Nibbi Bros Assoc Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Sep 2026
- Last 24 months
- 40 permits filed
495 permits since 2000: 353 completed, 32 in progress, 88 never finaled, 22 expired or cancelled.
Of the 88 never-finaled permits, 6 are 3 to 5 years old, 33 are 5 to 10 years old, 49 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
5 deck permits: 5 completed. Typically 36 days from filing to permit and 209 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2019 | Completed final sign-off Apr 2021 | 188 Hooper St | rev to pa# 201802161503 to use fire blocking instead of type x to the bottom of ply decksDetails
rev to pa# 201802161503 to use fire blocking instead of type x to the bottom of ply decks | |
| May 9, 2019 | Completed final sign-off Mar 2020 | 2445 Mariposa St | six exterior bridges ( bridges 1 to bridge 6 ) and adjacent exterior decks to be repaired w/ "replace in-kind" approach. 2nd flr exterior deck at stair 7 to be repaired w/ "replace in-kind" approach.Details
six exterior bridges ( bridges 1 to bridge 6 ) and adjacent exterior decks to be repaired w/ "replace in-kind" approach. 2nd flr exterior deck at stair 7 to be repaired w/ "replace in-kind" approach. | $200,000 |
| Jan 22, 2019 | Completed final sign-off Nov 2021 | 420 Taylor St | interior concrete demo of slab on grade and interior drive ramp as well as a portion of upper level concrete deck. n/a for maherDetails
interior concrete demo of slab on grade and interior drive ramp as well as a portion of upper level concrete deck. n/a for maher | $750,000 |
| Sep 1, 2016 | Completed final sign-off Jul 2017 | 1964 Union St | remodel of ground floor retail space, including re-framing raised floor to be level; removal of rear bsement doors & window, construction of (n) ground floor rear deck 6' above grade. also remodel of 2 apts on 2nd floor. (n) entry door & gate @ street. (e) rear storage shed to remain. mep under sepDetails
remodel of ground floor retail space, including re-framing raised floor to be level; removal of rear bsement doors & window, construction of (n) ground floor rear deck 6' above grade. also remodel of 2 apts on 2nd floor. (n) entry door & gate @ street. (e) rear storage shed to remain. mep under sep | $80,000 |
| Aug 27, 2009 | Completed final sign-off Jan 2010 | 150 Britton St | replace (e) guardrails @ six locations to repair dry rot damage & prevent future damage. replace (e) wood rails @ 6 stairs with steel pipe rails. paint rails. resurface & waterproof existing decks. no structural work.Details
replace (e) guardrails @ six locations to repair dry rot damage & prevent future damage. replace (e) wood rails @ 6 stairs with steel pipe rails. paint rails. resurface & waterproof existing decks. no structural work. | $299,967 |