Back to kitchen remodel contractors
Darc Ventures Inc Dba Spl Construction S
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Sep 2026
- Last 24 months
- 16 permits filed
148 permits since 2000: 138 completed, 4 in progress, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
70 kitchen remodel permits: 67 completed, 1 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 179 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Aug 2026 | 136 Downey St | kitchen & bath remodel, convert tub to showerpan, no wall movement, no movement of fixturesDetails
kitchen & bath remodel, convert tub to showerpan, no wall movement, no movement of fixtures | $50,000 |
| Jan 20, 2026 | Completed final sign-off Aug 2026 | 3939 19th St | 1 kitchen and 2 and half bath remodel. like for likeDetails
1 kitchen and 2 and half bath remodel. like for like | $75,000 |
| Aug 7, 2025 | Completed final sign-off May 2026 | 272 Collingwood St | kitchen & bathroom refresh. replace in-kind. kitchen, full bathroom, 1/2 bathroom. no structural or moving of walls/door.Details
kitchen & bathroom refresh. replace in-kind. kitchen, full bathroom, 1/2 bathroom. no structural or moving of walls/door. | $50,000 |
| Jul 30, 2025 | Completed final sign-off Sep 2026 | 1358 Fell St | revision to 202502079900: expanded scope of work. new rear deck at story 2 and convert e flast roof to deck at story 3. replace rear facing window at kitchen with glass door, create new glass door, create new glass door at story 3 deck. remodel 1 and add 1 new bath in story 3. reconfigure story 3Details
revision to 202502079900: expanded scope of work. new rear deck at story 2 and convert e flast roof to deck at story 3. replace rear facing window at kitchen with glass door, create new glass door, create new glass door at story 3 deck. remodel 1 and add 1 new bath in story 3. reconfigure story 3 | $110,000 |
| May 6, 2025 | Completed final sign-off Oct 2025 | 80 Parnassus Av | kitchen remodel in kind.Details
kitchen remodel in kind. | $25,000 |
| Feb 27, 2025 | Expired or cancelled cancelled Aug 2025 | 766 Hayes St | remodel 2 kitchens and 3 bathrooms across 2 units 480 sqftDetails
remodel 2 kitchens and 3 bathrooms across 2 units 480 sqft | $202,662 |
| Feb 7, 2025 | Completed final sign-off Sep 2026 | 1358 Fell St | interior reconfiguration & remodel containing a remodeled kitchen and remodeled 1/2 bathroom on story 2. remove (e) office in garage, relocate laundry to story 3. replace 2 windows in kind at story 2, add 1 new window in kitchen. patch and repair facade, paint.Details
interior reconfiguration & remodel containing a remodeled kitchen and remodeled 1/2 bathroom on story 2. remove (e) office in garage, relocate laundry to story 3. replace 2 windows in kind at story 2, add 1 new window in kitchen. patch and repair facade, paint. | $75,000 |
| Jul 3, 2024 | Completed final sign-off Dec 2024 | 590 30th St | remodeling the existing kitchen & moving the kitchen wall on the 2nd fl. replacing the existing window with a larger window in the kitchen area at the rear wall. not visible from the street. no horizontal or vertical additionsDetails
remodeling the existing kitchen & moving the kitchen wall on the 2nd fl. replacing the existing window with a larger window in the kitchen area at the rear wall. not visible from the street. no horizontal or vertical additions | $15,000 |
| Jun 3, 2024 | Completed final sign-off Dec 2024 | 590 30th St | kitchen remodel. replace cabinets, counters, and appliances. no moving wallsDetails
kitchen remodel. replace cabinets, counters, and appliances. no moving walls | $19,000 |
| Apr 23, 2024 | Completed final sign-off Aug 2024 | 3479 16th St | kitchen remodel, replace cabinets, countertops, appliances and painting. in kind remodel. no moving walls. approx. 80 sq ft.Details
kitchen remodel, replace cabinets, countertops, appliances and painting. in kind remodel. no moving walls. approx. 80 sq ft. | $35,000 |
| Mar 27, 2024 | Completed final sign-off Apr 2024 | 766 Hayes St | to address complaints: 202200721 (repair rear windows); 202171933 (heat) & 202171934 (rotted kitchen floor).Details
to address complaints: 202200721 (repair rear windows); 202171933 (heat) & 202171934 (rotted kitchen floor). | $1,000 |
| Feb 23, 2024 | Completed final sign-off Aug 2024 | 1024 Ortega St | kitchen and bath remodel. new fixtures, appliances, cabinets and counter surfaces in kindDetails
kitchen and bath remodel. new fixtures, appliances, cabinets and counter surfaces in kind | $75,000 |
| Mar 29, 2022 | Completed final sign-off Aug 2022 | 1450 43rd Av | 3 bathroom refresh, add 1 island in kitchen. no removal of wallsDetails
3 bathroom refresh, add 1 island in kitchen. no removal of walls | $45,000 |
| Oct 12, 2021 | Completed final sign-off Mar 2022 | 1868 Golden Gate Av | renovate one kitchen and 2 baths no movement of fixtures kitchen cabinet replacement. non structural.Details
renovate one kitchen and 2 baths no movement of fixtures kitchen cabinet replacement. non structural. | $55,000 |
| Oct 12, 2021 | Completed final sign-off Mar 2022 | 218 Funston Av | renovate one kitchen and 1 bath. no movement of fixtures. non structural.Details
renovate one kitchen and 1 bath. no movement of fixtures. non structural. | $35,000 |
| Sep 23, 2021 | Completed final sign-off Jun 2022 | 269 28th St | remodel (e) kitchen. remove wall between ktichen and porch, add posts and beams. replace existing windows with two new windows at the porch exterior wall, not visible from street.Details
remodel (e) kitchen. remove wall between ktichen and porch, add posts and beams. replace existing windows with two new windows at the porch exterior wall, not visible from street. | $45,000 |
| Jul 26, 2021 | Completed final sign-off Mar 2022 | 3294 Clay St | apt 5: remodel (e) kitchen and 2 bathroom (3/f & 4/f). remove non-load bear wall.Details
apt 5: remodel (e) kitchen and 2 bathroom (3/f & 4/f). remove non-load bear wall. | $50,000 |
| Mar 25, 2021 | Completed final sign-off Aug 2021 | 235 Berry St | renovate kitchen & (2) baths, no movement of fixtures,l no layout change, no wall framing demolitionDetails
renovate kitchen & (2) baths, no movement of fixtures,l no layout change, no wall framing demolition | $75,000 |
| Feb 17, 2021 | Completed final sign-off Jun 2021 | 1447 35th Av | kitchen remodel in kind.Details
kitchen remodel in kind. | $35,000 |
| Feb 8, 2021 | Completed final sign-off Jan 2022 | 324 Frederick St | remodel extg kitchen. remove load bearing wall between kitchen and dining room.Details
remodel extg kitchen. remove load bearing wall between kitchen and dining room. | $40,000 |
| Jan 6, 2021 | Completed final sign-off Aug 2021 | 116 Bradford St | remodel on both levels. remodel (e) kitchen & bathroom at 2nd fl. add new furnace. add new habitable space at ground floor. add an office room & full bathroom.Details
remodel on both levels. remodel (e) kitchen & bathroom at 2nd fl. add new furnace. add new habitable space at ground floor. add an office room & full bathroom. | $80,000 |
| Dec 9, 2020 | Completed final sign-off Sep 2021 | 1683 Hayes St | revision to app#201908279966. convert extg dining room to kitchen. convert extg kitchen to dining room. remove partition walls around washer/dryer mudroom.Details
revision to app#201908279966. convert extg dining room to kitchen. convert extg kitchen to dining room. remove partition walls around washer/dryer mudroom. | $25,000 |
| Dec 2, 2020 | Completed final sign-off Dec 2021 | 1364 Vermont St | kitchen remodel. widen three doors. add one toilet. no exterior workDetails
kitchen remodel. widen three doors. add one toilet. no exterior work | $75,000 |
| Oct 29, 2020 | Completed final sign-off Jun 2021 | 127 Gambier St | interior renovation of (e) kitchen, dining room & bathroom. additional bathroom created within (e) envelope. (e) back deck stairs to remain unchanged.Details
interior renovation of (e) kitchen, dining room & bathroom. additional bathroom created within (e) envelope. (e) back deck stairs to remain unchanged. | $70,000 |
| Oct 16, 2020 | Completed final sign-off Aug 2021 | 1341 Masonic Av | renovate existing kitchen. no movement of fixtures. new cabinets, countertop, upgrade electrical and plumbing as requiredDetails
renovate existing kitchen. no movement of fixtures. new cabinets, countertop, upgrade electrical and plumbing as required | $40,000 |
| Jun 29, 2020 | Completed final sign-off Dec 2020 | 738 Fell St | kitchen and 2.5 bath remodel. no movement of fixtures. " kitchen is 15'4" x 10'11" " bath 1- 5'8" x 10'8" (toilet, sink, tub/shower) " bath 2- 9'0" x 6'1" (toilet, sink, tub/shower) " bath 3- 4'7" x 3'6" (toilet, sink)Details
kitchen and 2.5 bath remodel. no movement of fixtures. " kitchen is 15'4" x 10'11" " bath 1- 5'8" x 10'8" (toilet, sink, tub/shower) " bath 2- 9'0" x 6'1" (toilet, sink, tub/shower) " bath 3- 4'7" x 3'6" (toilet, sink) | $20,000 |
| Jun 3, 2020 | Completed final sign-off Feb 2021 | 220 Funston Av | kitchen and bathroom renovation in-kind. all fixtures to remain in the same place. no movement of existing walls or doors.Details
kitchen and bathroom renovation in-kind. all fixtures to remain in the same place. no movement of existing walls or doors. | $50,000 |
| Mar 11, 2020 | Completed final sign-off Jul 2020 | 512 18th Av | renovation of 1 kitchen & 2 bathrooms. non momvent of plumbing fixtures & layout. no walls modified.Details
renovation of 1 kitchen & 2 bathrooms. non momvent of plumbing fixtures & layout. no walls modified. | $40,000 |
| Aug 1, 2019 | Completed final sign-off Feb 2020 | 1998 Broadway | unit # 406: kitchen remodel all fixtures to remain in place. 2 bathroom remodels, new tile, new vanity, new shower pan. kitchen 10x10 / bath 6x10 / bath 8x10Details
unit # 406: kitchen remodel all fixtures to remain in place. 2 bathroom remodels, new tile, new vanity, new shower pan. kitchen 10x10 / bath 6x10 / bath 8x10 | $35,000 |
| May 17, 2019 | Expired or cancelled expired Aug 2023 | 2701 Van Ness Av | unit 710: relocate kitchen, remodel 2 extg bathrooms, new lighting & electrical, modify interior soffits, minor modification of partition walls. n/a for maherDetails
unit 710: relocate kitchen, remodel 2 extg bathrooms, new lighting & electrical, modify interior soffits, minor modification of partition walls. n/a for maher | $110,000 |
| May 9, 2019 | Completed final sign-off Jan 2020 | 95 Ventura Av | upper fl - new kitchen in (e) location, (n) intertal stair & (n) master bathroom; 1st fl - new bathroom fixtures & finishes, relocated laundry. new fau & water heater. project will not expand (e) bldg envelope or alter (e) facadeDetails
upper fl - new kitchen in (e) location, (n) intertal stair & (n) master bathroom; 1st fl - new bathroom fixtures & finishes, relocated laundry. new fau & water heater. project will not expand (e) bldg envelope or alter (e) facade | $100,000 |
| Mar 18, 2019 | Completed final sign-off Jun 2019 | 640 Davis St | unit 20: replace countertops & cabinets in kitchen. no movement of fixtures.Details
unit 20: replace countertops & cabinets in kitchen. no movement of fixtures. | $25,000 |
| Feb 28, 2019 | Completed final sign-off Jan 2020 | 855 29th Av | kitchen and bath remodel. non-load bearing wall removal to enlarge family rm. re-tile (e) center patio.Details
kitchen and bath remodel. non-load bearing wall removal to enlarge family rm. re-tile (e) center patio. | $50,000 |
| Jan 31, 2019 | Completed final sign-off May 2019 | 1800 Washington St | remove and replace kitchen cabinets and countertop. remove and replace cabinet and tile surface in bathroom. no movement of bathroom or kitchen fixtures. (kitchen and bathroom remodel)Details
remove and replace kitchen cabinets and countertop. remove and replace cabinet and tile surface in bathroom. no movement of bathroom or kitchen fixtures. (kitchen and bathroom remodel) | $30,000 |
| Nov 8, 2018 | Completed final sign-off Mar 2019 | 1370 Webster St | remodel (e) kitchen and remove (e) load bearing wall. add posts and beamDetails
remodel (e) kitchen and remove (e) load bearing wall. add posts and beam | $30,000 |
| Jul 17, 2018 | Completed final sign-off Oct 2018 | 445 Upper Tr | remodel kitchen & laundry room. applances to remain in same location. laundry replace box, replace w/d, dryer to be ventless electric.Details
remodel kitchen & laundry room. applances to remain in same location. laundry replace box, replace w/d, dryer to be ventless electric. | $12,000 |
| Jan 11, 2018 | Completed final sign-off Sep 2018 | 1104 Noe St | connect extg 2nd floor with new stair create 2 bedrooms and 2 bathrooms at 1st floor. relocate kitchen, create open living space, remove hallway wall.Details
connect extg 2nd floor with new stair create 2 bedrooms and 2 bathrooms at 1st floor. relocate kitchen, create open living space, remove hallway wall. | $65,000 |
| Dec 12, 2017 | Completed final sign-off Jul 2018 | 1805 Golden Gate Av | remove and replace cabinets and appliances in kitchen. remove island sink. fixtures to remain in same place. no alteration at wall, window and door. maher n/aDetails
remove and replace cabinets and appliances in kitchen. remove island sink. fixtures to remain in same place. no alteration at wall, window and door. maher n/a | $25,000 |
| Oct 19, 2017 | Completed final sign-off Mar 2018 | 1327 Cabrillo St | removed and replace cabinets. fixtures to remain in same location. in fill doorway in kitchen area. maher n/aDetails
removed and replace cabinets. fixtures to remain in same location. in fill doorway in kitchen area. maher n/a | $27,500 |
| Aug 15, 2017 | Completed final sign-off Feb 2018 | 47 Fair Oaks St | kitchen remodel: no change to plumbing locations. remove and replace cabinets, new countertops and upgrade electrical. add water line to new refrigeratao. install new appliances, same location.Details
kitchen remodel: no change to plumbing locations. remove and replace cabinets, new countertops and upgrade electrical. add water line to new refrigeratao. install new appliances, same location. | $15,000 |
| Aug 8, 2017 | Completed final sign-off Jun 2018 | 162 College Av | relocate upper level dwelling unit. relocate bathroom, add bathroom, relocate kitchen. replace exterior cement plaster with (n) horizontal wood siding. new doors and window. new railing at terrace, seismic upgrades & framing upgradesDetails
relocate upper level dwelling unit. relocate bathroom, add bathroom, relocate kitchen. replace exterior cement plaster with (n) horizontal wood siding. new doors and window. new railing at terrace, seismic upgrades & framing upgrades | $60,000 |
| May 16, 2017 | Completed final sign-off Dec 2017 | 2255 Mariposa St | remodel (e) kitchen & add (n) bath on 1st floor. replace (e) deck & railing @ front of house. new window & sliding door at west elevation.Details
remodel (e) kitchen & add (n) bath on 1st floor. replace (e) deck & railing @ front of house. new window & sliding door at west elevation. | $35,000 |
| Nov 16, 2016 | Completed final sign-off Jul 2017 | 157 Winfield St | bathroom and kitchen remodel, structural upgrades, walls removed and added within existing foot print, window in back sealed up, plumbing updated, lighting and electricity upgradedDetails
bathroom and kitchen remodel, structural upgrades, walls removed and added within existing foot print, window in back sealed up, plumbing updated, lighting and electricity upgraded | $100,000 |
| Aug 31, 2016 | Completed final sign-off Nov 2016 | 101 States St | replace kitchen counter top, add 2 cabinets. remodel (3) existing baths. no movement of fixtures.Details
replace kitchen counter top, add 2 cabinets. remodel (3) existing baths. no movement of fixtures. | $35,000 |
| Jul 25, 2016 | Completed final sign-off Dec 2016 | 57 Lundys Ln | renovate single family home - kitchen and bath remodel. replace 2 damaged windows (non-street facing)Details
renovate single family home - kitchen and bath remodel. replace 2 damaged windows (non-street facing) | $45,000 |
| Jul 20, 2016 | Completed final sign-off Jan 2017 | 20 San Leandro Wy | replace kitchen cabinets and countertop in kind. replace exterior window in kind. not street facing.Details
replace kitchen cabinets and countertop in kind. replace exterior window in kind. not street facing. | $15,000 |
| Oct 23, 2015 | Completed final sign-off Jun 2016 | 1633 Oakdale Av | renovate existing cottage in the rear. remodel (1) kitchen, (1) full bathroom in kind. demo (e) lath & plaster, replace with (n) 5/8" sheetrock. no structural work under this permit. replacing finishes onlyDetails
renovate existing cottage in the rear. remodel (1) kitchen, (1) full bathroom in kind. demo (e) lath & plaster, replace with (n) 5/8" sheetrock. no structural work under this permit. replacing finishes only | $20,000 |
| Sep 21, 2015 | Completed final sign-off Mar 2016 | 15 Piedmont St | half bathroom remodel and kitchen remodel at same location, replace all fixtures. no new wall and no existing wall relocation. lighting in kitchen and bathroom remodel shall comply with cec 150.0(k)3 & 150.0(k)5 respectively.Details
half bathroom remodel and kitchen remodel at same location, replace all fixtures. no new wall and no existing wall relocation. lighting in kitchen and bathroom remodel shall comply with cec 150.0(k)3 & 150.0(k)5 respectively. | $25,000 |
| Aug 7, 2015 | Completed final sign-off Jun 2016 | 1633 Oakdale Av | demo (e) lath & plaster, replace with new 1/2" gyp board, remodel kitchen & bathroom, new cabinets, countertop, sink, tiles, toilet, vanity & bathtub, no structural work, comply with cec 150(k).Details
demo (e) lath & plaster, replace with new 1/2" gyp board, remodel kitchen & bathroom, new cabinets, countertop, sink, tiles, toilet, vanity & bathtub, no structural work, comply with cec 150(k). | $45,000 |
| Jul 3, 2015 | Completed final sign-off Dec 2015 | 2370 North Point St | revision to p.a. 201506249864; remove wall & replace with flush beam between kitchen & hallway. replace 2 windows and reframe to new positions; maher n/aDetails
revision to p.a. 201506249864; remove wall & replace with flush beam between kitchen & hallway. replace 2 windows and reframe to new positions; maher n/a | $10,000 |
| Jun 26, 2015 | Completed final sign-off Oct 2015 | 4442 18th St | interior renovation of existing kitchen. new lighting, electrical, relocate appliances, equip, fixtures, and new finishesDetails
interior renovation of existing kitchen. new lighting, electrical, relocate appliances, equip, fixtures, and new finishes | $20,000 |
| Jun 24, 2015 | Completed final sign-off Dec 2015 | 2370 North Point St | 1 kitchen and 1 bath remodel. non structuralDetails
1 kitchen and 1 bath remodel. non structural | $30,000 |
| Jun 3, 2015 | Completed final sign-off Oct 2015 | 936 Divisadero St | kitchen and bath remodel. replace window in kitchen, move door, enlarge door opening between kitchen and dining room. all work on 2nd flDetails
kitchen and bath remodel. replace window in kitchen, move door, enlarge door opening between kitchen and dining room. all work on 2nd fl | $40,000 |
| Feb 2, 2015 | Completed final sign-off May 2015 | 82 Parnassus Av | convert (e) close to new half bath on 2nd floor, relocate (e) closet to laundry. n/a maher ordinance; replace kitchen cabinet and countertop and also countertop in bathroom.Details
convert (e) close to new half bath on 2nd floor, relocate (e) closet to laundry. n/a maher ordinance; replace kitchen cabinet and countertop and also countertop in bathroom. | $10,000 |
| Dec 22, 2014 | Completed final sign-off Jan 2015 | 82 Parnassus Av | complyt w/nov 20148119 - new furnace system for unit #82 - bath & kitchen remodel per line 9 on bldg cc report for #80. n/a maher ordinance. no work on 84.Details
complyt w/nov 20148119 - new furnace system for unit #82 - bath & kitchen remodel per line 9 on bldg cc report for #80. n/a maher ordinance. no work on 84. | $15,000 |
| Sep 24, 2014 | Completed final sign-off Jan 2015 | 27 Judah St | removal of load bearing wall at 3rd fl. new framing to carr load. replace kitchen cabinets in kindDetails
removal of load bearing wall at 3rd fl. new framing to carr load. replace kitchen cabinets in kind | $20,000 |
| Jul 11, 2014 | Completed final sign-off Apr 2015 | 52 Russ St | interior remodel including removal of 1 wall and remodel existing kitchen an bathroom. add a new wahser and dryer. maher n/a.Details
interior remodel including removal of 1 wall and remodel existing kitchen an bathroom. add a new wahser and dryer. maher n/a. | $30,000 |
| Jul 11, 2014 | Completed final sign-off May 2015 | 547 Natoma St | interior remodel. remove one interior wall and remodel existing kitchen and bathroom. maher n/a.Details
interior remodel. remove one interior wall and remodel existing kitchen and bathroom. maher n/a. | $30,000 |
| Jul 11, 2014 | Completed final sign-off May 2015 | 50 Russ St | interior remodel. remove one interior wall and remodel existing kitchen and bathroom. add a new washer and dryer. maher n/a.Details
interior remodel. remove one interior wall and remodel existing kitchen and bathroom. add a new washer and dryer. maher n/a. | $30,000 |
| Jul 11, 2014 | Completed final sign-off Apr 2015 | 549 Natoma St | interior remodel. remove one interior wall and remodel existing kitchen and bathroom. exterior windows to be replaced in kind. maher n/a.Details
interior remodel. remove one interior wall and remodel existing kitchen and bathroom. exterior windows to be replaced in kind. maher n/a. | $30,000 |
| Mar 6, 2014 | Completed final sign-off Aug 2015 | 48 Russ St | remodel kitchen and bathroom repair damaged sheetrock, new flooring, paint no walls being moved, removed or added, all layout to remain the same, no new opening no window no door, no disturbance of soilDetails
remodel kitchen and bathroom repair damaged sheetrock, new flooring, paint no walls being moved, removed or added, all layout to remain the same, no new opening no window no door, no disturbance of soil | $25,000 |
| Mar 6, 2014 | Completed final sign-off Aug 2015 | 547 Natoma St | remodel kitchen and bathroom repair damaged sheetrock, new flooring, paint no walls being moved, removed or added, all layout to remain the same, no new opening no window no door, no disturbance of soilDetails
remodel kitchen and bathroom repair damaged sheetrock, new flooring, paint no walls being moved, removed or added, all layout to remain the same, no new opening no window no door, no disturbance of soil | $25,000 |
| Mar 18, 2013 | Completed final sign-off Sep 2013 | 742 Fell St | remodel 1 kitchen (new cabinets, counter appliances), remodel 2 bathrooms and 1 shower pan, remodel 2 half bathrooms. no structural. lighting for kitchen remodel per cec 150k, lighting for bathroom remodel per cec 150Details
remodel 1 kitchen (new cabinets, counter appliances), remodel 2 bathrooms and 1 shower pan, remodel 2 half bathrooms. no structural. lighting for kitchen remodel per cec 150k, lighting for bathroom remodel per cec 150 | $50,000 |
| Mar 6, 2013 | Completed final sign-off Nov 2013 | 1275 Bay St | #1275- amendment to pa#201209058997 additionally remove & replace cabinets in top floor kitchen, remodel additional bathroom in top floor.Details
#1275- amendment to pa#201209058997 additionally remove & replace cabinets in top floor kitchen, remodel additional bathroom in top floor. | $5,000 |
| Sep 5, 2012 | Completed final sign-off Feb 2014 | 1275 Bay St | add recessed lighting in common areas, install new water heaters for 2 units, same loc. replace appliances in top floor unit. kitchen countertop. replace rotten plywood on rear deck. new shower pan. tiling on top floor. remove steam heat and install elec in middle units. kitchen lighting comply wDetails
add recessed lighting in common areas, install new water heaters for 2 units, same loc. replace appliances in top floor unit. kitchen countertop. replace rotten plywood on rear deck. new shower pan. tiling on top floor. remove steam heat and install elec in middle units. kitchen lighting comply w | $20,000 |
| Aug 10, 2012 | Completed final sign-off Dec 2012 | 282 Moulton St | interior remodel of condo at 282 moulton street, addition of a new bedroom & closet space @ the 2nd floor & new electrical / lighting in the kitchen & new bedroom. infill of stair opening & removal of circular staircase.Details
interior remodel of condo at 282 moulton street, addition of a new bedroom & closet space @ the 2nd floor & new electrical / lighting in the kitchen & new bedroom. infill of stair opening & removal of circular staircase. | $25,000 |
| Mar 23, 2012 | Completed final sign-off Aug 2012 | 84 Parnassus Av | remove load bearing wall between kitchen & dining room, remodel (e) kitchen. relocate washer/dryer into hallway closet. upgrade foundation below new postDetails
remove load bearing wall between kitchen & dining room, remodel (e) kitchen. relocate washer/dryer into hallway closet. upgrade foundation below new post | $15,000 |
| Jan 25, 2012 | Completed final sign-off Jun 2012 | 1424 Page St | remodel kitchen & half bathroom on first floor, new finishes & lighting.Details
remodel kitchen & half bathroom on first floor, new finishes & lighting. | $40,000 |
| Apr 18, 2011 | Completed final sign-off Oct 2011 | 2372 North Point St | revisiohn to pa 201011054419, 2nd flr add quiet rock sound board typ x 5/8 in living dining, kitchen and bedrms, repair leak @ front of bldg above windows, rewire; repair replace above roof stucco patch and repair in kind, no chagne to front windowsDetails
revisiohn to pa 201011054419, 2nd flr add quiet rock sound board typ x 5/8 in living dining, kitchen and bedrms, repair leak @ front of bldg above windows, rewire; repair replace above roof stucco patch and repair in kind, no chagne to front windows | $8,000 |
| Nov 5, 2010 | Completed final sign-off Oct 2011 | 2372 North Point St | new master br at existing in-law ground floor remodel kitchen and baths lower unitDetails
new master br at existing in-law ground floor remodel kitchen and baths lower unit | $104,000 |