Steven Abernethy
- License
- C51998
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C51998 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Mfa Design
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Nov 2023
13 permits since 2000 (engineer on 8 permits, architect on 5 permits): 10 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Kevin Webb Construction Inc (3), Dijeau Poage Construction Inc. (2), Moroso Construction Inc (2), Upscale Construction Inc. (2), Andrew Poage, H R Casey Contruction, Mastec Network Solutions Inc, Paul Ryan Associates
- Engineers
- Jahandar Yadegar
- Authorized agents
- Erica Severns
Where they worked
- Single-family 6
- Multi-family (2-family, apartments) 6
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2023 | Completed final sign-off May 2024 | 1744 Armstrong Av | Mastec Network Solutions Inc | revision to 20203071837. revise cabinet attachement details, revise antenna mounting detail. no change to previous approved antennnas, batteries, electricalDetails
revision to 20203071837. revise cabinet attachement details, revise antenna mounting detail. no change to previous approved antennnas, batteries, electrical | |
| May 4, 2012 | Completed final sign-off Jun 2013 | 448 Diamond St | Kevin Webb Construction Inc | revision to pa #2010.07.13.6485/s: change at ground floor stair layout & rear garage wall, removal of windows, reconfiguration of laundry room, addition of roof hatch, no change in bldg envelope. changes in structural framing.Details
revision to pa #2010.07.13.6485/s: change at ground floor stair layout & rear garage wall, removal of windows, reconfiguration of laundry room, addition of roof hatch, no change in bldg envelope. changes in structural framing. | |
| Jul 25, 2011 | Completed final sign-off Sep 2011 | 862 26th Av | H R Casey Contruction | remove 2 non-load bearing walls in kitchen, install (n) cabinets, appliances, flooring, lighting @ unit #864. install (n) stair to connect 2nd floor to existing family room/study at ground level.Details
remove 2 non-load bearing walls in kitchen, install (n) cabinets, appliances, flooring, lighting @ unit #864. install (n) stair to connect 2nd floor to existing family room/study at ground level. | $24,300 |
| Jul 18, 2011 | Completed final sign-off May 2012 | 2535 Lyon St | Upscale Construction Inc. | revision to permit: 201011245615. two exterior windows moved 1 ft. west. several structural sketches issued for in the field conditions.Details
revision to permit: 201011245615. two exterior windows moved 1 ft. west. several structural sketches issued for in the field conditions. | |
| Jun 14, 2011 | Completed final sign-off Feb 2012 | 1872 Bush St | Paul Ryan Associates | relocate existing kitchen, remodel one bathroom & add one bathroom, replace existing wood burning fireplace w/gas, rebuild existing deck.Details
relocate existing kitchen, remodel one bathroom & add one bathroom, replace existing wood burning fireplace w/gas, rebuild existing deck. | $100,000 |
| Feb 10, 2011 | Never finaled issued Feb 2011, no final | 183 07th Av | Kevin Webb Construction Inc | re-framing closets in bedrooms to increase depth on 2nd floor.Details
re-framing closets in bedrooms to increase depth on 2nd floor. | $10,000 |
| Nov 24, 2010 | Completed final sign-off May 2012 | 2535 Lyon St | Upscale Construction Inc. | remodel of (e) 2 unit bldg: work includes seismic upgrade. legalization of (e) unit @ ground fl. new elevator, new ext. windows & doors. 2 (n) gas fireboxes replacing (e) fireplaces. new radiant heating, ,new plumbing system. new electrical system. remodel kitchens & bathrooms.Details
remodel of (e) 2 unit bldg: work includes seismic upgrade. legalization of (e) unit @ ground fl. new elevator, new ext. windows & doors. 2 (n) gas fireboxes replacing (e) fireplaces. new radiant heating, ,new plumbing system. new electrical system. remodel kitchens & bathrooms. | $600,000 |
| Jul 13, 2010 | Completed final sign-off Jun 2013 | 448 Diamond St | Dijeau Poage Construction Inc. | erect 3 stories, type 5, 1 dwelling unit building.Details
erect 3 stories, type 5, 1 dwelling unit building. | $600,000 |
| Jul 13, 2010 | Completed final sign-off Oct 2011 | 448 Diamond St | Dijeau Poage Construction Inc. | demolish 2 stories, 1 dwelling unit building.Details
demolish 2 stories, 1 dwelling unit building. | $5,000 |
| Apr 19, 2010 | Completed final sign-off Apr 2010 | 536 Hill St | Moroso Construction Inc | revision to 200712271443 and 200904247040. addition of powder room at 2nd floor.Details
revision to 200712271443 and 200904247040. addition of powder room at 2nd floor. | |
| Apr 9, 2010 | Never finaled issued Dec 2010, no final | 1831 Grant Av | Kevin Webb Construction Inc | remodel of top flr unit in rear-2 decks created by pulling in exterior walls, no extensions or additions to building. install new windows include 3 fire rated property line windows. remove wood burning firepace & replace with gas insert. new finishes throughout, bathrooms & kitchens remain in (e)Details
remodel of top flr unit in rear-2 decks created by pulling in exterior walls, no extensions or additions to building. install new windows include 3 fire rated property line windows. remove wood burning firepace & replace with gas insert. new finishes throughout, bathrooms & kitchens remain in (e) | $150,000 |
| Sep 17, 2009 | Completed final sign-off Apr 2011 | 20 San Leandro Wy | Moroso Construction Inc | replace glass lean to & bay @ 1st floor w/new french doors. expand 2nd floor master bedroom to enclose deck. reconfigure master suite.Details
replace glass lean to & bay @ 1st floor w/new french doors. expand 2nd floor master bedroom to enclose deck. reconfigure master suite. | $75,000 |
| Mar 17, 2005 | Never finaled issued Sep 2005, no final | 4065 25th St | Andrew Poage | 8'horizontal extension on g/f,add 3/f on back 1/2 of house,seismic upgrade of foundation,Details
8'horizontal extension on g/f,add 3/f on back 1/2 of house,seismic upgrade of foundation, | $150,000 |