Block 0963, lot 013
2950 Pacific Ave
- City’s use
- Single Family Residential
- Built
- 1907
- Stories
- 4
- Units
- 1
- Rooms
- 7 bedrooms, 7 bathrooms
- Building
- 11,500 sq ft
- Lot
- 12,209 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 2950 Pacific Av | Plath & Company Inc | revision to pa 202505297471 change of wall finish simplified landscaping, revised plans for walking between stairsDetails
revision to pa 202505297471 change of wall finish simplified landscaping, revised plans for walking between stairs | |
| Jul 31, 2026 | In progress issued Aug 2026 | 2950 Pacific Av | Plath & Company Inc | revision to pa 202505297474 for revised shoringDetails
revision to pa 202505297474 for revised shoring | |
| Jul 1, 2026 | In progress issued Jul 2026 | 2950 Pacific Av | Plath & Company Inc | revision to approved permit pa202505297471 in kind replacement of chimneys.Details
revision to approved permit pa202505297471 in kind replacement of chimneys. | |
| Jun 13, 2025 | In progress issued May 2026 | 2950 Pacific Av | Plath & Company Inc | facade alt and addition of 2 basement levels to (e).windows replacement,addition of garage and landscaping elements.new ped and vehicular entrance from broadway.interior renovation and relocate of elevator. rev to pa201602028565.Details
facade alt and addition of 2 basement levels to (e).windows replacement,addition of garage and landscaping elements.new ped and vehicular entrance from broadway.interior renovation and relocate of elevator. rev to pa201602028565. | $1,200,000 |
| Aug 24, 2020 | Completed final sign-off Oct 2022 | 2950 Pacific Av | Impact Builders Llc | interior/exterior painting. misc. minor repair as needed in conjunction w/painting. interior only on repairs.Details
interior/exterior painting. misc. minor repair as needed in conjunction w/painting. interior only on repairs. | $60,000 |
| May 23, 2017 | Never finaled issued May 2017, no final | 2950 Pacific Av | Impact Builders Llc | revision to pa #201704275065 - remove masonry vaneer -non-structural at base of bldg & reinstall with like kind. n/a maher ordinanceDetails
revision to pa #201704275065 - remove masonry vaneer -non-structural at base of bldg & reinstall with like kind. n/a maher ordinance | $10,000 |
| Apr 27, 2017 | Never finaled issued May 2017, no final | 2950 Pacific Av | Impact Builders Llc, Thompson Suskind L P | provide temporary shoring to facilitate excavation and construction of bldg reference to application # 201602028565 remodel. n/a maher ord. 155-13Details
provide temporary shoring to facilitate excavation and construction of bldg reference to application # 201602028565 remodel. n/a maher ord. 155-13 | $80,000 |
| Feb 2, 2016 | Never finaled issued Nov 2020, no final | 2950 Pacific Av | Impact Builders Llc | add 2 story type i-a bldg below (e) structure which upgraded to type v-a with (n) entrance from broadway. total six stories w/ a mezzanine.Details
add 2 story type i-a bldg below (e) structure which upgraded to type v-a with (n) entrance from broadway. total six stories w/ a mezzanine. | $500,000 |
| Aug 26, 2014 | Expired or cancelled withdrawn Feb 2016 | 2950 Pacific Av | Paul Ryan Associates | demolition of (e) carport & elevator. demolition of all interior finishes. renovation of (e) 4 level sfh with new partitions & finishes throughout. new bathrooms & kitchen @ (e) residence. new horizontal expansion of elevator & stair extension to west side & kitchen on east. excavtion & addition ofDetails
demolition of (e) carport & elevator. demolition of all interior finishes. renovation of (e) 4 level sfh with new partitions & finishes throughout. new bathrooms & kitchen @ (e) residence. new horizontal expansion of elevator & stair extension to west side & kitchen on east. excavtion & addition of | $4,650,000 |
| Jan 19, 2011 | Never finaled issued Jan 2011, no final | 2950 Pacific Av | street space & sidewalk permitDetails
street space & sidewalk permit | ||
| Nov 15, 2010 | Never finaled issued Nov 2010, no final | 2950 Pacific Av | street space permit (ew20101110663)Details
street space permit (ew20101110663) | ||
| Aug 16, 2010 | Never finaled issued Aug 2010, no final | 2950 Pacific Av | street space permitDetails
street space permit | ||
| May 3, 2010 | Completed final sign-off Aug 2010 | 2950 Pacific Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $36,950 |
| Mar 26, 2010 | Completed final sign-off Apr 2010 | 2950 Pacific Av | to obtain final inspection for work approved under pa# 200406237166. all work is complete.Details
to obtain final inspection for work approved under pa# 200406237166. all work is complete. | ||
| Sep 15, 2009 | Completed final sign-off Mar 2010 | 2950 Pacific Av | Collier Ostrom Enterpises | repair (e) brick porch landing in kind. remove brick and corroded metal from landing. install new struc. concrete slab, water proof new slab and install new brick wear layer. re point brick as needed. no change to (e) landing lay out and heightDetails
repair (e) brick porch landing in kind. remove brick and corroded metal from landing. install new struc. concrete slab, water proof new slab and install new brick wear layer. re point brick as needed. no change to (e) landing lay out and height | $15,000 |
| Jun 23, 2004 | Expired or cancelled expired Jan 2006 | 2950 Pacific Av | install 2hand excavated underpining piers at east property line to support (e).brick/concrete.......Details
install 2hand excavated underpining piers at east property line to support (e).brick/concrete....... | $6,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Impact Builders Llc (4), Plath & Company Inc (4), Collier Ostrom Enterpises, Paul Ryan Associates, Standardconstr/Standardroof, Thompson Suskind L P
- Architects
- Joshua G. Larson (4), Alla Agafonov, Babac Doane, Craig Edward Dykers
- Engineers
- Benjamin Lai (2), Adam Azofeifa, Denny Kwan, James Toby
- Authorized agent-otherss
- Jason A Sayner, Lisa Gunther
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.