George Wong
- Listed as
- architect, authorized agent-others, engineer
- Firm
- General Design
- Based in
- San Mateo
- On San Francisco permits
- Dec 2004 to Aug 2026
33 permits since 2000 (engineer on 29 permits, architect on 4 permits, authorized agent-others on 1 permit): 18 completed, 10 in progress, 1 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 4, 2026 | In progress filed Aug 2026, not yet issued | 1950 35th Av | two-story rear addition to (e) sfd, 302sf 1/f addition; 284sf 2/f additional, 55sf deck extension. interior remodel, rear facade modifications, skylights and associated structural andmep scope of work.Details
two-story rear addition to (e) sfd, 302sf 1/f addition; 284sf 2/f additional, 55sf deck extension. interior remodel, rear facade modifications, skylights and associated structural andmep scope of work. | $240,000 | |
| Jun 3, 2026 | In progress issued Jun 2026 | 663 San Jose Av | Topview Construction Group Inc | revision to 202504235073. children restroom relocation, washer/dryer installation, sink, dishwasher connection. one door at infant nap room revision, and addition of one outdoor deck for childcare use.Details
revision to 202504235073. children restroom relocation, washer/dryer installation, sink, dishwasher connection. one door at infant nap room revision, and addition of one outdoor deck for childcare use. | $20,000 |
| May 19, 2026 | In progress filed May 2026, not yet issued | 1944 Ocean Av | (e)tenant space @ 1944-1948 ocean ave previous use @ 1944 was cannabis retail & 1948 was billiard hall; both spaces will be converted to child day care & education use. 1/f infant child care i-4 occupancy, 2/f e-occupancy (3-5 yrs old as a separate business). new address on 2/f on fairfield way.Details
(e)tenant space @ 1944-1948 ocean ave previous use @ 1944 was cannabis retail & 1948 was billiard hall; both spaces will be converted to child day care & education use. 1/f infant child care i-4 occupancy, 2/f e-occupancy (3-5 yrs old as a separate business). new address on 2/f on fairfield way. | $150,000 | |
| Feb 4, 2026 | Expired or cancelled cancelled Jun 2026 | 566 Castro St | Wei Dang Builders Inc., Yfx Construction | change of use from (e) retail to massage use. new non bearing wall for each massage use. upgrade ada restroom per da checklist 20%.Details
change of use from (e) retail to massage use. new non bearing wall for each massage use. upgrade ada restroom per da checklist 20%. | $76,000 |
| Jan 23, 2026 | In progress filed Jan 2026, not yet issued | 126 Avalon Av | interior renovation at ground floor. to include 2 bedrooms, entertainment room, storage and 1/2 bath.Details
interior renovation at ground floor. to include 2 bedrooms, entertainment room, storage and 1/2 bath. | $5,000 | |
| Dec 17, 2025 | In progress issued Dec 2025 | 1750 Washington St | Dacora | revision to 202512010648. to correct unit number to 8 instead of 3. no change to location on plan. new wall framing as noted on plan. wall location unchanged. weindow replacement like for like in bathroom lightwell.Details
revision to 202512010648. to correct unit number to 8 instead of 3. no change to location on plan. new wall framing as noted on plan. wall location unchanged. weindow replacement like for like in bathroom lightwell. | |
| Dec 1, 2025 | In progress issued Dec 2025 | 1750 Washington St | Dacora | unit 3 on 2/f: remodel existing restroom wall and new closet for bedroom. kitchen remodel. window replacement like to like.Details
unit 3 on 2/f: remodel existing restroom wall and new closet for bedroom. kitchen remodel. window replacement like to like. | $40,000 |
| Jun 23, 2025 | In progress issued Apr 2026 | 663 San Jose Av | Topview Construction Group Inc | prop h:tenant improvements for a licensed child care center. scope of work include non-structural interior demolition. installation of new partition walls. upgrades to restrooms to meet child care and ada requirements. new flooring, finishes, electrical, and plumbing as needed. (change of use)Details
prop h:tenant improvements for a licensed child care center. scope of work include non-structural interior demolition. installation of new partition walls. upgrades to restrooms to meet child care and ada requirements. new flooring, finishes, electrical, and plumbing as needed. (change of use) | $150,000 |
| Jun 5, 2025 | In progress filed Jun 2025, not yet issued | 285 16th Av | legalize existing 6' height fence to code to comply with nov 202429758Details
legalize existing 6' height fence to code to comply with nov 202429758 | $5,000 | |
| May 29, 2025 | In progress issued Jun 2025 | 1750 Washington St | Dacora | unit 1 & 7: revision to 202412116630. unit 1 renew e) restroom wall & new closet for office. unit 7 remodel e) restroom wall & new closet for office. both units kitchen relocation. (no exterior work)Details
unit 1 & 7: revision to 202412116630. unit 1 renew e) restroom wall & new closet for office. unit 7 remodel e) restroom wall & new closet for office. both units kitchen relocation. (no exterior work) | $8,000 |
| Apr 2, 2025 | Completed final sign-off Jul 2025 | 1750 Washington St | Dacora | construction revision pa# 2024-2025-5937 ref 202503283308: relocate unit 10 and 12 kitchen to living room. (n) office at (e) kitchen. no change to fixture count.Details
construction revision pa# 2024-2025-5937 ref 202503283308: relocate unit 10 and 12 kitchen to living room. (n) office at (e) kitchen. no change to fixture count. | |
| Mar 28, 2025 | Completed final sign-off Jul 2025 | 1750 Washington St | Dacora | unit 10: renew e) molded wall to new. unit 12: remodel e) restroom wall & new closet for bedroom (no plumbing fixture count change) revision to 202412025937Details
unit 10: renew e) molded wall to new. unit 12: remodel e) restroom wall & new closet for bedroom (no plumbing fixture count change) revision to 202412025937 | $3,000 |
| Feb 24, 2025 | Completed final sign-off Feb 2026 | 2415 Buchanan St | Cmac Construction, West Valley Structural Co. | deck retrofit to comply with sf code. minor structural addition to meet the san francisco housing code, section 604Details
deck retrofit to comply with sf code. minor structural addition to meet the san francisco housing code, section 604 | $20,000 |
| Jan 21, 2025 | In progress issued Feb 2025 | 523 26th Av | Mta Construction Inc | remodel (e) kitchen at 2nd floor. new utility room at 2nd floor. new master bathroom at 3rd floor. remodel (e) bathroom. demo interior finish-install insulation & drywallDetails
remodel (e) kitchen at 2nd floor. new utility room at 2nd floor. new master bathroom at 3rd floor. remodel (e) bathroom. demo interior finish-install insulation & drywall | $10,000 |
| Jan 17, 2025 | Completed final sign-off Mar 2025 | 3886 17th St | Chubby Construction | prop h: change of use from existing "m" occupancy to child care "e" occupancy. ti to (e) building to include adding two children's water closets, lavatories, and a high/low drinking fountain(s).Details
prop h: change of use from existing "m" occupancy to child care "e" occupancy. ti to (e) building to include adding two children's water closets, lavatories, and a high/low drinking fountain(s). | $34,000 |
| Jan 16, 2025 | Completed final sign-off Feb 2026 | 2347 33rd Av | Bingo Builders | remodel e bathroom at 3rd fl. new bathroom at 4th fl. turn 608 sf to conditional space within bath and family roomDetails
remodel e bathroom at 3rd fl. new bathroom at 4th fl. turn 608 sf to conditional space within bath and family room | $90,600 |
| Jun 24, 2024 | Completed final sign-off Mar 2025 | 3886 17th St | Chubby Construction | partial voluntary seismic upgrade for 1st floor at grid c, d, e only remodel existing ada restroomDetails
partial voluntary seismic upgrade for 1st floor at grid c, d, e only remodel existing ada restroom | $26,000 |
| Jun 21, 2024 | Completed final sign-off Feb 2025 | 160 Gambier St | Bingo Builders | 1st fl: convert 834 sf from unconditioned to conditioned space. new bath, office & entertaining room 2nd fl: new stair case. interior remodel interior wall reconfiguration. infill existing lightwell (69sf) remodel (e) master suite. relocate (e) bathDetails
1st fl: convert 834 sf from unconditioned to conditioned space. new bath, office & entertaining room 2nd fl: new stair case. interior remodel interior wall reconfiguration. infill existing lightwell (69sf) remodel (e) master suite. relocate (e) bath | $220,000 |
| Mar 16, 2022 | Completed final sign-off Jun 2023 | 932 Central Av | Doherty Restoration, Inc. | voluntary partial seismic upgrade at basement level. excavation of basement to gain ceiling height.Details
voluntary partial seismic upgrade at basement level. excavation of basement to gain ceiling height. | $30,000 |
| Aug 2, 2021 | Completed final sign-off Jun 2023 | 932 Central Av | Doherty Restoration, Inc. | unit #934: interior remodel. reconfigure for 3 bedrooms, 2 bathrooms configuration. no visible changes to front or side of building.Details
unit #934: interior remodel. reconfigure for 3 bedrooms, 2 bathrooms configuration. no visible changes to front or side of building. | $60,000 |
| Mar 30, 2021 | Never finaled filed Mar 2021, never issued | 94 Bernal Heights Bl | Sincere Construction Company Inc | interior remodel of (e) 3 story with basement sfd. reconfigure for 5 bedrooms, 4.5 bathroom layout. expand rear of building underneath 3rd floor to grade below (e) basement to be excavated & converted into habitable space.Details
interior remodel of (e) 3 story with basement sfd. reconfigure for 5 bedrooms, 4.5 bathroom layout. expand rear of building underneath 3rd floor to grade below (e) basement to be excavated & converted into habitable space. | $250,000 |
| Nov 28, 2018 | Completed final sign-off Dec 2019 | 188 Hooper St | Nibbi Bros Assoc Inc. | drill displacement piles for site permit 2018-0216-1503. note: fee's for this work scope have been paid under the site permit. this is a $1.00 permit.Details
drill displacement piles for site permit 2018-0216-1503. note: fee's for this work scope have been paid under the site permit. this is a $1.00 permit. | $70,000 |
| Nov 27, 2018 | Completed final sign-off Mar 2022 | 2575 28th Av | Tsl Construction & Consultant Inc, Springs Construction | addition at rear of bld 9'-10" < 2 stories. reconfigure ground floor rooms (3) & full bath. 2nd flr interior remodel. kitchen & 2 baths. new electrical, rewire to code. tankless water heater. replace front window (in opening)& garage door. replace sewer lateral.Details
addition at rear of bld 9'-10" < 2 stories. reconfigure ground floor rooms (3) & full bath. 2nd flr interior remodel. kitchen & 2 baths. new electrical, rewire to code. tankless water heater. replace front window (in opening)& garage door. replace sewer lateral. | $265,000 |
| May 2, 2018 | Expired or cancelled expired Nov 2025 | 2171 03rd St | Build Group Inc. | ground improvements drill displacement columns. (revision to the permitted plans associated with pa #2013-06-21-0213 s1.)Details
ground improvements drill displacement columns. (revision to the permitted plans associated with pa #2013-06-21-0213 s1.) | |
| Aug 2, 2017 | Completed final sign-off Nov 2018 | 2000 Bryant St | Farrell Design Build Co Inc | ground improvement work to improve soil for foundation support by means of drilled displacement columns. grade site to provide even level working surface for ddc install. reference to building site permit application no. 201406239109 s. maher ord applied.Details
ground improvement work to improve soil for foundation support by means of drilled displacement columns. grade site to provide even level working surface for ddc install. reference to building site permit application no. 201406239109 s. maher ord applied. | $1,500,000 |
| Jan 28, 2015 | Completed final sign-off Nov 2020 | 1201 Illinois St | C. Overaa & Co | this is for revision to ddc column layout & addition. ddc columns are drilled piers, revision to 201407010205; maher n/aDetails
this is for revision to ddc column layout & addition. ddc columns are drilled piers, revision to 201407010205; maher n/a | $50,000 |
| Sep 11, 2014 | Completed final sign-off Sep 2018 | 350 08th St | James E Roberts-Obayashi Corporation | installation of soil improvements to improve the bearing capacity of the soil through the installation of drilled displacement columns (ddcs) & rammed aggregate piers (raps) under the future footing locations. ref pa# 2013/07/30/3137 's'. ** maher: exampted - approval letter from dph attached **Details
installation of soil improvements to improve the bearing capacity of the soil through the installation of drilled displacement columns (ddcs) & rammed aggregate piers (raps) under the future footing locations. ref pa# 2013/07/30/3137 's'. ** maher: exampted - approval letter from dph attached ** | $1,000 |
| Aug 6, 2012 | Expired or cancelled withdrawn Jan 2022 | 49 Nevada St | demolish 2 story single family dwelling.Details
demolish 2 story single family dwelling. | $30,000 | |
| Oct 26, 2011 | Completed final sign-off Mar 2012 | 2575 Greenwich St | Ruiz Construction | take down 2 old retaining walls and build 2 new retaining wall at raer of building.Details
take down 2 old retaining walls and build 2 new retaining wall at raer of building. | $40,000 |
| Mar 22, 2010 | Completed final sign-off Apr 2010 | 450 Peralta Av | Associated Builders | comply with nov# 200563236-legalize (e) steel stairs & wood platform with concrete footing at rearDetails
comply with nov# 200563236-legalize (e) steel stairs & wood platform with concrete footing at rear | $15,000 |
| Aug 18, 2005 | Completed final sign-off Dec 2005 | 4441 17th St | replace existing 2 story exterior deck in kind @ rear. replace dryrot framing under nook. removeDetails
replace existing 2 story exterior deck in kind @ rear. replace dryrot framing under nook. remove | $15,000 | |
| Jun 8, 2005 | Completed final sign-off Dec 2005 | 698 Victoria St | convert (e) basement storage to family room and bedroom/bath. convert (e) bath to 2 baths on 2nd/fl.Details
convert (e) basement storage to family room and bedroom/bath. convert (e) bath to 2 baths on 2nd/fl. | $25,000 | |
| Dec 13, 2004 | Expired or cancelled expired Jun 2007 | 735 41st Av | roof repair/damage to corner of roof from storm. repair dryrot in kindDetails
roof repair/damage to corner of roof from storm. repair dryrot in kind | $5,000 |