Back to kitchen remodel contractors
Maxg Construction Inc (Maxwell M Ghobadi
- Based in
- San Francisco
- On San Francisco permits
- Jul 2020 to Aug 2026
- Last 24 months
- 13 permits filed
29 permits since 2000: 18 completed, 9 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 3
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Kitchen remodel permits
5 kitchen remodel permits: 2 completed, 2 in progress, 1 never finaled. Typically 15 days from filing to permit and 201 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2026 | In progress issued Sep 2026 | 2575 Mission St | change double door to single door with sidelight and metal gate, new seperation wall between kitchen and dining area. relocate ada table.Details
change double door to single door with sidelight and metal gate, new seperation wall between kitchen and dining area. relocate ada table. | $10,000 |
| Jun 26, 2026 | Completed final sign-off Oct 2026 | 3532 17th St | interior remodel, 3532 17th st,2nd floor unit. work include interior alternations w/ adding three new bathrooms & kitchen relocation.Details
interior remodel, 3532 17th st,2nd floor unit. work include interior alternations w/ adding three new bathrooms & kitchen relocation. | $180,000 |
| Nov 4, 2025 | In progress issued Feb 2026 | 2571 Mission St | merge 2 vacant commercial spacwe ( 2573 & 2575 mission ) to one commercial space (2575 mission st). proposed ti at first fl & reviving the mezzanine to accomodate new restroom/bar, new kitchen, new restrooms, ramp. revision to bpa# 202211045905.Details
merge 2 vacant commercial spacwe ( 2573 & 2575 mission ) to one commercial space (2575 mission st). proposed ti at first fl & reviving the mezzanine to accomodate new restroom/bar, new kitchen, new restrooms, ramp. revision to bpa# 202211045905. | $120,000 |
| Aug 14, 2025 | Completed final sign-off Jul 2026 | 1204 Egbert Av | interior modification of 1st foor plan. install new window and new metal gate along front elevation. structural strengthening of existing floor framing. revise kitchen, bathroom, laundry room to office. revision to pa 2022-0318-0294Details
interior modification of 1st foor plan. install new window and new metal gate along front elevation. structural strengthening of existing floor framing. revise kitchen, bathroom, laundry room to office. revision to pa 2022-0318-0294 | $75,000 |
| Jun 1, 2021 | Never finaled issued Jun 2021, no final | 2520 Quint St | replace dry rotted wood to comply with nob # 201993851. repair of front exterior balcony at 2nd fl. interior remodeling of 2nd fl units. to relocate (e) kitchen, bedrm, & bath. to add 1 master bathroom to each unit. all work to be performanced within hte existing boundary of the bldg.Details
replace dry rotted wood to comply with nob # 201993851. repair of front exterior balcony at 2nd fl. interior remodeling of 2nd fl units. to relocate (e) kitchen, bedrm, & bath. to add 1 master bathroom to each unit. all work to be performanced within hte existing boundary of the bldg. | $35,000 |