Maxg Construction Inc (Maxwell M Ghobadi
- Based in
- San Francisco
- On San Francisco permits
- Jul 2020 to Aug 2026
- Last 24 months
- 13 permits filed
27 permits since 2000: 17 completed, 9 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 in progress. Typically 34 days from filing to permit and 231 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jun 2026 | 3532 17th St | interior remodel, 3532 17th st,2nd floor unit. work include interior alternations w/ adding three new bathrooms & kitchen relocation.Details
interior remodel, 3532 17th st,2nd floor unit. work include interior alternations w/ adding three new bathrooms & kitchen relocation. | $180,000 |
| Nov 26, 2025 | Completed final sign-off Jun 2026 | 471 Faxon Av | proposed expansion of condition space at ground floor to add: bathroom, bedroom, office and tv room.Details
proposed expansion of condition space at ground floor to add: bathroom, bedroom, office and tv room. | $75,000 |
| Aug 14, 2025 | Completed final sign-off Jul 2026 | 1204 Egbert Av | interior modification of 1st foor plan. install new window and new metal gate along front elevation. structural strengthening of existing floor framing. revise kitchen, bathroom, laundry room to office. revision to pa 2022-0318-0294Details
interior modification of 1st foor plan. install new window and new metal gate along front elevation. structural strengthening of existing floor framing. revise kitchen, bathroom, laundry room to office. revision to pa 2022-0318-0294 | $75,000 |
| Jul 23, 2024 | In progress issued Oct 2024 | 2573 Mission St | alterations at ground level commercial space. front door and main bathroom and ground levels.Details
alterations at ground level commercial space. front door and main bathroom and ground levels. | $15,000 |