Block 3070, lot 003
20 San Leandro Way
- City’s use
- Single Family Residential
- Built
- 1922
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,343 sq ft
- Lot
- 4,761 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 11, 2017 | Completed final sign-off Jun 2017 | 20 San Leandro Wy | Husted Construction | termite repair work at front crawl space. stucco repair at front of structure.Details
termite repair work at front crawl space. stucco repair at front of structure. | $30,000 |
| Jul 20, 2016 | Completed final sign-off Jan 2017 | 20 San Leandro Wy | Darc Ventures Inc Dba Spl Construction S | replace kitchen cabinets and countertop in kind. replace exterior window in kind. not street facing.Details
replace kitchen cabinets and countertop in kind. replace exterior window in kind. not street facing. | $15,000 |
| Sep 17, 2009 | Completed final sign-off Apr 2011 | 20 San Leandro Wy | Moroso Construction Inc | replace glass lean to & bay @ 1st floor w/new french doors. expand 2nd floor master bedroom to enclose deck. reconfigure master suite.Details
replace glass lean to & bay @ 1st floor w/new french doors. expand 2nd floor master bedroom to enclose deck. reconfigure master suite. | $75,000 |
| Mar 8, 2007 | Completed final sign-off May 2007 | 20 San Leandro Wy | Mannon Construction | raplace fireplace with gas insert in living room, remove wall heater direct vent, f. p patch floor. new lighting @ livingroom, familyroom, entry. replace existing furnace. gas vent to terminate min lift from p/l for fire place. repalce faucet in bathroom.non flourescent light shell be controlled byDetails
raplace fireplace with gas insert in living room, remove wall heater direct vent, f. p patch floor. new lighting @ livingroom, familyroom, entry. replace existing furnace. gas vent to terminate min lift from p/l for fire place. repalce faucet in bathroom.non flourescent light shell be controlled by | $10,000 |
| Jun 23, 2004 | Completed final sign-off Sep 2004 | 20 San Leandro Wy | Mannon Construction | remove kchn cabnts/redo 2 closetDetails
remove kchn cabnts/redo 2 closet | $1,800 |
| May 21, 2004 | Completed final sign-off Sep 2004 | 20 San Leandro Wy | Mannon Construction | upstair bathroom remodel, new tub,shower,fixtures,vanity,bath fan,light fix.tile @shower wall/floorDetails
upstair bathroom remodel, new tub,shower,fixtures,vanity,bath fan,light fix.tile @shower wall/floor | $15,400 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.