Craig Edward Dykers
- License
- C34352
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Ehdd
- Based in
- Sf
- On San Francisco permits
- Jul 2015 to Feb 2016
3 permits since 2000 (architect on 3 permits): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Webcor Construction Lp (2), Impact Builders Llc
- Architects
- Babac Doane
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 2, 2016 | Never finaled issued Nov 2020, no final | 2950 Pacific Av | Impact Builders Llc | add 2 story type i-a bldg below (e) structure which upgraded to type v-a with (n) entrance from broadway. total six stories w/ a mezzanine.Details
add 2 story type i-a bldg below (e) structure which upgraded to type v-a with (n) entrance from broadway. total six stories w/ a mezzanine. | $500,000 |
| Sep 9, 2015 | Completed final sign-off Apr 2016 | 151 03rd St | Webcor Construction Lp | revision to pa#201211093897 addendum #3, revision includes work at fsae lobbies and shafts as required by and discussed with sffd. n/a ordinance #155-13Details
revision to pa#201211093897 addendum #3, revision includes work at fsae lobbies and shafts as required by and discussed with sffd. n/a ordinance #155-13 | |
| Jul 10, 2015 | Completed final sign-off Apr 2016 | 151 03rd St | Webcor Construction Lp | revision to pa#201211093897 addendum #3, the revision includes one detail for elevator hoistway lighting and a copy of the fire service access elevator narrative. all related to fire alarm. n/a to ordinance #15-133.Details
revision to pa#201211093897 addendum #3, the revision includes one detail for elevator hoistway lighting and a copy of the fire service access elevator narrative. all related to fire alarm. n/a to ordinance #15-133. |