Tsl Construction & Consultant Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2008 to Dec 2021
- Last 24 months
- 0 permits filed
52 permits since 2000: 38 completed, 8 never finaled, 6 expired or cancelled.
Of the 8 never-finaled permits, 7 are 5 to 10 years old, 1 is over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2021 | Completed final sign-off Jan 2022 | 24 Costa St | revision to 201911217912, change bathroom layout and remove 2 previously proposed windowsDetails
revision to 201911217912, change bathroom layout and remove 2 previously proposed windows | |
| Oct 29, 2021 | Completed final sign-off Jan 2022 | 24 Costa St | revision to pa# 201911217912 to change the exterior stair direction at the rear.Details
revision to pa# 201911217912 to change the exterior stair direction at the rear. | $3,500 |
| Oct 6, 2021 | Completed final sign-off Feb 2022 | 1351 Gilman Av | replace (e) stucco at front facade, in-kind with same texture and raised detail at parapet.Details
replace (e) stucco at front facade, in-kind with same texture and raised detail at parapet. | $1,000 |
| Sep 30, 2021 | Completed final sign-off Apr 2025 | 1422 Ocean Av | to comply with nov 202179317. to legalize a stair from the g/f to the (e) attic and legalize (3) storage rooms at the (e) attic.Details
to comply with nov 202179317. to legalize a stair from the g/f to the (e) attic and legalize (3) storage rooms at the (e) attic. | $10,000 |
| Sep 30, 2021 | Completed final sign-off Apr 2022 | 953 Grant Av | provide/add all gender restroom on ground floor.Details
provide/add all gender restroom on ground floor. | $10,000 |
| Sep 14, 2021 | Never finaled issued Sep 2021, no final | 757 Beach St | install new awning.Details
install new awning. | $4,200 |
| Aug 10, 2021 | Never finaled issued Aug 2021, no final | 269 Gaven St | repair of front stairs in-kind, less than 50%. 5-6 steps.Details
repair of front stairs in-kind, less than 50%. 5-6 steps. | $300 |
| Jun 25, 2021 | Completed final sign-off Mar 2025 | 1619 27th Av | infill central light court; interior stair alteration, reconfigure kitchen; add 2 new bathroom @ ground floor. convert 164 sf storage to living space; add 1 skylightDetails
infill central light court; interior stair alteration, reconfigure kitchen; add 2 new bathroom @ ground floor. convert 164 sf storage to living space; add 1 skylight | $84,000 |
| Jun 14, 2021 | Completed final sign-off Feb 2022 | 1351 Gilman Av | structural revision only to pa# 202104078049Details
structural revision only to pa# 202104078049 | |
| Apr 7, 2021 | Completed final sign-off Feb 2022 | 1351 Gilman Av | revision to pa# 2021-0304-5858; 1st fl. add 1 bedroom, family and 2 full bath, 2nd fl. remodel kitchen, bathroom, add 1 bedroom and 1 full bath, add new deck at rear, relocate interior stairs.Details
revision to pa# 2021-0304-5858; 1st fl. add 1 bedroom, family and 2 full bath, 2nd fl. remodel kitchen, bathroom, add 1 bedroom and 1 full bath, add new deck at rear, relocate interior stairs. | $58,000 |
| Apr 6, 2021 | Never finaled filed Apr 2021, never issued | 1444 Silver Av | violation correction per nov #201838142, submit existing floor plans to show no illegal unit is pressent on site. existing commercial unit to remain. no work.Details
violation correction per nov #201838142, submit existing floor plans to show no illegal unit is pressent on site. existing commercial unit to remain. no work. | |
| Mar 16, 2021 | Never finaled issued May 2021, no final | 1365 Columbus Av | install fabric on the new marque. ref pa# 202103166675Details
install fabric on the new marque. ref pa# 202103166675 | $2,000 |
| Mar 16, 2021 | Never finaled issued May 2021, no final | 1365 Columbus Av | install an illuminated doubled face projecting sign: "sixt"Details
install an illuminated doubled face projecting sign: "sixt" | $2,800 |
| Mar 16, 2021 | Completed final sign-off Jul 2021 | 1365 Columbus Av | install a new marquee at the storefront.Details
install a new marquee at the storefront. | $4,800 |
| Mar 4, 2021 | Completed final sign-off Feb 2022 | 1351 Gilman Av | remodel kitchen & bathroom. no change in walls and layout.Details
remodel kitchen & bathroom. no change in walls and layout. | $18,000 |
| Feb 17, 2021 | Completed final sign-off Mar 2022 | 2575 28th Av | revision to existing bldg pa# 201811276720. repair stucco in kind for front and side of the stair of the bldg, front entry.Details
revision to existing bldg pa# 201811276720. repair stucco in kind for front and side of the stair of the bldg, front entry. | $4,000 |
| Jan 25, 2021 | Completed final sign-off Feb 2021 | 716 Columbus Av | apply for alcoholic beverage license. change of use from limited restaurant to restaurant. no work.Details
apply for alcoholic beverage license. change of use from limited restaurant to restaurant. no work. | |
| Oct 17, 2020 | Completed final sign-off Mar 2022 | 269 Gaven St | 1st floor: add 1 bedroom, 2 full bath, home office, and media room. 2nd floor: remodel kitchen, bedrooms, and bathroom. add 1 full bath & 1 bedroom. relocate interior staircase. remove shed.Details
1st floor: add 1 bedroom, 2 full bath, home office, and media room. 2nd floor: remodel kitchen, bedrooms, and bathroom. add 1 full bath & 1 bedroom. relocate interior staircase. remove shed. | $100,000 |
| Sep 23, 2020 | Completed final sign-off May 2023 | 1348 Douglass St | remodel kitchen, relocate bathroom, add 1/2 bathroom.replace stairs & skylights, remove walls, rearrange rooms. add deck on 2/f. add 3 bedrooms, 2 full bathrs, family, relocate garage door on 1/f. replace windows with alum-clad wood. replace stucco & room. replace wather heater, furnace. upgrade e&pDetails
remodel kitchen, relocate bathroom, add 1/2 bathroom.replace stairs & skylights, remove walls, rearrange rooms. add deck on 2/f. add 3 bedrooms, 2 full bathrs, family, relocate garage door on 1/f. replace windows with alum-clad wood. replace stucco & room. replace wather heater, furnace. upgrade e&p | $150,000 |
| Jul 22, 2020 | Expired or cancelled withdrawn Jun 2025 | 2024 15th Av | 000u1pper level; reconfigure kitchen ayout. lower level; relocated bathroom, add two & half bath, bedroom, media rm & wine celler. replace all widows to be aluminum wood clad windows.Details
000u1pper level; reconfigure kitchen ayout. lower level; relocated bathroom, add two & half bath, bedroom, media rm & wine celler. replace all widows to be aluminum wood clad windows. | $95,000 |
| Mar 11, 2020 | Never finaled issued Mar 2020, no final | 52 Amber Dr | street spaceDetails
street space | |
| Mar 10, 2020 | Completed final sign-off Sep 2020 | 52 Amber Dr | remodeling existing kitchen & 1.5 bathrooms. rewiring. replace broken drain pipe.Details
remodeling existing kitchen & 1.5 bathrooms. rewiring. replace broken drain pipe. | $65,000 |
| Feb 27, 2020 | Completed final sign-off Sep 2021 | 2527 28th Av | revision to pa #2018-1121-6595: interior modification per plans. replace front window w/ aluminum clad wood marvin true ultimate. fixed center window with two casements on side. total remodel thoroughout. comply w/ nov #202021796 & 202022965.Details
revision to pa #2018-1121-6595: interior modification per plans. replace front window w/ aluminum clad wood marvin true ultimate. fixed center window with two casements on side. total remodel thoroughout. comply w/ nov #202021796 & 202022965. | |
| Dec 30, 2019 | Completed final sign-off Jan 2021 | 1901 Ocean Av | add 1 new pizza oven direct vent type thru existing exhaust duct relocate kitchen equipment, build new dining counter, build new ada bathroom, install new gas meterDetails
add 1 new pizza oven direct vent type thru existing exhaust duct relocate kitchen equipment, build new dining counter, build new ada bathroom, install new gas meter | $38,000 |
| Dec 23, 2019 | Completed final sign-off Oct 2021 | 1614 27th Av | remove existing lightcourt at 2nd fl, reconfigure kitchen & bathroom layout, add 1 new bathroom. add 3 new skylights.Details
remove existing lightcourt at 2nd fl, reconfigure kitchen & bathroom layout, add 1 new bathroom. add 3 new skylights. | $68,000 |
| Jun 6, 2019 | Completed final sign-off Dec 2019 | 475 South Van Ness Av | install 2 electric signs sixt rent a carDetails
install 2 electric signs sixt rent a car | $2,000 |
| May 28, 2019 | Completed final sign-off Jan 2020 | 3251 20th Av | space 218, "tang bar by dainty" - interior ti for a restaurant.Details
space 218, "tang bar by dainty" - interior ti for a restaurant. | $460,000 |
| May 7, 2019 | Completed final sign-off Oct 2019 | 1112 Taraval St | ti- to (e) commercial space on grd flr. upgrade to (e)restroom, construct 3 new procedure rooms, install new service counter new light fixtures. change of use from office to beauty salonDetails
ti- to (e) commercial space on grd flr. upgrade to (e)restroom, construct 3 new procedure rooms, install new service counter new light fixtures. change of use from office to beauty salon | $30,000 |
| Feb 27, 2019 | Never finaled filed Feb 2019, never issued | 380 19th Av | commencement of work not started under previously approved permit application pa# 2008-0424-0526.Details
commencement of work not started under previously approved permit application pa# 2008-0424-0526. | $420,000 |
| Feb 13, 2019 | Completed final sign-off May 2020 | 1000 Vicente St | voluntary seismic retrofit of ground floor in accordance with 2016 cebc chapter a4Details
voluntary seismic retrofit of ground floor in accordance with 2016 cebc chapter a4 | $30,000 |
| Feb 8, 2019 | Expired or cancelled cancelled Oct 2025 | 2024 15th Av | replace existing foundation and new slab. remodel bathroom at 1st flrDetails
replace existing foundation and new slab. remodel bathroom at 1st flr | $32,000 |
| Dec 7, 2018 | Completed final sign-off Apr 2019 | 88 King St | apt 108: rev to pa#201811156038 for additional work: remodel kitchen in-kind in same location and layout.Details
apt 108: rev to pa#201811156038 for additional work: remodel kitchen in-kind in same location and layout. | $10,000 |
| Dec 7, 2018 | Completed final sign-off Aug 2019 | 1000 Vicente St | remove existing fire place. replace 5 existing windows to alum clad wood windows. no horizontal bar at bottom. no change to opening size. double hung windows.Details
remove existing fire place. replace 5 existing windows to alum clad wood windows. no horizontal bar at bottom. no change to opening size. double hung windows. | $8,000 |
| Nov 27, 2018 | Completed final sign-off Mar 2022 | 2575 28th Av | addition at rear of bld 9'-10" < 2 stories. reconfigure ground floor rooms (3) & full bath. 2nd flr interior remodel. kitchen & 2 baths. new electrical, rewire to code. tankless water heater. replace front window (in opening)& garage door. replace sewer lateral.Details
addition at rear of bld 9'-10" < 2 stories. reconfigure ground floor rooms (3) & full bath. 2nd flr interior remodel. kitchen & 2 baths. new electrical, rewire to code. tankless water heater. replace front window (in opening)& garage door. replace sewer lateral. | $265,000 |
| Nov 21, 2018 | Completed final sign-off Sep 2021 | 2527 28th Av | widen rear sunroom & infill. new deck @ rear. 1st floor: add 2 bedrooms, 2 full baths, family, media & laundry room. 2nd floor: remodel kitchen & bath. add 1 full bath.Details
widen rear sunroom & infill. new deck @ rear. 1st floor: add 2 bedrooms, 2 full baths, family, media & laundry room. 2nd floor: remodel kitchen & bath. add 1 full bath. | $110,000 |
| Nov 5, 2018 | Expired or cancelled cancelled Oct 2025 | 2024 15th Av | recommencement and completion of work approved under pa # 2009-1203-2588.Details
recommencement and completion of work approved under pa # 2009-1203-2588. | $5,000 |
| Nov 1, 2018 | Completed final sign-off Nov 2019 | 1951 Oak St | repair exterior stucco structure in kind. comply with complaint # 201898641. texture to match existing.Details
repair exterior stucco structure in kind. comply with complaint # 201898641. texture to match existing. | $8,300 |
| Nov 1, 2018 | Expired or cancelled expired Jan 2023 | 1951 Oak St | revision to soft story permit #201606240864. soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. use shearwall instead of steel frame.Details
revision to soft story permit #201606240864. soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. use shearwall instead of steel frame. | |
| Nov 1, 2018 | Expired or cancelled cancelled Oct 2025 | 2024 15th Av | repair stucco wall in-kind comply with nov 200916124 #2, nov 201704162 #11, nov 201137487Details
repair stucco wall in-kind comply with nov 200916124 #2, nov 201704162 #11, nov 201137487 | $5,000 |
| Oct 15, 2018 | Completed final sign-off Apr 2019 | 1427 28th Av | revision to app#2011802020247. change heating system to install new furnace.Details
revision to app#2011802020247. change heating system to install new furnace. | $15,000 |
| Oct 5, 2018 | Expired or cancelled cancelled Oct 2025 | 2024 15th Av | comply with complaint # 201163827, 201205401, 201704162, 20170634, remodel kitchen & 2 bathrooms at 2nd flr replace (e) plaster wall finishes to 5/8" type x gyp bd in bedrooms & living room .Details
comply with complaint # 201163827, 201205401, 201704162, 20170634, remodel kitchen & 2 bathrooms at 2nd flr replace (e) plaster wall finishes to 5/8" type x gyp bd in bedrooms & living room . | $45,000 |
| Sep 6, 2018 | Completed final sign-off Jun 2019 | 4039 19th Av | to obtain final inspection for work approved under pa #201507313081. all work is complete.Details
to obtain final inspection for work approved under pa #201507313081. all work is complete. | |
| May 24, 2018 | Completed final sign-off Nov 2018 | 514 41st Av | remodel one bathroom in kind by adding to existing permit application # 201805189581. change bathtub to showerDetails
remodel one bathroom in kind by adding to existing permit application # 201805189581. change bathtub to shower | $4,000 |
| May 18, 2018 | Completed final sign-off Nov 2018 | 514 41st Av | to replace cabinets in-kind in bathroom & kitchen , replace floor & wall tile, bathtub in same location. no moving of walls/doorsDetails
to replace cabinets in-kind in bathroom & kitchen , replace floor & wall tile, bathtub in same location. no moving of walls/doors | $5,000 |
| Feb 2, 2018 | Completed final sign-off Apr 2019 | 1427 28th Av | legalization of (1) (e) unit, ordinance 43-14Details
legalization of (1) (e) unit, ordinance 43-14 | $15,000 |
| May 19, 2017 | Completed final sign-off Apr 2019 | 3501 Noriega St | unit legalization ordinancer 43-14. legalize dwelling unit at first floor per plan.Details
unit legalization ordinancer 43-14. legalize dwelling unit at first floor per plan. | $5,000 |
| Feb 17, 2017 | Completed final sign-off May 2017 | 1618 27th Av | to comply with complaint #201757409. 2/f: rev to pa#201610119991 - relocate kitchen & interior stair. add 1 full bathroom& exercise room. 1/f: remodel (e) bedroom, add one bedroom, 2 full bathrooms, media room, relocate laundry room per plans.Details
to comply with complaint #201757409. 2/f: rev to pa#201610119991 - relocate kitchen & interior stair. add 1 full bathroom& exercise room. 1/f: remodel (e) bedroom, add one bedroom, 2 full bathrooms, media room, relocate laundry room per plans. | $63,000 |
| Jan 13, 2017 | Completed final sign-off May 2017 | 312 Elliot St | 2/f: remodel (e) kitchen & bathroom. remove (e) fireplace and add lighting at living & dining rooms; all per plans.Details
2/f: remodel (e) kitchen & bathroom. remove (e) fireplace and add lighting at living & dining rooms; all per plans. | $26,500 |
| Dec 13, 2016 | Completed final sign-off Jun 2018 | 1737 Post St | tenant improve for (n) restaurant. (n) service counter. install (n) sinks, install (n) guarry title flooring. install (n) security door. change of use to restaurant.Details
tenant improve for (n) restaurant. (n) service counter. install (n) sinks, install (n) guarry title flooring. install (n) security door. change of use to restaurant. | $60,000 |
| Oct 11, 2016 | Completed final sign-off May 2017 | 1618 27th Av | remodel kitchen & 2 bathrooms; replace interior finishes with 5/8" gyp. board in-kind.Details
remodel kitchen & 2 bathrooms; replace interior finishes with 5/8" gyp. board in-kind. | $37,500 |
| Oct 30, 2015 | Completed final sign-off Dec 2016 | 22 Newman St | remodeling extg single family home. adding new dormer. adding new deck, relocate extg bath, add 3 new baths. relocate kitchen, add 2 bedrooms. infill below extg habitable space area at rear, replace vinyl windows at front with marvin traditional wood windows. new vinyl windows throughout.Details
remodeling extg single family home. adding new dormer. adding new deck, relocate extg bath, add 3 new baths. relocate kitchen, add 2 bedrooms. infill below extg habitable space area at rear, replace vinyl windows at front with marvin traditional wood windows. new vinyl windows throughout. | $10,000 |
| Apr 24, 2008 | Never finaled issued May 2012, no final | 380 19th Av | horizontal & vertical addition, excavate 1 ft.@ garage area, add bedrm & bath to ground flr;add ma bedrm,bath & relocate ktichen on 2nd flr;unit #2:add ma beth & relocate kitchen on 3rd flr; new 4th flr includes fam room,two bedrm, two bathrms and den.Details
horizontal & vertical addition, excavate 1 ft.@ garage area, add bedrm & bath to ground flr;add ma bedrm,bath & relocate ktichen on 2nd flr;unit #2:add ma beth & relocate kitchen on 3rd flr; new 4th flr includes fam room,two bedrm, two bathrms and den. | $350,000 |