Paul Ryan Associates
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to May 2018
- Last 24 months
- 0 permits filed
235 permits since 2000: 182 completed, 13 never finaled, 40 expired or cancelled.
Of the 13 never-finaled permits, 2 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 235.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2018 | Completed final sign-off May 2019 | 1170 Sacramento St | renovation of unit 18d including renovate of ktiche, bathroom,s laundry, new partitions, lighting, fixtures and finished. no change to mechanical system, no exterior changes.Details
renovation of unit 18d including renovate of ktiche, bathroom,s laundry, new partitions, lighting, fixtures and finished. no change to mechanical system, no exterior changes. | $350,000 |
| Apr 6, 2018 | Completed final sign-off Sep 2020 | 1940 Broadway | unit 10: revision to approved app#201712186708. scope is to remove extg clay tile, and construct new 2 hour rated walls around openings in penthouse.Details
unit 10: revision to approved app#201712186708. scope is to remove extg clay tile, and construct new 2 hour rated walls around openings in penthouse. | $30,000 |
| Apr 3, 2018 | Completed final sign-off Feb 2019 | 2233 Lyon St | revision to pa#2017-0508-5972 electrical only, changes to distribution panel to accomadate future booster pump for sprinklers. minor relocations of outletsDetails
revision to pa#2017-0508-5972 electrical only, changes to distribution panel to accomadate future booster pump for sprinklers. minor relocations of outlets | $4,000 |
| Mar 14, 2018 | Completed final sign-off Jul 2020 | 1940 Broadway | 10th floor: minor temporary shoring to facilitate penthouse remodel approved under app#201712186708Details
10th floor: minor temporary shoring to facilitate penthouse remodel approved under app#201712186708 | $5,000 |
| Dec 18, 2017 | Completed final sign-off Jul 2020 | 1940 Broadway | 10th floor penthouse: interior alterationsDetails
10th floor penthouse: interior alterations | $550,000 |
| Nov 15, 2017 | Completed final sign-off Aug 2018 | 2650 Green St | (n) patio on roof of 3rd fl extension @ rear of property (102 sq ft)Details
(n) patio on roof of 3rd fl extension @ rear of property (102 sq ft) | $100,000 |
| Nov 8, 2017 | Completed final sign-off Mar 2018 | 2618 Buchanan St | revision to temporary shoring 201703141389. replace e brick foundations- portions. n/a for maherDetails
revision to temporary shoring 201703141389. replace e brick foundations- portions. n/a for maher | |
| Nov 8, 2017 | Completed final sign-off Mar 2018 | 2620 Buchanan St | temporary shoring revision to 201610049523 and 201703141391Details
temporary shoring revision to 201610049523 and 201703141391 | |
| Nov 1, 2017 | Completed final sign-off Nov 2018 | 301 Mission St | removal of existing water feature from the corner of lounge area the perimeter of unit ph2b. new flooring to be installed where water feature is removed. maher naDetails
removal of existing water feature from the corner of lounge area the perimeter of unit ph2b. new flooring to be installed where water feature is removed. maher na | $17,000 |
| Aug 24, 2017 | Completed final sign-off Nov 2019 | 999 Green St | 28th fl unit #2801 & 2803: arch renovation to include new finishes, new cabinetry, new elec. wiring & new plumbing fictures, exterior work includes replacement of windows walls, restoration of railing on north side & west side. an modification of the window wall at the norht side.Details
28th fl unit #2801 & 2803: arch renovation to include new finishes, new cabinetry, new elec. wiring & new plumbing fictures, exterior work includes replacement of windows walls, restoration of railing on north side & west side. an modification of the window wall at the norht side. | $210,000 |
| Aug 22, 2017 | Never finaled issued Sep 2017, no final | 1020 Union St | replace wood guard rail/trellis with steel guard rail/trellis. not visible from street.Details
replace wood guard rail/trellis with steel guard rail/trellis. not visible from street. | $2,000 |
| Jul 12, 2017 | Completed final sign-off Oct 2020 | 2280 Vallejo St | construct new retaining wallls w/ associated shade arbor structure at rear yard portion of propertyDetails
construct new retaining wallls w/ associated shade arbor structure at rear yard portion of property | $150,000 |
| Jun 29, 2017 | Completed final sign-off Aug 2018 | 2650 Green St | replace existing sloped skylight with new. patdh & repair roof as needed.Details
replace existing sloped skylight with new. patdh & repair roof as needed. | $30,000 |
| May 8, 2017 | Completed final sign-off May 2017 | 2747 Green St | administrative permit to correct record: pa2001110126599, 201112019907 & 201205160558 superceded by pa 20130078942 & 201306078962 pull by gc when original contractor left job.Details
administrative permit to correct record: pa2001110126599, 201112019907 & 201205160558 superceded by pa 20130078942 & 201306078962 pull by gc when original contractor left job. | |
| Apr 24, 2017 | Expired or cancelled cancelled Jan 2026 | 301 Mission St | 60th fl: gpha - work includes new construction of architectural partitions, finishes & fixtures for the addition of a bedroom & bath. mechanical to be design build. n/a maher ordinance. sprinkler work on deferred submittal if required.Details
60th fl: gpha - work includes new construction of architectural partitions, finishes & fixtures for the addition of a bedroom & bath. mechanical to be design build. n/a maher ordinance. sprinkler work on deferred submittal if required. | $78,000 |
| Mar 14, 2017 | Completed final sign-off Mar 2018 | 2618 Buchanan St | provide termporary shoring and underpinning to facilitate excavation and construction of proposed (n) building, next door @ 2620 buchanan, in conjunction with pa#2017031413891. n/a maher ord. 155-13Details
provide termporary shoring and underpinning to facilitate excavation and construction of proposed (n) building, next door @ 2620 buchanan, in conjunction with pa#2017031413891. n/a maher ord. 155-13 | $10,000 |
| Mar 14, 2017 | Completed final sign-off Feb 2020 | 2620 Buchanan St | provide termporary shoring and underpinning to facilitate excavation and construction of proposed (n) building. n/a maherDetails
provide termporary shoring and underpinning to facilitate excavation and construction of proposed (n) building. n/a maher | $25,000 |
| Feb 13, 2017 | Completed final sign-off Aug 2018 | 2650 Green St | horizontal addition.new sitting room off bedroom (e). add 112 sqft at rear of 3rd floor. interior remodel finishes & fixtures.Details
horizontal addition.new sitting room off bedroom (e). add 112 sqft at rear of 3rd floor. interior remodel finishes & fixtures. | $287,000 |
| Jan 10, 2017 | Expired or cancelled withdrawn Apr 2017 | 2620 Buchanan St | alterations to garage, new interior elevator, changes to rear yard terrace, redo 1st flr apartments, addition of bathroom on second floor. remove exterior stair at rear. structural improvements. n/a for maher ordinance.Details
alterations to garage, new interior elevator, changes to rear yard terrace, redo 1st flr apartments, addition of bathroom on second floor. remove exterior stair at rear. structural improvements. n/a for maher ordinance. | $3,500,000 |
| Dec 13, 2016 | Expired or cancelled cancelled Aug 2019 | 1730 Jones St | interior remodel lower unit #d. replace kitchen & bath fixtures. no structural work. no exterior work. n/a for maher.Details
interior remodel lower unit #d. replace kitchen & bath fixtures. no structural work. no exterior work. n/a for maher. | $12,000 |
| Oct 19, 2016 | Never finaled issued Oct 2016, no final | 2798 Broadway | exterior work only - cleaning and preservatin of existing redwood siding. application of one coat "preserva-wood" clear wood sealer.Details
exterior work only - cleaning and preservatin of existing redwood siding. application of one coat "preserva-wood" clear wood sealer. | $50,000 |
| Oct 4, 2016 | Completed final sign-off Feb 2020 | 2620 Buchanan St | revision to 201504012576 & 201510099357: new basement slab, garage & elevator. reconfig 2 apt units, change layouts all floors.ext door & windows change. replace masonry chimney. shoring & fire under sep permit. new curb cut to be 10' max. ** maner: n/a **Details
revision to 201504012576 & 201510099357: new basement slab, garage & elevator. reconfig 2 apt units, change layouts all floors.ext door & windows change. replace masonry chimney. shoring & fire under sep permit. new curb cut to be 10' max. ** maner: n/a ** | |
| Sep 27, 2016 | Never finaled issued Sep 2016, no final | 2650 Green St | adding to (e) sprinkler system in 'basement' - provide 13r coverage on 1st, 2nd, 3rd floor, relocate 3 heads in basement & replace riser assembly in garage. no work in garage & basement level unless noted. 2" combo underground not changed & servicing system. 60gpm @44psiDetails
adding to (e) sprinkler system in 'basement' - provide 13r coverage on 1st, 2nd, 3rd floor, relocate 3 heads in basement & replace riser assembly in garage. no work in garage & basement level unless noted. 2" combo underground not changed & servicing system. 60gpm @44psi | $20,000 |
| Aug 30, 2016 | Expired or cancelled expired Feb 2021 | 190 Seacliff Av | r&r in kind stone pavers over waterproof members at exterior terraces and stucco over drain mat at bld exterior, north elevation. repair in kindDetails
r&r in kind stone pavers over waterproof members at exterior terraces and stucco over drain mat at bld exterior, north elevation. repair in kind | $250,000 |
| Jul 28, 2016 | Completed final sign-off May 2018 | 123 Retiro Wy | new roof deck: replace window with door from master bedroom; new windows at rear; new skylights; new doors todeck. no changes visible from street.Details
new roof deck: replace window with door from master bedroom; new windows at rear; new skylights; new doors todeck. no changes visible from street. | $67,786 |
| Jul 28, 2016 | Completed final sign-off Feb 2018 | 2650 Green St | new elevator at east side of home; interior demo and exterior addition at breezaway for elvator & stair; new exterior materials finishes windows & door to match existing.Details
new elevator at east side of home; interior demo and exterior addition at breezaway for elvator & stair; new exterior materials finishes windows & door to match existing. | $317,430 |
| Apr 29, 2016 | Completed final sign-off Aug 2018 | 2650 Green St | 4th floor: demo interior partition walls, new exterior windows - enlarge (e) on west side. electrical work and finishesDetails
4th floor: demo interior partition walls, new exterior windows - enlarge (e) on west side. electrical work and finishes | $185,000 |
| Feb 1, 2016 | Completed final sign-off Oct 2017 | 1880 Jackson St | unit #601: to remove non-structural partition walls and replace them. to replace finishes and fixtures in the bathrooms. n/a for maher.Details
unit #601: to remove non-structural partition walls and replace them. to replace finishes and fixtures in the bathrooms. n/a for maher. | $5,000 |
| Jan 7, 2016 | Completed final sign-off Apr 2018 | 3878 Jackson St | widening of existing garage opening, new garage door, install finish at (e) front stairs, new pavers over garage for (e) exterior roof deck, new paver over (e) front deck, replace (e) front gate in kind.Details
widening of existing garage opening, new garage door, install finish at (e) front stairs, new pavers over garage for (e) exterior roof deck, new paver over (e) front deck, replace (e) front gate in kind. | $76,000 |
| Dec 22, 2015 | Completed final sign-off Feb 2017 | 42 Decatur St | t.i. project to an extg interior space. the scope will include new partitions, new ceiling, new finishes, new mep, new lighting and new level 2 ramp and corridor. n/a for maher. fire spr, evacuation signage, & l/s under seperate permit.Details
t.i. project to an extg interior space. the scope will include new partitions, new ceiling, new finishes, new mep, new lighting and new level 2 ramp and corridor. n/a for maher. fire spr, evacuation signage, & l/s under seperate permit. | $539,280 |
| Nov 19, 2015 | Completed final sign-off May 2018 | 123 Retiro Wy | in-kind replacement of extg permitted roof deck on 2nd story roof. replace guardrail with new 42" guardrail. no expansion to roofdeck and no expansion to building envelope.Details
in-kind replacement of extg permitted roof deck on 2nd story roof. replace guardrail with new 42" guardrail. no expansion to roofdeck and no expansion to building envelope. | $5,000 |
| Oct 9, 2015 | Completed final sign-off Feb 2020 | 2620 Buchanan St | renovation of 3 units residence, 2620 buchanan st #1, 2 & 3. complete interior renovation & upgrade to all units. n/a ordinance #155-13.Details
renovation of 3 units residence, 2620 buchanan st #1, 2 & 3. complete interior renovation & upgrade to all units. n/a ordinance #155-13. | $550,433 |
| Aug 31, 2015 | Completed final sign-off Apr 2016 | 2856 Vallejo St | temp shoring along rear property line to assist in construction on 2747 green, in conjunction with pa#201411262609Details
temp shoring along rear property line to assist in construction on 2747 green, in conjunction with pa#201411262609 | $5,000 |
| Aug 6, 2015 | Completed final sign-off Jun 2016 | 1034 Filbert St | #250 - kitchen remodel - replace cabinets & appliances, replace (e) can lights. bath & master bath remodel - replace (e) finishes, new vanities, replace (e) lighting.Details
#250 - kitchen remodel - replace cabinets & appliances, replace (e) can lights. bath & master bath remodel - replace (e) finishes, new vanities, replace (e) lighting. | $300,000 |
| Jul 21, 2015 | Never finaled issued Aug 2015, no final | 1034 Filbert St | revision to app#201410169133. replacement windows change to fixed from operable.Details
revision to app#201410169133. replacement windows change to fixed from operable. | |
| Apr 8, 2015 | Completed final sign-off Mar 2016 | 8 Octavia St | 8th flr - penthouse - remodel #804 within (e) bld. removation will include remodel of (e) kitchen and bathroom . no mechanical work, all work within (e) envelope. maher - not req'dDetails
8th flr - penthouse - remodel #804 within (e) bld. removation will include remodel of (e) kitchen and bathroom . no mechanical work, all work within (e) envelope. maher - not req'd | $10,000 |
| Mar 23, 2015 | Never finaled issued Mar 2015, no final | 711 Ashbury St | remodel tow existing bathrooms on upper unit. no walls moved, removed, or added. all layouts to remain unchanged.Details
remodel tow existing bathrooms on upper unit. no walls moved, removed, or added. all layouts to remain unchanged. | $30,000 |
| Nov 26, 2014 | Completed final sign-off May 2017 | 2747 Green St | revision to landscape pa#201407151314 as noted in 1. scope is: deletion of upper dining terrace & steps in lieu of 2 raised platforms at rear yard, bbq counter relocated to west side, water feature deleted.Details
revision to landscape pa#201407151314 as noted in 1. scope is: deletion of upper dining terrace & steps in lieu of 2 raised platforms at rear yard, bbq counter relocated to west side, water feature deleted. | |
| Nov 7, 2014 | Completed final sign-off Mar 2022 | 1020 Union St | add toilet and shower to existing laundry room and modify existing closet in storage room. this project does not include any changes to building use, type of construction, exterior openings or structure.Details
add toilet and shower to existing laundry room and modify existing closet in storage room. this project does not include any changes to building use, type of construction, exterior openings or structure. | $8,000 |
| Nov 3, 2014 | Completed final sign-off May 2016 | 2674 Broadway | revision to appl. 2011.1106.7875 to change the door swing out per approved ab-005.Details
revision to appl. 2011.1106.7875 to change the door swing out per approved ab-005. | $10,000 |
| Oct 17, 2014 | Never finaled issued Sep 2015, no final | 2798 Broadway | enlarge window on north facadeDetails
enlarge window on north facade | $3,500 |
| Oct 10, 2014 | Completed final sign-off Oct 2015 | 2798 Broadway | upgrade water service to 1.5" under bpa #201312315421Details
upgrade water service to 1.5" under bpa #201312315421 | $30,000 |
| Sep 24, 2014 | Expired or cancelled cancelled Nov 2021 | 625 Duncan St | structural upgrade and interior alteration. no exterior changes.Details
structural upgrade and interior alteration. no exterior changes. | $135,000 |
| Aug 26, 2014 | Expired or cancelled withdrawn Feb 2016 | 2950 Pacific Av | demolition of (e) carport & elevator. demolition of all interior finishes. renovation of (e) 4 level sfh with new partitions & finishes throughout. new bathrooms & kitchen @ (e) residence. new horizontal expansion of elevator & stair extension to west side & kitchen on east. excavtion & addition ofDetails
demolition of (e) carport & elevator. demolition of all interior finishes. renovation of (e) 4 level sfh with new partitions & finishes throughout. new bathrooms & kitchen @ (e) residence. new horizontal expansion of elevator & stair extension to west side & kitchen on east. excavtion & addition of | $4,650,000 |
| Aug 18, 2014 | Completed final sign-off May 2017 | 2747 Green St | revision to 201306078962. change usage in 2 rooms in basement. stoage 009 to home theater 009. storage 002 to av storage 00s. no other workDetails
revision to 201306078962. change usage in 2 rooms in basement. stoage 009 to home theater 009. storage 002 to av storage 00s. no other work | $10,000 |
| Aug 8, 2014 | Expired or cancelled cancelled Nov 2021 | 625 Duncan St | exploratory demolition, selective removal, interior finishes, replace in kind. no structural work.Details
exploratory demolition, selective removal, interior finishes, replace in kind. no structural work. | $50,000 |
| Jul 31, 2014 | Completed final sign-off Mar 2015 | 2735 Green St | replace (e) concrete wall in rear yard with (n) in kind. no exterior work.Details
replace (e) concrete wall in rear yard with (n) in kind. no exterior work. | $10,000 |
| Jul 15, 2014 | Completed final sign-off May 2017 | 2747 Green St | landscaping work for rear & side yard. work includes reinforcing (e) retaining walls, (n) terraced patios, steps, piers, walls, drainage and lighting. no work on house.Details
landscaping work for rear & side yard. work includes reinforcing (e) retaining walls, (n) terraced patios, steps, piers, walls, drainage and lighting. no work on house. | $65,000 |
| Jun 27, 2014 | Completed final sign-off Jul 2014 | 3410 Jackson St | to obtain final inspection for work approved under pa# 201105045337. all work is complete.Details
to obtain final inspection for work approved under pa# 201105045337. all work is complete. | |
| May 6, 2014 | Never finaled issued Oct 2014, no final | 1020 Union St | remodel unit 12 - interior finishes. alteration to windows - new windows to be wood - 9 windows. replaced in kind to be field verified.Details
remodel unit 12 - interior finishes. alteration to windows - new windows to be wood - 9 windows. replaced in kind to be field verified. | $145,000 |
| Apr 15, 2014 | Completed final sign-off Oct 2014 | 301 Mission St | the scope of work involves a revision to the fireplace flue penetration at the existing shaft wall. revision to pa#201403241517. n/a ordinance #155-13.Details
the scope of work involves a revision to the fireplace flue penetration at the existing shaft wall. revision to pa#201403241517. n/a ordinance #155-13. | |
| Mar 24, 2014 | Completed final sign-off Oct 2014 | 301 Mission St | revision app. 2013.08.06.3622. updated mechanical drawings & architectural information. the information included revised location and additional informatioa for the heat pumps and revised location of the exhaust flue for the gas fireplace. compliance with ord. no. 155-13 not required. exc.<50 cu.yd.Details
revision app. 2013.08.06.3622. updated mechanical drawings & architectural information. the information included revised location and additional informatioa for the heat pumps and revised location of the exhaust flue for the gas fireplace. compliance with ord. no. 155-13 not required. exc.<50 cu.yd. | $300 |
| Jan 7, 2014 | Completed final sign-off Sep 2014 | 1340 Clay St | 9th floor #901 kitchen remodel: work to include countertops, appliances, fixtures, cabinets to be augmented, no changes to (e) lighting.Details
9th floor #901 kitchen remodel: work to include countertops, appliances, fixtures, cabinets to be augmented, no changes to (e) lighting. | $25,000 |
| Dec 31, 2013 | Completed final sign-off Oct 2015 | 2798 Broadway | remove portion of flat roof and slope in conformity w/ remaining roofline, create new storage at rear of lower level, lanscaping change as shown.Details
remove portion of flat roof and slope in conformity w/ remaining roofline, create new storage at rear of lower level, lanscaping change as shown. | $70,000 |
| Dec 18, 2013 | Completed final sign-off Jul 2014 | 1880 Jackson St | unit #603 - to remodel the kitchen & 3 bathrooms, replacing fixtures + finishes in kind, to add lighting. a new opening between kitchen and dining room wall. compliance with ordinance 155-13 not requiredDetails
unit #603 - to remodel the kitchen & 3 bathrooms, replacing fixtures + finishes in kind, to add lighting. a new opening between kitchen and dining room wall. compliance with ordinance 155-13 not required | $30,000 |
| Dec 12, 2013 | Completed final sign-off Nov 2014 | 301 Mission St | level ph2 corridor - work includes renovation of common lobby & corridor. new floor & wall finishes & new light fixtures. no work will be done to existing mechanical system, fire & alarm system except minor movement to sprinkler heads if ocnflicting with light fixtures. no structural work to be doneDetails
level ph2 corridor - work includes renovation of common lobby & corridor. new floor & wall finishes & new light fixtures. no work will be done to existing mechanical system, fire & alarm system except minor movement to sprinkler heads if ocnflicting with light fixtures. no structural work to be done | $250,000 |
| Nov 22, 2013 | Completed final sign-off Aug 2014 | 1177 California St | partial removal of spray on fire proofing on structural beams and replaced with 1ntumescent fire resistive material. this scope of work for the beam fireproofing is a revision to (e) permit 201212196572Details
partial removal of spray on fire proofing on structural beams and replaced with 1ntumescent fire resistive material. this scope of work for the beam fireproofing is a revision to (e) permit 201212196572 | $8,000 |
| Oct 10, 2013 | Completed final sign-off Oct 2013 | 2747 Green St | demolish unreinforced unsafe masonry chimneyDetails
demolish unreinforced unsafe masonry chimney | $5,000 |
| Sep 20, 2013 | Completed final sign-off May 2016 | 2674 Broadway | revision to pa# 2011-0610-7875-window replacement @north facade, new alum framed windows with insulated glazing units to be installed within (e) window openings. number of divisions & type of operation per attached elevation.Details
revision to pa# 2011-0610-7875-window replacement @north facade, new alum framed windows with insulated glazing units to be installed within (e) window openings. number of divisions & type of operation per attached elevation. | |
| Sep 18, 2013 | Completed final sign-off Nov 2014 | 301 Mission St | ph2b: revision to app#201308063622. to include structural calculations and drawings for a cmu block wall adjacent to a demising wall between the client's residential unit and his neighbor's unit on the 57th floor.Details
ph2b: revision to app#201308063622. to include structural calculations and drawings for a cmu block wall adjacent to a demising wall between the client's residential unit and his neighbor's unit on the 57th floor. | $2,000 |
| Aug 30, 2013 | Completed final sign-off Mar 2014 | 2747 Green St | install temporary building & bsmt shoring along east property line. additional shoring work at adjacent property is under a separate permit.Details
install temporary building & bsmt shoring along east property line. additional shoring work at adjacent property is under a separate permit. | $80,000 |
| Aug 30, 2013 | Completed final sign-off Mar 2014 | 2735 Green St | install temporary building & bsmt shoring along west property line during construction at adjacent property (2747 green) under a separate permit.Details
install temporary building & bsmt shoring along west property line during construction at adjacent property (2747 green) under a separate permit. | $50,000 |
| Aug 15, 2013 | Completed final sign-off Feb 2014 | 1235 Stanyan St | shoring plan for 201308023437. cribbing and drilled piers per planDetails
shoring plan for 201308023437. cribbing and drilled piers per plan | $60,000 |
| Aug 6, 2013 | Completed final sign-off Oct 2014 | 301 Mission St | ph2b-revision to pa #2013.04.19.4987/r-1: additional mechanical & plumbing information is shown in this submittal related to new hot tub per rquirement of bldg management.(entire plan set of pa#2013.04.19.4987/r-1 including revisions,is submitted. this sumbittal will replace pa# 2013-0419-4987/ r1.Details
ph2b-revision to pa #2013.04.19.4987/r-1: additional mechanical & plumbing information is shown in this submittal related to new hot tub per rquirement of bldg management.(entire plan set of pa#2013.04.19.4987/r-1 including revisions,is submitted. this sumbittal will replace pa# 2013-0419-4987/ r1. | $20,000 |
| Aug 2, 2013 | Completed final sign-off Jun 2014 | 1235 Stanyan St | rev. to pa# 201102099928 struct. upgrade per plans, foundation, framing at 2/f & 3/fDetails
rev. to pa# 201102099928 struct. upgrade per plans, foundation, framing at 2/f & 3/f | |
| Jun 7, 2013 | Completed final sign-off May 2017 | 2747 Green St | expansion of basement. foundation & new framing. no work above 1st floor. structural work only. mechanical & electrical work to be submitted under separate permit.Details
expansion of basement. foundation & new framing. no work above 1st floor. structural work only. mechanical & electrical work to be submitted under separate permit. | $250,000 |
| Jun 7, 2013 | Completed final sign-off May 2017 | 2747 Green St | horizontal expansion of 3 floors at rear of house. enclose (e) porte cochere, relocate garage to basement. demo attached garage in rear.Details
horizontal expansion of 3 floors at rear of house. enclose (e) porte cochere, relocate garage to basement. demo attached garage in rear. | $300,000 |
| May 31, 2013 | Completed final sign-off Apr 2014 | 1170 Sacramento St | unit a: revision to pa # 201208217921 & 201202284991. penthouse a. new bedroom, remodel bathroom & kitchen. new closets, new opening & minor structural. window replacement not visible from street.Details
unit a: revision to pa # 201208217921 & 201202284991. penthouse a. new bedroom, remodel bathroom & kitchen. new closets, new opening & minor structural. window replacement not visible from street. | $65,000 |
| Apr 19, 2013 | Completed final sign-off Oct 2014 | 301 Mission St | architectural residential build-out of unit "ph2b" at mullenium tower. contruction of non-structural partitions, finishes, mechanical, elelctrical, telecom, fire sprinkler, fire management and plumbing; includes relocation of front entry door, level 58Details
architectural residential build-out of unit "ph2b" at mullenium tower. contruction of non-structural partitions, finishes, mechanical, elelctrical, telecom, fire sprinkler, fire management and plumbing; includes relocation of front entry door, level 58 | $700,000 |
| Apr 17, 2013 | Completed final sign-off Dec 2013 | 1170 Sacramento St | unit #19b -revision to appl #2012.02.28.4991 - revised exterior railing.Details
unit #19b -revision to appl #2012.02.28.4991 - revised exterior railing. | $10,000 |
| Apr 12, 2013 | Completed final sign-off Aug 2014 | 1177 California St | renovation of an (e) permitted roof deck including replacing (e) surface finishes, new code complaint handrails, new led ground lighting. repair (e) waterproofing membranes & flashing & new drain connection to (e) drain line & splash blockDetails
renovation of an (e) permitted roof deck including replacing (e) surface finishes, new code complaint handrails, new led ground lighting. repair (e) waterproofing membranes & flashing & new drain connection to (e) drain line & splash block | $35,000 |
| Apr 1, 2013 | Completed final sign-off Dec 2013 | 3410 Jackson St | revision to pa# 2012-0904-8852-relocate bbq enclosure at rear deck to bring into compliance with variance decision letter dated 12/4/12 case #2012:0043vDetails
revision to pa# 2012-0904-8852-relocate bbq enclosure at rear deck to bring into compliance with variance decision letter dated 12/4/12 case #2012:0043v | |
| Mar 22, 2013 | Completed final sign-off Oct 2014 | 301 Mission St | ph2b (millenium tower) - work include the preparation of the shell for the future build-out of interiors. plumbing will be modified & re-routed according to future architectural design. the existing slab will be levelled as necessary. mech & elec submit scope will be submitted under subsequentDetails
ph2b (millenium tower) - work include the preparation of the shell for the future build-out of interiors. plumbing will be modified & re-routed according to future architectural design. the existing slab will be levelled as necessary. mech & elec submit scope will be submitted under subsequent | $18,000 |
| Mar 22, 2013 | Completed final sign-off May 2016 | 2674 Broadway | revision to pa# 2011-0610-7875-s2-new plumbing planDetails
revision to pa# 2011-0610-7875-s2-new plumbing plan | $1,000 |
| Jan 7, 2013 | Completed final sign-off May 2016 | 2674 Broadway | revision to pa# 201106107875s1. foundation and super structure.Details
revision to pa# 201106107875s1. foundation and super structure. | $5,000 |
| Jan 3, 2013 | Completed final sign-off Jan 2014 | 1170 Sacramento St | relocate existing 3" dry fire standpipe above new ceiling (within unit b). ref. pa# 2012-0228-4991. tenant improvement.Details
relocate existing 3" dry fire standpipe above new ceiling (within unit b). ref. pa# 2012-0228-4991. tenant improvement. | $2,700 |
| Dec 21, 2012 | Completed final sign-off Oct 2015 | 2798 Broadway | expansion of habitable area into existing crawl space below and within existing structure; no expansion of bldg footprint height. new windows to match existing.Details
expansion of habitable area into existing crawl space below and within existing structure; no expansion of bldg footprint height. new windows to match existing. | $320,000 |
| Dec 19, 2012 | Completed final sign-off Aug 2014 | 1177 California St | unit# 1717, 17th fl - renovation of condo.(n)floor, (n) wall & ceiling finishes, (n) fixts, (n) plumbing fixts, (n) kitchen appliances, (n) fireplace & (n) casework. exterior wor limited to patio including replacement of patio tile w/ stone. new guardrail will be a deferred submittal.Details
unit# 1717, 17th fl - renovation of condo.(n)floor, (n) wall & ceiling finishes, (n) fixts, (n) plumbing fixts, (n) kitchen appliances, (n) fireplace & (n) casework. exterior wor limited to patio including replacement of patio tile w/ stone. new guardrail will be a deferred submittal. | $650,000 |
| Dec 12, 2012 | Completed final sign-off Dec 2013 | 3410 Jackson St | replace existing decorative metal juliet railings @ existing french doors, new metal juliet railings to match existing railings in kind & height @ 2'-8".Details
replace existing decorative metal juliet railings @ existing french doors, new metal juliet railings to match existing railings in kind & height @ 2'-8". | $20,000 |
| Oct 9, 2012 | Completed final sign-off Jan 2013 | 3343 Pierce St | to repair & replace finishes on the facade. no new windows.Details
to repair & replace finishes on the facade. no new windows. | $5,000 |
| Oct 5, 2012 | Completed final sign-off Oct 2015 | 2798 Broadway | remove and replace finestration in kind. remove and replace interior finishes in kind. repairs as needed. remove and replace interior finishes and complete system upgrades/replacementDetails
remove and replace finestration in kind. remove and replace interior finishes in kind. repairs as needed. remove and replace interior finishes and complete system upgrades/replacement | $274,919 |
| Oct 3, 2012 | Completed final sign-off May 2014 | 2324 Vallejo St | design revision to north, east, west elevation. no changes to previously approved building envelope or dimensions. revision to 201009080455 s1/r3Details
design revision to north, east, west elevation. no changes to previously approved building envelope or dimensions. revision to 201009080455 s1/r3 | $10,000 |
| Sep 4, 2012 | Completed final sign-off Jul 2014 | 3410 Jackson St | replace (e) 3-sided rear bay window w/ new curved bay window. replace (e) rear deck w/ (n) wood rear deck. planning approval for (n) deck depth by admin variance case #20120043v previously filed. (n) rear yard gas burning fireplace (n) green trellis @ front entry strips for privacy to west neighbor.Details
replace (e) 3-sided rear bay window w/ new curved bay window. replace (e) rear deck w/ (n) wood rear deck. planning approval for (n) deck depth by admin variance case #20120043v previously filed. (n) rear yard gas burning fireplace (n) green trellis @ front entry strips for privacy to west neighbor. | $75,000 |
| Aug 31, 2012 | Completed final sign-off Dec 2013 | 1170 Sacramento St | mechanical, elctrical and plmg work associated with approved app#201202284991Details
mechanical, elctrical and plmg work associated with approved app#201202284991 | $44,000 |
| Aug 30, 2012 | Never finaled issued Sep 2012, no final | 2808 Laguna St | metal stairs, landing and railings for roof deck on separate permitDetails
metal stairs, landing and railings for roof deck on separate permit | $15,000 |
| Aug 21, 2012 | Never finaled issued Sep 2012, no final | 1170 Sacramento St | remodel penthouse unit 19a. new bathroom, closets and finishes. new exterior commercial grade window system and terrace finishes.Details
remodel penthouse unit 19a. new bathroom, closets and finishes. new exterior commercial grade window system and terrace finishes. | $350,000 |
| Aug 14, 2012 | Completed final sign-off Sep 2013 | 2324 Vallejo St | construct additional shoring for the construction & approved pa #2012.0703.3985.Details
construct additional shoring for the construction & approved pa #2012.0703.3985. | $5,000 |
| Aug 13, 2012 | Completed final sign-off Apr 2013 | 574 Jersey St | revision to permitted structural pa #2012.12.30.7678: change new engineer & revise footing.Details
revision to permitted structural pa #2012.12.30.7678: change new engineer & revise footing. | |
| Jul 3, 2012 | Completed final sign-off Sep 2013 | 2324 Vallejo St | replace soldier beam with hand - dug pier to facilitate the excavation and modified the construction sequence suite field condition per approved pa# 201204057657. (revision)Details
replace soldier beam with hand - dug pier to facilitate the excavation and modified the construction sequence suite field condition per approved pa# 201204057657. (revision) | $100 |
| Jun 25, 2012 | Completed final sign-off Aug 2012 | 1438 Green St | #5e- int. remodel of studio a on 2nd floor. work includes new paneling, cabinets, flooring, wet bar. no exterior work.Details
#5e- int. remodel of studio a on 2nd floor. work includes new paneling, cabinets, flooring, wet bar. no exterior work. | $15,000 |
| Jun 15, 2012 | Completed final sign-off Apr 2014 | 1170 Sacramento St | remodel existing bathroom in unit 19a.Details
remodel existing bathroom in unit 19a. | $10,000 |
| Jun 14, 2012 | Completed final sign-off Dec 2013 | 1170 Sacramento St | remodel kitchens and bathrooms in penthouse units b and c. no lighting change.Details
remodel kitchens and bathrooms in penthouse units b and c. no lighting change. | $40,000 |
| Jun 6, 2012 | Completed final sign-off Jul 2012 | 2685 Pacific Av | remove existing skylight in kitchen bay, new roof over existing kitchen bay (52sf). remove and replace (e) rough openings to match (1) door and (3) sidelight. new (3) led lights in ceiling of kitchen bayDetails
remove existing skylight in kitchen bay, new roof over existing kitchen bay (52sf). remove and replace (e) rough openings to match (1) door and (3) sidelight. new (3) led lights in ceiling of kitchen bay | $65,000 |
| May 22, 2012 | Completed final sign-off Sep 2013 | 2324 Vallejo St | provide temporary shoring to (e) floor framing to facilitate excavation & construction of the proposed basement additoin per pa #2010.0908.0455-s1/r3.Details
provide temporary shoring to (e) floor framing to facilitate excavation & construction of the proposed basement additoin per pa #2010.0908.0455-s1/r3. | $4,000 |
| May 4, 2012 | Completed final sign-off Jul 2013 | 2006 Washington St | revision to app#201105035220. glazing specification for a new windows has changed title 24 calculations have been updated.Details
revision to app#201105035220. glazing specification for a new windows has changed title 24 calculations have been updated. | |
| Apr 19, 2012 | Completed final sign-off Jun 2012 | 188 Minna St | renovation of master suite in unit 38a. work includes demo of finish ceilings, replacement of light fixtures with 3 new lights, replace fabric wrapped wall covering with new flame treated covering, reconfirgure sprinkler layout. no work outside master suite. revision to 200510135508Details
renovation of master suite in unit 38a. work includes demo of finish ceilings, replacement of light fixtures with 3 new lights, replace fabric wrapped wall covering with new flame treated covering, reconfirgure sprinkler layout. no work outside master suite. revision to 200510135508 | $20,000 |
| Apr 5, 2012 | Completed final sign-off Sep 2013 | 2324 Vallejo St | install temporary shoring to facilitate the excavation & construction of the proposed basement construction per approved pa #2010.09.08.0455/s1.Details
install temporary shoring to facilitate the excavation & construction of the proposed basement construction per approved pa #2010.09.08.0455/s1. | $20,000 |
| Feb 28, 2012 | Completed final sign-off Dec 2013 | 1170 Sacramento St | merge penthouse units 19b & 19c to become 19c.Details
merge penthouse units 19b & 19c to become 19c. | $9,000 |
| Dec 7, 2011 | Expired or cancelled withdrawn Apr 2012 | 1170 Sacramento St | replace entire window system w/ (n) commercial grade system. move window wall west 4'-0" on westside; move north window wall on eastside south 2'-4". move portion of east wall, west portion to the east. move south wall north 24". dwelling subject of pending merger of unit a & c, app #201107019399Details
replace entire window system w/ (n) commercial grade system. move window wall west 4'-0" on westside; move north window wall on eastside south 2'-4". move portion of east wall, west portion to the east. move south wall north 24". dwelling subject of pending merger of unit a & c, app #201107019399 | $2,000,000 |
| Nov 18, 2011 | Never finaled issued Nov 2011, no final | 1872 Bush St | this permit is to capture corrections to permit #201106148085. apartment numbers were inverted & mislabeled. 1874 bush-upper unit. 1872 bush lower unit. replace (e) windows (quantity-4) in-kind, add interior doors & relocate water heater in attic.Details
this permit is to capture corrections to permit #201106148085. apartment numbers were inverted & mislabeled. 1874 bush-upper unit. 1872 bush lower unit. replace (e) windows (quantity-4) in-kind, add interior doors & relocate water heater in attic. | $5,000 |