Block 3722, lot 367
151 03rd St
- City’s use
- Commercial Retail
- Lot
- 76,211 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
60 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 5, 2026 | Completed final sign-off Aug 2026 | 151 03rd St | 7/fl- (n) configuration of movable walls, construction of (n) temp walls. no change to monorail track, fire sprinklers, floor occupancy use or load. add (n) movable walls.Details
7/fl- (n) configuration of movable walls, construction of (n) temp walls. no change to monorail track, fire sprinklers, floor occupancy use or load. add (n) movable walls. | $110,000 | |
| Feb 10, 2026 | Completed final sign-off Mar 2026 | 151 03rd St | Cosco Fire Protection Inc. | 6th fl: extend (e) nfpa 13 system to protect 2 new rooms (508 sqft). 2 rooms will require 3 sprinkler heads in total, which will be connected to (e) branchlines. new heads will utilize frictionless flexible drops, hydraulic impact is negilble ref#202601214200Details
6th fl: extend (e) nfpa 13 system to protect 2 new rooms (508 sqft). 2 rooms will require 3 sprinkler heads in total, which will be connected to (e) branchlines. new heads will utilize frictionless flexible drops, hydraulic impact is negilble ref#202601214200 | $21,100 |
| Jan 21, 2026 | Completed final sign-off Apr 2026 | 151 03rd St | 6/fl- construction of walls for exhibit gallery upgrade to bathrooms toilet paper dispenserDetails
6/fl- construction of walls for exhibit gallery upgrade to bathrooms toilet paper dispenser | $110,000 | |
| Aug 25, 2025 | Completed final sign-off Sep 2025 | 151 03rd St | revision 202506178833- change location of movable walls and temp walls. change angle of (1) wall. no change to general plan layoutDetails
revision 202506178833- change location of movable walls and temp walls. change angle of (1) wall. no change to general plan layout | ||
| Jun 17, 2025 | Completed final sign-off Sep 2025 | 151 03rd St | Romak Iron Works | install structural strongbank support and ceiling monorailtrack in level 7 temp. exhibit gallery to support movable exhibit wall panels; const. & installation of movable wall panels; const. of temporary wall panels. scope only applies to layout on a2.2. additional changes require separate permit(s).Details
install structural strongbank support and ceiling monorailtrack in level 7 temp. exhibit gallery to support movable exhibit wall panels; const. & installation of movable wall panels; const. of temporary wall panels. scope only applies to layout on a2.2. additional changes require separate permit(s). | $197,000 |
| Jun 24, 2024 | Completed final sign-off Jul 2024 | 151 03rd St | Cosco Fire Protection Inc. | ductwork in area of work not protected. add sprinklers as required by code under ductwork.Details
ductwork in area of work not protected. add sprinklers as required by code under ductwork. | $16,000 |
| Dec 1, 2020 | Completed final sign-off Sep 2021 | 151 03rd St | install temporary structural steel interface to support temporary mural display wall for exhibition. interface is between display structure and (e) building structure. no change to fire or life safety systems.Details
install temporary structural steel interface to support temporary mural display wall for exhibition. interface is between display structure and (e) building structure. no change to fire or life safety systems. | $50,000 | |
| Sep 28, 2020 | Completed final sign-off Jul 2021 | 151 03rd St | Thomas Swan Sign Co Inc | 18 evacuation plan maps. garage levels 1,2,3,7,8. main building levels 2,4 fire only.Details
18 evacuation plan maps. garage levels 1,2,3,7,8. main building levels 2,4 fire only. | $7,200 |
| Oct 15, 2019 | Completed final sign-off Feb 2020 | 151 03rd St | Thomas Swan Sign Co Inc | 2 projecting electric signs: p^Details
2 projecting electric signs: p^ | $10,000 |
| Oct 15, 2019 | Completed final sign-off Feb 2020 | 151 03rd St | Thomas Swan Sign Co Inc | 2 projecting electric wall signs : p^Details
2 projecting electric wall signs : p^ | $10,000 |
| Jul 23, 2019 | Completed final sign-off Feb 2020 | 151 03rd St | Thomas Swan Sign Co Inc | 7 evacuation plan maps. floors ll, l1,l3,l4,l5,l6,l7. n/a for maherDetails
7 evacuation plan maps. floors ll, l1,l3,l4,l5,l6,l7. n/a for maher | $2,800 |
| Apr 2, 2019 | Completed final sign-off Jul 2019 | 151 03rd St | Thomas Swan Sign Co Inc | revision to 201902223577 added non visible safety feature four bolts to attachmentDetails
revision to 201902223577 added non visible safety feature four bolts to attachment | $20,000 |
| Feb 22, 2019 | Completed final sign-off Jun 2019 | 151 03rd St | Thomas Swan Sign Co Inc | install temporary art object (sculpture) on roof of level 4. maher naDetails
install temporary art object (sculpture) on roof of level 4. maher na | $20,000 |
| Feb 21, 2019 | Never finaled issued Feb 2019, no final | 151 03rd St | install temporary structural steel interface to support temporary video display wall for exhibition. interface is between display structure and existing building structure. maher n/aDetails
install temporary structural steel interface to support temporary video display wall for exhibition. interface is between display structure and existing building structure. maher n/a | $20,000 | |
| Feb 4, 2019 | Never finaled issued Feb 2019, no final | 151 03rd St | street spaceDetails
street space | ||
| Nov 29, 2018 | Completed final sign-off Mar 2019 | 151 03rd St | temporarly remove storefront system to move art object. no change to design or materials. remove and replace 150' sf of sidwalk with propertyline. remove and replace 200 sf of exterior plaster along soffit. within property line. n/a for maher cordianted with sffd permit officerDetails
temporarly remove storefront system to move art object. no change to design or materials. remove and replace 150' sf of sidwalk with propertyline. remove and replace 200 sf of exterior plaster along soffit. within property line. n/a for maher cordianted with sffd permit officer | $50,000 | |
| Jul 10, 2017 | Completed final sign-off Aug 2017 | 151 03rd St | permanent assembly permit including change in occupancy from a3 to a2 for 6 e spaces and change in occupant load/load factor in 2 spaces (levels 2/3) no physical changes to e building or fire l/s systems in this scope.all new revisions clouded in bold.changes due to 2016 code cycle/minor constructnDetails
permanent assembly permit including change in occupancy from a3 to a2 for 6 e spaces and change in occupant load/load factor in 2 spaces (levels 2/3) no physical changes to e building or fire l/s systems in this scope.all new revisions clouded in bold.changes due to 2016 code cycle/minor constructn | ||
| Jul 1, 2016 | Never finaled issued Jul 2016, no final | 151 03rd St | Service West Inc | installation and seismic bracing of shelving units on floors; basement, 1,2, 9 & 10 of the sfmoma are museum. ref pa 2012-1109-3897s (r1)Details
installation and seismic bracing of shelving units on floors; basement, 1,2, 9 & 10 of the sfmoma are museum. ref pa 2012-1109-3897s (r1) | $13,747 |
| Jun 17, 2016 | Completed final sign-off May 2017 | 151 03rd St | 7th & 8th fl: installation of new aluminum frame and millwork structure sliding wall panels of the sfmoma conservation studios for storage of artist materials. all storage portions of structure are <10' aff. revision pa 201211093897 to install only sliding panel structureDetails
7th & 8th fl: installation of new aluminum frame and millwork structure sliding wall panels of the sfmoma conservation studios for storage of artist materials. all storage portions of structure are <10' aff. revision pa 201211093897 to install only sliding panel structure | ||
| Apr 28, 2016 | Completed final sign-off Apr 2019 | 151 03rd St | Convergint Technologies Llc | 1st flr: fire alarm - ref pa 2016 0303 1048 includes 1 control replay maher naDetails
1st flr: fire alarm - ref pa 2016 0303 1048 includes 1 control replay maher na | $2,500 |
| Apr 28, 2016 | Never finaled issued Apr 2016, no final | 151 03rd St | Convergint Technologies Llc | 1st flr: fire alarm - ref pa 2016 0407 4214, includes reprogramming elevator call for elevator. maher naDetails
1st flr: fire alarm - ref pa 2016 0407 4214, includes reprogramming elevator call for elevator. maher na | $2,000 |
| Apr 22, 2016 | Never finaled issued May 2016, no final | 151 03rd St | Plant Construction Co, Lp | revision to pa#201507272564 to correct clerical error of room name "dining 102" no longer existing and occupant load correct to "160" to match approved load calculation on existing diagram, plan detail 1/a0.2. n/a ordinance #155-13Details
revision to pa#201507272564 to correct clerical error of room name "dining 102" no longer existing and occupant load correct to "160" to match approved load calculation on existing diagram, plan detail 1/a0.2. n/a ordinance #155-13 | |
| Apr 19, 2016 | Completed final sign-off Jun 2016 | 151 03rd St | Thomas Swan Sign Co Inc | 4 evacuation plan maps, floor 5. maher not reqDetails
4 evacuation plan maps, floor 5. maher not req | $1,600 |
| Apr 7, 2016 | Completed final sign-off May 2016 | 151 03rd St | temporary modification of extg sfmoma expansion freight elevator l including removal of stop at ground floor level 1 and infill of extg door opening with 2 hour fire rated partition. fire alarm modifications under seperate permit. elevator modifications to be submitted to state elevator divisionDetails
temporary modification of extg sfmoma expansion freight elevator l including removal of stop at ground floor level 1 and infill of extg door opening with 2 hour fire rated partition. fire alarm modifications under seperate permit. elevator modifications to be submitted to state elevator division | $4,000 | |
| Apr 5, 2016 | Never finaled issued Apr 2016, no final | 151 03rd St | Aaa Restaurant Fire Control/Dba Aaa Fire | install (4) hood & duct fire suppression system. n/a ordinance #155-13Details
install (4) hood & duct fire suppression system. n/a ordinance #155-13 | $6,000 |
| Apr 5, 2016 | Completed final sign-off Apr 2016 | 151 03rd St | Aaa Restaurant Fire Control/Dba Aaa Fire | install hood & duct fire suppression system.ref# 201510210634 n/a ordinance #155-13Details
install hood & duct fire suppression system.ref# 201510210634 n/a ordinance #155-13 | $3,000 |
| Mar 31, 2016 | Completed final sign-off May 2016 | 151 03rd St | Desert Fire Protection Inc Of Nevada | as built fire sprinklers for permit 201510280974. bracing calcs done & new calcs for wood ceiling & ws heads both sides of wall.Details
as built fire sprinklers for permit 201510280974. bracing calcs done & new calcs for wood ceiling & ws heads both sides of wall. | |
| Mar 21, 2016 | Completed final sign-off Apr 2016 | 151 03rd St | Convergint Technologies Llc | fire alarm ti on 3rd,4th and 5th floors, floor, add 1 speaker/strobe, relocate 3 speaker.strobes, 1 strobe. ref pa 2015-1021-0364. maher naDetails
fire alarm ti on 3rd,4th and 5th floors, floor, add 1 speaker/strobe, relocate 3 speaker.strobes, 1 strobe. ref pa 2015-1021-0364. maher na | $5,000 |
| Mar 21, 2016 | Never finaled issued Mar 2016, no final | 151 03rd St | Convergint Technologies Llc | fire alarm ti on 1st,4th and 5th floors, add 2 smoke detectors, demo 1 smoke detector, relocate 1 smoke detector, relocate air sampling ports. add test port. ref pa 2015-12145083. maher naDetails
fire alarm ti on 1st,4th and 5th floors, add 2 smoke detectors, demo 1 smoke detector, relocate 1 smoke detector, relocate air sampling ports. add test port. ref pa 2015-12145083. maher na | $4,000 |
| Mar 21, 2016 | Never finaled issued Mar 2016, no final | 151 03rd St | Convergint Technologies Llc | fire alarm ti on 1st floor, demo 3 smoke detectors, relocate 1 smoke detector. ref pa 2015-1021-0367. maher naDetails
fire alarm ti on 1st floor, demo 3 smoke detectors, relocate 1 smoke detector. ref pa 2015-1021-0367. maher na | $5,000 |
| Mar 18, 2016 | Completed final sign-off May 2016 | 151 03rd St | Plant Construction Co, Lp | ground floor: install air treatment systems as an addendum to original permit 2015 0727 2564. maher naDetails
ground floor: install air treatment systems as an addendum to original permit 2015 0727 2564. maher na | $10,000 |
| Mar 17, 2016 | Never finaled issued Mar 2016, no final | 151 03rd St | meters/street spaceDetails
meters/street space | ||
| Mar 17, 2016 | Never finaled issued Mar 2016, no final | 151 03rd St | Desert Fire Protection Inc Of Nevada | relocate 12 fire sprinkler heads, 4th floor ref pa 2015-1214-5083. maher naDetails
relocate 12 fire sprinkler heads, 4th floor ref pa 2015-1214-5083. maher na | $7,000 |
| Mar 3, 2016 | Completed final sign-off May 2016 | 151 03rd St | Plant Construction Co, Lp | reroute catering kitchen hood exhaust to compliant discharge location on 3rd level roof. there are no kitchen equipment changes to the catering kitchen, maher n/aDetails
reroute catering kitchen hood exhaust to compliant discharge location on 3rd level roof. there are no kitchen equipment changes to the catering kitchen, maher n/a | $50,000 |
| Mar 2, 2016 | Never finaled issued Mar 2016, no final | 171 Natoma St | at block 3722, lot 367, create new adress for san francisco museum of modern art (employee entrance)Details
at block 3722, lot 367, create new adress for san francisco museum of modern art (employee entrance) | ||
| Feb 29, 2016 | Never finaled issued Feb 2016, no final | 151 03rd St | street spaceDetails
street space | ||
| Feb 26, 2016 | Completed final sign-off Apr 2019 | 151 03rd St | Convergint Technologies Llc | fire alarm ti for 1st floor restaurant ref pa 2015-0727-2564, including 6 monitor modules, 11 duct detectors, 6 strobes, 5 relays, 2 speakers, 1 smoke detector, 15 speaker/strobesDetails
fire alarm ti for 1st floor restaurant ref pa 2015-0727-2564, including 6 monitor modules, 11 duct detectors, 6 strobes, 5 relays, 2 speakers, 1 smoke detector, 15 speaker/strobes | $20,000 |
| Feb 24, 2016 | Never finaled issued Feb 2016, no final | 151 03rd St | Allied Fire Protection | add 2 pendent sprinklers @ new ceiling/room, level 7. ref pa 2016-0219-0009. maher naDetails
add 2 pendent sprinklers @ new ceiling/room, level 7. ref pa 2016-0219-0009. maher na | $2,200 |
| Feb 19, 2016 | Completed final sign-off May 2016 | 151 03rd St | 7th floor:installation of a gypsum board ceiling in a 550 sq.ft. gallery on level 7, work to include modification to existing mechanical supply diffusers and new lighting. ref. to sfmoma expansion pa#201211093987 & temp. wall pa#201507302945. n/a ordinance #155-13Details
7th floor:installation of a gypsum board ceiling in a 550 sq.ft. gallery on level 7, work to include modification to existing mechanical supply diffusers and new lighting. ref. to sfmoma expansion pa#201211093987 & temp. wall pa#201507302945. n/a ordinance #155-13 | $20,000 | |
| Feb 16, 2016 | Completed final sign-off May 2016 | 151 03rd St | Plant Construction Co, Lp | defered submittal of interior suspended sculptural wood ceiling canopy in a full service restaurant and assembly space on the ground floor of an existing museum. t.i. pa#201507272564. n/a ordinance #155-13Details
defered submittal of interior suspended sculptural wood ceiling canopy in a full service restaurant and assembly space on the ground floor of an existing museum. t.i. pa#201507272564. n/a ordinance #155-13 | $40,000 |
| Dec 14, 2015 | Completed final sign-off Jun 2016 | 151 03rd St | Plant Construction Co, Lp | level 1 coat check includes modifications to (e) partitions, doors, floor finishes, cubbies & lighting; 3rd st - entry replaces (e) ticket booths with exterior metal panel signage display walls; level 4 white box multipurpose space includes new theatrical grid for av/theatrical lighting & accousticDetails
level 1 coat check includes modifications to (e) partitions, doors, floor finishes, cubbies & lighting; 3rd st - entry replaces (e) ticket booths with exterior metal panel signage display walls; level 4 white box multipurpose space includes new theatrical grid for av/theatrical lighting & accoustic | $450,000 |
| Dec 7, 2015 | Completed final sign-off Apr 2016 | 151 03rd St | Thomas Swan Sign Co Inc | revision to app# 201508134168 to 6 evacuation plan maps. floors 1,3,8,9, and 10. n/a for maher.Details
revision to app# 201508134168 to 6 evacuation plan maps. floors 1,3,8,9, and 10. n/a for maher. | |
| Dec 1, 2015 | Completed final sign-off Jun 2016 | 151 03rd St | Thomas Swan Sign Co Inc | g/f: to erect 1 non-illuminated wall sign for sf moma. n/a for maherDetails
g/f: to erect 1 non-illuminated wall sign for sf moma. n/a for maher | $10,000 |
| Nov 30, 2015 | Completed final sign-off Jun 2016 | 151 03rd St | Thomas Swan Sign Co Inc | erect a non-electric single faced wall sign. n/a maher ordinanceDetails
erect a non-electric single faced wall sign. n/a maher ordinance | $3,000 |
| Nov 30, 2015 | Completed final sign-off Jun 2016 | 151 03rd St | Thomas Swan Sign Co Inc | erect (2) non-electric single faced wall sign. n/a maher ordinanceDetails
erect (2) non-electric single faced wall sign. n/a maher ordinance | $10,000 |
| Nov 4, 2015 | Never finaled issued Nov 2015, no final | 151 03rd St | street spaceDetails
street space | ||
| Oct 28, 2015 | Completed final sign-off May 2016 | 151 03rd St | Desert Fire Protection Inc Of Nevada | 1st floor: modify (e) fire sprinkler system- adding 91 heads- using flex heads and 8 ws heads on interior window- bracing and calculations under separate permit.Details
1st floor: modify (e) fire sprinkler system- adding 91 heads- using flex heads and 8 ws heads on interior window- bracing and calculations under separate permit. | $15,200 |
| Oct 21, 2015 | Completed final sign-off Apr 2016 | 151 03rd St | Plant Construction Co, Lp | interior reno of sfmom and sfmoma expansion - ref pa 2012 1109 3897. replace (e) finishes, casework, lighting, av, and elect in level1. retail space: replace finishes and plumb fixtures in lvel 1 restrm, new casework and gyp board pilasters/soffits in level 2 retail; new casework, light & conveyorsDetails
interior reno of sfmom and sfmoma expansion - ref pa 2012 1109 3897. replace (e) finishes, casework, lighting, av, and elect in level1. retail space: replace finishes and plumb fixtures in lvel 1 restrm, new casework and gyp board pilasters/soffits in level 2 retail; new casework, light & conveyors | $750,000 |
| Oct 21, 2015 | Completed final sign-off Apr 2016 | 151 03rd St | Plant Construction Co, Lp | interior renovation of sfmoma & sfmoma expansion - ref pa 2012 1109 3897. new cofee bar in (e) level 3 gallery space with work area to make a serve coffee and pastries prepared offsite. renovation of (e) cafe kitchen at level 5 - sculpture garden. maher ord n/a.Details
interior renovation of sfmoma & sfmoma expansion - ref pa 2012 1109 3897. new cofee bar in (e) level 3 gallery space with work area to make a serve coffee and pastries prepared offsite. renovation of (e) cafe kitchen at level 5 - sculpture garden. maher ord n/a. | $350,000 |
| Sep 9, 2015 | Completed final sign-off Apr 2016 | 151 03rd St | Webcor Construction Lp | revision to pa#201211093897 addendum #3, revision includes work at fsae lobbies and shafts as required by and discussed with sffd. n/a ordinance #155-13Details
revision to pa#201211093897 addendum #3, revision includes work at fsae lobbies and shafts as required by and discussed with sffd. n/a ordinance #155-13 | |
| Aug 13, 2015 | Never finaled issued Aug 2015, no final | 151 03rd St | Thomas Swan Sign Co Inc | revision to eprmit 201505156412; 65 evacuation plan maps floors b,1 thru 10 and roof; maher n/aDetails
revision to eprmit 201505156412; 65 evacuation plan maps floors b,1 thru 10 and roof; maher n/a | |
| Jul 30, 2015 | Completed final sign-off Nov 2015 | 151 03rd St | Webcor Construction Lp | installation of temporary gallery walls, exit signs, fire extinguisher cabinets in sfmoma galleries on levels 2-7. compliance with maher ordinance no 155-13 not required.Details
installation of temporary gallery walls, exit signs, fire extinguisher cabinets in sfmoma galleries on levels 2-7. compliance with maher ordinance no 155-13 not required. | $400,000 |
| Jul 29, 2015 | Never finaled issued Jul 2015, no final | 151 03rd St | street spaceDetails
street space | ||
| Jul 27, 2015 | Completed final sign-off Jun 2016 | 151 03rd St | Plant Construction Co, Lp | retail t-i construction of a full service restaurant on ground floor of an (e) museum. new interior wall portitions, interior mechanical, electrical, plumbing, lighting. food service equipment and interior finisher. type 1 hood/duct fire supression, l/s under sep. permit. n/a for maher ordinance.Details
retail t-i construction of a full service restaurant on ground floor of an (e) museum. new interior wall portitions, interior mechanical, electrical, plumbing, lighting. food service equipment and interior finisher. type 1 hood/duct fire supression, l/s under sep. permit. n/a for maher ordinance. | $3,000,000 |
| Jul 24, 2015 | Completed final sign-off Jun 2016 | 151 03rd St | Plant Construction Co, Lp | interior demolition of (e) build-out of cafe and assembly room for future restaurant tenant, space to remain vacant per ab-017; maher n/aDetails
interior demolition of (e) build-out of cafe and assembly room for future restaurant tenant, space to remain vacant per ab-017; maher n/a | $75,000 |
| Jul 10, 2015 | Completed final sign-off Apr 2016 | 151 03rd St | Webcor Construction Lp | revision to pa#201211093897 addendum #3, the revision includes one detail for elevator hoistway lighting and a copy of the fire service access elevator narrative. all related to fire alarm. n/a to ordinance #15-133.Details
revision to pa#201211093897 addendum #3, the revision includes one detail for elevator hoistway lighting and a copy of the fire service access elevator narrative. all related to fire alarm. n/a to ordinance #15-133. | |
| May 28, 2015 | Never finaled issued Jul 2015, no final | 151 03rd St | Plant Construction Co, Lp | modification to existing storefront and existing mechanical vents on g/f for a new a-2 occupancy restaurant. n/a ordinance #155-13. arch, mep, fire alarm and fire sprinkler submittals are under separate applicationDetails
modification to existing storefront and existing mechanical vents on g/f for a new a-2 occupancy restaurant. n/a ordinance #155-13. arch, mep, fire alarm and fire sprinkler submittals are under separate application | $150,000 |
| May 15, 2015 | Completed final sign-off Apr 2016 | 151 03rd St | Thomas Swan Sign Co Inc | moma expansion: 65 evacuation plan maps--floors b, 1st floor through 10th floor and roof. n/a for the maherDetails
moma expansion: 65 evacuation plan maps--floors b, 1st floor through 10th floor and roof. n/a for the maher | $19,500 |
| Apr 29, 2015 | Never finaled issued May 2015, no final | 151 03rd St | street spaceDetails
street space | ||
| Apr 10, 2015 | Completed final sign-off Apr 2016 | 151 03rd St | Webcor Construction Lp | revision to addendum #3 - mechanical fire control system and cals of heat load in fire service elevator machine roomDetails
revision to addendum #3 - mechanical fire control system and cals of heat load in fire service elevator machine room |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Thomas Swan Sign Co Inc (13), Plant Construction Co, Lp (10), Convergint Technologies Llc (6), Webcor Construction Lp (4), Desert Fire Protection Inc Of Nevada (3), Aaa Restaurant Fire Control/Dba Aaa Fire (2), Cosco Fire Protection Inc. (2), Allied Fire Protection, Romak Iron Works, Service West Inc
- Architects
- Duncan Ballash (5), Rebecca Sharkey (5), David Darling (3), Craig Edward Dykers (2), Jennifer Devlin
- Engineers
- David G. Kallmeyer (2), David G. Kallmeyer, David Johnson, Erik C Kneer, Geoffrey Bomba, John Wong, Steven T. Taylor
- Designers
- Duncan Ballash, Jennifer Devlin, Ment-Hsiu Chen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.