Block 0814, lot 020
100 Van Ness Ave
- City’s use
- Multi-Family Residential
- Built
- 2015
- Stories
- 28
- Units
- 420
- Building
- 337,664 sq ft
- Lot
- 15,500 sq ft
- Zoning
- C3G
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
184 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 100 Van Ness Av | abate planning code enforcement case no. 2022-000721enf. comply with planning motion no. 18682. 117 class 1 bicycle storage spaces required, 118 class 1 spaces required. previous permit app #201208026344Details
abate planning code enforcement case no. 2022-000721enf. comply with planning motion no. 18682. 117 class 1 bicycle storage spaces required, 118 class 1 spaces required. previous permit app #201208026344 | $10,000 | |
| Jun 11, 2026 | In progress filed Jun 2026, not yet issued | 100 Van Ness Av | Discount Signs & Neon Inc | install 1 electric, wall, single faced sign, "fedex office" 3' x 20'3", illuminated, hanging wall sign.Details
install 1 electric, wall, single faced sign, "fedex office" 3' x 20'3", illuminated, hanging wall sign. | $9,000 |
| Dec 29, 2025 | In progress issued Aug 2026 | 100 Van Ness Av | Lakeview Construction/Wisconsin Lakeview | suite c tenant improvement. mep and finish updates includedDetails
suite c tenant improvement. mep and finish updates included | $641,229 |
| May 8, 2025 | In progress issued May 2025 | 100 Van Ness Av | Nwestco Llc | replace failed pipe penetration fittings in underground storage 2 containment pump (fuel tank)Details
replace failed pipe penetration fittings in underground storage 2 containment pump (fuel tank) | $8,500 |
| Oct 28, 2022 | Never finaled issued Oct 2022, no final | 100 Van Ness Av | Build Group Inc. | to comply with nov#202296997 replacement of sheetrock flooring and cabinetry casual by flood. work as necessarry on floors 3-11 (no structural work in-kind)Details
to comply with nov#202296997 replacement of sheetrock flooring and cabinetry casual by flood. work as necessarry on floors 3-11 (no structural work in-kind) | $2,000,000 |
| Oct 17, 2022 | Never finaled issued Oct 2022, no final | 100 Van Ness Av | Jon K Takata Corp Dba Restoration Mgmt | demo of water damaged floor coverings, base, drywall, insulation, paint. plumbing repairs if needed. 11th down to ground floor plus 3 level parking garage. affected areas to remain vacant until repairs are completed. under sep permit.Details
demo of water damaged floor coverings, base, drywall, insulation, paint. plumbing repairs if needed. 11th down to ground floor plus 3 level parking garage. affected areas to remain vacant until repairs are completed. under sep permit. | $1,500,000 |
| Jan 26, 2022 | Completed final sign-off Apr 2022 | 100 Van Ness Av | Nwestco Llc | remove (e) incon monitor from current location (b2). install & connect veeder-root ti s450 monitor to the new location (ground fl/fcc room). install materials to upgrde the veeder-root sensors. 208 veeder root sump sensors. 308 veeder root ecpu software. install (2) atg probes-mag plusDetails
remove (e) incon monitor from current location (b2). install & connect veeder-root ti s450 monitor to the new location (ground fl/fcc room). install materials to upgrde the veeder-root sensors. 208 veeder root sump sensors. 308 veeder root ecpu software. install (2) atg probes-mag plus | $22,000 |
| Jan 21, 2022 | Never finaled issued Jan 2022, no final | 100 Van Ness Av | Custom Contracting Services | install 1 electric, wall mounted, single face sign. 9.0'x1.8'. (the madrigal) 12v dc power.Details
install 1 electric, wall mounted, single face sign. 9.0'x1.8'. (the madrigal) 12v dc power. | $4,500 |
| Jan 26, 2021 | Never finaled issued May 2021, no final | 100 Van Ness Av | to install metal tube steel frame vestibule w/ vinyl cover at existing ground flr restaurant main entrance at van ness av to be baffle high winds . to provide steps at fell st as a second means of egress to existing retail space. to comply w/ nov 202017531.Details
to install metal tube steel frame vestibule w/ vinyl cover at existing ground flr restaurant main entrance at van ness av to be baffle high winds . to provide steps at fell st as a second means of egress to existing retail space. to comply w/ nov 202017531. | $1,000 | |
| Jan 5, 2021 | Completed final sign-off Jun 2021 | 100 Van Ness Av | Jon K Takata Corp Dba Restoration Mgmt | (unit #405) fire & water damage to interior walls & ceiling, drywall, insulation, hvac cleaning, flooring & interior cabinets. all repairs are in kind bago to original walls & ceilings.Details
(unit #405) fire & water damage to interior walls & ceiling, drywall, insulation, hvac cleaning, flooring & interior cabinets. all repairs are in kind bago to original walls & ceilings. | $59,450 |
| Aug 13, 2019 | Never finaled issued Aug 2019, no final | 100 Van Ness Av | Pacific Auxiliary Fire Alarm | fire alarm t.i. adding 6 speaker strobes, 3 dual pt monitor modules, 2 relay modules and 2 smoke detectors to an extg notifier nfs2-3030 fa system. ref app#201804207003. n/a for maherDetails
fire alarm t.i. adding 6 speaker strobes, 3 dual pt monitor modules, 2 relay modules and 2 smoke detectors to an extg notifier nfs2-3030 fa system. ref app#201804207003. n/a for maher | $6,222 |
| Jul 9, 2019 | Completed final sign-off Sep 2019 | 100 Van Ness Av | 1/f: rev to pa201804207003: revision to garage fresh air intake duct from gypsum board enclosure to use morgan flame master. maher n/a.Details
1/f: rev to pa201804207003: revision to garage fresh air intake duct from gypsum board enclosure to use morgan flame master. maher n/a. | ||
| Jun 26, 2019 | Completed final sign-off Oct 2019 | 100 Van Ness Av | window repair work in compliance with engineering evaluation to correct window breakage and failure. approximate number of effected windows are 950 units.Details
window repair work in compliance with engineering evaluation to correct window breakage and failure. approximate number of effected windows are 950 units. | $100,000 | |
| May 29, 2019 | Completed final sign-off Oct 2019 | 100 Van Ness Av | Cupertino Electric Inc. | remove reinstall (e) lights, fire alarm (drawings submitted under separate contractor), teledata raceways. arch pa 201804207003. provide exit light for tenant space.Details
remove reinstall (e) lights, fire alarm (drawings submitted under separate contractor), teledata raceways. arch pa 201804207003. provide exit light for tenant space. | $90,000 |
| May 15, 2019 | Never finaled issued May 2019, no final | 100 Van Ness Av | Critchfield Mechanical Inc | area currently a drive isle into parking garage, is being altered into a retail space, this permit is for the plumbing and mechanical work needed for alteration. ref pa#201804207003Details
area currently a drive isle into parking garage, is being altered into a retail space, this permit is for the plumbing and mechanical work needed for alteration. ref pa#201804207003 | $75,000 |
| May 2, 2019 | Completed final sign-off Aug 2019 | 100 Van Ness Av | Allied Fire Protection | fire sprinklers ground level doors 4 added uprights. ref pa 2018-0906-9298 n/a for maher.Details
fire sprinklers ground level doors 4 added uprights. ref pa 2018-0906-9298 n/a for maher. | $2,300 |
| May 2, 2019 | Completed final sign-off Aug 2019 | 100 Van Ness Av | Allied Fire Protection | fire sprinklers ground lev entry 3 added pendents, 2 relocated uprights and 5 sprinklers. ref pa 2018-0420-7003 r1. n/a for maher.Details
fire sprinklers ground lev entry 3 added pendents, 2 relocated uprights and 5 sprinklers. ref pa 2018-0420-7003 r1. n/a for maher. | $2,800 |
| Feb 5, 2019 | Expired or cancelled cancelled Jan 2026 | 100 Van Ness Av | Jon K Takata Corp Dba Restoration Mgmt | revision to pa 201901140279. submitting plans per fire inspector request. 29th flr utility room. ceiling drywall repairDetails
revision to pa 201901140279. submitting plans per fire inspector request. 29th flr utility room. ceiling drywall repair | |
| Jan 17, 2019 | Completed final sign-off Feb 2019 | 100 Van Ness Av | Allied Fire Protection | level 2 fire sprinklers 2 add heads. ref pa 2017-1211-6094 (r1). n/a for maher.Details
level 2 fire sprinklers 2 add heads. ref pa 2017-1211-6094 (r1). n/a for maher. | $1,400 |
| Jan 14, 2019 | Completed final sign-off Mar 2019 | 100 Van Ness Av | Jon K Takata Corp Dba Restoration Mgmt | 29/f: drywall repair in utility room. rated ceiling. repair to match (e). maher n/a.Details
29/f: drywall repair in utility room. rated ceiling. repair to match (e). maher n/a. | $2,500 |
| Jan 11, 2019 | Never finaled issued Jan 2019, no final | 100 Van Ness Av | street spaceDetails
street space | ||
| Dec 18, 2018 | Completed final sign-off Feb 2019 | 100 Van Ness Av | Clark Construction Group Ca Lp | provide electrical, hook-up power to 2 new overhead rolling doors, relocate 3 (e) light fixturesDetails
provide electrical, hook-up power to 2 new overhead rolling doors, relocate 3 (e) light fixtures | $5,000 |
| Nov 1, 2018 | Completed final sign-off Feb 2019 | 100 Van Ness Av | Acco Engineered Systems Inc. Dba Acco En | replacement of one water source heat pump in apt 909. we are placing the existing 4 year old 2 ton unit with an exact replacement. we are reconnecting to the existing electrical and pipes. no modication to be done.Details
replacement of one water source heat pump in apt 909. we are placing the existing 4 year old 2 ton unit with an exact replacement. we are reconnecting to the existing electrical and pipes. no modication to be done. | $3,500 |
| Jun 29, 2018 | Completed final sign-off Sep 2019 | 100 Van Ness Av | g/f -to replace extg sliding entry door at 100 van ness with new automatic revolving door. fire alarm separate permit to connect to door. maher n/a.Details
g/f -to replace extg sliding entry door at 100 van ness with new automatic revolving door. fire alarm separate permit to connect to door. maher n/a. | $8,000 | |
| Apr 20, 2018 | Completed final sign-off Oct 2019 | 100 Van Ness Av | convert existing garage entry at ground fl, continuing existing storefront over garage opening for further retail package room expansion and bicycle storage use. provide new openings at ground level for future connection to 150 van nessDetails
convert existing garage entry at ground fl, continuing existing storefront over garage opening for further retail package room expansion and bicycle storage use. provide new openings at ground level for future connection to 150 van ness | $90,000 | |
| Dec 11, 2017 | Completed final sign-off Feb 2019 | 100 Van Ness Av | provide new openings at 2nd and b1 levels for future connection to 150 van ness avenue. n/a ordinance #155-13Details
provide new openings at 2nd and b1 levels for future connection to 150 van ness avenue. n/a ordinance #155-13 | $76,000 | |
| Feb 16, 2017 | Completed final sign-off Apr 2017 | 100 Van Ness Av | R 3 Builders Inc. | revision to pa #201508184601 - removal of two light fixtures. n/a maher ord. 155-13Details
revision to pa #201508184601 - removal of two light fixtures. n/a maher ord. 155-13 | |
| Nov 16, 2016 | Completed final sign-off May 2017 | 100 Van Ness Av | to replace existing swinging entry doors at 100 van ness with new automatic sliding doors.ref chnage of use # 201208226344. n/a ordinance #155-13Details
to replace existing swinging entry doors at 100 van ness with new automatic sliding doors.ref chnage of use # 201208226344. n/a ordinance #155-13 | $3,000 | |
| Sep 22, 2016 | Never finaled issued Sep 2016, no final | 100 Van Ness Av | street space w/mtaDetails
street space w/mta | ||
| Jul 11, 2016 | Completed final sign-off Apr 2017 | 100 Van Ness Av | R 3 Builders Inc. | ground floor. administrative correction to pa#201508184601. t.i. for 92 occupant restaurant was incorrectly labeled b, correct to a-2 occupancy. no work.Details
ground floor. administrative correction to pa#201508184601. t.i. for 92 occupant restaurant was incorrectly labeled b, correct to a-2 occupancy. no work. | |
| Jul 7, 2016 | Completed final sign-off Apr 2017 | 100 Van Ness Av | International Fire Equip | revision to ref 2016-0509-6879. change griddle to range. reference ti 2015.0818.4601. ul300 coverage for new kitchen equipment. n/a maher ord. 155-13Details
revision to ref 2016-0509-6879. change griddle to range. reference ti 2015.0818.4601. ul300 coverage for new kitchen equipment. n/a maher ord. 155-13 | |
| Jun 14, 2016 | Never finaled issued Jun 2016, no final | 100 Van Ness Av | street space and mta parking.Details
street space and mta parking. | ||
| May 25, 2016 | Completed final sign-off Apr 2017 | 100 Van Ness Av | Pacific Auxiliary Fire Alarm | 1st floor: fire alarm. add (8) speaker/stroes, (2) duct detectors, (2) relays & (1) monitoring module as part of ti. ref bldg # 2015-0818-4601.Details
1st floor: fire alarm. add (8) speaker/stroes, (2) duct detectors, (2) relays & (1) monitoring module as part of ti. ref bldg # 2015-0818-4601. | $8,000 |
| May 24, 2016 | Completed final sign-off Sep 2016 | 100 Van Ness Av | revision to pa #201410108636: addition of structural steel supports for an existing cmu wall and framing over existing plaster wall both located on the east side of bldg, not visible from street. n/a maher ordinanceDetails
revision to pa #201410108636: addition of structural steel supports for an existing cmu wall and framing over existing plaster wall both located on the east side of bldg, not visible from street. n/a maher ordinance | $3,000 | |
| May 16, 2016 | Never finaled issued May 2016, no final | 100 Van Ness Av | street spaceDetails
street space | ||
| May 12, 2016 | Completed final sign-off Jun 2016 | 100 Van Ness Av | Allied Fire Protection | fire sprinklers - t/1: level 3 (35) added; level 4 (35) added; level 5 (35) added, level 6 (35) added; level 7 (32) added and level 8 (32) added. totals 204 fire sprinklers. ref pa 2014-1010-8636Details
fire sprinklers - t/1: level 3 (35) added; level 4 (35) added; level 5 (35) added, level 6 (35) added; level 7 (32) added and level 8 (32) added. totals 204 fire sprinklers. ref pa 2014-1010-8636 | $105,470 |
| May 9, 2016 | Never finaled issued May 2016, no final | 100 Van Ness Av | International Fire Equip | install ul300 fire system. ref app#201508184601. n/a for maherDetails
install ul300 fire system. ref app#201508184601. n/a for maher | $4,000 |
| Apr 4, 2016 | Never finaled issued Apr 2016, no final | 100 Van Ness Av | street spaceDetails
street space | ||
| Feb 19, 2016 | Completed final sign-off Apr 2017 | 100 Van Ness Av | R 3 Builders Inc. | revision to appl #201508184601 - scope is ot replace hog with air-maid system per sffd requirements , revised structural & mep plans. n/a maher ordinanceDetails
revision to appl #201508184601 - scope is ot replace hog with air-maid system per sffd requirements , revised structural & mep plans. n/a maher ordinance | $20,000 |
| Jan 22, 2016 | Never finaled issued Jan 2016, no final | 100 Van Ness Av | R 3 Builders Inc. | companion electrical plans for work under pa #201509298302. n/a meher ordinanceDetails
companion electrical plans for work under pa #201509298302. n/a meher ordinance | $55,000 |
| Jan 21, 2016 | Completed final sign-off Mar 2017 | 100 Van Ness Av | All Valley Fire Protection **See Notes* | install 25 pendent heads to new ceiling at 1/f & mezz. install 1 upright in new w/h closet. t.i. pa# 201508184601. n/a ordinance #155-13Details
install 25 pendent heads to new ceiling at 1/f & mezz. install 1 upright in new w/h closet. t.i. pa# 201508184601. n/a ordinance #155-13 | $8,000 |
| Jan 7, 2016 | Completed final sign-off Feb 2016 | 100 Van Ness Av | All Valley Fire Protection **See Notes* | add 3 fire sprinklers for new ceiling. t.i. app#201509298302Details
add 3 fire sprinklers for new ceiling. t.i. app#201509298302 | $5,000 |
| Jan 5, 2016 | Completed final sign-off Feb 2016 | 100 Van Ness Av | Pacific Auxiliary Fire Alarm | addition to existing notifier nfs2-3030 fire alarm panel, add 4 speaker/strobe. all devices connected into e circuits serving the areaDetails
addition to existing notifier nfs2-3030 fire alarm panel, add 4 speaker/strobe. all devices connected into e circuits serving the area | $10,000 |
| Dec 16, 2015 | Never finaled issued Dec 2015, no final | 100 Van Ness Av | street spaceDetails
street space | ||
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 100 Van Ness Av | R 3 Builders Inc. | install projecting electrical single faced sign. maher naDetails
install projecting electrical single faced sign. maher na | $5,000 |
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 100 Van Ness Av | R 3 Builders Inc. | install electric wall single faced sign. maher naDetails
install electric wall single faced sign. maher na | $7,500 |
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 100 Van Ness Av | R 3 Builders Inc. | install projecting electrical double faced signDetails
install projecting electrical double faced sign | $7,500 |
| Sep 29, 2015 | Completed final sign-off Jun 2016 | 100 Van Ness Av | R 3 Builders Inc. | no change to (e) bldg footprint,square footage,of height, ti. including (n) food prep area, retail/seating area,elec,mech & plmbg work with 1 new accessible restroom,signage & exterior seating area under separate permit,no changes to exterior facade;maher n/aDetails
no change to (e) bldg footprint,square footage,of height, ti. including (n) food prep area, retail/seating area,elec,mech & plmbg work with 1 new accessible restroom,signage & exterior seating area under separate permit,no changes to exterior facade;maher n/a | $128,000 |
| Sep 14, 2015 | Never finaled issued Sep 2015, no final | 100 Van Ness Av | street space & mta permitDetails
street space & mta permit | ||
| Aug 18, 2015 | Completed final sign-off Apr 2017 | 100 Van Ness Av | R 3 Builders Inc. | ti for (n) restaurant on g/f work includes (n) equipment, fixtures, finishes, restrooms, mep (n) ext. doors steps and risers. fire protection and signage under separate permit. n/a for maher ordinance.Details
ti for (n) restaurant on g/f work includes (n) equipment, fixtures, finishes, restrooms, mep (n) ext. doors steps and risers. fire protection and signage under separate permit. n/a for maher ordinance. | $311,000 |
| Jul 29, 2015 | Never finaled issued Jul 2015, no final | 100 Van Ness Av | per pa #201208026344, add addresses for commercial space at block 0814, lot 020 as; 100a, 100b van ness ave.Details
per pa #201208026344, add addresses for commercial space at block 0814, lot 020 as; 100a, 100b van ness ave. | ||
| Jul 21, 2015 | Completed final sign-off Apr 2017 | 100 Van Ness Av | to provide equal access for the physically challenged from level 1 to the existing mezzanine level by means of a new mechanical lift. the work includes the installation of the lift only. n/a maher ordinanceDetails
to provide equal access for the physically challenged from level 1 to the existing mezzanine level by means of a new mechanical lift. the work includes the installation of the lift only. n/a maher ordinance | $54,000 | |
| Jun 4, 2015 | Never finaled issued Jun 2015, no final | 100 Van Ness Av | street space w/mtaDetails
street space w/mta | ||
| May 8, 2015 | Expired or cancelled cancelled Sep 2023 | 100 Van Ness Av | need occupany load for rooftop. maher naDetails
need occupany load for rooftop. maher na | ||
| Feb 19, 2015 | Never finaled issued Feb 2015, no final | 100 Van Ness Av | street space permit renewal of permit #1332460 - m509167Details
street space permit renewal of permit #1332460 - m509167 | ||
| Jan 15, 2015 | Completed final sign-off May 2015 | 100 Van Ness Av | Allied Fire Protection | as built revision to app#201412123590 to show location of fuel oil vent at exterior wall. plan new shows property line. n/a for the maherDetails
as built revision to app#201412123590 to show location of fuel oil vent at exterior wall. plan new shows property line. n/a for the maher | |
| Dec 12, 2014 | Completed final sign-off May 2015 | 100 Van Ness Av | Allied Fire Protection | revision to application 2014/03/21/1400 - install 280 ft of 4 in vent lines and install new double contained pipe from fuel pump to fire pump tanks/diesel fire pumps. diesel fire pumps existing. n/a ordinance #155-13Details
revision to application 2014/03/21/1400 - install 280 ft of 4 in vent lines and install new double contained pipe from fuel pump to fire pump tanks/diesel fire pumps. diesel fire pumps existing. n/a ordinance #155-13 | $70,000 |
| Nov 10, 2014 | Completed final sign-off May 2015 | 100 Van Ness Av | Maguire Inc Dba Lahue And Associates | installation of 96 evacuation signs throughout buildingDetails
installation of 96 evacuation signs throughout building | $12,900 |
| Nov 5, 2014 | Completed final sign-off May 2015 | 100 Van Ness Av | Allied Fire Protection | temporary leasing office ti at level 1, 2 added pendent fire sprikler headsDetails
temporary leasing office ti at level 1, 2 added pendent fire sprikler heads | $1,200 |
| Oct 21, 2014 | Completed final sign-off Dec 2014 | 100 Van Ness Av | Pacific Auxiliary Fire Alarm | grnd flr: installation of new fire alarm system for the temporary leasing office, ref. approved bldg permit app. 20403140846; maher n/aDetails
grnd flr: installation of new fire alarm system for the temporary leasing office, ref. approved bldg permit app. 20403140846; maher n/a | $5,000 |
| Oct 10, 2014 | Completed final sign-off Sep 2016 | 100 Van Ness Av | 1)correct appln #201208026344 the original unit count from 399 to 400 units count. 2) revision to approved bpa #201208026344 to add 18 additional units to the unfinished northside of level 3-9 & to complete the curtain wall on the north & portion of the east facades. mep is included.to complyDetails
1)correct appln #201208026344 the original unit count from 399 to 400 units count. 2) revision to approved bpa #201208026344 to add 18 additional units to the unfinished northside of level 3-9 & to complete the curtain wall on the north & portion of the east facades. mep is included.to comply | $1,124,000 | |
| Sep 16, 2014 | Expired or cancelled cancelled Jan 2020 | 100 Van Ness Av | demolition for the north and east property line walls at levels 02-08. to comply with maher ordinance 155-13 not requiredDetails
demolition for the north and east property line walls at levels 02-08. to comply with maher ordinance 155-13 not required | $150,000 | |
| Aug 6, 2014 | Never finaled issued Aug 2014, no final | 100 Van Ness Av | street spaceDetails
street space | ||
| Mar 21, 2014 | Completed final sign-off Jul 2022 | 100 Van Ness Av | Allied Fire Protection | add two fire pump fuel tanks with vent piping, relocate pump by-pass line and reroute existing mains in pump room. reference pa# 2012/0802/6344/Details
add two fire pump fuel tanks with vent piping, relocate pump by-pass line and reroute existing mains in pump room. reference pa# 2012/0802/6344/ | $55,000 |
| Mar 14, 2014 | Completed final sign-off Aug 2015 | 100 Van Ness Av | provide new kitchen mock-up in temporary leasing office at ground floor. building under construction under pa# 2012-0802-6344.Details
provide new kitchen mock-up in temporary leasing office at ground floor. building under construction under pa# 2012-0802-6344. | $54,000 | |
| Feb 18, 2014 | Completed final sign-off May 2015 | 100 Van Ness Av | Plant Construction Company Lp | provide stair #1 details. refer to approved bpa #2012-08-02-6344. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd.Details
provide stair #1 details. refer to approved bpa #2012-08-02-6344. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd. | |
| Jan 31, 2014 | Never finaled issued Jan 2014, no final | 100 Van Ness Av | street space permitDetails
street space permit | ||
| Aug 6, 2013 | Never finaled issued Aug 2013, no final | 100 Van Ness Av | street space permitDetails
street space permit | ||
| Feb 12, 2013 | Never finaled issued Feb 2013, no final | 100 Van Ness Av | street space permitDetails
street space permit | ||
| Jan 25, 2013 | Expired or cancelled cancelled Apr 2013 | 100 Van Ness Av | Plant Construction Company Lp | erection of tower crane attached to existing buildingDetails
erection of tower crane attached to existing building | $200,000 |
| Jan 15, 2013 | Never finaled issued Jan 2013, no final | 100 Van Ness Av | street spaceDetails
street space | ||
| Nov 29, 2012 | Completed final sign-off May 2015 | 100 Van Ness Av | hard demo in an unoccupied building. work includes removal of all (e) plaster, stud partitions, doors, frames, thresholds, brackets, screws, conduit, ductwork, plumbing fixts. ab-017 bldg remain vacant. demo all 28th floors.removing stair and one standpipe- new standpipe separate permitDetails
hard demo in an unoccupied building. work includes removal of all (e) plaster, stud partitions, doors, frames, thresholds, brackets, screws, conduit, ductwork, plumbing fixts. ab-017 bldg remain vacant. demo all 28th floors.removing stair and one standpipe- new standpipe separate permit | $400,000 | |
| Nov 27, 2012 | Never finaled filed Nov 2012, never issued | 100 Van Ness Av | street space with metersDetails
street space with meters | ||
| Nov 27, 2012 | Never finaled issued Nov 2012, no final | 100 Van Ness Av | street space with metersDetails
street space with meters | ||
| Aug 2, 2012 | Completed final sign-off Sep 2016 | 100 Van Ness Av | convert (e) office building int 399 residential apartments ground floor retail and roof deck. maintain (e) steel frame structure and garage. remove pre-cast concrete skin and replace with glass curtain wall. renovate interior of building.Details
convert (e) office building int 399 residential apartments ground floor retail and roof deck. maintain (e) steel frame structure and garage. remove pre-cast concrete skin and replace with glass curtain wall. renovate interior of building. | $75,000,000 | |
| Jul 17, 2012 | Completed final sign-off Jan 2014 | 100 Van Ness Av | interior non-structural demolition & hazardous materials remediation work in an unoccupied bldg.Details
interior non-structural demolition & hazardous materials remediation work in an unoccupied bldg. | $318,000 | |
| Jun 1, 2012 | Completed final sign-off Jan 2014 | 100 Van Ness Av | W. Wong Construction Co. Inc. | abate complaint no. 201227241. exploratory demolition on levels 3,5,7,11,13,17,20,22,24,25, and 28.Details
abate complaint no. 201227241. exploratory demolition on levels 3,5,7,11,13,17,20,22,24,25, and 28. | $10,000 |
| Aug 30, 2011 | Expired or cancelled expired May 2013 | 100 Van Ness Av | Accutite Technology Engineering | provide secondary containment for fire pump fuel tank. instrall day tank level gauge and leak sensor.Details
provide secondary containment for fire pump fuel tank. instrall day tank level gauge and leak sensor. | $4,000 |
| Sep 17, 2010 | Never finaled issued Sep 2010, no final | 100 Van Ness Av | Cosco Fire Protection Inc. | provide 7 new sprinklers heads at heads at existing unprotected storage room on the 29th floor.Details
provide 7 new sprinklers heads at heads at existing unprotected storage room on the 29th floor. | $4,956 |
| Jul 7, 2010 | Completed final sign-off Jul 2010 | 100 Van Ness Av | Accutite Technology Engineering | replace diesel fuel piping from ust sump to building. use existing secondary piping as conduit to install apt coaxial supply and return lines. no excavation. no concrete. use existing sumps for accessDetails
replace diesel fuel piping from ust sump to building. use existing secondary piping as conduit to install apt coaxial supply and return lines. no excavation. no concrete. use existing sumps for access | $14,000 |
| Feb 24, 2010 | Completed final sign-off Mar 2010 | 100 Van Ness Av | to obtain final inspection for work approved under pa 200808280241; all work is completeDetails
to obtain final inspection for work approved under pa 200808280241; all work is complete | ||
| Sep 10, 2009 | Never finaled issued Sep 2009, no final | 100 Van Ness Av | street space permitDetails
street space permit | ||
| Jul 1, 2009 | Never finaled issued Jul 2009, no final | 100 Van Ness Av | street space only.Details
street space only. | ||
| May 19, 2009 | Completed final sign-off Aug 2009 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa# 2008/07/17/6929 to obtain final inspection. all work has been completed.Details
renew pa# 2008/07/17/6929 to obtain final inspection. all work has been completed. | |
| Apr 21, 2009 | Never finaled issued Apr 2009, no final | 100 Van Ness Av | street space permit only.Details
street space permit only. | ||
| Feb 26, 2009 | Never finaled issued Feb 2009, no final | 100 Van Ness Av | J T & T Enterprises Inc | to final work approved ujnder pa#200106282544. all work is complete.Details
to final work approved ujnder pa#200106282544. all work is complete. | |
| Jan 21, 2009 | Completed final sign-off Jan 2009 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa# 9924882 to obtain final inspection. all work is completed.Details
renew pa# 9924882 to obtain final inspection. all work is completed. | |
| Jan 20, 2009 | Completed final sign-off Jan 2009 | 100 Van Ness Av | Hathaway Dinwiddie Co. | 3rd fl. scope 0f permit is to delete the s-swing door from pa# 9920061, pa# 2008-1104-5844 & pa# 2008-0916-1713-work that triggered the upgrade of the corridor has been deleted from the oringinal plans listed under pa# 9920061. the door from the mail lobby to the mail sorting room is corrected toDetails
3rd fl. scope 0f permit is to delete the s-swing door from pa# 9920061, pa# 2008-1104-5844 & pa# 2008-0916-1713-work that triggered the upgrade of the corridor has been deleted from the oringinal plans listed under pa# 9920061. the door from the mail lobby to the mail sorting room is corrected to | |
| Dec 18, 2008 | Completed final sign-off Jan 2009 | 100 Van Ness Av | Hathaway Dinwiddie Co. | amend permit #200811196952 for as buildt floor plan delete 3 offices and show 2 existing offices & revise office configuration @ stairwell on the 17th floor.Details
amend permit #200811196952 for as buildt floor plan delete 3 offices and show 2 existing offices & revise office configuration @ stairwell on the 17th floor. | |
| Dec 4, 2008 | Completed final sign-off Dec 2008 | 100 Van Ness Av | Pribuss Engineering Inc | fire sprinkler ti: add 6 heads, relocate 2 heads. total 8 heads.Details
fire sprinkler ti: add 6 heads, relocate 2 heads. total 8 heads. | $1,600 |
| Dec 2, 2008 | Completed final sign-off Feb 2009 | 100 Van Ness Av | to obtain final inspection for work approved under pa #200104056077. all work complete.Details
to obtain final inspection for work approved under pa #200104056077. all work complete. | ||
| Dec 2, 2008 | Completed final sign-off Feb 2009 | 100 Van Ness Av | J T & T Enterprises Inc | renew pa# 2001/10/30/2107 to obtain final inspection. all work has been completed.Details
renew pa# 2001/10/30/2107 to obtain final inspection. all work has been completed. | |
| Nov 19, 2008 | Completed final sign-off Jan 2009 | 100 Van Ness Av | Hathaway Dinwiddie Co. | at 17th fl: revised drawing per pa #9801654, to show no door between departments, this an existing as built condition.Details
at 17th fl: revised drawing per pa #9801654, to show no door between departments, this an existing as built condition. | $100 |
| Nov 17, 2008 | Never finaled issued Nov 2008, no final | 100 Van Ness Av | Hathaway Dinwiddie Co. | to obtain final inspection for work approved under (orig. permit application #200503107188) permit application #200710094808. all work has been complete.Details
to obtain final inspection for work approved under (orig. permit application #200503107188) permit application #200710094808. all work has been complete. | |
| Nov 4, 2008 | Completed final sign-off Jan 2009 | 100 Van Ness Av | Hathaway Dinwiddie Co. | revise restroom plan on pa# 2008-0908-0956-complete work already approved on previous plans. original pa# 2005-0404-9061Details
revise restroom plan on pa# 2008-0908-0956-complete work already approved on previous plans. original pa# 2005-0404-9061 | |
| Nov 4, 2008 | Completed final sign-off Dec 2008 | 100 Van Ness Av | Hathaway Dinwiddie Co. | 3rd floor revision to appl #9920061 all work complete w/reduced scope of work per new plans. no work north of elevators in conf. rm, private dining room, office or food service room.Details
3rd floor revision to appl #9920061 all work complete w/reduced scope of work per new plans. no work north of elevators in conf. rm, private dining room, office or food service room. | |
| Oct 24, 2008 | Completed final sign-off Jan 2009 | 100 Van Ness Av | Hathaway Dinwiddie Co. | 11th floor revision & provide as-built dwgs for work performed under pa #9924882 - additional demolition work and construct 3 new offices.Details
11th floor revision & provide as-built dwgs for work performed under pa #9924882 - additional demolition work and construct 3 new offices. | $1,000 |
| Oct 17, 2008 | Never finaled issued Oct 2008, no final | 100 Van Ness Av | street spaceDetails
street space | ||
| Sep 16, 2008 | Completed final sign-off Jan 2009 | 100 Van Ness Av | Hathaway Dinwiddie Co. | work complete final inspection only. under pa#9920061Details
work complete final inspection only. under pa#9920061 | |
| Sep 16, 2008 | Expired or cancelled withdrawn Oct 2008 | 100 Van Ness Av | Hathaway Dinwiddie Co. | work complete final inspection only. under pa#200104056077Details
work complete final inspection only. under pa#200104056077 | |
| Sep 16, 2008 | Completed final sign-off Oct 2008 | 100 Van Ness Av | Hathaway Dinwiddie Co. | work complete final inspection only. under pa#200503107188Details
work complete final inspection only. under pa#200503107188 | |
| Sep 16, 2008 | Expired or cancelled withdrawn Feb 2009 | 100 Van Ness Av | Hathaway Dinwiddie Co. | work complete final inspection only. under pa#9803702Details
work complete final inspection only. under pa#9803702 | |
| Sep 8, 2008 | Completed final sign-off Oct 2008 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa#200508109887 for final inspection only.Details
renew pa#200508109887 for final inspection only. | |
| Sep 8, 2008 | Completed final sign-off Jan 2009 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa#200504049061 for final inspection only.Details
renew pa#200504049061 for final inspection only. | |
| Sep 8, 2008 | Expired or cancelled withdrawn Oct 2008 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa#200503248244 for final inspection only.Details
renew pa#200503248244 for final inspection only. | |
| Sep 8, 2008 | Completed final sign-off Oct 2008 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa#200508109886 for final inspection only.Details
renew pa#200508109886 for final inspection only. | |
| Sep 3, 2008 | Completed final sign-off Sep 2008 | 100 Van Ness Av | Pribuss Engineering Inc | 26th floor-add heads: 6, relocated: 22, total heads 28Details
26th floor-add heads: 6, relocated: 22, total heads 28 | $5,500 |
| Aug 28, 2008 | Expired or cancelled expired Mar 2010 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa# 2007/10/09/4805, pa# 2007/09/10/2182, pa# 2005/11/22/8841, pa# 2005/06/03/4080 & pa# 2005/09/29/4218 for final inspection only. all work complete.Details
renew pa# 2007/10/09/4805, pa# 2007/09/10/2182, pa# 2005/11/22/8841, pa# 2005/06/03/4080 & pa# 2005/09/29/4218 for final inspection only. all work complete. | |
| Aug 18, 2008 | Never finaled issued Aug 2008, no final | 100 Van Ness Av | street space permit only.Details
street space permit only. | ||
| Aug 14, 2008 | Completed final sign-off Sep 2008 | 100 Van Ness Av | 26th floor - mechanical & electric work, reference application 200807247503.Details
26th floor - mechanical & electric work, reference application 200807247503. | $150,000 | |
| Aug 6, 2008 | Completed final sign-off Oct 2008 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa#200611228315 & #200610033988 for final inspection.Details
renew pa#200611228315 & #200610033988 for final inspection. | |
| Aug 6, 2008 | Completed final sign-off Dec 2008 | 100 Van Ness Av | Hathaway Dinwiddie Co. | work @ 11th floor. construct a 226 sf office tenant improvement. no electrical work, no mechanical work. no mechanical work. construct 2 new non-structural walls to create a new office with sidelite and clerestory windows.Details
work @ 11th floor. construct a 226 sf office tenant improvement. no electrical work, no mechanical work. no mechanical work. construct 2 new non-structural walls to create a new office with sidelite and clerestory windows. | $3,500 |
| Aug 6, 2008 | Never finaled issued Aug 2008, no final | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa# 9924882 & pa# 9920061 for final inspection only.Details
renew pa# 9924882 & pa# 9920061 for final inspection only. | |
| Aug 6, 2008 | Completed final sign-off Jan 2009 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa# 9801654, pa# 9803702 for final inspection only.Details
renew pa# 9801654, pa# 9803702 for final inspection only. | |
| Jul 31, 2008 | Completed final sign-off Aug 2008 | 100 Van Ness Av | Pribuss Engineering Inc | 27th floor fire sprinkler t.i. - added 11 heads, relocated 15 heads, total 26 heads.Details
27th floor fire sprinkler t.i. - added 11 heads, relocated 15 heads, total 26 heads. | $5,200 |
| Jul 24, 2008 | Completed final sign-off Sep 2008 | 100 Van Ness Av | 26th floor: t.i. demolition & construction of offices. no new area. mech, elect., fire alarm and sprinkler system modifications is not included. (under separate permit).Details
26th floor: t.i. demolition & construction of offices. no new area. mech, elect., fire alarm and sprinkler system modifications is not included. (under separate permit). | $200,000 | |
| Jul 22, 2008 | Completed final sign-off Aug 2008 | 100 Van Ness Av | Intrepid Electronic Systems Inc | 27th tenant improvment, modification of existing fire alarm system. add or replace 3 smoke detectors, 4 door holders, 8 strobe lights, 12 combination speaker/strobes.Details
27th tenant improvment, modification of existing fire alarm system. add or replace 3 smoke detectors, 4 door holders, 8 strobe lights, 12 combination speaker/strobes. | $6,000 |
| Jul 17, 2008 | Expired or cancelled withdrawn Feb 2009 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa#200610033988 for final inspeciton.Details
renew pa#200610033988 for final inspeciton. | |
| Jun 11, 2008 | Never finaled issued Jun 2008, no final | 100 Van Ness Av | Hathaway Dinwiddie Co. | 27th floor-replace (e) lighting with new fixtures, provide power and data to office cubicles and conference rooms. revision to pa# 2008-0508-1560Details
27th floor-replace (e) lighting with new fixtures, provide power and data to office cubicles and conference rooms. revision to pa# 2008-0508-1560 | $31,000 |
| May 8, 2008 | Completed final sign-off Aug 2008 | 100 Van Ness Av | Hathaway Dinwiddie Co. | construct new non-bearing partitions for conference rooms and offices. construct new 1 hour rated corridor. fire alarm & life safety under separate permit. electric under esperate permit.Details
construct new non-bearing partitions for conference rooms and offices. construct new 1 hour rated corridor. fire alarm & life safety under separate permit. electric under esperate permit. | $45,000 |
| Apr 16, 2008 | Never finaled issued Apr 2008, no final | 100 Van Ness Av | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Nov 19, 2007 | Completed final sign-off Nov 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | umbrella permit for retrofit ordinance #377-93 ( high rise sprinkler)Details
umbrella permit for retrofit ordinance #377-93 ( high rise sprinkler) | |
| Oct 9, 2007 | Never finaled issued Oct 2007, no final | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa# 2005/03/24/8244 & pa# 2005/03/10/7188.Details
renew pa# 2005/03/24/8244 & pa# 2005/03/10/7188. | |
| Oct 9, 2007 | Expired or cancelled expired Mar 2010 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa# 2005/11/22/8841.Details
renew pa# 2005/11/22/8841. | |
| Oct 9, 2007 | Completed final sign-off Oct 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa# 9725283.Details
renew pa# 9725283. | |
| Oct 9, 2007 | Never finaled issued Oct 2007, no final | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa# 2005/04/04/9061 & pa# 2005/04/07/9437.Details
renew pa# 2005/04/04/9061 & pa# 2005/04/07/9437. | |
| Oct 9, 2007 | Completed final sign-off Oct 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa# 2005/08/10/9887.Details
renew pa# 2005/08/10/9887. | |
| Sep 10, 2007 | Expired or cancelled expired Mar 2010 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa#200506034080,#200509294218 for final inspection.Details
renew pa#200506034080,#200509294218 for final inspection. | |
| Sep 10, 2007 | Completed final sign-off Oct 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa3200511178437 & # 200508049411 for final inspection.Details
renew pa3200511178437 & # 200508049411 for final inspection. | |
| May 31, 2007 | Completed final sign-off Sep 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew appl#200508109886 for final inspection.Details
renew appl#200508109886 for final inspection. | |
| May 17, 2007 | Completed final sign-off Sep 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | demlish non sturctural partions and doors no new constuction.Details
demlish non sturctural partions and doors no new constuction. | $25,000 |
| May 10, 2007 | Completed final sign-off May 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | demo non structural partition. all fire rated corridors to be maintained. fire life safety including fire sprinklers and alarm shall be maintained per code (nfpa 13 & 72) during and after demolition. ada access & aac documentation is shown on plans. ref. appl#200703297624.Details
demo non structural partition. all fire rated corridors to be maintained. fire life safety including fire sprinklers and alarm shall be maintained per code (nfpa 13 & 72) during and after demolition. ada access & aac documentation is shown on plans. ref. appl#200703297624. | $2,500 |
| Mar 29, 2007 | Completed final sign-off May 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | demo non structural partition. all fire rated corridors to be maintained. fire life safty including fire spknlr and fire alarm shall be maintained per code (nfpa 13 and nfpa 72) (required by sf fire dept)Details
demo non structural partition. all fire rated corridors to be maintained. fire life safty including fire spknlr and fire alarm shall be maintained per code (nfpa 13 and nfpa 72) (required by sf fire dept) | $2,500 |
| Mar 16, 2007 | Expired or cancelled cancelled Mar 2007 | 100 Van Ness Av | oti 2 3rd floor, el & meDetails
oti 2 3rd floor, el & me | $277,000 | |
| Jan 24, 2007 | Completed final sign-off Jan 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa#2003032506169 & pa#9617272 for final inspection.Details
renew pa#2003032506169 & pa#9617272 for final inspection. | |
| Jan 24, 2007 | Completed final sign-off Jan 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew pa#9417788 for final inspection.Details
renew pa#9417788 for final inspection. | |
| Jan 11, 2007 | Expired or cancelled cancelled Jan 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew: 9415883, 9415884 951145 for final inspection onlyDetails
renew: 9415883, 9415884 951145 for final inspection only | |
| Jan 11, 2007 | Expired or cancelled cancelled Jan 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | renew: 9415803 and 9415885 for final inspectionDetails
renew: 9415803 and 9415885 for final inspection | |
| Nov 22, 2006 | Expired or cancelled expired Jun 2011 | 100 Van Ness Av | Hathaway Dinwiddie Co. | oti-1, 8th floor, revision to pa# 2006/10/03/3988.Details
oti-1, 8th floor, revision to pa# 2006/10/03/3988. | $7,500 |
| Oct 3, 2006 | Expired or cancelled expired Jun 2011 | 100 Van Ness Av | Hathaway Dinwiddie Co. | oti-1, 8th floor.Details
oti-1, 8th floor. | $7,500 |
| Nov 22, 2005 | Expired or cancelled expired Mar 2010 | 100 Van Ness Av | Hathaway Dinwiddie Co. | oti-1 rev 26th floorDetails
oti-1 rev 26th floor | $100 |
| Nov 17, 2005 | Expired or cancelled expired Mar 2007 | 100 Van Ness Av | Decker Electric Co Inc Electrical Contra | fire alarm system - rearrange (e) equipment to make new wall layout . add new devices as requiredDetails
fire alarm system - rearrange (e) equipment to make new wall layout . add new devices as required | $11,783 |
| Sep 29, 2005 | Expired or cancelled expired Mar 2007 | 100 Van Ness Av | Pribuss Engineering Inc | 26th floor - fire spprinkler t.i. relocate 81, add 37.Details
26th floor - fire spprinkler t.i. relocate 81, add 37. | $16,000 |
| Aug 10, 2005 | Expired or cancelled expired Mar 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | demo non-bearing partitions, repair paint, carpet and ceiling (27th floor)Details
demo non-bearing partitions, repair paint, carpet and ceiling (27th floor) | $8,750 |
| Aug 10, 2005 | Expired or cancelled expired Mar 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | remove non-bearing partitions and patch walls & carpet tiles where walls are removed (21st floor)Details
remove non-bearing partitions and patch walls & carpet tiles where walls are removed (21st floor) | $7,500 |
| Aug 4, 2005 | Expired or cancelled expired Mar 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | oti-2, 26th floor, el, me.Details
oti-2, 26th floor, el, me. | $120,000 |
| Aug 4, 2005 | Completed final sign-off Apr 2006 | 100 Van Ness Av | Hathaway Dinwiddie Co. | install replacement emergency generator on roof of building.Details
install replacement emergency generator on roof of building. | $237,000 |
| Jun 22, 2005 | Expired or cancelled cancelled Dec 2006 | 100 Van Ness Av | Hathaway Dinwiddie Co. | oti-1 rev. 28th floorDetails
oti-1 rev. 28th floor | $100 |
| Jun 13, 2005 | Expired or cancelled cancelled Jun 2006 | 100 Van Ness Av | Hathaway Dinwiddie Co. | structural supports for roll up doors and roll down projection screen re: oti-1: 200506034080Details
structural supports for roll up doors and roll down projection screen re: oti-1: 200506034080 | $1,000 |
| Jun 3, 2005 | Completed final sign-off Mar 2009 | 100 Van Ness Av | Hathaway Dinwiddie Co. | oti-1, 26th floor, el, me, ls, sp.Details
oti-1, 26th floor, el, me, ls, sp. | $287,154 |
| May 18, 2005 | Expired or cancelled withdrawn Jul 2005 | 100 Van Ness Av | Hathaway Dinwiddie Co. | oti-1 18th floor elDetails
oti-1 18th floor el | $15,000 |
| Apr 7, 2005 | Expired or cancelled expired Mar 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | demolish non-structural partitions, ceiling & doors on 20th floor. comply w/ ab17.Details
demolish non-structural partitions, ceiling & doors on 20th floor. comply w/ ab17. | $42,000 |
| Apr 4, 2005 | Expired or cancelled expired Mar 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | oti-1, 20th floor, me.Details
oti-1, 20th floor, me. | $54,000 |
| Mar 24, 2005 | Expired or cancelled expired Mar 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | oti-1 28th floor el meDetails
oti-1 28th floor el me | $25,000 |
| Mar 10, 2005 | Expired or cancelled expired Mar 2007 | 100 Van Ness Av | Hathaway Dinwiddie Co. | remove non-bearing partition and partial t bar ceiling at send of 28th floor demo onlyDetails
remove non-bearing partition and partial t bar ceiling at send of 28th floor demo only | $10,000 |
| Nov 15, 2004 | Never finaled issued Nov 2004, no final | 100 Van Ness Av | street space permitDetails
street space permit | ||
| Sep 17, 2004 | Never finaled issued Sep 2004, no final | 100 Van Ness Av | street space permit.Details
street space permit. | ||
| Mar 25, 2003 | Never finaled issued Mar 2003, no final | 100 Van Ness Av | Armor Fire Protection Group Inc | replacing approx 1100 recalled sprinkler heads w/central/or -155 k factor 5.6 replacement in kind omDetails
replacing approx 1100 recalled sprinkler heads w/central/or -155 k factor 5.6 replacement in kind om | $43,000 |
| Mar 13, 2003 | Never finaled issued Mar 2003, no final | 100 Van Ness Av | street spaceDetails
street space | ||
| Jun 14, 2002 | Completed final sign-off Sep 2002 | 100 Van Ness Av | Pribuss Engineering Inc | t.i. relocate, add & change out fire sprkrs & dropsDetails
t.i. relocate, add & change out fire sprkrs & drops | $18,000 |
| May 15, 2002 | Completed final sign-off Sep 2002 | 100 Van Ness Av | Hathaway Dinwiddie Co. | oti-1 12th floor mechDetails
oti-1 12th floor mech | $88,500 |
| May 7, 2002 | Completed final sign-off May 2002 | 100 Van Ness Av | Decker Electric Co Inc Electrical Contra | as built drawings for fire alarm systemDetails
as built drawings for fire alarm system | |
| Mar 21, 2002 | Completed final sign-off Sep 2002 | 100 Van Ness Av | Hathaway Dinwiddie Co. | oti-1 3rd flfoor, no oti-2Details
oti-1 3rd flfoor, no oti-2 | $10,000 |
| Jan 4, 2002 | Completed final sign-off Oct 2002 | 100 Van Ness Av | Pribuss Engineering Inc | install wter flow switches in spkr systemDetails
install wter flow switches in spkr system | $12,300 |
| Dec 21, 2001 | Completed final sign-off Feb 2002 | 100 Van Ness Av | addition to fire alarm system associated with installation of new sprinkler flow switchesDetails
addition to fire alarm system associated with installation of new sprinkler flow switches | $25,000 | |
| Dec 14, 2001 | Completed final sign-off Sep 2002 | 100 Van Ness Av | W. Bradley Electric | permit for concrete out of open issued of exsting fire alarm sys, org permit expired, permit to closDetails
permit for concrete out of open issued of exsting fire alarm sys, org permit expired, permit to clos | $20,000 |
| Dec 14, 2001 | Completed final sign-off Sep 2002 | 100 Van Ness Av | W. Bradley Electric | permit to close out open permit issues of existing fire alarm system, org permit expiredDetails
permit to close out open permit issues of existing fire alarm system, org permit expired | $20,000 |
| Nov 1, 2001 | Expired or cancelled cancelled Aug 2002 | 100 Van Ness Av | Hathaway Dinwiddie Co. | replace of water cooling tower (roof)Details
replace of water cooling tower (roof) | $175,286 |
| Oct 30, 2001 | Expired or cancelled expired Sep 2002 | 100 Van Ness Av | Thomas Swan Sign Co Inc | erect electric wall signDetails
erect electric wall sign | |
| Sep 7, 2001 | Completed final sign-off May 2002 | 100 Van Ness Av | replacement of fire alarm system for entire buildingDetails
replacement of fire alarm system for entire building | $1,000,000 | |
| Jun 28, 2001 | Expired or cancelled expired Oct 2001 | 100 Van Ness Av | Pribuss Engineering Inc | fire sprinkler ti relocate change to exist system at gr fl locationDetails
fire sprinkler ti relocate change to exist system at gr fl location | $1,500 |
| May 21, 2001 | Expired or cancelled expired Nov 2001 | 100 Van Ness Av | streetspaceDetails
streetspace | ||
| Apr 5, 2001 | Expired or cancelled expired Oct 2001 | 100 Van Ness Av | remove walls in mezzanine-construct office in lobbyDetails
remove walls in mezzanine-construct office in lobby | $16,500 | |
| Mar 6, 2001 | Expired or cancelled expired Jul 2001 | 100 Van Ness Av | Armor Fire Protection Group Inc | replace n9 existing pressure reduction values in stair wells #1 & 2. after values ave installed by uDetails
replace n9 existing pressure reduction values in stair wells #1 & 2. after values ave installed by u | $225 |
| Jan 11, 2001 | Completed final sign-off Oct 2002 | 100 Van Ness Av | Pribuss Engineering Inc | fire sprinkler (t.i.)Details
fire sprinkler (t.i.) | $13,500 |
| Nov 6, 2000 | Completed final sign-off Sep 2002 | 100 Van Ness Av | Hathaway Dinwiddie Co. | oti-2 22nd floor el.Details
oti-2 22nd floor el. | $97,500 |
| Oct 19, 2000 | Completed final sign-off Nov 2002 | 100 Van Ness Av | Hathaway Dinwiddie Co. | oti-1:22nd fl only: me, l/s, spDetails
oti-1:22nd fl only: me, l/s, sp | $135,500 |
| May 4, 2000 | Completed final sign-off Oct 2002 | 100 Van Ness Av | Pribuss Engineering Inc | fire sprk as built per sffd insp burt reyes on 14th & 15th fls org apl9925091Details
fire sprk as built per sffd insp burt reyes on 14th & 15th fls org apl9925091 | |
| Mar 15, 2000 | Completed final sign-off Sep 2002 | 100 Van Ness Av | Hathaway Dinwiddie Constr**See 729664*** | t/1 addition to life safety systemDetails
t/1 addition to life safety system | $15,000 |
| Mar 10, 2000 | Completed final sign-off Sep 2002 | 100 Van Ness Av | Pribuss Engineering Inc | fire sprinklerDetails
fire sprinkler | $14,800 |
| Feb 1, 2000 | Completed final sign-off Sep 2002 | 100 Van Ness Av | Hathaway Dinwiddie Co. | oti-2 el, me 5th floorDetails
oti-2 el, me 5th floor | $102,540 |
| Jan 21, 2000 | Completed final sign-off Sep 2002 | 100 Van Ness Av | oti-1, full floor owner occupied tenant builb-out. new walls, ceilings, floor & finishesDetails
oti-1, full floor owner occupied tenant builb-out. new walls, ceilings, floor & finishes | $149,947 | |
| Jan 7, 2000 | Completed final sign-off Sep 2002 | 100 Van Ness Av | revision to #9917810: relocate fire sprinklers per/ inspector requestDetails
revision to #9917810: relocate fire sprinklers per/ inspector request | ||
| Jan 6, 2000 | Completed final sign-off Sep 2002 | 100 Van Ness Av | non-strctl/preconstctn demoDetails
non-strctl/preconstctn demo | $22,875 |