Build Group Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Aug 2026
- Last 24 months
- 52 permits filed
695 permits since 2000: 448 completed, 30 in progress, 188 never finaled, 29 expired or cancelled.
Of the 188 never-finaled permits, 15 are 3 to 5 years old, 94 are 5 to 10 years old, 79 are over 10 years old. 6 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 695.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Sep 2026 | 735 Market St | revision to bpa: 202603207976 - design originally calle out for (n) breakdown appliances. (meps) scope has been reduced to no longer include the construction/ installation of appliances.Details
revision to bpa: 202603207976 - design originally calle out for (n) breakdown appliances. (meps) scope has been reduced to no longer include the construction/ installation of appliances. | |
| Jul 23, 2026 | In progress issued Jul 2026 | 451 Pacific Av | deferred stair shop drawing submittal per pa# 202505126265. interior stair, structural detail only.Details
deferred stair shop drawing submittal per pa# 202505126265. interior stair, structural detail only. | |
| Jul 2, 2026 | Completed final sign-off Sep 2026 | 999 Van Ness Av | to obtain final inspection for work approved under pa# 201607192674. all work is complete.Details
to obtain final inspection for work approved under pa# 201607192674. all work is complete. | |
| Jun 8, 2026 | Completed final sign-off Jun 2026 | 3349 Divisadero St | revision 202601224286 for mixed interior doors.Details
revision 202601224286 for mixed interior doors. | |
| May 18, 2026 | In progress issued Sep 2026 | 451 Pacific Av | revision to core & shell pa# 202505126265: framing detail @ level 3 elevator penthouse, elevator shaft structural framing, structural strengthening at level 3 underside of north & south roof, modification to restroom at level 2 mezzanine, a switch from a prefabication metal stair to a pre-fab woodDetails
revision to core & shell pa# 202505126265: framing detail @ level 3 elevator penthouse, elevator shaft structural framing, structural strengthening at level 3 underside of north & south roof, modification to restroom at level 2 mezzanine, a switch from a prefabication metal stair to a pre-fab wood | $50,000 |
| Apr 8, 2026 | In progress issued Jun 2026 | 1028 Market St | 14/fl-roof membrane replacement for roof deck and penthouse roof level with a surround expansion of dog run area, replacement of wood benches with (n) planter boxesDetails
14/fl-roof membrane replacement for roof deck and penthouse roof level with a surround expansion of dog run area, replacement of wood benches with (n) planter boxes | $200,000 |
| Mar 20, 2026 | In progress issued Jun 2026 | 735 Market St | t.i. for 1st flr + basement interior built out of existing sapce to create museum-style immersive exhibits. (n) non-load bearing partition, finishes, lighting, mep. fire sprinkler on separate permit.Details
t.i. for 1st flr + basement interior built out of existing sapce to create museum-style immersive exhibits. (n) non-load bearing partition, finishes, lighting, mep. fire sprinkler on separate permit. | $1,600,000 |
| Mar 4, 2026 | Completed final sign-off Sep 2026 | 599 Skyline Bl | replacement of existing exterior windows and doors along south wall at garden court room. new door added between garden court room and event patio.Details
replacement of existing exterior windows and doors along south wall at garden court room. new door added between garden court room and event patio. | $100,000 |
| Mar 2, 2026 | In progress issued Mar 2026 | 5 03rd St | soft demo in preparation for future renovation and seismic upgrade per ab 017Details
soft demo in preparation for future renovation and seismic upgrade per ab 017 | $190,000 |
| Feb 19, 2026 | In progress issued Jul 2026 | 3270 18th St | install non-electric single faced wall sign "la scuola international school"Details
install non-electric single faced wall sign "la scuola international school" | $35,000 |
| Feb 12, 2026 | In progress issued Jul 2026 | 451 Pacific Av | 3rd fl arch ti - new non-load bearing partitions, doors & door hardware, interior glazing, ceilings, light fixtures, millwork and associated finishes. mep under separate permit see pa 202505126265 for arch core/shellDetails
3rd fl arch ti - new non-load bearing partitions, doors & door hardware, interior glazing, ceilings, light fixtures, millwork and associated finishes. mep under separate permit see pa 202505126265 for arch core/shell | $150,000 |
| Feb 9, 2026 | In progress issued Mar 2026 | 451 Pacific Av | 2/fl- ref 202512192346- includes provide and install 5 fan coil units, run line set from units to heat pumps on the roofDetails
2/fl- ref 202512192346- includes provide and install 5 fan coil units, run line set from units to heat pumps on the roof | $130,000 |
| Jan 30, 2026 | In progress issued Feb 2026 | 451 Pacific Av | 1st floor and 1m mep ti: see arch pa # 202510036734. work includes: provide and install 7 fan coil units; condensate piping by plumbing contractor.Details
1st floor and 1m mep ti: see arch pa # 202510036734. work includes: provide and install 7 fan coil units; condensate piping by plumbing contractor. | $120,000 |
| Jan 27, 2026 | In progress filed Jan 2026, not yet issued | 524 Post St | revision to bpa: 202411134879 - to add / replace cooler with fountain. (inspection found water fountain not on original plans)Details
revision to bpa: 202411134879 - to add / replace cooler with fountain. (inspection found water fountain not on original plans) | |
| Jan 22, 2026 | Completed final sign-off Jun 2026 | 3349 Divisadero St | new drywall, new sliding door at storage, new storage windows, new lighting and electrical. replacmeent facade windows in kind localized voluntary structural strengthening at gridline b and c. mandatory seismic strenghting at gridline a. new garage storage.Details
new drywall, new sliding door at storage, new storage windows, new lighting and electrical. replacmeent facade windows in kind localized voluntary structural strengthening at gridline b and c. mandatory seismic strenghting at gridline a. new garage storage. | $35,000 |
| Jan 14, 2026 | In progress issued Jan 2026 | 451 Pacific Av | revision 202505126265- to include the moment frame foundation are necessitated by field verified conditions of tghe (e) footing. (e) footing was found to be too shallow to accomadate the required dowels to resist design uplift forcesDetails
revision 202505126265- to include the moment frame foundation are necessitated by field verified conditions of tghe (e) footing. (e) footing was found to be too shallow to accomadate the required dowels to resist design uplift forces | |
| Jan 7, 2026 | In progress issued Apr 2026 | 1693 Market St | underpinning of existing building, shoring and tie backs for fourth side of excavated area of 1687 market st. three other sides to be permitted under pa# 202412035997-s1.Details
underpinning of existing building, shoring and tie backs for fourth side of excavated area of 1687 market st. three other sides to be permitted under pa# 202412035997-s1. | $475,000 |
| Dec 30, 2025 | Completed final sign-off Feb 2026 | 201 Spear St | (ste# 220) revision to pa# 202511038751: to remove fire sprinkler and fire alarm deferred submittals. building is fully sprinklered and has existing strobes. scope of work includes assemble & structurally anchor 4 pre manufactured privacy booths for tenant use.Details
(ste# 220) revision to pa# 202511038751: to remove fire sprinkler and fire alarm deferred submittals. building is fully sprinklered and has existing strobes. scope of work includes assemble & structurally anchor 4 pre manufactured privacy booths for tenant use. | |
| Dec 19, 2025 | In progress issued Jan 2026 | 451 Pacific Av | level 2 - 2m: scope of work includes construction of new non-load bearing partitions, doors and door + door hardware, interior glazing, ceilings, light fixtures, millwork, and associated finishes. mep under seperate permit.Details
level 2 - 2m: scope of work includes construction of new non-load bearing partitions, doors and door + door hardware, interior glazing, ceilings, light fixtures, millwork, and associated finishes. mep under seperate permit. | $150,000 |
| Nov 24, 2025 | Completed final sign-off Jul 2026 | 425 Market St | 26/f: revision/deferred structural permit to #202507090436 (see page a1.26.Details
26/f: revision/deferred structural permit to #202507090436 (see page a1.26. | |
| Nov 17, 2025 | Completed final sign-off Jun 2026 | 525 Market St | 34/f: new tenant improvement includes construction of non-structural partitions, ceilings, doors, glazing, light fixtures, casework, power/signal, and finishes. mep is deferred.Details
34/f: new tenant improvement includes construction of non-structural partitions, ceilings, doors, glazing, light fixtures, casework, power/signal, and finishes. mep is deferred. | $4,100,000 |
| Nov 12, 2025 | In progress issued Jan 2026 | 451 Pacific Av | core and shell mep. work includes osa supply unit, restroom exhaust and a riser for future ti permits. ref arch permit #202505126265.Details
core and shell mep. work includes osa supply unit, restroom exhaust and a riser for future ti permits. ref arch permit #202505126265. | $120,000 |
| Nov 12, 2025 | Completed final sign-off Mar 2026 | 3407 California St | formula retail ground floor tenant improvement - exercise use. interior work including new non-bearing partitions, finishes, ceilings, lighting, mep. exterior signage under separate permit.Details
formula retail ground floor tenant improvement - exercise use. interior work including new non-bearing partitions, finishes, ceilings, lighting, mep. exterior signage under separate permit. | $205,000 |
| Nov 3, 2025 | Completed final sign-off Feb 2026 | 201 Spear St | ste 220; instll (4) pre-manufactured privacy booth in an existing commercial office space.Details
ste 220; instll (4) pre-manufactured privacy booth in an existing commercial office space. | $26,000 |
| Oct 30, 2025 | Completed final sign-off Dec 2025 | 703 Market St | 11th fl: tenant improvement includes the structural anchoring of 4 existing phone booths as required by sf fire dept, no revision to e mep or life safety. building fully sprinklered.Details
11th fl: tenant improvement includes the structural anchoring of 4 existing phone booths as required by sf fire dept, no revision to e mep or life safety. building fully sprinklered. | $25,000 |
| Oct 30, 2025 | Completed final sign-off May 2026 | 525 Market St | 34/f. demolition of non-structural partitions, dors, glazing, ceilings, light fixtures and finishes per ab-17 space will remain unoccupied. permit for construction and related accessible features will be required prior to be occupancy.Details
34/f. demolition of non-structural partitions, dors, glazing, ceilings, light fixtures and finishes per ab-17 space will remain unoccupied. permit for construction and related accessible features will be required prior to be occupancy. | $296,311 |
| Oct 8, 2025 | Completed final sign-off Mar 2026 | 201 Spear St | 16/fl- (n) anchorage connections securing previously installed pre fabricated phone booth to floor. extention of (e) fire sprinker system to each (e) phone booth and fire protection under separate permitDetails
16/fl- (n) anchorage connections securing previously installed pre fabricated phone booth to floor. extention of (e) fire sprinker system to each (e) phone booth and fire protection under separate permit | $73,000 |
| Oct 8, 2025 | In progress issued Oct 2025 | 599 Skyline Bl | revision to 202508122854 adding make-up air unit.Details
revision to 202508122854 adding make-up air unit. | $20,000 |
| Oct 6, 2025 | Completed final sign-off Jul 2026 | 755 Ashbury St | new 823 sf all electric kitchen withing (e) basement space, including all associated mechanical, electrical, plumbing and finish work. work limited to east (ashbury) wing of the building.Details
new 823 sf all electric kitchen withing (e) basement space, including all associated mechanical, electrical, plumbing and finish work. work limited to east (ashbury) wing of the building. | $500,000 |
| Oct 3, 2025 | In progress issued Jan 2026 | 451 Pacific Av | 1st floor: interior office build-out of level 1 and level2 mezzanine (l1 +lm1). scope includes construction of new non-load bearing partitions, doors, and door hardware, interior glazing ceilings, light fixtures, millwork, and associated finishes.Details
1st floor: interior office build-out of level 1 and level2 mezzanine (l1 +lm1). scope includes construction of new non-load bearing partitions, doors, and door hardware, interior glazing ceilings, light fixtures, millwork, and associated finishes. | $150,000 |
| Sep 29, 2025 | In progress issued Feb 2026 | 2810 Pierce St | revision to pa#202312011757-s1. accessible toilet rm, grade beam elevations, concrete beam revisions & additional shoring support over (e) basement stairs, demolition scope around (e) gym basement stairs, garage & east stair lighting revisions, north court bioretention planter, sanitary sewer line-Details
revision to pa#202312011757-s1. accessible toilet rm, grade beam elevations, concrete beam revisions & additional shoring support over (e) basement stairs, demolition scope around (e) gym basement stairs, garage & east stair lighting revisions, north court bioretention planter, sanitary sewer line- | |
| Sep 9, 2025 | In progress issued Sep 2025 | 50 08th St | to obtain final inspection for work approved under pa 201809119634. all work is complete.Details
to obtain final inspection for work approved under pa 201809119634. all work is complete. | |
| Sep 5, 2025 | In progress issued Sep 2025 | 50 08th St | recommencement and completion of work approved under pa# 201807255560 and 201807305925.Details
recommencement and completion of work approved under pa# 201807255560 and 201807305925. | $550,000 |
| Aug 27, 2025 | In progress issued Aug 2025 | 3270 18th St | install underground fire service. fire suppression under pa 202212148290-s5.Details
install underground fire service. fire suppression under pa 202212148290-s5. | $50,000 |
| Aug 12, 2025 | Completed final sign-off Nov 2025 | 599 Skyline Bl | install new grease exhaust fan for type 1 hood, exhaust fan for pizza oven & dx split system for supplemental cooling. no plumbing fixtures.Details
install new grease exhaust fan for type 1 hood, exhaust fan for pizza oven & dx split system for supplemental cooling. no plumbing fixtures. | $80,000 |
| Aug 5, 2025 | Completed final sign-off Jul 2026 | 425 Market St | 26/f: meps for tenant improvement permit 202507090436.Details
26/f: meps for tenant improvement permit 202507090436. | |
| Jul 25, 2025 | Completed final sign-off Oct 2025 | 1151 04th St | rev 202409050160 to correct project address & minor revisions to exercise studio #104 including new ceiling framing, elimination of acoustic foam and suspended isolators. material, fixtures, equipment & door specifications updates.Details
rev 202409050160 to correct project address & minor revisions to exercise studio #104 including new ceiling framing, elimination of acoustic foam and suspended isolators. material, fixtures, equipment & door specifications updates. | |
| Jul 9, 2025 | In progress issued Nov 2025 | 1687 Market St | demolish (e) 3 story type v retail building.Details
demolish (e) 3 story type v retail building. | $300,000 |
| Jul 9, 2025 | Completed final sign-off Jul 2026 | 425 Market St | 26th floor: t.i. includes demo of non-structural partitions and building new nonstructural partitions. update includes new millwork and new finishes throughout. all new new or revised mep & life safty work will be submitted for permit seperately. (bldg is fully sprinklered)Details
26th floor: t.i. includes demo of non-structural partitions and building new nonstructural partitions. update includes new millwork and new finishes throughout. all new new or revised mep & life safty work will be submitted for permit seperately. (bldg is fully sprinklered) | $932,656 |
| Jul 3, 2025 | Completed final sign-off Nov 2025 | 2171 03rd St | to obtain final inspection for work approved under pa # 201801128512, 201805027964, 201804055592. all work is complete.Details
to obtain final inspection for work approved under pa # 201801128512, 201805027964, 201804055592. all work is complete. | |
| Jun 30, 2025 | Completed final sign-off Jul 2026 | 755 Ashbury St | new door at ashbury facade. demo e walls (partitoins-no strutural work) at e basement, demo e cabinets. new walls for feconfiguration of music and art room. remove and capp off plumbing as requiredDetails
new door at ashbury facade. demo e walls (partitoins-no strutural work) at e basement, demo e cabinets. new walls for feconfiguration of music and art room. remove and capp off plumbing as required | $50,000 |
| Jun 6, 2025 | In progress issued Nov 2025 | 451 Pacific Av | addition of new enclosed exit stair extending from level b to 2;(n) elevator erviing lvl 1,1m,2,2m,3.construction & assoc demo for the partial reframing of mezz.mod to steel bracing frams and seismic bracing.(n) partitions,elevator shaft, exit stair.new ada baths, lighting & finishes.Details
addition of new enclosed exit stair extending from level b to 2;(n) elevator erviing lvl 1,1m,2,2m,3.construction & assoc demo for the partial reframing of mezz.mod to steel bracing frams and seismic bracing.(n) partitions,elevator shaft, exit stair.new ada baths, lighting & finishes. | $2,100,000 |
| May 20, 2025 | Completed final sign-off Nov 2025 | 631 Folsom St | deferred mechanical permit for application# 202410012046Details
deferred mechanical permit for application# 202410012046 | $3,500 |
| May 6, 2025 | Completed final sign-off Sep 2025 | 175 Frida Kahlo Wy | barrier removal; non structural renovation of (e) restrooms to gender neutral multi-accomodation ada compliant restroom.Details
barrier removal; non structural renovation of (e) restrooms to gender neutral multi-accomodation ada compliant restroom. | $25,000 |
| Apr 15, 2025 | Completed final sign-off Nov 2025 | 599 Skyline Bl | 1/fl- small remodel of (e) bar and millwork and fixtues and finishes to kitchen equipment.Details
1/fl- small remodel of (e) bar and millwork and fixtues and finishes to kitchen equipment. | $150,000 |
| Mar 11, 2025 | In progress issued Mar 2025 | 1075 California St | selective demolition of interior nonstrucutral partitions, ceilings, millwork, finishes and fixtures per ab-17Details
selective demolition of interior nonstrucutral partitions, ceilings, millwork, finishes and fixtures per ab-17 | |
| Feb 24, 2025 | In progress issued Sep 2025 | 451 Pacific Av | front bldg: ab-017. interior non structural demo of non-bearing interior partitions, doors, ceilings, lighting, mech, ductwork, interior finishesDetails
front bldg: ab-017. interior non structural demo of non-bearing interior partitions, doors, ceilings, lighting, mech, ductwork, interior finishes | $20,000 |
| Feb 18, 2025 | In progress issued Mar 2025 | 2350 Green St | revision to 202312011757 s1. foundation along grid p.a. have been updated to reflect a reduction in vertical gravity load. as divided by the owner, a portion of the structute north of grid p.a. has been entirely eliminated resulting in reduced laod. this change does not impact structural design,Details
revision to 202312011757 s1. foundation along grid p.a. have been updated to reflect a reduction in vertical gravity load. as divided by the owner, a portion of the structute north of grid p.a. has been entirely eliminated resulting in reduced laod. this change does not impact structural design, | |
| Feb 11, 2025 | In progress issued Nov 2025 | 1687 Market St | mayors directive 13-01: construction of a 17-story type i-a, 94 units of 100% affordable housing. 17 total stories of occupancy including 2 basements providing both dwelling units and art community colaboration spaces.Details
mayors directive 13-01: construction of a 17-story type i-a, 94 units of 100% affordable housing. 17 total stories of occupancy including 2 basements providing both dwelling units and art community colaboration spaces. | $70,205,789 |
| Nov 25, 2024 | Completed final sign-off Mar 2025 | 1028 Market St | drywall and flooring repairs to flood cuts in approximately (24) units on floors 2-6 due to tenant damage. one "like" complete kitchen replacement in unit #616. fire rated drywall to be replaced w/proper stagger overlap inkindDetails
drywall and flooring repairs to flood cuts in approximately (24) units on floors 2-6 due to tenant damage. one "like" complete kitchen replacement in unit #616. fire rated drywall to be replaced w/proper stagger overlap inkind | $50,000 |
| Nov 4, 2024 | In progress issued Nov 2024 | 2350 Green St | stormwater pid plan check revision 202312011757Details
stormwater pid plan check revision 202312011757 | |
| Oct 10, 2024 | Completed final sign-off Nov 2024 | 1 Daniel Burnham Ct | unit #311: remodel of master bathroom- replace vanity cabinets, sink and countertop, fixtures. replace shower walls, glass door and fixtures, replace lights, fan and flooring.Details
unit #311: remodel of master bathroom- replace vanity cabinets, sink and countertop, fixtures. replace shower walls, glass door and fixtures, replace lights, fan and flooring. | $25,000 |
| Oct 1, 2024 | Completed final sign-off Nov 2025 | 631 Folsom St | tenant improvement conversion of e open work area to new 298 sf conference room. work to include electrical and ada upgrades. mep deferred.Details
tenant improvement conversion of e open work area to new 298 sf conference room. work to include electrical and ada upgrades. mep deferred. | $40,000 |
| Sep 6, 2024 | Completed final sign-off Oct 2024 | 3225 Fillmore St | rev 2024-0617-4597- entry door relocation from moulton st to fillmore st. new storefront glazing at both locations.Details
rev 2024-0617-4597- entry door relocation from moulton st to fillmore st. new storefront glazing at both locations. | |
| Sep 5, 2024 | Completed final sign-off Oct 2025 | 1155 04th St | ste 1b- change of use/tenant improvement for unoccupied space to workout space to include (n) non bearing partions, doors, finishes, celings, lighting,& mep work. b occupancy for health studio/gym cfc required, 1st time tenantDetails
ste 1b- change of use/tenant improvement for unoccupied space to workout space to include (n) non bearing partions, doors, finishes, celings, lighting,& mep work. b occupancy for health studio/gym cfc required, 1st time tenant | $201,000 |
| Jul 3, 2024 | Completed final sign-off May 2025 | 175 Frida Kahlo Wy | revision to 202406043620: revised ada toilet stall & shower location, reframing e) walls. no fixture count changesDetails
revision to 202406043620: revised ada toilet stall & shower location, reframing e) walls. no fixture count changes | |
| Jun 21, 2024 | Completed final sign-off Mar 2025 | 175 Frida Kahlo Wy | barrier removal- demolition of existing ada wheelchair lift and steps. replace with new ada compliant ramp and steps.Details
barrier removal- demolition of existing ada wheelchair lift and steps. replace with new ada compliant ramp and steps. | $30,000 |
| Jun 17, 2024 | Completed final sign-off Oct 2024 | 3225 Fillmore St | new non-bearing partitions, doors, finishes, ceilings, lighting, mep and floor infill. replacement of (e) storefront double entry door w/ (n) storefront double door entry and side lites.Details
new non-bearing partitions, doors, finishes, ceilings, lighting, mep and floor infill. replacement of (e) storefront double entry door w/ (n) storefront double door entry and side lites. | $200,000 |
| Jun 4, 2024 | Completed final sign-off May 2025 | 175 Frida Kahlo Wy | cosmetic upgrades of (e) dormitory rooms and private bathroom. voluntary ada upgrade of dormitory restrooms and showers. scope of work to include electrical and plumbing work. mech and sprinkler under separate permit.Details
cosmetic upgrades of (e) dormitory rooms and private bathroom. voluntary ada upgrade of dormitory restrooms and showers. scope of work to include electrical and plumbing work. mech and sprinkler under separate permit. | $25,000 |
| May 20, 2024 | Completed final sign-off Mar 2025 | 175 Frida Kahlo Wy | conversion of 2 existing classrooms into 9 counselor's offices. scope of work to include electric work.Details
conversion of 2 existing classrooms into 9 counselor's offices. scope of work to include electric work. | $150,000 |
| May 7, 2024 | Completed final sign-off Aug 2024 | 22 Battery St | ground fl: interior work for food service. removal of (e) non bearing wall. replacement of (e) finishes where there was damage. (n) light fixtures and act tiles where damaged. (n) walk in coolers and food service equipment. no exterior workDetails
ground fl: interior work for food service. removal of (e) non bearing wall. replacement of (e) finishes where there was damage. (n) light fixtures and act tiles where damaged. (n) walk in coolers and food service equipment. no exterior work | $190,000 |
| Apr 24, 2024 | Completed final sign-off Sep 2024 | 2175 Market St | formula retail ground floor tenant improvement- exercise room, interior work includes new non-bearing partitions, doors, finishes, ceilings, lighting, mep & floor infill. exterior work includes replacement of (e) double entry door w/ single entry door.Details
formula retail ground floor tenant improvement- exercise room, interior work includes new non-bearing partitions, doors, finishes, ceilings, lighting, mep & floor infill. exterior work includes replacement of (e) double entry door w/ single entry door. | $195,358 |
| Apr 12, 2024 | Completed final sign-off Jan 2025 | 150 Van Ness Av | ste b: interior ti for massage therapy and clinic in exterior ground floor shell. new non-structural parttions, new electrical transfomer in basement, nre equipment new light fixtures, new furnitur and new finishesDetails
ste b: interior ti for massage therapy and clinic in exterior ground floor shell. new non-structural parttions, new electrical transfomer in basement, nre equipment new light fixtures, new furnitur and new finishes | $625,000 |
| Dec 1, 2023 | In progress issued Jun 2024 | 2350 Green St | new structure is proposed to be an open private parking garage which locates on the merged lot 7 & lot 13 w/ a play yard above as an occupied roof.play yard is intended to accomodate students use during recess.property line adjustment app has been submitted.Details
new structure is proposed to be an open private parking garage which locates on the merged lot 7 & lot 13 w/ a play yard above as an occupied roof.play yard is intended to accomodate students use during recess.property line adjustment app has been submitted. | $3,000,000 |
| Jul 18, 2023 | Completed final sign-off Dec 2023 | 1201 Ortega St | scope includes removal of moisture damaged (e) floor slab on grade to edge of walls in 2 rooms (class #117 & multi purpose room #129) on the 1st fl; installation of (n) concrete slab over 15-mil x-treeme wood below slab vapor barrier membrane. provide polished concrete finish in both roomsDetails
scope includes removal of moisture damaged (e) floor slab on grade to edge of walls in 2 rooms (class #117 & multi purpose room #129) on the 1st fl; installation of (n) concrete slab over 15-mil x-treeme wood below slab vapor barrier membrane. provide polished concrete finish in both rooms | $63,000 |
| May 31, 2023 | Never finaled issued Jun 2023, no final | 1055 Ellis St | removal of (e) offices for new classrooms. new wall and paint, salvage (e) doors, interior windows, and lighting. renovate (e) restrooms to be accessible. enlarge above to provide clear floor space at low drinking fountains. mep & lif safety under separate permits.Details
removal of (e) offices for new classrooms. new wall and paint, salvage (e) doors, interior windows, and lighting. renovate (e) restrooms to be accessible. enlarge above to provide clear floor space at low drinking fountains. mep & lif safety under separate permits. | $186,000 |
| May 25, 2023 | Completed final sign-off Sep 2023 | 300 California St | 1/f: demolition of 2 partition walls in existing mdf room. patching as necessary of demo scars after wall removal. vacant space on ground flrDetails
1/f: demolition of 2 partition walls in existing mdf room. patching as necessary of demo scars after wall removal. vacant space on ground flr | $10,000 |
| Apr 6, 2023 | Completed final sign-off Dec 2023 | 175 Frida Kahlo Wy | 2nd fl. renovation of (e) library and accessory rooms, work to include (2) new classrooms and video studio verticle platform lift to be provided for accessibilityDetails
2nd fl. renovation of (e) library and accessory rooms, work to include (2) new classrooms and video studio verticle platform lift to be provided for accessibility | $600,000 |
| Dec 14, 2022 | In progress issued Dec 2023 | 3270 18th St | erect a new 4 story school(k-8) bldg, no dwellings,no basement.type 3-aDetails
erect a new 4 story school(k-8) bldg, no dwellings,no basement.type 3-a | $13,500,000 |
| Nov 14, 2022 | Expired or cancelled cancelled Jan 2026 | 130 Townsend St | vapor intrusion mitigation system.Details
vapor intrusion mitigation system. | $31,500 |
| Nov 14, 2022 | Expired or cancelled cancelled Jan 2026 | 130 Townsend St | vapor intrusion mitigation system.Details
vapor intrusion mitigation system. | $31,500 |
| Oct 28, 2022 | Never finaled issued Oct 2022, no final | 100 Van Ness Av | to comply with nov#202296997 replacement of sheetrock flooring and cabinetry casual by flood. work as necessarry on floors 3-11 (no structural work in-kind)Details
to comply with nov#202296997 replacement of sheetrock flooring and cabinetry casual by flood. work as necessarry on floors 3-11 (no structural work in-kind) | $2,000,000 |
| Sep 29, 2022 | Completed final sign-off Oct 2023 | 145 Jefferson St | retail store interior t.i., no change of use/structural/exterior. new partitions, triple sink, water heater, hand sink, refurbish e(e toilets, install new fixtures, lighting/diffusers & power, flooring, perimeter shelving, refurbish hvac units/utilize (e) ducting, add new trunks where required,Details
retail store interior t.i., no change of use/structural/exterior. new partitions, triple sink, water heater, hand sink, refurbish e(e toilets, install new fixtures, lighting/diffusers & power, flooring, perimeter shelving, refurbish hvac units/utilize (e) ducting, add new trunks where required, | $85,000 |
| Aug 25, 2022 | Never finaled issued Sep 2022, no final | 130 Townsend St | storm water control plans for bpa#2021/0204/4027-Details
storm water control plans for bpa#2021/0204/4027- | |
| Aug 25, 2022 | Never finaled issued Jan 2023, no final | 130 Townsend St | storm water control plans for bpa#2021/0204/4023.Details
storm water control plans for bpa#2021/0204/4023. | |
| Aug 15, 2022 | Never finaled issued Aug 2022, no final | 1395 22nd St | recommencement and completion of work, approved under pa# 201902112602Details
recommencement and completion of work, approved under pa# 201902112602 | |
| Jul 21, 2022 | Never finaled filed Jul 2022, never issued | 130 Townsend St | temp lateral support to facilitate mass excavation at 130 townsend aka 50 stanford. soil nails and shotcrete facing. soldier piles, raker bracing, shotcrete facing. shoring soil nails, shotcrete, soldier piles will not extend beyond the project property lines, into city streets, or adjacent properDetails
temp lateral support to facilitate mass excavation at 130 townsend aka 50 stanford. soil nails and shotcrete facing. soldier piles, raker bracing, shotcrete facing. shoring soil nails, shotcrete, soldier piles will not extend beyond the project property lines, into city streets, or adjacent proper | $300,000 |
| Jul 21, 2022 | Never finaled filed Jul 2022, never issued | 130 Townsend St | temp lateral support to facilitate mass excavation at 130 townsend. soil nails and shotcrete facing. soldier piles, raker bracing, and shotcrete facing. shoring soil nails, shotcrete, and soldier piles will not extend beyond the project property lines, into city streets, or adjacent propertiesDetails
temp lateral support to facilitate mass excavation at 130 townsend. soil nails and shotcrete facing. soldier piles, raker bracing, and shotcrete facing. shoring soil nails, shotcrete, and soldier piles will not extend beyond the project property lines, into city streets, or adjacent properties | $300,000 |
| Jun 30, 2022 | Never finaled issued Aug 2022, no final | 1192 Market St | revision to pa 202204182448. add 2 accessible ramps and a stair to resolve multiple structural slab elevations. only interior workDetails
revision to pa 202204182448. add 2 accessible ramps and a stair to resolve multiple structural slab elevations. only interior work | |
| Jun 21, 2022 | Never finaled issued Jun 2022, no final | 175 Phelan Av | interior barrier removal. non-structural interior renovation of 4 existing bay bathrooms. 2 bathrooms to become girl bathrooms. deferred electrical.Details
interior barrier removal. non-structural interior renovation of 4 existing bay bathrooms. 2 bathrooms to become girl bathrooms. deferred electrical. | $100,000 |
| May 5, 2022 | Never finaled filed May 2022, never issued | 919 Illinois St | proj-22-0463. port-priority. revision to pa 201911258098 to document 7 stories over basement per definitions of grade plane and story above grade plane in cbc chapter 2.Details
proj-22-0463. port-priority. revision to pa 201911258098 to document 7 stories over basement per definitions of grade plane and story above grade plane in cbc chapter 2. | |
| Apr 18, 2022 | Never finaled issued Jun 2022, no final | 1192 Market St | renovation of bar #1: demo of non-bearing partitions, doors, ceiling, lighting, millwork & finishes. upgrade (e) utilities. new partitions, doors, finishes, ceilings, lighting. new bar, & shelving. mep deferred.Details
renovation of bar #1: demo of non-bearing partitions, doors, ceiling, lighting, millwork & finishes. upgrade (e) utilities. new partitions, doors, finishes, ceilings, lighting. new bar, & shelving. mep deferred. | $273,420 |
| Apr 18, 2022 | Never finaled issued Jun 2022, no final | 1192 Market St | renovation of (n) bar #2: demo of non-bearing partitions, doors, ceiling, lighting, millwork & finish materials. upgrade utilities. install (n) walls & doors, finished ceilings and lighting. (n) bar.Details
renovation of (n) bar #2: demo of non-bearing partitions, doors, ceiling, lighting, millwork & finish materials. upgrade utilities. install (n) walls & doors, finished ceilings and lighting. (n) bar. | $214,578 |
| Mar 30, 2022 | Never finaled filed Mar 2022, never issued | 1028 Market St | fire alarm as builts for entire building. reference pa #201707172085-s6Details
fire alarm as builts for entire building. reference pa #201707172085-s6 | |
| Mar 29, 2022 | Expired or cancelled cancelled Jan 2026 | 2 Folsom St | 1/f: revision to permit 202109158456. added storage room 0144d, updated egress plan and finishes.Details
1/f: revision to permit 202109158456. added storage room 0144d, updated egress plan and finishes. | $10,000 |
| Mar 17, 2022 | Expired or cancelled cancelled Jan 2026 | 2 Folsom St | 1/f: revision to permit 202110069959. added scope in studio 1 and 2 broadcast room.Details
1/f: revision to permit 202110069959. added scope in studio 1 and 2 broadcast room. | $100 |
| Mar 17, 2022 | Expired or cancelled cancelled Jan 2026 | 2 Folsom St | lobby: revision to permit 202110069889. added av scope behind the security desk. remove all gender restroom scope of work from original permit.Details
lobby: revision to permit 202110069889. added av scope behind the security desk. remove all gender restroom scope of work from original permit. | $1,000 |
| Jan 13, 2022 | Completed final sign-off May 2022 | 1028 Market St | administrative permit only to correct dwelling unit count from 186 to 193 units per plans as approved in -site permit pa#201707172085 & arch/mep addendum #3. see sheet a0.06 for approved unit count.Details
administrative permit only to correct dwelling unit count from 186 to 193 units per plans as approved in -site permit pa#201707172085 & arch/mep addendum #3. see sheet a0.06 for approved unit count. | |
| Jan 7, 2022 | Completed final sign-off Sep 2022 | 434 Minna St | revision to pa 2018-0806-6535 s3 record keeping permit only to obtain sffd assembly space stamp for existing outdoor terrace spaceDetails
revision to pa 2018-0806-6535 s3 record keeping permit only to obtain sffd assembly space stamp for existing outdoor terrace space | |
| Nov 16, 2021 | Completed final sign-off Apr 2022 | 1028 Market St | added signatures to smoke control report for approved pa201701172085-s3.Details
added signatures to smoke control report for approved pa201701172085-s3. | |
| Oct 27, 2021 | Completed final sign-off Apr 2022 | 1028 Market St | revision to select electrical sheets due to upgrade switchgear for approved permit #201707172085 (s3)Details
revision to select electrical sheets due to upgrade switchgear for approved permit #201707172085 (s3) | |
| Oct 22, 2021 | Completed final sign-off Sep 2022 | 434 Minna St | install a single face wall non-structural aluminium "resident parking" above entry along minna st. sign #pa.Details
install a single face wall non-structural aluminium "resident parking" above entry along minna st. sign #pa. | $2,000 |
| Oct 22, 2021 | Completed final sign-off Sep 2022 | 434 Minna St | install a single face wall plaque "the george" along mission street. sign #pc.Details
install a single face wall plaque "the george" along mission street. sign #pc. | $1,500 |
| Oct 22, 2021 | Completed final sign-off Sep 2022 | 434 Minna St | install 1 electrical single faced wall sign "the george" above entry way along minna st. sign #eaDetails
install 1 electrical single faced wall sign "the george" above entry way along minna st. sign #ea | $5,000 |
| Oct 14, 2021 | Completed final sign-off Jun 2022 | 3850 17th St | deferred mep submittal for seismic attachments for original pa 202006018035.Details
deferred mep submittal for seismic attachments for original pa 202006018035. | $50,000 |
| Oct 6, 2021 | Completed final sign-off Mar 2023 | 2 Folsom St | demolition of (e) security access turnstiles, security desk, men's & women's rest rooms, installation of (n) security access turnstiles & secutity desk, construction of (n) partitons, mep & all gender restroomsDetails
demolition of (e) security access turnstiles, security desk, men's & women's rest rooms, installation of (n) security access turnstiles & secutity desk, construction of (n) partitons, mep & all gender restrooms | $300,000 |
| Oct 6, 2021 | Completed final sign-off Sep 2022 | 2 Folsom St | 1st fl - selective demo of (e) partitions, ceiling tiles, millwork & light fixtures; construction of new partitions ceiling tiles & light fixturesDetails
1st fl - selective demo of (e) partitions, ceiling tiles, millwork & light fixtures; construction of new partitions ceiling tiles & light fixtures | $300,000 |
| Sep 17, 2021 | Completed final sign-off Oct 2021 | 1301 Pierce St | for administrative purpose only. revision to pa 201612225776 to document a technical infeasibility for 2 (e) load bearing columns located at the west side of the ramp that projects into the (e) ramp having 48" min width.Details
for administrative purpose only. revision to pa 201612225776 to document a technical infeasibility for 2 (e) load bearing columns located at the west side of the ramp that projects into the (e) ramp having 48" min width. | |
| Sep 17, 2021 | Never finaled issued Jan 2022, no final | 2 Folsom St | ste #2a & 2b: anchorage of field and mobile retail shelving units. this plans only contain details pertaining to proper anchorage of the fixed and mobile shelving system. ref 2021 0909 8066.Details
ste #2a & 2b: anchorage of field and mobile retail shelving units. this plans only contain details pertaining to proper anchorage of the fixed and mobile shelving system. ref 2021 0909 8066. | $5,000 |
| Sep 17, 2021 | Completed final sign-off Sep 2022 | 2 Folsom St | anchorage of fixed & mobile retail shelving unit. these drawings contain only the plans and details pertaining to the proper anchonarage of the fixed and mobile shelving system. ref pa202109108196 arch plans.Details
anchorage of fixed & mobile retail shelving unit. these drawings contain only the plans and details pertaining to the proper anchonarage of the fixed and mobile shelving system. ref pa202109108196 arch plans. | $5,000 |