Rebecca C. Sharkey
- License
- C29382
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C29382 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Rebecca Sharkey
- On San Francisco permits
- Dec 2020 to Sep 2026
11 permits since 2000 (architect on 9 permits, engineer on 2 permits): 9 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Johnstone - Mc Auliffe Const. Inc. (3), Romak Iron Works
- Architects
- Duncan Ballash
- Engineers
- Erik C Kneer, Geoffrey Bomba
- Authorized agents
- Sam Gazale
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 2
- Other or unknown 8
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 2601 Mariposa St | level 3: add walls + alter interior layout to provide separate tenant division on level 3.Details
level 3: add walls + alter interior layout to provide separate tenant division on level 3. | $195,000 | |
| May 5, 2026 | Completed final sign-off Aug 2026 | 151 03rd St | 7/fl- (n) configuration of movable walls, construction of (n) temp walls. no change to monorail track, fire sprinklers, floor occupancy use or load. add (n) movable walls.Details
7/fl- (n) configuration of movable walls, construction of (n) temp walls. no change to monorail track, fire sprinklers, floor occupancy use or load. add (n) movable walls. | $110,000 | |
| Jan 21, 2026 | Completed final sign-off Apr 2026 | 151 03rd St | 6/fl- construction of walls for exhibit gallery upgrade to bathrooms toilet paper dispenserDetails
6/fl- construction of walls for exhibit gallery upgrade to bathrooms toilet paper dispenser | $110,000 | |
| Aug 25, 2025 | Completed final sign-off Sep 2025 | 151 03rd St | revision 202506178833- change location of movable walls and temp walls. change angle of (1) wall. no change to general plan layoutDetails
revision 202506178833- change location of movable walls and temp walls. change angle of (1) wall. no change to general plan layout | ||
| Jun 17, 2025 | Completed final sign-off Sep 2025 | 151 03rd St | Romak Iron Works | install structural strongbank support and ceiling monorailtrack in level 7 temp. exhibit gallery to support movable exhibit wall panels; const. & installation of movable wall panels; const. of temporary wall panels. scope only applies to layout on a2.2. additional changes require separate permit(s).Details
install structural strongbank support and ceiling monorailtrack in level 7 temp. exhibit gallery to support movable exhibit wall panels; const. & installation of movable wall panels; const. of temporary wall panels. scope only applies to layout on a2.2. additional changes require separate permit(s). | $197,000 |
| Aug 7, 2024 | In progress issued Aug 2024 | 2601 Mariposa St | new steel structure @ (e) roof deck to support 2 removable umbrellas. patch/repair (e) roofing as required for installationDetails
new steel structure @ (e) roof deck to support 2 removable umbrellas. patch/repair (e) roofing as required for installation | $30,000 | |
| Jun 25, 2024 | Completed final sign-off Nov 2024 | 147 Minna St | Johnstone - Mc Auliffe Const. Inc. | stair landing repair & matal stud wall w/ dry wall car accidentDetails
stair landing repair & matal stud wall w/ dry wall car accident | $40,000 |
| Jun 14, 2024 | Completed final sign-off Sep 2024 | 147 Minna St | Johnstone - Mc Auliffe Const. Inc. | revision to pa 202312112253 as required with sf abe rev 2 electric meter/panel interference abe 22211235318Details
revision to pa 202312112253 as required with sf abe rev 2 electric meter/panel interference abe 22211235318 | |
| Dec 11, 2023 | Completed final sign-off Sep 2024 | 147 Minna St | Johnstone - Mc Auliffe Const. Inc. | barrier removal work in (e) parking garage structure as required for comliance with san francisco accessible business entrance program - abe# 202211235318 operating force, r & r 10'x12'concrete rrampre-strip accessible route.Details
barrier removal work in (e) parking garage structure as required for comliance with san francisco accessible business entrance program - abe# 202211235318 operating force, r & r 10'x12'concrete rrampre-strip accessible route. | $83,240 |
| Feb 26, 2021 | Completed final sign-off Apr 2022 | 1429 Fulton St | remodel (e) kitchen including new cabinets, coutertops, appliances, ligthing and finishes, relocate rear exterior entry door/window and interior door opening to hallway, add pantry and hall closetDetails
remodel (e) kitchen including new cabinets, coutertops, appliances, ligthing and finishes, relocate rear exterior entry door/window and interior door opening to hallway, add pantry and hall closet | $20,000 | |
| Dec 1, 2020 | Completed final sign-off Sep 2021 | 151 03rd St | install temporary structural steel interface to support temporary mural display wall for exhibition. interface is between display structure and (e) building structure. no change to fire or life safety systems.Details
install temporary structural steel interface to support temporary mural display wall for exhibition. interface is between display structure and (e) building structure. no change to fire or life safety systems. | $50,000 |