495 permits since 2000: 353 completed, 32 in progress, 88 never finaled, 22 expired or cancelled.
Of the 88 never-finaled permits, 6 are 3 to 5 years old, 33 are 5 to 10 years old, 49 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 495.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2026 | In progress filed Sep 2026, not yet issued | 1123 Sutter St | exterior roof top stainless spa hot tub for issued full permits. pa# 202411215452 (market rate 201 units). pa# 202411215486 (affordable 102 units).Details
exterior roof top stainless spa hot tub for issued full permits. pa# 202411215452 (market rate 201 units). pa# 202411215486 (affordable 102 units). | |
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 1123 Sutter St | generator fuel oil & piping for issued full permits: pa# 202411215452(market reate=201 units); pa# 202411215486(affordable=102 unnits)Details
generator fuel oil & piping for issued full permits: pa# 202411215452(market reate=201 units); pa# 202411215486(affordable=102 unnits) | |
| Aug 4, 2026 | In progress issued Sep 2026 | 1123 Sutter St | stormwater plans for issued full permits 202411215452 & 202411215486.Details
stormwater plans for issued full permits 202411215452 & 202411215486. | |
| Jul 30, 2026 | In progress issued Jul 2026 | 485 Irwin St | this permit is for the 2 test piles required in support of the issued building permit for the charging facility canopy foundation ref pa 202510248147Details
this permit is for the 2 test piles required in support of the issued building permit for the charging facility canopy foundation ref pa 202510248147 | |
| Jul 30, 2026 | In progress issued Jul 2026 | 465 Irwin St | subject of this permit is for the (2) test piles required in support of the issued building permit for the charging facility comply foundationsDetails
subject of this permit is for the (2) test piles required in support of the issued building permit for the charging facility comply foundations | |
| Jul 28, 2026 | In progress issued Aug 2026 | 967 Mission St | stormwater for issued pa # 202309227225 sDetails
stormwater for issued pa # 202309227225 s | |
| Jul 8, 2026 | In progress filed Jul 2026, not yet issued | 1201 08th St | demolish 1 (e) 1-story type-v storage shed/building.Details
demolish 1 (e) 1-story type-v storage shed/building. | $10,000 |
| Mar 31, 2026 | In progress issued May 2026 | 2348 Jerrold Av | new ada toilet. additional sprinklers. new exterior doorDetails
new ada toilet. additional sprinklers. new exterior door | $30,000 |
| Mar 12, 2026 | In progress issued Jul 2026 | 1601 Webster St | ed-1301: accessible path of travel improvements, r/r (e) yard fencing within property, remove all fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing,Details
ed-1301: accessible path of travel improvements, r/r (e) yard fencing within property, remove all fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing, | $7,561,942 |
| Mar 12, 2026 | In progress issued Jul 2026 | 1820 Post St | ed13-01:accessible path of travel improvements throughout, r/r (e) yard fencing within property, remove fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing,Details
ed13-01:accessible path of travel improvements throughout, r/r (e) yard fencing within property, remove fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing, | $7,561,942 |
| Mar 12, 2026 | In progress issued Jul 2026 | 1901 Sutter St | ed-1301: accessible path of travel improvements, r/r (e) yard fencing within property, remove all fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing,Details
ed-1301: accessible path of travel improvements, r/r (e) yard fencing within property, remove all fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing, | $5,747,076 |
| Feb 26, 2026 | Completed final sign-off Apr 2026 | 457 Minna St | revision to permit 202509084764 for correcting door swings per 11b-404 code including title 24.Details
revision to permit 202509084764 for correcting door swings per 11b-404 code including title 24. | |
| Jan 5, 2026 | In progress issued Mar 2026 | 1123 Sutter St | metal stiars for new construction re issued full permits: pa# 202411215452 (market rate). pa# 202411215486 (affordable)Details
metal stiars for new construction re issued full permits: pa# 202411215452 (market rate). pa# 202411215486 (affordable) | |
| Dec 19, 2025 | In progress issued Jan 2026 | 1123 Sutter St | permit for temporary tower crane erection for new construction high-rise buildingDetails
permit for temporary tower crane erection for new construction high-rise building | |
| Dec 2, 2025 | In progress issued Jun 2026 | 1201 08th St | fleet charge station/parking lot: demo of (e) pavement and structures 2 site grading,storm draining, paving, desiment and erosion control.housekeeping pad and fountain design of structure & equiment site lighting,electrical service and comm infrastructure.install 8ft fence & shade canopies,gate openDetails
fleet charge station/parking lot: demo of (e) pavement and structures 2 site grading,storm draining, paving, desiment and erosion control.housekeeping pad and fountain design of structure & equiment site lighting,electrical service and comm infrastructure.install 8ft fence & shade canopies,gate open | $3,361,665 |
| Dec 2, 2025 | In progress issued Jun 2026 | 465 Irwin St | demolition of (e) pavement & structurs. site grading, storm drainage, paving, sediment & erosion control. housekeeping pad & foundation design of structures & equipment. site lighting, electrical service & communication infrastrastructure. install 8' ornamental fence, shade canopies, lighting, gateDetails
demolition of (e) pavement & structurs. site grading, storm drainage, paving, sediment & erosion control. housekeeping pad & foundation design of structures & equipment. site lighting, electrical service & communication infrastrastructure. install 8' ornamental fence, shade canopies, lighting, gate | $6,189,760 |
| Nov 24, 2025 | Completed final sign-off Aug 2026 | 540 Mission Bay Blvd North Bl | adding 4 qty guest suites to existing 80 qty suites by adding unit entry door and adding shower to existing toilet rooms at flr 2-5. scope includes structural adjustments to existing wood shear walls to accommodate new shower entries. revision to pa #202508143093Details
adding 4 qty guest suites to existing 80 qty suites by adding unit entry door and adding shower to existing toilet rooms at flr 2-5. scope includes structural adjustments to existing wood shear walls to accommodate new shower entries. revision to pa #202508143093 | $7,500 |
| Oct 24, 2025 | In progress issued Jun 2026 | 485 Irwin St | demolition of (e) pavement & structurs. site grading, storm drainage, paving, sediment & erosion control. housekeeping pad & foundation design of structures & equipment. site lighting, electrical service & communication infrastrastructure. install 8' ornamental fence, shade canopies, lighting, gateDetails
demolition of (e) pavement & structurs. site grading, storm drainage, paving, sediment & erosion control. housekeeping pad & foundation design of structures & equipment. site lighting, electrical service & communication infrastrastructure. install 8' ornamental fence, shade canopies, lighting, gate | $5,975,169 |
| Oct 6, 2025 | Completed final sign-off Jun 2026 | 3433 03rd St | deferred curtainwall submittal, ref pa# 202408148660.Details
deferred curtainwall submittal, ref pa# 202408148660. | |
| Aug 14, 2025 | Completed final sign-off Aug 2026 | 540 Mission Bay Blvd North Bl | addition of showers at (e) accessible bathrooms located floors 2-5 at se corner of building. floors 3-5 showers will be made accessible. scope includes structrual adjustments to (e) wood shear walls to accommodate (n) shower entries/openingsDetails
addition of showers at (e) accessible bathrooms located floors 2-5 at se corner of building. floors 3-5 showers will be made accessible. scope includes structrual adjustments to (e) wood shear walls to accommodate (n) shower entries/openings | $225,000 |
| Aug 11, 2025 | Completed final sign-off Jan 2026 | 11 Frida Kahlo Wy | temporary stockpile locations of 26t (18k cy) of recycle class ii aggreage base material in an area 40wx95lx10h from sfo to site.Details
temporary stockpile locations of 26t (18k cy) of recycle class ii aggreage base material in an area 40wx95lx10h from sfo to site. | $200,000 |
| Aug 6, 2025 | In progress filed Aug 2025, not yet issued | 650 Divisadero St | to erect 10 stories, no basement, type i-a, 107 units (100% affordable housing). (r-2, a-3, s-2)Details
to erect 10 stories, no basement, type i-a, 107 units (100% affordable housing). (r-2, a-3, s-2) | $58,874,000 |
| Jul 14, 2025 | In progress issued Jan 2026 | 150 04th Ti St | priority 100% affortable project - erect a 5-story, no basement, type ii-a, 100 units of affordable senior housing with associated community and management spaces. (r-2,s-2,b)Details
priority 100% affortable project - erect a 5-story, no basement, type ii-a, 100 units of affordable senior housing with associated community and management spaces. (r-2,s-2,b) | $40,000,000 |
| Jun 16, 2025 | In progress issued May 2026 | 3433 03rd St | stormwater plan review for pa 202408148660.Details
stormwater plan review for pa 202408148660. | |
| May 9, 2025 | In progress issued Jan 2026 | 465 Irwin St | submittal to plumbing inspection division for adminstrative review of stormwater control plans associated with sfpuc storm water control plan.Details
submittal to plumbing inspection division for adminstrative review of stormwater control plans associated with sfpuc storm water control plan. | |
| May 9, 2025 | In progress issued Jan 2026 | 1201 08th St | submittal to plumbing inspection division for adminstrative review of stormwater control plans associated with sfpuc storm water control plan.Details
submittal to plumbing inspection division for adminstrative review of stormwater control plans associated with sfpuc storm water control plan. | |
| May 9, 2025 | In progress issued Jan 2026 | 485 Irwin St | submittal to plumbing inspection division for adminstrative review of stormwater control plans associated with sfpuc storm water control plan.Details
submittal to plumbing inspection division for adminstrative review of stormwater control plans associated with sfpuc storm water control plan. | |
| Apr 28, 2025 | Completed final sign-off Aug 2025 | 4220 Geary Bl | revision to addendum 2 for pa 202009305561- add a smoke partition wall and door to laundry room # 116, add elevator penthouse smoke detector access hatch and to include sffd ab2.05 fire smoke damper (fsd) info table in the mechanical drawing.Details
revision to addendum 2 for pa 202009305561- add a smoke partition wall and door to laundry room # 116, add elevator penthouse smoke detector access hatch and to include sffd ab2.05 fire smoke damper (fsd) info table in the mechanical drawing. | $50,000 |
| Feb 14, 2025 | In progress filed Feb 2025, not yet issued | 11 Innes Ct | final stormwater control plan for dbi plumbing division. renew of the new catch basin located at the parking garage driveway into new building along kennedy drive. see sheet note 122 on c-5.1 ref pa 2021-0426-9364Details
final stormwater control plan for dbi plumbing division. renew of the new catch basin located at the parking garage driveway into new building along kennedy drive. see sheet note 122 on c-5.1 ref pa 2021-0426-9364 | $40,000 |
| Feb 7, 2025 | Expired or cancelled withdrawn Feb 2025 | 1044 Howard St | revision to bpa #202305047097 to document code equivalency proposing egress door loading from the level 2 exterior terrace area back into the interior area to be lockable when building is not occupied.Details
revision to bpa #202305047097 to document code equivalency proposing egress door loading from the level 2 exterior terrace area back into the interior area to be lockable when building is not occupied. | |
| Jan 14, 2025 | Completed final sign-off Jun 2025 | 1044 Howard St | revision 202305047097 to document walls, door, mechanical, electrical, associated with fire alarm locationDetails
revision 202305047097 to document walls, door, mechanical, electrical, associated with fire alarm location | |
| Jan 2, 2025 | In progress issued Oct 2025 | 1123 Sutter St | this permit# 202411215452 is only for the 201 market rate housing units and for the mixed occupancies: r-2,a-3,m,e. 22 story over 1 basement, type 1a, fully sprinklered mixed use residential. the 102 affordable units and base, core, shell are under separate permit# 202411215486.Details
this permit# 202411215452 is only for the 201 market rate housing units and for the mixed occupancies: r-2,a-3,m,e. 22 story over 1 basement, type 1a, fully sprinklered mixed use residential. the 102 affordable units and base, core, shell are under separate permit# 202411215486. | $80,000,000 |
| Jan 2, 2025 | In progress issued Jun 2025 | 1123 Sutter St | this permit #202411215486 is only for the building base, core shell and 102 affordable units.22 story over 1 basement, type 1a, fully sprinklered mixed use residential.(r-2 occupancy only approved at this stage).the 201 market rate units and commercial spaces are under separate permit #202411215452.Details
this permit #202411215486 is only for the building base, core shell and 102 affordable units.22 story over 1 basement, type 1a, fully sprinklered mixed use residential.(r-2 occupancy only approved at this stage).the 201 market rate units and commercial spaces are under separate permit #202411215452. | $40,000,000 |
| Dec 23, 2024 | Completed final sign-off Mar 2025 | 1044 Howard St | administrative permit to remove the errcs requirement. due to passing results from field test.Details
administrative permit to remove the errcs requirement. due to passing results from field test. | |
| Dec 20, 2024 | Completed final sign-off Jun 2025 | 1044 Howard St | painted wall sign "united playaz"Details
painted wall sign "united playaz" | |
| Nov 20, 2024 | Completed final sign-off Apr 2025 | 1501 Sunnydale Av | revision to pa 202106031549 addendum 3 minor architectural & mechanical revisions to satisfy conditions of approval for addendum 6 fire alarm. scope includes adding smoke damper to ducting between janitor and laundry room at each residential level; adding smoke detector w/access panel, cage andDetails
revision to pa 202106031549 addendum 3 minor architectural & mechanical revisions to satisfy conditions of approval for addendum 6 fire alarm. scope includes adding smoke damper to ducting between janitor and laundry room at each residential level; adding smoke detector w/access panel, cage and | |
| Nov 12, 2024 | In progress issued Mar 2025 | 3433 03rd St | to erect 2 story, no basement, type v-b, union meeting hall & office building. (a-3,b,s-2)Details
to erect 2 story, no basement, type v-b, union meeting hall & office building. (a-3,b,s-2) | $15,551,608 |
| Nov 12, 2024 | Expired or cancelled withdrawn Dec 2024 | 3433 03rd St | excavation, fill & grading of site located at 3433-03rd street in preparation for new construction of carpenter's union hall & offices.Details
excavation, fill & grading of site located at 3433-03rd street in preparation for new construction of carpenter's union hall & offices. | $583,600 |
| Oct 15, 2024 | In progress issued Oct 2024 | 850 Turk St | 100% affordable housing altered site permit for adminstrative construction type change form 1a to 1b. no change in building design as approved under site permit. reference pa# 202212087884.Details
100% affordable housing altered site permit for adminstrative construction type change form 1a to 1b. no change in building design as approved under site permit. reference pa# 202212087884. | |
| Oct 7, 2024 | Completed final sign-off Apr 2025 | 1501 Sunnydale Av | the work covered by this application is minor architectural & mechanical revision to approved addendum 3,fa add 5(pa #202106031523) including 1) adding a smoke damper to ducting between the janitor & laundry room at each residential level. 2) adding a smoke detector with access panel, cage & louwerDetails
the work covered by this application is minor architectural & mechanical revision to approved addendum 3,fa add 5(pa #202106031523) including 1) adding a smoke damper to ducting between the janitor & laundry room at each residential level. 2) adding a smoke detector with access panel, cage & louwer | |
| Sep 24, 2024 | Completed final sign-off Jun 2025 | 1044 Howard St | ref 202305047097- deferred elevator submittal for structural, fire, and mep reviewDetails
ref 202305047097- deferred elevator submittal for structural, fire, and mep review | |
| Sep 23, 2024 | Completed final sign-off Jun 2025 | 1044 Howard St | level 2: decorative fence deferred submittal from issued permit 202305047097 for structural review.Details
level 2: decorative fence deferred submittal from issued permit 202305047097 for structural review. | |
| Sep 5, 2024 | Completed final sign-off Jun 2025 | 1044 Howard St | roof sound barrier deferred submittal from issued bpa 202305047097 for structural review.Details
roof sound barrier deferred submittal from issued bpa 202305047097 for structural review. | |
| Aug 30, 2024 | Completed final sign-off Jun 2025 | 1044 Howard St | storefront and operable walls deferred submittal from issued bpa# 202305047097 for structural review.Details
storefront and operable walls deferred submittal from issued bpa# 202305047097 for structural review. | |
| Aug 13, 2024 | Completed final sign-off Jun 2025 | 1044 Howard St | deferred submittal for 202305047097 to include (n) interior metal stairs and guardrails.Details
deferred submittal for 202305047097 to include (n) interior metal stairs and guardrails. | |
| Jun 5, 2024 | Completed final sign-off Jun 2025 | 1044 Howard St | revision to bpa:2023.0504.7097 to document demo/ removal of final structural wall in field to abate nov: 202424433Details
revision to bpa:2023.0504.7097 to document demo/ removal of final structural wall in field to abate nov: 202424433 | |
| Feb 13, 2024 | Completed final sign-off May 2024 | 650 Linden St | for pid plan check: review of final stormwater control systems, 100% affordable housing, ref pa# 201912270759, 201912270764, 201912270765, 201912270766, 201912270767, 201912270768 & 201912270769.Details
for pid plan check: review of final stormwater control systems, 100% affordable housing, ref pa# 201912270759, 201912270764, 201912270765, 201912270766, 201912270767, 201912270768 & 201912270769. | |
| Jan 4, 2024 | In progress issued May 2024 | 11 Innes Ct | revision to pa # 202104269364 s2 & s3 to revise rooms 114 & 116 rating to match adjoining garage area rating of s-2 for removal of fsd at mech ducts; revise elevator penthouse to add ul listed rate access hatch for smoke detector.Details
revision to pa # 202104269364 s2 & s3 to revise rooms 114 & 116 rating to match adjoining garage area rating of s-2 for removal of fsd at mech ducts; revise elevator penthouse to add ul listed rate access hatch for smoke detector. | |
| Oct 24, 2023 | Completed final sign-off Nov 2023 | 420 Taylor St | relocate existing wall + floor mounted bike racks so as to comply with 1a bulletin no.9 only. no other work is proposed.Details
relocate existing wall + floor mounted bike racks so as to comply with 1a bulletin no.9 only. no other work is proposed. | |
| Oct 16, 2023 | Completed final sign-off Feb 2025 | 1501 Sunnydale Av | priority processing per ab-004 & under mayor ed 13-01 & 17-02 - erection of (1) tower crane for new construction under pa 202106031523Details
priority processing per ab-004 & under mayor ed 13-01 & 17-02 - erection of (1) tower crane for new construction under pa 202106031523 | $38,439 |
| Sep 22, 2023 | In progress issued Aug 2024 | 967 Mission St | mayoral ed 13-01 priority process ab004 - erect 9-story residential apartment building, 95 dwelling units with no basement,type 1a.Details
mayoral ed 13-01 priority process ab004 - erect 9-story residential apartment building, 95 dwelling units with no basement,type 1a. | $61,000,000 |
| Aug 30, 2023 | Completed final sign-off Jun 2024 | 78 Johnson St | revision to pa# 201912139581 s1. plans of the roof penthouse were altered to show location of access hatch & smoke detector cage at the top of elevator shaft.Details
revision to pa# 201912139581 s1. plans of the roof penthouse were altered to show location of access hatch & smoke detector cage at the top of elevator shaft. | |
| Aug 9, 2023 | Never finaled issued Aug 2023, no final | 355 Avocet Wy | priortiy process - 100% affordable housing project. revision to pa #202205043564: tiebacks from adjacent shoring systems at 351 freidell st. reference pa #201910083919 s2 & #202307283193.Details
priortiy process - 100% affordable housing project. revision to pa #202205043564: tiebacks from adjacent shoring systems at 351 freidell st. reference pa #201910083919 s2 & #202307283193. | |
| May 4, 2023 | Completed final sign-off Jun 2025 | 1044 Howard St | alteration & change of use and occupancy to the existing vacant 2-story bldg.new use will be community hall.project includes renovation & seismic rehabilitaion of existing structure.Details
alteration & change of use and occupancy to the existing vacant 2-story bldg.new use will be community hall.project includes renovation & seismic rehabilitaion of existing structure. | $3,500,000 |
| Feb 28, 2023 | Completed final sign-off Feb 2025 | 11 Innes Ct | deferred permit for shoring to site permit bpa#2021-0426-9364-sDetails
deferred permit for shoring to site permit bpa#2021-0426-9364-s | |
| Dec 23, 2022 | In progress issued Mar 2024 | 725 Davis St | warm shell t.i. for a future cafe tenant. mep work to be design-buildDetails
warm shell t.i. for a future cafe tenant. mep work to be design-build | $927,000 |
| Oct 28, 2022 | Never finaled issued Mar 2023, no final | 201 West Point Rd | mohcd. lot 3 & 4 temporary shoring as noted on the shoring design plansDetails
mohcd. lot 3 & 4 temporary shoring as noted on the shoring design plans | $900,000 |
| Jul 28, 2022 | In progress issued Jan 2025 | 11 Frida Kahlo Wy | bldg e - mayor's ed# 17-02. erect a 7-story, type 3a over type 1a construction, with 128 residential units & community facility.Details
bldg e - mayor's ed# 17-02. erect a 7-story, type 3a over type 1a construction, with 128 residential units & community facility. | $72,464,450 |
| Jul 27, 2022 | Expired or cancelled cancelled Nov 2023 | 645 Linden St | permit revision for removal of unit# 683 linden from pa# 2019-1227-0767 bldg 5 at 645 linden. to remove scope of work in unit# 683.Details
permit revision for removal of unit# 683 linden from pa# 2019-1227-0767 bldg 5 at 645 linden. to remove scope of work in unit# 683. | |
| Jun 17, 2022 | Completed final sign-off May 2024 | 78 Johnson St | operation of potain mdt 219-j10 tower crane for erecting 7-story affordable housing apartment building. heaviest load = 7,000 lbs of rebar. crane foundation shell on grade. ref pa# 202206176610 sDetails
operation of potain mdt 219-j10 tower crane for erecting 7-story affordable housing apartment building. heaviest load = 7,000 lbs of rebar. crane foundation shell on grade. ref pa# 202206176610 s | $90,000 |
| May 4, 2022 | Completed final sign-off Oct 2023 | 474 Valencia St | ste 230: interior tenant improvement to (e) office space with new finishes, lighting, & hvac modifications. replace (e) 13 windows.Details
ste 230: interior tenant improvement to (e) office space with new finishes, lighting, & hvac modifications. replace (e) 13 windows. | $300,000 |
| May 4, 2022 | Never finaled issued May 2023, no final | 355 Avocet Wy | 100% afordable housing project.tiebacks from adjacent shoring sytems at 351 friedell st. reference bpa#201910083919-s2Details
100% afordable housing project.tiebacks from adjacent shoring sytems at 351 friedell st. reference bpa#201910083919-s2 | |
| May 3, 2022 | Expired or cancelled withdrawn May 2023 | 570 Innes Av | 100% affordable housing project. tieback and underpinning from adjacent shoring systems at 151 friedell street. ref pa# 2019-1008-3908 s2.Details
100% affordable housing project. tieback and underpinning from adjacent shoring systems at 151 friedell street. ref pa# 2019-1008-3908 s2. | |
| May 3, 2022 | Expired or cancelled withdrawn May 2023 | 551 Hudson Av | 100% affordable housing project. tieback and underpinning from adjacent shoring systems at 151 friedell street. ref pa# 2019-1008-3908 s2.Details
100% affordable housing project. tieback and underpinning from adjacent shoring systems at 151 friedell street. ref pa# 2019-1008-3908 s2. | |
| Mar 23, 2022 | Completed final sign-off May 2022 | 1049 Golden Gate Av | commen area - revised civil plans to show access gates & grade elevations to coordinate with (e) sidewalks original app 2019-0626-4459.Details
commen area - revised civil plans to show access gates & grade elevations to coordinate with (e) sidewalks original app 2019-0626-4459. | |
| Mar 7, 2022 | Never finaled issued Jun 2022, no final | 650 Linden St | revision for scope market by mod as "deferred approval" on sheet l103 + l700 during permit review. scope is limited to accessible paths for pa# 201912270759, 201912270764, 201912270766, 201912270767, 201912270768, 201912270769.Details
revision for scope market by mod as "deferred approval" on sheet l103 + l700 during permit review. scope is limited to accessible paths for pa# 201912270759, 201912270764, 201912270766, 201912270767, 201912270768, 201912270769. | |
| Jan 28, 2022 | Completed final sign-off Apr 2022 | 588 Mission Bay Blvd North Bl | repairs to (e) laundry room including structural repairs. replacement of damaged roofing & revisions to mechanical system.Details
repairs to (e) laundry room including structural repairs. replacement of damaged roofing & revisions to mechanical system. | $350,000 |
| Dec 17, 2021 | In progress issued Nov 2025 | 1101 Sutter St | priority processing per ab-004. ground floor of the existing concrete building will receive new infill storefront & garage door on sutter st. garage door on larkin st to be removed & infilled with concrete/window. interior improvements include new exit staris and new retail space.Details
priority processing per ab-004. ground floor of the existing concrete building will receive new infill storefront & garage door on sutter st. garage door on larkin st to be removed & infilled with concrete/window. interior improvements include new exit staris and new retail space. | $1,000,000 |
| Oct 12, 2021 | Never finaled issued Dec 2021, no final | 290 Malosi St | rev to pa 201806202372. revise bathroom from bathtubs to rolling showers in units, 302a, 304a, 310a, 302b, 307b, 309b, 402a, 404a, 410a, 402b, 408b, 410b, 502a, 504a, 510a, 502b, 508b, 510b. per exception of cbc 11-b-608.4 shower seats will not be provided in residential units provided that reinforcDetails
rev to pa 201806202372. revise bathroom from bathtubs to rolling showers in units, 302a, 304a, 310a, 302b, 307b, 309b, 402a, 404a, 410a, 402b, 408b, 410b, 502a, 504a, 510a, 502b, 508b, 510b. per exception of cbc 11-b-608.4 shower seats will not be provided in residential units provided that reinforc | $10,000 |
| Sep 23, 2021 | Never finaled issued Oct 2021, no final | 650 Linden St | adminstrative permit to remove street tree irrigation as shown on sheets l400, l401, l402, l403, l404. ref. bpa #'s 20191227-0759, -0764, -0765, -0766, -0767, -0768, -0769. mayoral ed-13-01. 100% affordable housing. proposed irrigation was never installed.Details
adminstrative permit to remove street tree irrigation as shown on sheets l400, l401, l402, l403, l404. ref. bpa #'s 20191227-0759, -0764, -0765, -0766, -0767, -0768, -0769. mayoral ed-13-01. 100% affordable housing. proposed irrigation was never installed. | |
| Sep 14, 2021 | Completed final sign-off Dec 2021 | 1990 Folsom St | administrative submittal to 202102245214 r1 for mod review of commercial space restroomsDetails
administrative submittal to 202102245214 r1 for mod review of commercial space restrooms | |
| Aug 9, 2021 | Completed final sign-off Sep 2023 | 3434 18th St | proposed conversion of garage (6 parking spaces) into 3 accessory dwelling units. includes structural, mechanical, electrical, & plumbing work. addition of dwelling units per ordinance nos. 162-16, 95-17 & 162-17.Details
proposed conversion of garage (6 parking spaces) into 3 accessory dwelling units. includes structural, mechanical, electrical, & plumbing work. addition of dwelling units per ordinance nos. 162-16, 95-17 & 162-17. | $600,000 |
| Aug 4, 2021 | Completed final sign-off Sep 2023 | 3434 18th St | interior remodels of units 1, 2, 3, 4, 5, 6, 7 & 8 and common areas. includes mechanical, electrical and plumbing work. no structural work. executive directive 13-01 (100% affordable priority process) privately funded.Details
interior remodels of units 1, 2, 3, 4, 5, 6, 7 & 8 and common areas. includes mechanical, electrical and plumbing work. no structural work. executive directive 13-01 (100% affordable priority process) privately funded. | $360,000 |
| Jun 3, 2021 | Completed final sign-off Apr 2025 | 1501 Sunnydale Av | sunnydale block 3a (lot 3)-priority 100% housing project. to erect 5-story, 4 stories of type 5 over 1 story of type 1, mixed use bldg with child center, retail, restaurants, wellness center and 80 residential units.Details
sunnydale block 3a (lot 3)-priority 100% housing project. to erect 5-story, 4 stories of type 5 over 1 story of type 1, mixed use bldg with child center, retail, restaurants, wellness center and 80 residential units. | $53,000,000 |
| Jun 3, 2021 | Completed final sign-off Oct 2021 | 3138 Kamille Ct | mayoral ed13-01.interior-repair/replacement include new paint, flooring, plumbing fixtures, smoke & carbon monoxide detectors, light fixtures, door hardware, & hvac equipment. exterior-changing (e) door to a window, exterior light fixtures & signage. no addition/additional condition space proposedDetails
mayoral ed13-01.interior-repair/replacement include new paint, flooring, plumbing fixtures, smoke & carbon monoxide detectors, light fixtures, door hardware, & hvac equipment. exterior-changing (e) door to a window, exterior light fixtures & signage. no addition/additional condition space proposed | $375,000 |
| May 20, 2021 | Never finaled filed May 2021, never issued | 212 Ritch St | erect new five story(s), type 3a, office & restaurant buildingDetails
erect new five story(s), type 3a, office & restaurant building | $4,500,000 |
| Apr 26, 2021 | Completed final sign-off Nov 2025 | 11 Innes Ct | 100% affordable housing. erect a 5 stories, 73 dwelling unit with residential and offices type 1 building with no basement.Details
100% affordable housing. erect a 5 stories, 73 dwelling unit with residential and offices type 1 building with no basement. | $28,704,000 |
| Mar 30, 2021 | Completed final sign-off Nov 2021 | 1340 04th St | first time t.i to one vacant 'e' retail space on level 1 cold shell in a recently completed podium. project area is approx. 1057 sq.ft including a storage closet and kitchenette to serve as a mission bay community food hub in partnership with sf marin food bank.Details
first time t.i to one vacant 'e' retail space on level 1 cold shell in a recently completed podium. project area is approx. 1057 sq.ft including a storage closet and kitchenette to serve as a mission bay community food hub in partnership with sf marin food bank. | $95,130 |
| Feb 24, 2021 | Completed final sign-off Dec 2021 | 1990 Folsom St | add 9 ground floor public restrooms & 2 janitor's closets to the scope of a 100% affordable housing project pa# 201707051030.Details
add 9 ground floor public restrooms & 2 janitor's closets to the scope of a 100% affordable housing project pa# 201707051030. | $50,000 |
| Feb 4, 2021 | Completed final sign-off Oct 2021 | 150 Golden Gate Av | adding 3 new unisex bathrooms & a laundry space at ground floor of existing building.Details
adding 3 new unisex bathrooms & a laundry space at ground floor of existing building. | $105,000 |
| Jan 29, 2021 | Never finaled issued Apr 2021, no final | 301 Buchanan St | administrative recognition & correction of occupancy, from b occupancy to e occupancy (daycare). no work under this permit. reference to permit application #201908148760.Details
administrative recognition & correction of occupancy, from b occupancy to e occupancy (daycare). no work under this permit. reference to permit application #201908148760. | |
| Jan 15, 2021 | Never finaled issued Apr 2021, no final | 3115 Kamille Ct | 100% affordable housing: replace existing floor & wall finishes, existing plumbing fixtures, and existing light fixture with new in existing building 10 resident services restroom. plumbing fixtures and light fixture to remain in same location.Details
100% affordable housing: replace existing floor & wall finishes, existing plumbing fixtures, and existing light fixture with new in existing building 10 resident services restroom. plumbing fixtures and light fixture to remain in same location. | $30,000 |
| Dec 16, 2020 | Completed final sign-off Dec 2023 | 45 Onondaga Av | core & shell upgrades only including new mechanical system, new structural framing associated with new rooftop mechanical unit. replacing plumbing lines in kind. new sprinkler system. new electrical & fire alarm.Details
core & shell upgrades only including new mechanical system, new structural framing associated with new rooftop mechanical unit. replacing plumbing lines in kind. new sprinkler system. new electrical & fire alarm. | $150,000 |
| Nov 30, 2020 | Completed final sign-off Nov 2021 | 420 Taylor St | revision to bpa# 201901160492. this application is for the review and approval of design/build interior steel stairs. the attached shop drawings and calculations have been reviewed and approved by the project architect and structural engineer.Details
revision to bpa# 201901160492. this application is for the review and approval of design/build interior steel stairs. the attached shop drawings and calculations have been reviewed and approved by the project architect and structural engineer. | $150,000 |
| Sep 30, 2020 | Completed final sign-off Aug 2025 | 4200 Geary Bl | 100% affordable housing. to erect a type 1-a, 7-story, 98 senior residential units over ground floor commerical space. open space includes a rear yard and two 7th floor open spaces. all units are adaptable or mobility units. to be on 3 lots 1438-017a, 017 and 016.Details
100% affordable housing. to erect a type 1-a, 7-story, 98 senior residential units over ground floor commerical space. open space includes a rear yard and two 7th floor open spaces. all units are adaptable or mobility units. to be on 3 lots 1438-017a, 017 and 016. | $44,800,000 |
| Sep 30, 2020 | Completed final sign-off Aug 2025 | 4200 Geary Bl | to demolish a 2-story, mortuary with one basement.Details
to demolish a 2-story, mortuary with one basement. | $224,982 |
| Sep 4, 2020 | Completed final sign-off Nov 2021 | 420 Taylor St | revision to pa #2019-0116-0492: revise the extension of the (e) traction elevator serving the 1st through 4th floor to the newly converted basement level office space.Details
revision to pa #2019-0116-0492: revise the extension of the (e) traction elevator serving the 1st through 4th floor to the newly converted basement level office space. | $195,000 |
| Aug 20, 2020 | Completed final sign-off Feb 2024 | 35 Onondaga Av | tenant improvement. demo of non-historic, non-load bearing partitions; addition of partitions, plumbing & electrical and mechanical equipment and the preservation of historic elements.Details
tenant improvement. demo of non-historic, non-load bearing partitions; addition of partitions, plumbing & electrical and mechanical equipment and the preservation of historic elements. | $2,400,000 |
| Aug 17, 2020 | Completed final sign-off Feb 2021 | 490 South Van Ness Av | revision to pa# 201010052342-s2 (arch / mep) & altered site pa# 201710110918. revision to documented elevator cab dimensions on sheet a6.41 to match otis provided cab size & gurney requirements. ** maher: n/a **Details
revision to pa# 201010052342-s2 (arch / mep) & altered site pa# 201710110918. revision to documented elevator cab dimensions on sheet a6.41 to match otis provided cab size & gurney requirements. ** maher: n/a ** | |
| Feb 4, 2020 | Completed final sign-off Feb 2021 | 490 South Van Ness Av | revision to issued s2(arch/mep)for: pa#2017-10-11-0918 s2 & pa#2010-10-05-2342 s2; elevator smoke detector access hatch detail.Details
revision to issued s2(arch/mep)for: pa#2017-10-11-0918 s2 & pa#2010-10-05-2342 s2; elevator smoke detector access hatch detail. | |
| Jan 9, 2020 | Completed final sign-off Jan 2020 | 2675 Geary Bl | building c, lot a. revision to app#201708023634 s2. 2 new designated bicycle parking for 18 additional class 1 bike stalls in the protected parking garage.Details
building c, lot a. revision to app#201708023634 s2. 2 new designated bicycle parking for 18 additional class 1 bike stalls in the protected parking garage. | |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 650 Linden St | bldg 3. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 3. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $4,473,000 |
| Dec 27, 2019 | Never finaled issued Jan 2021, no final | 645 Linden St | bldg 5. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements.maher n/a.Details
bldg 5. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements.maher n/a. | $2,130,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 695 Buchanan St | bldg 2. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 2. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $1,278,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 550 Webster St | bldg 4. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 4. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $1,278,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 500 Webster St | bldg 7. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 7. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $1,278,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 751 Hayes St | bldg 1. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 1. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $4,260,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 650 Fell St | bldg 6. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 6. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $3,408,000 |
| Dec 23, 2019 | Never finaled issued Dec 2019, no final | 1150 03rd St | street spaceDetails
street space | |
| Dec 18, 2019 | Completed final sign-off Apr 2021 | 188 Hooper St | revision to pa# 2018-0216-1503 s3: to include permanent gate at entry to court 2 on hooper; additional permanent gate at entry to court 2 on channel st; and temporary gates out of 184 hooper while court 2 is under counstructionDetails
revision to pa# 2018-0216-1503 s3: to include permanent gate at entry to court 2 on hooper; additional permanent gate at entry to court 2 on channel st; and temporary gates out of 184 hooper while court 2 is under counstruction | $300,000 |