Block 3617, lot 079
3321 21st St
- City’s use
- Multi-Family Residential
- Built
- 1904
- Stories
- 2
- Units
- 12
- Rooms
- 12 bedrooms, 12 bathrooms
- Building
- 5,776 sq ft
- Lot
- 5,358 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 14, 2023 | Never finaled issued Feb 2023, no final | 3321 21st St | Sft Construction Corp | revision to 201910033492 soft story retrofit. document e transverse foundation are concrete at gl 2 and 3, modify anchorage of seismic elements.Details
revision to 201910033492 soft story retrofit. document e transverse foundation are concrete at gl 2 and 3, modify anchorage of seismic elements. | |
| Oct 3, 2019 | Completed final sign-off Mar 2023 | 3321 21st St | Sft Construction Corp | mandotory soft-story retrofit per sf ordinance 66-b per sfebc chapter 4d engineering criteria: maher n/a.Details
mandotory soft-story retrofit per sf ordinance 66-b per sfebc chapter 4d engineering criteria: maher n/a. | $100,000 |
| Dec 21, 2017 | Expired or cancelled cancelled Jan 2026 | 3321 21st St | lower basement floorDetails
lower basement floor | $100,000 | |
| Nov 28, 2017 | Never finaled filed Nov 2017, never issued | 3321 21st St | to comply with nov 201721018 seismic retrofit per sf ordinance sfebc 405dDetails
to comply with nov 201721018 seismic retrofit per sf ordinance sfebc 405d | $50,000 | |
| Jan 22, 2015 | Completed final sign-off Feb 2016 | 3321 21st St | Make Ready Maintenance Inc | unit 12: kitchen and bathroom remodel cabinets and countertops only. no walls to be moved.Details
unit 12: kitchen and bathroom remodel cabinets and countertops only. no walls to be moved. | $22,000 |
| Jan 22, 2015 | Completed final sign-off Feb 2016 | 3321 21st St | Make Ready Maintenance Inc | unit 11: kitchen and bathroom remodel cabinets and countertops onlyDetails
unit 11: kitchen and bathroom remodel cabinets and countertops only | $22,000 |
| Sep 18, 2014 | Never finaled issued Sep 2014, no final | 3321 21st St | street spaceDetails
street space | ||
| Aug 29, 2014 | Completed final sign-off Dec 2015 | 3321 21st St | Best Exteriors Construction Inc | remodeling unit #3, # 4, #6, #8 - bathroom (5x8) and kitchen (7x15). no removal or relocation of wallsDetails
remodeling unit #3, # 4, #6, #8 - bathroom (5x8) and kitchen (7x15). no removal or relocation of walls | $45,000 |
| Aug 15, 2014 | Never finaled issued Aug 2014, no final | 3321 21st St | street spaceDetails
street space | ||
| Dec 13, 2012 | Completed final sign-off Jan 2013 | 3321 21st St | 2 H | unit #9: replace drywall in bathrm with 5/8" bathrm remodeling for units 9&3, fire rated gypsum. new gfci outlet, new light, new wall and floor tile, repl toilet and wall sink in kind. floor plan unchanged (e) bath tub remains, unit #3: repl bathrm ceiling drywall gypsum, repl toilet, sink &Details
unit #9: replace drywall in bathrm with 5/8" bathrm remodeling for units 9&3, fire rated gypsum. new gfci outlet, new light, new wall and floor tile, repl toilet and wall sink in kind. floor plan unchanged (e) bath tub remains, unit #3: repl bathrm ceiling drywall gypsum, repl toilet, sink & | $10,000 |
| Sep 22, 2004 | Never finaled issued Sep 2004, no final | 3321 21st St | streetspaceDetails
streetspace |