Maxg Construction Inc (Maxwell M Ghobadi
- Based in
- San Francisco
- On San Francisco permits
- Jul 2020 to Aug 2026
- Last 24 months
- 13 permits filed
27 permits since 2000: 17 completed, 9 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
5 deck permits: 5 completed. Typically 58 days from filing to permit and 237 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 10, 2026 | Completed final sign-off Sep 2026 | 444 04th Av | to comply with nov 202538488- remove sheetrock at the main level as required to expose work for inspection. expose or resume (n) structural members as required for inspection. obtain permits and complete requiredinsepctions for (e) decks, stairs, concerte work. revision 202407106218 to remove (e)Details
to comply with nov 202538488- remove sheetrock at the main level as required to expose work for inspection. expose or resume (n) structural members as required for inspection. obtain permits and complete requiredinsepctions for (e) decks, stairs, concerte work. revision 202407106218 to remove (e) | $50,000 |
| Feb 15, 2024 | Completed final sign-off Dec 2025 | 584 02nd Av | deck replacement at rear of the building to comply with nov# 2024200052. elimination of e) stairs, proposed n) spiral stairsDetails
deck replacement at rear of the building to comply with nov# 2024200052. elimination of e) stairs, proposed n) spiral stairs | $5,000 |
| Feb 15, 2023 | Completed final sign-off Sep 2023 | 1530 Kirkwood Av | to comply with nov 202293768 and 202292866. revision to permit 202211156524 to remove and replace dryrotted structural member of the rear projection as per plan. size/shape of deck to remain the sameDetails
to comply with nov 202293768 and 202292866. revision to permit 202211156524 to remove and replace dryrotted structural member of the rear projection as per plan. size/shape of deck to remain the same | $2,000 |
| Nov 15, 2022 | Completed final sign-off Sep 2023 | 1530 Kirkwood Av | comply with complaint 202292866. remove unwarranted storage/laundry space at ground floor built under 2nd fl rear popout/deck.Details
comply with complaint 202292866. remove unwarranted storage/laundry space at ground floor built under 2nd fl rear popout/deck. | $10,000 |
| Mar 18, 2022 | Completed final sign-off Jul 2026 | 1204 Egbert Av | proposed addition of adu (unit #2) at g/f per government code section 65852.2. in conjunction w/ sb9 permit & lot split #202202147891. reduction of 2/f deck to maintain 3' to proposed property line.Details
proposed addition of adu (unit #2) at g/f per government code section 65852.2. in conjunction w/ sb9 permit & lot split #202202147891. reduction of 2/f deck to maintain 3' to proposed property line. | $80,000 |