Darc Ventures Inc Dba Spl Construction S
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Sep 2026
- Last 24 months
- 16 permits filed
148 permits since 2000: 138 completed, 4 in progress, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 148.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | Completed final sign-off Sep 2026 | 1358 Fell St | to obtain final inspection for work approved under pa# 202502079900. all work is complete.Details
to obtain final inspection for work approved under pa# 202502079900. all work is complete. | |
| Aug 12, 2026 | In progress issued Aug 2026 | 136 Downey St | kitchen & bath remodel, convert tub to showerpan, no wall movement, no movement of fixturesDetails
kitchen & bath remodel, convert tub to showerpan, no wall movement, no movement of fixtures | $50,000 |
| Jul 13, 2026 | In progress issued Aug 2026 | 77 Ventura Av | 2/fl- divide (e) bathroom into (1) full bathroom and (1) powder room.Details
2/fl- divide (e) bathroom into (1) full bathroom and (1) powder room. | $60,000 |
| Apr 23, 2026 | In progress issued Apr 2026 | 89 Ventura Av | new interior stair to replace existing stair in same general location. project adds a shower to existing 1/f bathroom.Details
new interior stair to replace existing stair in same general location. project adds a shower to existing 1/f bathroom. | $50,000 |
| Apr 17, 2026 | In progress filed Apr 2026, not yet issued | 834 Peralta Av | correct nov#202651897 and 202651397Details
correct nov#202651897 and 202651397 | $10,000 |
| Apr 13, 2026 | Completed final sign-off Aug 2026 | 3939 19th St | new plan configuration for the master bedroom bathroom, remove non-load bearing walls. bathroom remodel is uner permit 202601204129Details
new plan configuration for the master bedroom bathroom, remove non-load bearing walls. bathroom remodel is uner permit 202601204129 | $15,000 |
| Jan 20, 2026 | Completed final sign-off Aug 2026 | 3939 19th St | 1 kitchen and 2 and half bath remodel. like for likeDetails
1 kitchen and 2 and half bath remodel. like for like | $75,000 |
| Sep 30, 2025 | Completed final sign-off Aug 2026 | 590 30th St | add a full bath in the garage on the gr floor. replace water heater with tankless water heater.Details
add a full bath in the garage on the gr floor. replace water heater with tankless water heater. | $25,000 |
| Aug 7, 2025 | Completed final sign-off May 2026 | 272 Collingwood St | kitchen & bathroom refresh. replace in-kind. kitchen, full bathroom, 1/2 bathroom. no structural or moving of walls/door.Details
kitchen & bathroom refresh. replace in-kind. kitchen, full bathroom, 1/2 bathroom. no structural or moving of walls/door. | $50,000 |
| Jul 30, 2025 | Completed final sign-off Sep 2026 | 1358 Fell St | revision to 202502079900: expanded scope of work. new rear deck at story 2 and convert e flast roof to deck at story 3. replace rear facing window at kitchen with glass door, create new glass door, create new glass door at story 3 deck. remodel 1 and add 1 new bath in story 3. reconfigure story 3Details
revision to 202502079900: expanded scope of work. new rear deck at story 2 and convert e flast roof to deck at story 3. replace rear facing window at kitchen with glass door, create new glass door, create new glass door at story 3 deck. remodel 1 and add 1 new bath in story 3. reconfigure story 3 | $110,000 |
| Jul 2, 2025 | Completed final sign-off Mar 2026 | 208 Moultrie St | convert part of garage level to add 1 family room and one office. convert powder room into full bathroom. install patio door & window in the rear facade.Details
convert part of garage level to add 1 family room and one office. convert powder room into full bathroom. install patio door & window in the rear facade. | $40,000 |
| May 6, 2025 | Completed final sign-off Oct 2025 | 80 Parnassus Av | kitchen remodel in kind.Details
kitchen remodel in kind. | $25,000 |
| Feb 27, 2025 | Expired or cancelled cancelled Aug 2025 | 766 Hayes St | remodel 2 kitchens and 3 bathrooms across 2 units 480 sqftDetails
remodel 2 kitchens and 3 bathrooms across 2 units 480 sqft | $202,662 |
| Feb 27, 2025 | Expired or cancelled withdrawn Sep 2025 | 766 Hayes St | foundation upgrade and 174 sq ft infill of unconditioned space beneth cantilevered rooms and associated revision rear facade at ground floor.Details
foundation upgrade and 174 sq ft infill of unconditioned space beneth cantilevered rooms and associated revision rear facade at ground floor. | $95,000 |
| Feb 7, 2025 | Completed final sign-off Sep 2026 | 1358 Fell St | interior reconfiguration & remodel containing a remodeled kitchen and remodeled 1/2 bathroom on story 2. remove (e) office in garage, relocate laundry to story 3. replace 2 windows in kind at story 2, add 1 new window in kitchen. patch and repair facade, paint.Details
interior reconfiguration & remodel containing a remodeled kitchen and remodeled 1/2 bathroom on story 2. remove (e) office in garage, relocate laundry to story 3. replace 2 windows in kind at story 2, add 1 new window in kitchen. patch and repair facade, paint. | $75,000 |
| Jan 28, 2025 | Completed final sign-off Apr 2025 | 1253 48th Av | add new full bathroom at 2nd floor: lavy, shower, sink.Details
add new full bathroom at 2nd floor: lavy, shower, sink. | $20,000 |
| Sep 30, 2024 | Expired or cancelled cancelled Aug 2025 | 766 Hayes St | bathroom remodel, fixture remain same location.Details
bathroom remodel, fixture remain same location. | $15,000 |
| Aug 30, 2024 | Completed final sign-off Sep 2024 | 3756 23rd St | rear deck repair less than 50%Details
rear deck repair less than 50% | $5,000 |
| Jul 3, 2024 | Completed final sign-off Dec 2024 | 590 30th St | remodeling the existing kitchen & moving the kitchen wall on the 2nd fl. replacing the existing window with a larger window in the kitchen area at the rear wall. not visible from the street. no horizontal or vertical additionsDetails
remodeling the existing kitchen & moving the kitchen wall on the 2nd fl. replacing the existing window with a larger window in the kitchen area at the rear wall. not visible from the street. no horizontal or vertical additions | $15,000 |
| Jun 21, 2024 | Completed final sign-off Dec 2024 | 436 Utah St | bath room remodelDetails
bath room remodel | $15,000 |
| Jun 3, 2024 | Completed final sign-off Aug 2024 | 3479 16th St | repair dry rot on rear wall. approx 50sqftDetails
repair dry rot on rear wall. approx 50sqft | $15,000 |
| Jun 3, 2024 | Completed final sign-off Dec 2024 | 590 30th St | kitchen remodel. replace cabinets, counters, and appliances. no moving wallsDetails
kitchen remodel. replace cabinets, counters, and appliances. no moving walls | $19,000 |
| Apr 23, 2024 | Completed final sign-off May 2024 | 783 35th Av | rear deck repair less than 50%. all work in kind.Details
rear deck repair less than 50%. all work in kind. | $7,000 |
| Apr 23, 2024 | Completed final sign-off Aug 2024 | 3479 16th St | kitchen remodel, replace cabinets, countertops, appliances and painting. in kind remodel. no moving walls. approx. 80 sq ft.Details
kitchen remodel, replace cabinets, countertops, appliances and painting. in kind remodel. no moving walls. approx. 80 sq ft. | $35,000 |
| Mar 27, 2024 | Completed final sign-off Apr 2024 | 766 Hayes St | to address complaints: 202200721 (repair rear windows); 202171933 (heat) & 202171934 (rotted kitchen floor).Details
to address complaints: 202200721 (repair rear windows); 202171933 (heat) & 202171934 (rotted kitchen floor). | $1,000 |
| Feb 23, 2024 | Completed final sign-off Aug 2024 | 1024 Ortega St | kitchen and bath remodel. new fixtures, appliances, cabinets and counter surfaces in kindDetails
kitchen and bath remodel. new fixtures, appliances, cabinets and counter surfaces in kind | $75,000 |
| Feb 2, 2024 | Completed final sign-off May 2024 | 1805 Golden Gate Av | remodel 1 full bath. like for likeDetails
remodel 1 full bath. like for like | $15,000 |
| Sep 20, 2023 | Completed final sign-off Oct 2023 | 2958 Scott St | rear repair (e) deck less than 50%.Details
rear repair (e) deck less than 50%. | $10,000 |
| Jun 29, 2023 | Completed final sign-off Jan 2024 | 76 Conkling St | converting ground flr into habitable space, add 560sf living space for new bedroom, media room, full bathroom and wetbar. add 2 new deck in the rear less than 36" off the ground (30"high).Details
converting ground flr into habitable space, add 560sf living space for new bedroom, media room, full bathroom and wetbar. add 2 new deck in the rear less than 36" off the ground (30"high). | $125,000 |
| May 5, 2023 | Completed final sign-off Jul 2023 | 388 Urbano Dr | add 1 new bathroom in garage serving the family room.Details
add 1 new bathroom in garage serving the family room. | $50,000 |
| Mar 20, 2023 | Completed final sign-off Jul 2023 | 374 22nd Av | revision to bpa# 202103317610. no new work under this permit. reduce scope of work 2nd omit new posts & beam on ground floorDetails
revision to bpa# 202103317610. no new work under this permit. reduce scope of work 2nd omit new posts & beam on ground floor | |
| Jan 17, 2023 | Completed final sign-off Feb 2023 | 1364 Vermont St | rear deck repair less than 50%Details
rear deck repair less than 50% | $10,000 |
| Aug 2, 2022 | Completed final sign-off Dec 2023 | 2958 Scott St | rev to pa202102195043 to expand 3/f roof terrace.Details
rev to pa202102195043 to expand 3/f roof terrace. | $5,000 |
| May 5, 2022 | Completed final sign-off Aug 2022 | 1450 43rd Av | revision to no plan permit 202203291113. remodel 1 existing bathroom. remove non-load bearing wall. refresh (2) existing bathrooms.Details
revision to no plan permit 202203291113. remodel 1 existing bathroom. remove non-load bearing wall. refresh (2) existing bathrooms. | $10,000 |
| Mar 31, 2022 | Completed final sign-off Apr 2024 | 80 Ventura Av | revision to pa#202009214643. elevator shaft has increased by 10" to the east and stairs have been adjusted for revised elevator door location.Details
revision to pa#202009214643. elevator shaft has increased by 10" to the east and stairs have been adjusted for revised elevator door location. | |
| Mar 29, 2022 | Completed final sign-off Aug 2022 | 1450 43rd Av | 3 bathroom refresh, add 1 island in kitchen. no removal of wallsDetails
3 bathroom refresh, add 1 island in kitchen. no removal of walls | $45,000 |
| Feb 18, 2022 | Completed final sign-off Jun 2022 | 269 28th St | (1) bathroom remodel, no movement of fixtures.Details
(1) bathroom remodel, no movement of fixtures. | $15,000 |
| Oct 12, 2021 | Completed final sign-off Mar 2022 | 1868 Golden Gate Av | renovate one kitchen and 2 baths no movement of fixtures kitchen cabinet replacement. non structural.Details
renovate one kitchen and 2 baths no movement of fixtures kitchen cabinet replacement. non structural. | $55,000 |
| Oct 12, 2021 | Completed final sign-off Mar 2022 | 218 Funston Av | renovate one kitchen and 1 bath. no movement of fixtures. non structural.Details
renovate one kitchen and 1 bath. no movement of fixtures. non structural. | $35,000 |
| Sep 23, 2021 | Completed final sign-off Jun 2022 | 269 28th St | remodel (e) kitchen. remove wall between ktichen and porch, add posts and beams. replace existing windows with two new windows at the porch exterior wall, not visible from street.Details
remodel (e) kitchen. remove wall between ktichen and porch, add posts and beams. replace existing windows with two new windows at the porch exterior wall, not visible from street. | $45,000 |
| Jul 26, 2021 | Completed final sign-off Mar 2022 | 3294 Clay St | apt 5: remodel (e) kitchen and 2 bathroom (3/f & 4/f). remove non-load bear wall.Details
apt 5: remodel (e) kitchen and 2 bathroom (3/f & 4/f). remove non-load bear wall. | $50,000 |
| Mar 25, 2021 | Completed final sign-off Aug 2021 | 235 Berry St | renovate kitchen & (2) baths, no movement of fixtures,l no layout change, no wall framing demolitionDetails
renovate kitchen & (2) baths, no movement of fixtures,l no layout change, no wall framing demolition | $75,000 |
| Feb 17, 2021 | Completed final sign-off Jun 2021 | 1447 35th Av | kitchen remodel in kind.Details
kitchen remodel in kind. | $35,000 |
| Feb 8, 2021 | Completed final sign-off Jan 2022 | 324 Frederick St | remodel extg kitchen. remove load bearing wall between kitchen and dining room.Details
remodel extg kitchen. remove load bearing wall between kitchen and dining room. | $40,000 |
| Jan 6, 2021 | Completed final sign-off Aug 2021 | 116 Bradford St | remodel on both levels. remodel (e) kitchen & bathroom at 2nd fl. add new furnace. add new habitable space at ground floor. add an office room & full bathroom.Details
remodel on both levels. remodel (e) kitchen & bathroom at 2nd fl. add new furnace. add new habitable space at ground floor. add an office room & full bathroom. | $80,000 |
| Dec 9, 2020 | Completed final sign-off Sep 2021 | 1683 Hayes St | revision to app#201908279966. convert extg dining room to kitchen. convert extg kitchen to dining room. remove partition walls around washer/dryer mudroom.Details
revision to app#201908279966. convert extg dining room to kitchen. convert extg kitchen to dining room. remove partition walls around washer/dryer mudroom. | $25,000 |
| Dec 2, 2020 | Completed final sign-off Dec 2021 | 1364 Vermont St | kitchen remodel. widen three doors. add one toilet. no exterior workDetails
kitchen remodel. widen three doors. add one toilet. no exterior work | $75,000 |
| Oct 29, 2020 | Completed final sign-off Jun 2021 | 127 Gambier St | interior renovation of (e) kitchen, dining room & bathroom. additional bathroom created within (e) envelope. (e) back deck stairs to remain unchanged.Details
interior renovation of (e) kitchen, dining room & bathroom. additional bathroom created within (e) envelope. (e) back deck stairs to remain unchanged. | $70,000 |
| Oct 16, 2020 | Completed final sign-off Aug 2021 | 1341 Masonic Av | renovate existing kitchen. no movement of fixtures. new cabinets, countertop, upgrade electrical and plumbing as requiredDetails
renovate existing kitchen. no movement of fixtures. new cabinets, countertop, upgrade electrical and plumbing as required | $40,000 |
| Oct 10, 2020 | Completed final sign-off Jan 2024 | 2958 Scott St | interior improvement. provide 1-hr rating at garage, (n) lighting, enlarge garage door. lightwell infill at basement level north side, lightwell infill at 2nd & 1st flr south side against blank wall of adjacent building. replace interior stair.Details
interior improvement. provide 1-hr rating at garage, (n) lighting, enlarge garage door. lightwell infill at basement level north side, lightwell infill at 2nd & 1st flr south side against blank wall of adjacent building. replace interior stair. | $80,000 |
| Sep 21, 2020 | Completed final sign-off Apr 2024 | 80 Ventura Av | new interior stair and elevator being added at entry. exterior staircase and cupola being removed at entry. deck being replaced, expanded and redesigned at rear. both bathrooms being remodeled at 3rd floor.Details
new interior stair and elevator being added at entry. exterior staircase and cupola being removed at entry. deck being replaced, expanded and redesigned at rear. both bathrooms being remodeled at 3rd floor. | $150,000 |
| Jun 29, 2020 | Completed final sign-off Dec 2020 | 738 Fell St | kitchen and 2.5 bath remodel. no movement of fixtures. " kitchen is 15'4" x 10'11" " bath 1- 5'8" x 10'8" (toilet, sink, tub/shower) " bath 2- 9'0" x 6'1" (toilet, sink, tub/shower) " bath 3- 4'7" x 3'6" (toilet, sink)Details
kitchen and 2.5 bath remodel. no movement of fixtures. " kitchen is 15'4" x 10'11" " bath 1- 5'8" x 10'8" (toilet, sink, tub/shower) " bath 2- 9'0" x 6'1" (toilet, sink, tub/shower) " bath 3- 4'7" x 3'6" (toilet, sink) | $20,000 |
| Jun 4, 2020 | Completed final sign-off Aug 2020 | 893 Ashbury St | remodel bathroom in kind, no movement of fixtures. deck repair less than 50% at the rear of building.Details
remodel bathroom in kind, no movement of fixtures. deck repair less than 50% at the rear of building. | $35,000 |
| Jun 3, 2020 | Completed final sign-off Feb 2021 | 220 Funston Av | kitchen and bathroom renovation in-kind. all fixtures to remain in the same place. no movement of existing walls or doors.Details
kitchen and bathroom renovation in-kind. all fixtures to remain in the same place. no movement of existing walls or doors. | $50,000 |
| Mar 11, 2020 | Completed final sign-off Jul 2020 | 512 18th Av | renovation of 1 kitchen & 2 bathrooms. non momvent of plumbing fixtures & layout. no walls modified.Details
renovation of 1 kitchen & 2 bathrooms. non momvent of plumbing fixtures & layout. no walls modified. | $40,000 |
| Mar 4, 2020 | Completed final sign-off May 2020 | 57 Lundys Ln | revision to 201905140588 remove voluntary structural upgrades to undeside of existing rear yard structure. replac with non structural lattice work and remove special inspection from permitDetails
revision to 201905140588 remove voluntary structural upgrades to undeside of existing rear yard structure. replac with non structural lattice work and remove special inspection from permit | |
| Mar 3, 2020 | Expired or cancelled expired Aug 2023 | 2701 Van Ness Av | unit# 710: revision to permit #201905170976 to reduce area of work at entry/closets.Details
unit# 710: revision to permit #201905170976 to reduce area of work at entry/closets. | |
| Mar 2, 2020 | Completed final sign-off Jul 2020 | 1424 Page St | bathroom: remove and replace tub, vanity and tile bath floorDetails
bathroom: remove and replace tub, vanity and tile bath floor | $12,000 |
| Dec 16, 2019 | Completed final sign-off Mar 2021 | 1370 Webster St | add full bath to lower level and spiral stair to access level. convert (e) storage space to new living room in basementDetails
add full bath to lower level and spiral stair to access level. convert (e) storage space to new living room in basement | $20,000 |
| Aug 1, 2019 | Completed final sign-off Feb 2020 | 1998 Broadway | unit # 406: kitchen remodel all fixtures to remain in place. 2 bathroom remodels, new tile, new vanity, new shower pan. kitchen 10x10 / bath 6x10 / bath 8x10Details
unit # 406: kitchen remodel all fixtures to remain in place. 2 bathroom remodels, new tile, new vanity, new shower pan. kitchen 10x10 / bath 6x10 / bath 8x10 | $35,000 |
| May 17, 2019 | Expired or cancelled expired Aug 2023 | 2701 Van Ness Av | unit 710: relocate kitchen, remodel 2 extg bathrooms, new lighting & electrical, modify interior soffits, minor modification of partition walls. n/a for maherDetails
unit 710: relocate kitchen, remodel 2 extg bathrooms, new lighting & electrical, modify interior soffits, minor modification of partition walls. n/a for maher | $110,000 |
| May 14, 2019 | Completed final sign-off Feb 2021 | 57 Lundys Ln | replace exterior concrete steps and ramp in rear yard. continue painted wood sheathing and siding of (e) storage structure down to the (e) foundation. replacement of rear yard planters in 2 locations. (n) pavers & permeable decomposed granite in center of rear yard. (n) paint & siding at rearDetails
replace exterior concrete steps and ramp in rear yard. continue painted wood sheathing and siding of (e) storage structure down to the (e) foundation. replacement of rear yard planters in 2 locations. (n) pavers & permeable decomposed granite in center of rear yard. (n) paint & siding at rear | $20,000 |
| May 9, 2019 | Completed final sign-off Jan 2020 | 95 Ventura Av | upper fl - new kitchen in (e) location, (n) intertal stair & (n) master bathroom; 1st fl - new bathroom fixtures & finishes, relocated laundry. new fau & water heater. project will not expand (e) bldg envelope or alter (e) facadeDetails
upper fl - new kitchen in (e) location, (n) intertal stair & (n) master bathroom; 1st fl - new bathroom fixtures & finishes, relocated laundry. new fau & water heater. project will not expand (e) bldg envelope or alter (e) facade | $100,000 |
| Apr 25, 2019 | Completed final sign-off Jul 2020 | 373 Warren Dr | rebuild (e) retaining wall, add deck.Details
rebuild (e) retaining wall, add deck. | $67,000 |
| Mar 20, 2019 | Completed final sign-off May 2019 | 373 Warren Dr | replace two front windows in-kind with aluminum-clad wood.Details
replace two front windows in-kind with aluminum-clad wood. | $5,000 |
| Mar 18, 2019 | Completed final sign-off Jun 2019 | 640 Davis St | unit 20: replace countertops & cabinets in kitchen. no movement of fixtures.Details
unit 20: replace countertops & cabinets in kitchen. no movement of fixtures. | $25,000 |
| Feb 28, 2019 | Completed final sign-off Jan 2020 | 855 29th Av | kitchen and bath remodel. non-load bearing wall removal to enlarge family rm. re-tile (e) center patio.Details
kitchen and bath remodel. non-load bearing wall removal to enlarge family rm. re-tile (e) center patio. | $50,000 |
| Jan 31, 2019 | Completed final sign-off May 2019 | 1800 Washington St | remove and replace kitchen cabinets and countertop. remove and replace cabinet and tile surface in bathroom. no movement of bathroom or kitchen fixtures. (kitchen and bathroom remodel)Details
remove and replace kitchen cabinets and countertop. remove and replace cabinet and tile surface in bathroom. no movement of bathroom or kitchen fixtures. (kitchen and bathroom remodel) | $30,000 |
| Nov 8, 2018 | Completed final sign-off Mar 2019 | 1370 Webster St | remodel (e) kitchen and remove (e) load bearing wall. add posts and beamDetails
remodel (e) kitchen and remove (e) load bearing wall. add posts and beam | $30,000 |
| Oct 30, 2018 | Completed final sign-off May 2019 | 373 Warren Dr | 2nd flr bathroom remodel. (e) walls to be removed, toilet relocation, (n) partial height wall to be added and (n) finishes and fixturesDetails
2nd flr bathroom remodel. (e) walls to be removed, toilet relocation, (n) partial height wall to be added and (n) finishes and fixtures | $20,000 |
| Oct 17, 2018 | Completed final sign-off Jan 2019 | 1370 Webster St | repair rear deck less than 50% front stair framing less than 50% no other work.Details
repair rear deck less than 50% front stair framing less than 50% no other work. | $10,000 |
| Aug 23, 2018 | Completed final sign-off May 2019 | 157 Winfield St | interior renovation of (e) conditioned 3rd fl apt. relocate e bathroom, add bathroom, closet, skylights.Details
interior renovation of (e) conditioned 3rd fl apt. relocate e bathroom, add bathroom, closet, skylights. | $75,000 |
| Jul 27, 2018 | Completed final sign-off Dec 2018 | 1636 09th Av | remodel (e) bathroom and water closet. add shower, infill door, remove partition wall btn old bath & water closetDetails
remodel (e) bathroom and water closet. add shower, infill door, remove partition wall btn old bath & water closet | $20,000 |
| Jul 17, 2018 | Completed final sign-off Oct 2018 | 346 Crescent Av | bathroom remodel: new fixtures in same location. new shower pan.Details
bathroom remodel: new fixtures in same location. new shower pan. | $12,000 |
| Jul 17, 2018 | Completed final sign-off Oct 2018 | 445 Upper Tr | remodel kitchen & laundry room. applances to remain in same location. laundry replace box, replace w/d, dryer to be ventless electric.Details
remodel kitchen & laundry room. applances to remain in same location. laundry replace box, replace w/d, dryer to be ventless electric. | $12,000 |
| Apr 17, 2018 | Completed final sign-off Jan 2020 | 135 Webster St | minor revision to 201701036382. layout change interior, windows at rear, front step replacment, in kind skylight additionsDetails
minor revision to 201701036382. layout change interior, windows at rear, front step replacment, in kind skylight additions | |
| Feb 20, 2018 | Completed final sign-off Dec 2018 | 738 Fell St | revision to 201712277565 to include adding partition wall in bathroom and adding a washer/dryer hookup and closet next to bathroomDetails
revision to 201712277565 to include adding partition wall in bathroom and adding a washer/dryer hookup and closet next to bathroom | $5,000 |
| Jan 11, 2018 | Completed final sign-off Sep 2018 | 1104 Noe St | connect extg 2nd floor with new stair create 2 bedrooms and 2 bathrooms at 1st floor. relocate kitchen, create open living space, remove hallway wall.Details
connect extg 2nd floor with new stair create 2 bedrooms and 2 bathrooms at 1st floor. relocate kitchen, create open living space, remove hallway wall. | $65,000 |
| Dec 27, 2017 | Completed final sign-off Dec 2018 | 738 Fell St | bathroom remodel: fixtures remain in same location. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5Details
bathroom remodel: fixtures remain in same location. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5 | $15,000 |
| Dec 12, 2017 | Completed final sign-off Jul 2018 | 1805 Golden Gate Av | remove and replace cabinets and appliances in kitchen. remove island sink. fixtures to remain in same place. no alteration at wall, window and door. maher n/aDetails
remove and replace cabinets and appliances in kitchen. remove island sink. fixtures to remain in same place. no alteration at wall, window and door. maher n/a | $25,000 |
| Nov 20, 2017 | Completed final sign-off Sep 2018 | 148 Marview Wy | ground floor addition for single familey dwelling: construct a family room with 1.5 bathroom in current garage and storage area.Details
ground floor addition for single familey dwelling: construct a family room with 1.5 bathroom in current garage and storage area. | $35,000 |
| Oct 30, 2017 | Completed final sign-off Jun 2018 | 162 College Av | revision to app#201708084190 to show roof framing plan and skylight at upper level.Details
revision to app#201708084190 to show roof framing plan and skylight at upper level. | $5,000 |
| Oct 19, 2017 | Completed final sign-off Mar 2018 | 1327 Cabrillo St | removed and replace cabinets. fixtures to remain in same location. in fill doorway in kitchen area. maher n/aDetails
removed and replace cabinets. fixtures to remain in same location. in fill doorway in kitchen area. maher n/a | $27,500 |
| Aug 24, 2017 | Completed final sign-off Jun 2018 | 162 College Av | add dwelling unit at 1/f conforming with allowable 2 units density dwelling unit in rh-2 zoning. provide 1 class, 1 bicycle parking space, (n) landscaping at front, (n) windows: 2 @ front, 2 @ rear and 6 @ east sideDetails
add dwelling unit at 1/f conforming with allowable 2 units density dwelling unit in rh-2 zoning. provide 1 class, 1 bicycle parking space, (n) landscaping at front, (n) windows: 2 @ front, 2 @ rear and 6 @ east side | $125,000 |
| Aug 15, 2017 | Completed final sign-off Feb 2018 | 47 Fair Oaks St | kitchen remodel: no change to plumbing locations. remove and replace cabinets, new countertops and upgrade electrical. add water line to new refrigeratao. install new appliances, same location.Details
kitchen remodel: no change to plumbing locations. remove and replace cabinets, new countertops and upgrade electrical. add water line to new refrigeratao. install new appliances, same location. | $15,000 |
| Aug 8, 2017 | Completed final sign-off Jun 2018 | 162 College Av | relocate upper level dwelling unit. relocate bathroom, add bathroom, relocate kitchen. replace exterior cement plaster with (n) horizontal wood siding. new doors and window. new railing at terrace, seismic upgrades & framing upgradesDetails
relocate upper level dwelling unit. relocate bathroom, add bathroom, relocate kitchen. replace exterior cement plaster with (n) horizontal wood siding. new doors and window. new railing at terrace, seismic upgrades & framing upgrades | $60,000 |
| Jul 13, 2017 | Completed final sign-off Jan 2018 | 358 Los Palmos Dr | remodel bathroom on lower level, move toiklet 6in to left, other fixtures remain in same location. bathroom preexisting; constructin in 19725 under pa#366358&408518.Details
remodel bathroom on lower level, move toiklet 6in to left, other fixtures remain in same location. bathroom preexisting; constructin in 19725 under pa#366358&408518. | $15,000 |
| Jul 13, 2017 | Never finaled issued Jul 2017, no final | 162 College Av | street spaceDetails
street space | |
| Jun 27, 2017 | Completed final sign-off Oct 2017 | 1735 16th Av | convert full bath to full bath and half bath. remodel bothDetails
convert full bath to full bath and half bath. remodel both | $20,000 |
| Jun 26, 2017 | Completed final sign-off Jun 2018 | 162 College Av | foundation replacement and seismic strengthening of 1st fl storage area. area to remain as storageDetails
foundation replacement and seismic strengthening of 1st fl storage area. area to remain as storage | $50,000 |
| May 16, 2017 | Completed final sign-off Dec 2017 | 2255 Mariposa St | remodel (e) kitchen & add (n) bath on 1st floor. replace (e) deck & railing @ front of house. new window & sliding door at west elevation.Details
remodel (e) kitchen & add (n) bath on 1st floor. replace (e) deck & railing @ front of house. new window & sliding door at west elevation. | $35,000 |
| Mar 31, 2017 | Completed final sign-off Jul 2017 | 152 Lombard St | remove: replace shower pan, vanity and toilet. new tile surround and floor vanity, toilet and vanity top in bathroom. no walls moved, removed, added or installed. all layouts to remain unchanged.Details
remove: replace shower pan, vanity and toilet. new tile surround and floor vanity, toilet and vanity top in bathroom. no walls moved, removed, added or installed. all layouts to remain unchanged. | $7,000 |
| Jan 3, 2017 | Completed final sign-off Jan 2020 | 135 Webster St | horizontal addition to rear of property at 1st & 2nd level. renovation of (e) interior. addition includes (2) new bathrooms & (2) bedrooms. no change to existing garage.Details
horizontal addition to rear of property at 1st & 2nd level. renovation of (e) interior. addition includes (2) new bathrooms & (2) bedrooms. no change to existing garage. | $90,000 |
| Nov 16, 2016 | Completed final sign-off Jul 2017 | 157 Winfield St | bathroom and kitchen remodel, structural upgrades, walls removed and added within existing foot print, window in back sealed up, plumbing updated, lighting and electricity upgradedDetails
bathroom and kitchen remodel, structural upgrades, walls removed and added within existing foot print, window in back sealed up, plumbing updated, lighting and electricity upgraded | $100,000 |
| Nov 14, 2016 | Completed final sign-off Feb 2017 | 1636 09th Av | replace permiter foundation for rear parking structure . rpleace door with new window, add new door, replace (e) window and garage door in kindDetails
replace permiter foundation for rear parking structure . rpleace door with new window, add new door, replace (e) window and garage door in kind | $10,000 |
| Sep 22, 2016 | Completed final sign-off Sep 2016 | 1060 Pine St | to obtain final inspection for work approved under pa # 200310167653, 200411199770, 201101248904. all work is complete.Details
to obtain final inspection for work approved under pa # 200310167653, 200411199770, 201101248904. all work is complete. | |
| Aug 31, 2016 | Completed final sign-off Dec 2016 | 57 Lundys Ln | revision to ref pa 201608175266 (e) brick foundation is replaced toncrete footing due to sig dry rot.Details
revision to ref pa 201608175266 (e) brick foundation is replaced toncrete footing due to sig dry rot. | $2,500 |
| Aug 31, 2016 | Completed final sign-off Nov 2016 | 101 States St | replace kitchen counter top, add 2 cabinets. remodel (3) existing baths. no movement of fixtures.Details
replace kitchen counter top, add 2 cabinets. remodel (3) existing baths. no movement of fixtures. | $35,000 |
| Aug 17, 2016 | Completed final sign-off Aug 2016 | 2754 24th St | construct existing storage shed in backyard to comply with n.o.v. 201602361. legalized less than 100 sq. ft. and height 8ft or less above grade. reduce bldg size to comply no permit.Details
construct existing storage shed in backyard to comply with n.o.v. 201602361. legalized less than 100 sq. ft. and height 8ft or less above grade. reduce bldg size to comply no permit. | $1,000 |
| Aug 17, 2016 | Completed final sign-off Dec 2016 | 57 Lundys Ln | revision to 201607253238 existing brick ftg is preplaced with concrete ftg due to dry rotDetails
revision to 201607253238 existing brick ftg is preplaced with concrete ftg due to dry rot | $5,000 |