Erik C Kneer
- Listed as
- engineer
- Firm
- Holmes Structures
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Mar 2022
7 permits since 2000 (engineer on 7 permits): 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 28, 2022 | Completed final sign-off Aug 2023 | 1 Zoo Rd | Ca Bear Construction | revise exhibit mesh enclosure layout and support columns as permitted on pa# 201912139568 and pa# 202105180495. (fossa habitat)Details
revise exhibit mesh enclosure layout and support columns as permitted on pa# 201912139568 and pa# 202105180495. (fossa habitat) | $10,000 |
| May 18, 2021 | Completed final sign-off Aug 2023 | 1 Zoo Rd | construct one baobab tree exhibit and install mesh enclosure for animal habitat exhibits. demo existing concrete low wall to accommodate new baobab tree exhibit. struct supt wrk for baobab tree. new outdoor lighting and lighting inside tree exhibit. new guard railing around animal habitat/exhibit.Details
construct one baobab tree exhibit and install mesh enclosure for animal habitat exhibits. demo existing concrete low wall to accommodate new baobab tree exhibit. struct supt wrk for baobab tree. new outdoor lighting and lighting inside tree exhibit. new guard railing around animal habitat/exhibit. | $100 | |
| Dec 1, 2020 | Completed final sign-off Sep 2021 | 151 03rd St | install temporary structural steel interface to support temporary mural display wall for exhibition. interface is between display structure and (e) building structure. no change to fire or life safety systems.Details
install temporary structural steel interface to support temporary mural display wall for exhibition. interface is between display structure and (e) building structure. no change to fire or life safety systems. | $50,000 | |
| Feb 26, 2020 | Completed final sign-off Jan 2021 | 100 John F Kennedy Dr | Finnegan Construction | (aka 625 john f kennedy dr - job site is in front of the conservatory of flowers) using engineered drawings - replace temporary installation of sculpture of flowerbed into permanent install by installing concrete footing, attching new base & scupture to new footing.Details
(aka 625 john f kennedy dr - job site is in front of the conservatory of flowers) using engineered drawings - replace temporary installation of sculpture of flowerbed into permanent install by installing concrete footing, attching new base & scupture to new footing. | $3,400 |
| Jan 26, 2016 | Completed final sign-off Jun 2016 | 1019 Union St | Moroso Construction Inc | soft story retrofit of the ground floor only to address the 2013 s.f. bldg code's administrative bulletin #107 ( ab107); th e2012 iebc appendix a-4 is used for retrofit design. n/a maher ordinanceDetails
soft story retrofit of the ground floor only to address the 2013 s.f. bldg code's administrative bulletin #107 ( ab107); th e2012 iebc appendix a-4 is used for retrofit design. n/a maher ordinance | $100,000 |
| Dec 9, 2015 | Expired or cancelled withdrawn Oct 2017 | 1455 Folsom St | convert industrial building to school change of use. add 2nd floor internal to envelop of existig building, not enlarging envelop (maher ordinance -extended - route to health for compliance with ordinance no.155-13)Details
convert industrial building to school change of use. add 2nd floor internal to envelop of existig building, not enlarging envelop (maher ordinance -extended - route to health for compliance with ordinance no.155-13) | $1,000,000 | |
| Oct 30, 2015 | Completed final sign-off Oct 2018 | 2698 California St | Nibbi Bros Assoc Inc. | moh rad priority project. life safety & accessibility improv,voluntary stru,upgrade,modernization or replace orig bldg systems. resident unit renovation & modifiy to common areas incl horiz addition of 396 sq ft.Details
moh rad priority project. life safety & accessibility improv,voluntary stru,upgrade,modernization or replace orig bldg systems. resident unit renovation & modifiy to common areas incl horiz addition of 396 sq ft. | $10,790,892 |