| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 2, 2024 | Completed final sign-off Feb 2024 | 184 Hooper St | Everon Llc | fire alarm ti add 1 duct detector for mua shutdown ref pa 2022-0921-2902Details
fire alarm ti add 1 duct detector for mua shutdown ref pa 2022-0921-2902 | $1,500 |
| May 12, 2023 | Completed final sign-off Mar 2024 | 184 Hooper St | Ayoob & Peery Plumbing Co Inc | 2/f: add 1 relocate 1 fire sprinkler per t.i. ref pa# 2022-0921-2902Details
2/f: add 1 relocate 1 fire sprinkler per t.i. ref pa# 2022-0921-2902 | $1,242 |
| Sep 21, 2022 | Completed final sign-off May 2024 | 184 Hooper St | Johnstone - Mc Auliffe Const. Inc. | new dust collector for school woodshop - 2nd flr exterior. ref 202204222827.Details
new dust collector for school woodshop - 2nd flr exterior. ref 202204222827. | $50,000 |
| Jul 6, 2022 | Completed final sign-off Aug 2022 | 184 Hooper St | Ayoob & Peery Plumbing Co Inc | 2/f: add 2, relocate 13, change out 3 fire sprinkler heads per t.i. pa 202204222827.Details
2/f: add 2, relocate 13, change out 3 fire sprinkler heads per t.i. pa 202204222827. | $4,650 |
| Apr 22, 2022 | Completed final sign-off May 2024 | 184 Hooper St | Johnstone - Mc Auliffe Const. Inc. | interior tenant improvement, non structural, approx. 9200 sq ft.Details
interior tenant improvement, non structural, approx. 9200 sq ft. | $140,000 |
| Jul 28, 2020 | Completed final sign-off Apr 2021 | 188 Hooper St | International Fire Equipment Co Incorpor | installation of (2) ul 300 fire systems.Details
installation of (2) ul 300 fire systems. | $10,000 |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 188 Hooper St | street spaceDetails
street space | ||
| Dec 18, 2019 | Completed final sign-off Apr 2021 | 188 Hooper St | Nibbi Bros Assoc Inc. | revision to pa# 2018-0216-1503 s3: to include permanent gate at entry to court 2 on hooper; additional permanent gate at entry to court 2 on channel st; and temporary gates out of 184 hooper while court 2 is under counstructionDetails
revision to pa# 2018-0216-1503 s3: to include permanent gate at entry to court 2 on hooper; additional permanent gate at entry to court 2 on channel st; and temporary gates out of 184 hooper while court 2 is under counstruction | $300,000 |
| Oct 1, 2019 | Completed final sign-off Apr 2021 | 188 Hooper St | Nibbi Bros Assoc Inc. | rev to pa# 201802161503 to use fire blocking instead of type x to the bottom of ply decksDetails
rev to pa# 201802161503 to use fire blocking instead of type x to the bottom of ply decks | |
| Sep 24, 2019 | Never finaled issued Oct 2019, no final | 188 Hooper St | Nibbi Bros Assoc Inc. | assembly permit ref 201802161503 s3Details
assembly permit ref 201802161503 s3 | |
| Jul 26, 2019 | Completed final sign-off Apr 2021 | 186 Hooper St | per pa #201802161503, add address to dinning hall to apn #3808/004 as; 186 hooper st and add/change adress to pa #201802161503 as; 186, 188 hooper street.Details
per pa #201802161503, add address to dinning hall to apn #3808/004 as; 186 hooper st and add/change adress to pa #201802161503 as; 186, 188 hooper street. | ||
| May 15, 2019 | Never finaled issued Jun 2019, no final | 188 Hooper St | street spaceDetails
street space | ||
| Apr 24, 2019 | Completed final sign-off Jun 2019 | 184 Hooper St | Johnstone - Mc Auliffe Const. Inc. | 1st flr bathrooms - new plumbing fixtures, new paritionsDetails
1st flr bathrooms - new plumbing fixtures, new paritions | $200,000 |
| Feb 21, 2019 | Completed final sign-off Apr 2021 | 188 Hooper St | Nibbi Bros Assoc Inc. | administrative permit for sffd review of truck turnking templates in association with bpa #2018-0216-1503.Details
administrative permit for sffd review of truck turnking templates in association with bpa #2018-0216-1503. | |
| Feb 14, 2019 | Completed final sign-off Nov 2020 | 188 Hooper St | Nibbi Bros Inc. | revision to 201807114315 to reflect field conditions and revised calculationsDetails
revision to 201807114315 to reflect field conditions and revised calculations | |
| Dec 5, 2018 | Completed final sign-off Apr 2021 | 188 Hooper St | rough grading for permit 2018-0216-1503 excavate 2300 cubic yard & fill 120 cubic yardDetails
rough grading for permit 2018-0216-1503 excavate 2300 cubic yard & fill 120 cubic yard | ||
| Nov 28, 2018 | Completed final sign-off Dec 2019 | 188 Hooper St | Nibbi Bros Assoc Inc. | drill displacement piles for site permit 2018-0216-1503. note: fee's for this work scope have been paid under the site permit. this is a $1.00 permit.Details
drill displacement piles for site permit 2018-0216-1503. note: fee's for this work scope have been paid under the site permit. this is a $1.00 permit. | $70,000 |
| Sep 13, 2018 | Never finaled issued Sep 2018, no final | 184 Hooper St | Red Hawk Fire & Security Ca Llc | relocate 1 exg facu, 1 extg annunciator, 1 extg weatherproof manual pull station, and 1 extg module as shown. add 1 smoke detector. 1 wireless communicator. remove extg nofication and initiating devices at demolished area shown o plan. ref app#201802161494Details
relocate 1 exg facu, 1 extg annunciator, 1 extg weatherproof manual pull station, and 1 extg module as shown. add 1 smoke detector. 1 wireless communicator. remove extg nofication and initiating devices at demolished area shown o plan. ref app#201802161494 | $8,000 |
| Sep 6, 2018 | Completed final sign-off Apr 2021 | 188 Hooper St | Nibbi Bros Inc. | storm water control system in connection with construction of five story bldg #2018/0216/1503Details
storm water control system in connection with construction of five story bldg #2018/0216/1503 | |
| Aug 10, 2018 | Completed final sign-off Oct 2018 | 188 Hooper St | Ferma Corporation, Nibbi Bros Assoc Inc. | bldg 3. demolition of a one-story, type iib building. maher n/a. (ref:bldg 1 - demo appl# 2018-02-16-1494).Details
bldg 3. demolition of a one-story, type iib building. maher n/a. (ref:bldg 1 - demo appl# 2018-02-16-1494). | |
| Aug 10, 2018 | Completed final sign-off Oct 2018 | 188 Hooper St | Ferma Corporation, Nibbi Bros Assoc Inc. | bldg 2. demolition of a one-story, type iib building. maher n/a. ref bldg 1 - demo appl# 2018-02-16-1494.Details
bldg 2. demolition of a one-story, type iib building. maher n/a. ref bldg 1 - demo appl# 2018-02-16-1494. | |
| Jul 11, 2018 | Completed final sign-off Apr 2021 | 188 Hooper St | Value Fire Protection Inc | underground fire line installationDetails
underground fire line installation | $13,500 |
| Feb 16, 2018 | Completed final sign-off Oct 2018 | 188 Hooper St | Ferma Corporation, Nibbi Bros Assoc Inc. | bldg 1. priority processing. demolition of a one-story, type iib building. maher n/a.Details
bldg 1. priority processing. demolition of a one-story, type iib building. maher n/a. | $120,000 |
| Feb 16, 2018 | Completed final sign-off Apr 2021 | 188 Hooper St | Nibbi Bros Assoc Inc. | to erect 5 stories, no basement, type iii-b over i-a, 280 dwelling unit building for residential student housing. (r-2,a-2,s-2) maher ordinance comply.Details
to erect 5 stories, no basement, type iii-b over i-a, 280 dwelling unit building for residential student housing. (r-2,a-2,s-2) maher ordinance comply. | $28,600,000 |
| Nov 28, 2016 | Never finaled issued Dec 2016, no final | 188 Hooper St | Dpr Construction | temporary shoring and excavation along property line at 150 hooper to accomodate future new construction at 150 hooperDetails
temporary shoring and excavation along property line at 150 hooper to accomodate future new construction at 150 hooper | $50,000 |
| Jun 8, 2015 | Completed final sign-off Oct 2015 | 184 Hooper St | Johnstone - Mc Auliffe Const. Inc. | interior work only, this project consists of the demolition of existing partial height partitions. accessible restrooms, elevator and path of travel are existing to remain. n/a ordinance #155-13Details
interior work only, this project consists of the demolition of existing partial height partitions. accessible restrooms, elevator and path of travel are existing to remain. n/a ordinance #155-13 | $80,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nibbi Bros Assoc Inc. (9), Johnstone - Mc Auliffe Const. Inc. (4), Ferma Corporation (3), Ayoob & Peery Plumbing Co Inc (2), Nibbi Bros Inc. (2), Dpr Construction, Everon Llc, International Fire Equipment Co Incorpor, Red Hawk Fire & Security Ca Llc, Value Fire Protection Inc
- Architects
- Neil Kaye (6), Joshua Cohn (2), Neil Kaye (2), Mark T. Jensen
- Engineers
- Alan Robinson, Chris Warner, Dennis Cheung, Manish Dalia, Tom Farrell, Yue Xu
- Attorneys
- Charlotte Hofstter
- Authorized agent-otherss
- Sam Gazale
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.