2025 | In progress issued Feb 2026 | 2571 Mission St | merge 2 vacant commercial spacwe ( 2573 & 2575 mission ) to one commercial space (2575 mission st). proposed ti at first fl & reviving the mezzanine to accomodate new restroom/bar, new kitchen, new restrooms, ramp. revision to bpa# 202211045905.Details
merge 2 vacant commercial spacwe ( 2573 & 2575 mission ) to one commercial space (2575 mission st). proposed ti at first fl & reviving the mezzanine to accomodate new restroom/bar, new kitchen, new restrooms, ramp. revision to bpa# 202211045905. | $120,000 |
| Sep 8, 2025 | Completed final sign-off Sep 2026 | 584 02nd Av | revision 202502190633- revise front windows to vinyl no changes to opening size or operation. replace garage door in kind.Details
revision 202502190633- revise front windows to vinyl no changes to opening size or operation. replace garage door in kind. | |
| Aug 14, 2025 | Completed final sign-off Jul 2026 | 1204 Egbert Av | interior modification of 1st foor plan. install new window and new metal gate along front elevation. structural strengthening of existing floor framing. revise kitchen, bathroom, laundry room to office. revision to pa 2022-0318-0294Details
interior modification of 1st foor plan. install new window and new metal gate along front elevation. structural strengthening of existing floor framing. revise kitchen, bathroom, laundry room to office. revision to pa 2022-0318-0294 | $75,000 |
| Aug 5, 2025 | In progress issued Aug 2025 | 2571 Mission St | proposed revision to pa # 2022-1104-5905. change electric to gas for dwelling units.Details
proposed revision to pa # 2022-1104-5905. change electric to gas for dwelling units. | |
| Feb 19, 2025 | Completed final sign-off Dec 2025 | 584 02nd Av | replacement of 18 windows in kind. no changes to opening size or operation. wood aluminum clad for the 6 facade windows, vinyl for remaining windows. 80 sq,ft siding replacement on left (southeast) side of bldg(facing the bldg from back yard) partial compliance with n.o.v #202420052 (window changes)Details
replacement of 18 windows in kind. no changes to opening size or operation. wood aluminum clad for the 6 facade windows, vinyl for remaining windows. 80 sq,ft siding replacement on left (southeast) side of bldg(facing the bldg from back yard) partial compliance with n.o.v #202420052 (window changes) | $21,000 |
| Dec 13, 2024 | In progress issued Mar 2025 | 2573 Mission St | revision to pa# 202407237062: add pg&e closet at the front. relocate store entry due to pg&e closet. all works to be performed within (e) boundary of the building.Details
revision to pa# 202407237062: add pg&e closet at the front. relocate store entry due to pg&e closet. all works to be performed within (e) boundary of the building. | $10,000 |
| Aug 9, 2024 | In progress issued Oct 2024 | 2575 Mission St | new platform lift to mezzanine. ti for a2 occupancy under seperate permit - ada accessability ti work under this permit onlyDetails
new platform lift to mezzanine. ti for a2 occupancy under seperate permit - ada accessability ti work under this permit only | $40,000 |
| Jul 23, 2024 | In progress issued Oct 2024 | 2573 Mission St | alterations at ground level commercial space. front door and main bathroom and ground levels.Details
alterations at ground level commercial space. front door and main bathroom and ground levels. | $15,000 |
| Feb 15, 2024 | Completed final sign-off Dec 2025 | 584 02nd Av | deck replacement at rear of the building to comply with nov# 2024200052. elimination of e) stairs, proposed n) spiral stairsDetails
deck replacement at rear of the building to comply with nov# 2024200052. elimination of e) stairs, proposed n) spiral stairs | $5,000 |
| Aug 21, 2023 | Completed final sign-off Apr 2024 | 1945 Carroll Av | revision to permit 202206277127. to replace 2 entrances with auto sliding doors as shown on plansDetails
revision to permit 202206277127. to replace 2 entrances with auto sliding doors as shown on plans | $5,000 |
| Jul 19, 2023 | Completed final sign-off Jun 2026 | 104 Sadowa St | erect a two story type 5v-b adu per state law.goverment code sec.65852.2 at rear.Details
erect a two story type 5v-b adu per state law.goverment code sec.65852.2 at rear. | $200,000 |
| Jun 6, 2023 | Completed final sign-off Jun 2026 | 201 Plymouth Av | adding one new restidential unit at rear of ground fl within the existing boundary of mixed-use building (102 sadowa st). adding a restroom for commercial area at ground fl (201 plymouth st). interior remodel to 2nd fl existing boundaty (203 plymouth st). voluntary structural strentheningDetails
adding one new restidential unit at rear of ground fl within the existing boundary of mixed-use building (102 sadowa st). adding a restroom for commercial area at ground fl (201 plymouth st). interior remodel to 2nd fl existing boundaty (203 plymouth st). voluntary structural strenthening | $180,000 |
| Feb 15, 2023 | Completed final sign-off Sep 2023 | 1530 Kirkwood Av | to comply with nov 202293768 and 202292866. revision to permit 202211156524 to remove and replace dryrotted structural member of the rear projection as per plan. size/shape of deck to remain the sameDetails
to comply with nov 202293768 and 202292866. revision to permit 202211156524 to remove and replace dryrotted structural member of the rear projection as per plan. size/shape of deck to remain the same | $2,000 |
| Nov 15, 2022 | Completed final sign-off Sep 2023 | 1530 Kirkwood Av | comply with complaint 202292866. remove unwarranted storage/laundry space at ground floor built under 2nd fl rear popout/deck.Details
comply with complaint 202292866. remove unwarranted storage/laundry space at ground floor built under 2nd fl rear popout/deck. | $10,000 |
| Nov 4, 2022 | In progress issued Nov 2024 | 2571 Mission St | proposed legalization of three un-warranted dwelling units under local adu provisions. adding a second emergency exit for units @ 2nd floor. full seismic retrofitDetails
proposed legalization of three un-warranted dwelling units under local adu provisions. adding a second emergency exit for units @ 2nd floor. full seismic retrofit | $800,000 |
| Oct 26, 2022 | Completed final sign-off Feb 2024 | 4619 Lincoln Wy | to comply with nov# 202293773 & revision to pa# 9914370s. adding 1 additional (n) dwelling from adu legalization making propose building to a 3 dewlling-unit building. completing all outstanding works & inspections for obtaining final inspection for pa# 9914370s. proposed to change from r-3 to r-2.Details
to comply with nov# 202293773 & revision to pa# 9914370s. adding 1 additional (n) dwelling from adu legalization making propose building to a 3 dewlling-unit building. completing all outstanding works & inspections for obtaining final inspection for pa# 9914370s. proposed to change from r-3 to r-2. | $70,000 |
| Jun 27, 2022 | Completed final sign-off Apr 2024 | 1945 Carroll Av | to comply with nov# 202175173. as built plans modification of handicap restrooms. entrance accessibility. accessibility to 2nd fl (equipment platform area/ storage), change of office/ storage to retail/ showroom.Details
to comply with nov# 202175173. as built plans modification of handicap restrooms. entrance accessibility. accessibility to 2nd fl (equipment platform area/ storage), change of office/ storage to retail/ showroom. | $60,000 |
| Mar 18, 2022 | Completed final sign-off Jul 2026 | 1204 Egbert Av | proposed addition of adu (unit #2) at g/f per government code section 65852.2. in conjunction w/ sb9 permit & lot split #202202147891. reduction of 2/f deck to maintain 3' to proposed property line.Details
proposed addition of adu (unit #2) at g/f per government code section 65852.2. in conjunction w/ sb9 permit & lot split #202202147891. reduction of 2/f deck to maintain 3' to proposed property line. | $80,000 |
| Jan 25, 2022 | Completed final sign-off Feb 2025 | 213 Capistrano Av | addition of one two-story adu unit at the rear of the building under the state adu program.Details
addition of one two-story adu unit at the rear of the building under the state adu program. | $230,000 |
| Jul 27, 2020 | Never finaled issued Aug 2020, no final | 2575 Mission St | foundation repair & replacement in-kind existing deteriorated foundation.Details
foundation repair & replacement in-kind existing deteriorated foundation. | $80,000 |