Block 3719, lot 386
301 Mission St
- City’s use
- Single Family Residential
- Built
- 2009
- Stories
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 5,009 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 15, 2026 | In progress issued May 2026 | 301 Mission St | installation & relocation of mechanical & plumbing systemsDetails
installation & relocation of mechanical & plumbing systems | $25,000 | |
| Dec 2, 2025 | In progress issued Dec 2025 | 301 Mission St | Allied Fire Protection | gpha: modify fire sprinkler system for tenant improvement. add 6, relocate 34. ref permit 202502130260Details
gpha: modify fire sprinkler system for tenant improvement. add 6, relocate 34. ref permit 202502130260 | $20,000 |
| Feb 13, 2025 | In progress issued Feb 2025 | 301 Mission St | Black Mountain Development, Aaron Gordon Construction Inc | gpha: removal of existing ceiling in kitchen and living room. removal of existing kitchen island, new construction of architctural partitions, finishes & fixtures for the addition of a primary bedroom suite, laundry, guest room & bath, new kitchen island, other cabinetry.Details
gpha: removal of existing ceiling in kitchen and living room. removal of existing kitchen island, new construction of architctural partitions, finishes & fixtures for the addition of a primary bedroom suite, laundry, guest room & bath, new kitchen island, other cabinetry. | $718,000 |
| Apr 24, 2017 | Expired or cancelled cancelled Jan 2026 | 301 Mission St | Paul Ryan Associates | 60th fl: gpha - work includes new construction of architectural partitions, finishes & fixtures for the addition of a bedroom & bath. mechanical to be design build. n/a maher ordinance. sprinkler work on deferred submittal if required.Details
60th fl: gpha - work includes new construction of architectural partitions, finishes & fixtures for the addition of a bedroom & bath. mechanical to be design build. n/a maher ordinance. sprinkler work on deferred submittal if required. | $78,000 |
| Jun 1, 2011 | Completed final sign-off Aug 2011 | 301 Mission St | Pribuss Engineering Inc | fire sprinkler t.i. add one sprinkler, relocate 13 sprinklers on 58th floor corridoor and elevator lobby.Details
fire sprinkler t.i. add one sprinkler, relocate 13 sprinklers on 58th floor corridoor and elevator lobby. | $7,205 |
| Apr 1, 2011 | Completed final sign-off Oct 2011 | 301 Mission St | Paul Ryan Associates | this permit is a deferred submittal for the electrical and lighting scope. the drawings subitted are the title-24 compliance forms for the t.i. lighting scope.Details
this permit is a deferred submittal for the electrical and lighting scope. the drawings subitted are the title-24 compliance forms for the t.i. lighting scope. | $500,000 |
| Jan 11, 2011 | Never finaled issued Jan 2011, no final | 301 Mission St | Paul Ryan Associates | level 58 - unit gpha - 58th floor:mech/lighting modifications for common corridor upgrade on 58th floor. this is an additional mechanical submittal to permit #1226388, app #201011225444. main permit for corridor improvement.Details
level 58 - unit gpha - 58th floor:mech/lighting modifications for common corridor upgrade on 58th floor. this is an additional mechanical submittal to permit #1226388, app #201011225444. main permit for corridor improvement. | $22,000 |
| Dec 22, 2010 | Completed final sign-off Oct 2011 | 301 Mission St | Diversified Fire Products | fire alarm tenant improvement-8 speakers, 5 system 120 v smokesDetails
fire alarm tenant improvement-8 speakers, 5 system 120 v smokes | $7,500 |
| Nov 30, 2010 | Completed final sign-off Oct 2011 | 301 Mission St | Paul Ryan Associates | install (3) terrace flood lights on exterior terrace at gpha of 301 mission street. reivision to 201004089860 to clarify notes on original plans.Details
install (3) terrace flood lights on exterior terrace at gpha of 301 mission street. reivision to 201004089860 to clarify notes on original plans. | $600 |
| Nov 22, 2010 | Completed final sign-off Feb 2012 | 301 Mission St | Paul Ryan Associates | grand penthouse a (gpha) on 58th fl. renovation of corridor including new finishes. flooring doors and lighting. all existing egress ad life safety elements to remain.Details
grand penthouse a (gpha) on 58th fl. renovation of corridor including new finishes. flooring doors and lighting. all existing egress ad life safety elements to remain. | $180,000 |
| Sep 28, 2010 | Completed final sign-off Oct 2011 | 301 Mission St | Paul Ryan Associates | revision to 201004089860 using duct fire spray instead of wrap per manufactures specs 58th floorDetails
revision to 201004089860 using duct fire spray instead of wrap per manufactures specs 58th floor | |
| Sep 7, 2010 | Completed final sign-off Oct 2011 | 301 Mission St | Paul Ryan Associates | replacement of (e) exterior sliding doors w/ new exterior doors to match. doors not visible from street. doors located at rear portion of building on the 58th floor, gpha (grand penthouse a)Details
replacement of (e) exterior sliding doors w/ new exterior doors to match. doors not visible from street. doors located at rear portion of building on the 58th floor, gpha (grand penthouse a) | $50,000 |
| Aug 25, 2010 | Completed final sign-off Oct 2011 | 301 Mission St | Pribuss Engineering Inc | fire sprinkler ti, intall 70 sprinkler 70 sprinkler headsDetails
fire sprinkler ti, intall 70 sprinkler 70 sprinkler heads | $21,000 |
| Apr 8, 2010 | Completed final sign-off Oct 2011 | 301 Mission St | Paul Ryan Associates | level 58 - first time build-out of (e) shell space in high-rise residential bldg. work includes construction of a kitchen, (3) bathrooms, (2) bedrooms, & living sapce. permit for plumbing work alreadu issued.Details
level 58 - first time build-out of (e) shell space in high-rise residential bldg. work includes construction of a kitchen, (3) bathrooms, (2) bedrooms, & living sapce. permit for plumbing work alreadu issued. | $1,200,000 |
| Feb 16, 2010 | Completed final sign-off Oct 2011 | 301 Mission St | Paul Ryan Associates | floor 58. relocate some plumbing and waste pipes for grand penthouse. some coring of slab required for relocation of some pipes. apartment is a shell only. work to finish apartment will be under separate permit later.Details
floor 58. relocate some plumbing and waste pipes for grand penthouse. some coring of slab required for relocation of some pipes. apartment is a shell only. work to finish apartment will be under separate permit later. | $43,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.