W. Wong Construction Co. Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2001 to Feb 2023
- Last 24 months
- 0 permits filed
144 permits since 2000: 76 completed, 52 never finaled, 16 expired or cancelled.
Of the 52 never-finaled permits, 1 is 3 to 5 years old, 11 are 5 to 10 years old, 40 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 144.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 14, 2023 | Never finaled issued Feb 2023, no final | 4 Embarcadero Center | add one entrance door to lobby of plaza area, fill (e) niche at walk way for part of cold storage within restaurant kitchen. fire sprinkler and life safety under seperate permit.Details
add one entrance door to lobby of plaza area, fill (e) niche at walk way for part of cold storage within restaurant kitchen. fire sprinkler and life safety under seperate permit. | $50,000 |
| Apr 21, 2021 | Never finaled issued Jun 2021, no final | 4 Embarcadero Center | install hydronic radiant pane (heat) and circulation pump for heating of outdoor patio area.Details
install hydronic radiant pane (heat) and circulation pump for heating of outdoor patio area. | $3,000 |
| Feb 19, 2020 | Never finaled issued Feb 2020, no final | 67 Twin Peaks Bl | remodel master bathroom, replace floor tile, bathroom fixtures, repair and replace dryrot flooring plywood as needed.Details
remodel master bathroom, replace floor tile, bathroom fixtures, repair and replace dryrot flooring plywood as needed. | $5,000 |
| Feb 19, 2020 | Never finaled issued Feb 2020, no final | 67 Twin Peaks Bl | replace roofing with "cold apply" mtacrylics roofing repair/patch and replace dryrot plywood as needed. work not visible from street.Details
replace roofing with "cold apply" mtacrylics roofing repair/patch and replace dryrot plywood as needed. work not visible from street. | $2,000 |
| Nov 25, 2019 | Completed final sign-off Dec 2019 | 1601 Quesada Av | administrative permit to revise pa#201906193909, remove all scope of work in basement level and 2/f, maintenance noly, all plumbing fixtures are replaced in-kind, update da checklist.Details
administrative permit to revise pa#201906193909, remove all scope of work in basement level and 2/f, maintenance noly, all plumbing fixtures are replaced in-kind, update da checklist. | |
| Nov 13, 2019 | Completed final sign-off Feb 2020 | 3906 Sacramento St | replace roof sheathing caused by dry rot, remove (e) roofing material and apply new cold apply metacrylico roofing. not visible from street. maher n/a.Details
replace roof sheathing caused by dry rot, remove (e) roofing material and apply new cold apply metacrylico roofing. not visible from street. maher n/a. | $9,000 |
| Oct 17, 2019 | Expired or cancelled expired Oct 2023 | 2050 Jackson St | interior remodel of ground floor to consist of adding 1 bedroom to family room and increasing bathroom size by reducing laundry room n/a maherDetails
interior remodel of ground floor to consist of adding 1 bedroom to family room and increasing bathroom size by reducing laundry room n/a maher | $5,000 |
| Sep 13, 2019 | Completed final sign-off Sep 2021 | 557 03rd Av | remove partition wall at 1st floor and relocate bathroom fixtures. install 2 new tankless water heater. add 1 new master bathroom and bedroom at 2nd floor. add 1 new bedrooms, bathroom, and storage at 3rd floor. add 2 new skylights and 6 dormers at roof.Details
remove partition wall at 1st floor and relocate bathroom fixtures. install 2 new tankless water heater. add 1 new master bathroom and bedroom at 2nd floor. add 1 new bedrooms, bathroom, and storage at 3rd floor. add 2 new skylights and 6 dormers at roof. | $150,000 |
| Sep 4, 2019 | Completed final sign-off Jun 2021 | 32 Clement St | commercial ti interior renovation on gr fl for medical officeDetails
commercial ti interior renovation on gr fl for medical office | $12,000 |
| Jun 25, 2019 | Never finaled issued Jun 2019, no final | 557 03rd Av | clean up trash and no structural fire damage debris repair works under sep permit. electrical service will be turn back on for repair and clean up.Details
clean up trash and no structural fire damage debris repair works under sep permit. electrical service will be turn back on for repair and clean up. | $1,000 |
| Jun 19, 2019 | Completed final sign-off Dec 2019 | 1601 Quesada Av | renovation. ada barrier removal and deferred maintenance repair. prop-up wooden fence. repair and replace bathroom fixtures in-kind on basement level. (e) heating system to remain.Details
renovation. ada barrier removal and deferred maintenance repair. prop-up wooden fence. repair and replace bathroom fixtures in-kind on basement level. (e) heating system to remain. | $400,000 |
| Mar 13, 2019 | Completed final sign-off Apr 2019 | 205 13th St | revision to approved bpa #201902011859. update for usage of training rooms and reflected lighting plan.Details
revision to approved bpa #201902011859. update for usage of training rooms and reflected lighting plan. | |
| Feb 1, 2019 | Completed final sign-off Apr 2019 | 205 13th St | 2nd floor #2050: t.i. to remove non structural partition walls and doors. install new non-structural partition walls and doors, including new paint and carpet, no change of use. n/a for maherDetails
2nd floor #2050: t.i. to remove non structural partition walls and doors. install new non-structural partition walls and doors, including new paint and carpet, no change of use. n/a for maher | $75,000 |
| Nov 20, 2018 | Completed final sign-off Nov 2018 | 4 Embarcadero Center | replace (e) gate with new gate new panic hardware and fire know box at restaurant on lobby levelDetails
replace (e) gate with new gate new panic hardware and fire know box at restaurant on lobby level | $1,000 |
| Sep 13, 2018 | Completed final sign-off Dec 2019 | 1601 Quesada Av | replace existing exterior wood windows, 21 total. replace in-kind. same size. same location. m= 0.32 maxDetails
replace existing exterior wood windows, 21 total. replace in-kind. same size. same location. m= 0.32 max | $6,000 |
| Aug 24, 2018 | Completed final sign-off Sep 2018 | 145 Jefferson St | provide lighting plan with title 24, refer ti permit #201806141864. maher naDetails
provide lighting plan with title 24, refer ti permit #201806141864. maher na | $3,000 |
| Jul 20, 2018 | Never finaled issued Jul 2018, no final | 145 Jefferson St | provide structural detail to exterior signs and facade decoration. ref 201805149067. maher n/aDetails
provide structural detail to exterior signs and facade decoration. ref 201805149067. maher n/a | $5,000 |
| Jul 18, 2018 | Completed final sign-off Sep 2018 | 145 Jefferson St | install one illuminated single-faced wall sign for giants dugout store.Details
install one illuminated single-faced wall sign for giants dugout store. | $2,000 |
| Jul 18, 2018 | Completed final sign-off Sep 2018 | 145 Jefferson St | install one illuminated single-faced wall sign for lefty ballpark baseball buffet & cafe. maher n/a.Details
install one illuminated single-faced wall sign for lefty ballpark baseball buffet & cafe. maher n/a. | $3,000 |
| Jun 14, 2018 | Completed final sign-off Sep 2018 | 145 Jefferson St | ti for change ownership of (e) restaurant - mep, fire sprinkler & fire alarm under separate permit. maher naDetails
ti for change ownership of (e) restaurant - mep, fire sprinkler & fire alarm under separate permit. maher na | $180,000 |
| May 14, 2018 | Never finaled issued Jun 2018, no final | 145 Jefferson St | facade improvements to include new metal truss, metal faux truss, sconces, led digital panels, signs sep permitDetails
facade improvements to include new metal truss, metal faux truss, sconces, led digital panels, signs sep permit | $8,000 |
| May 4, 2018 | Completed final sign-off May 2018 | 531 28th Av | voluntary strengthening existing concrete wall and footing in the garage.Details
voluntary strengthening existing concrete wall and footing in the garage. | $6,000 |
| May 1, 2018 | Completed final sign-off Sep 2018 | 145 Jefferson St | in existing vacant restaurant space, replace damaged non-structural walls, install non-bearing partition for out walls and infill extg floor opening at 2nd floor in preparation for future t.i. no exterior work. n/a for maherDetails
in existing vacant restaurant space, replace damaged non-structural walls, install non-bearing partition for out walls and infill extg floor opening at 2nd floor in preparation for future t.i. no exterior work. n/a for maher | $30,000 |
| Apr 17, 2018 | Never finaled issued Apr 2018, no final | 2231 Leavenworth St | to obtain final inspection for work approved under pa#09502550, 8413306. all work is complete.Details
to obtain final inspection for work approved under pa#09502550, 8413306. all work is complete. | |
| Feb 15, 2018 | Never finaled issued Feb 2018, no final | 1317 20th Av | administrative permit to clarify proposed occupancy class on 201707212606(change from retail use), should be from e b occupancy to (massage, personal use) to new b occupancy after school tutorial, personal service. (incorrectly entered as e) maher not reqDetails
administrative permit to clarify proposed occupancy class on 201707212606(change from retail use), should be from e b occupancy to (massage, personal use) to new b occupancy after school tutorial, personal service. (incorrectly entered as e) maher not req | |
| Feb 14, 2018 | Completed final sign-off Sep 2018 | 145 Jefferson St | exploratory soft demolition, not structure, remove artificial folies and decorative panels. prepare for future tenant improvement. interior only. maher not reqDetails
exploratory soft demolition, not structure, remove artificial folies and decorative panels. prepare for future tenant improvement. interior only. maher not req | $1,000 |
| Feb 6, 2018 | Completed final sign-off Mar 2018 | 1345 Taylor St | administrative permit to clarify the design system, method and scope of work of soft story permit #201708023707 and supersede permit #201609076934Details
administrative permit to clarify the design system, method and scope of work of soft story permit #201708023707 and supersede permit #201609076934 | $70,000 |
| Jan 19, 2018 | Never finaled issued May 2018, no final | 26 Clement St | voluntary soft story upgrade per ab-094 using cebc 2016 appx a4 maher na 201801199094 demo work to be done first. maher n/aDetails
voluntary soft story upgrade per ab-094 using cebc 2016 appx a4 maher na 201801199094 demo work to be done first. maher n/a | $50,000 |
| Jan 19, 2018 | Never finaled issued May 2018, no final | 26 Clement St | safe demo at ground floor level, remain vacancy under ab-017 maher na- to be done before soft story under 201801109092. maher n/aDetails
safe demo at ground floor level, remain vacancy under ab-017 maher na- to be done before soft story under 201801109092. maher n/a | $1,500 |
| Nov 13, 2017 | Completed final sign-off May 2018 | 165 Jefferson St | install new sink & prep tables, install new low wall 6' h, (e) mep to be remain. fire sprinkler & life safety system under separate permit.nochange of occupancy.Details
install new sink & prep tables, install new low wall 6' h, (e) mep to be remain. fire sprinkler & life safety system under separate permit.nochange of occupancy. | $4,500 |
| Oct 18, 2017 | Completed final sign-off Jun 2019 | 1010 Market St | change of use from retail to office, g/f- interior t.i. to convert retail space into public facility business office at ground floor. work includes non-structural work, new non-load bearing partitions, doors, windows, floor and wall finishes and ceiling repairs.Details
change of use from retail to office, g/f- interior t.i. to convert retail space into public facility business office at ground floor. work includes non-structural work, new non-load bearing partitions, doors, windows, floor and wall finishes and ceiling repairs. | $27,000 |
| Oct 16, 2017 | Completed final sign-off Oct 2017 | 634 45th Av | to abate nov #201762863 by removing window and infill opening as previously approved under pa# 201404294518. revert back to approved plans.Details
to abate nov #201762863 by removing window and infill opening as previously approved under pa# 201404294518. revert back to approved plans. | |
| Sep 26, 2017 | Never finaled issued Sep 2017, no final | 1149 Potrero Av | replace extg side windows in kind with double pane. n/a for maherDetails
replace extg side windows in kind with double pane. n/a for maher | $2,000 |
| Aug 2, 2017 | Completed final sign-off Mar 2018 | 1345 Taylor St | revision to pa#201609076934 and to reconfigurate structural detail for soft story retrofit.Details
revision to pa#201609076934 and to reconfigurate structural detail for soft story retrofit. | |
| Oct 26, 2016 | Completed final sign-off Nov 2017 | 2233 Vicente St | painted wall, non-structural signDetails
painted wall, non-structural sign | $1,000 |
| Sep 1, 2016 | Never finaled issued Sep 2016, no final | 1224 Grant Av | install 2 hours fire rated concrete block wall approx 3'x8'to close up opening to adjacent building which was openned under pa #9502053Details
install 2 hours fire rated concrete block wall approx 3'x8'to close up opening to adjacent building which was openned under pa #9502053 | $600 |
| Jun 3, 2016 | Completed final sign-off Jun 2016 | 316 Columbus Av | to renew pa# 9921736 for final inspection, all works were completed.Details
to renew pa# 9921736 for final inspection, all works were completed. | |
| Dec 11, 2015 | Never finaled issued Dec 2015, no final | 950 Geneva Av | to comply n.o.v. #201519031 and #20152232, get plumbing and electrical permits for inspectionDetails
to comply n.o.v. #201519031 and #20152232, get plumbing and electrical permits for inspection | $1,000 |
| Sep 18, 2015 | Expired or cancelled expired Dec 2018 | 634 45th Av | revision to pa#201504083139 temperory shoringDetails
revision to pa#201504083139 temperory shoring | $40,000 |
| Sep 18, 2015 | Completed final sign-off Apr 2018 | 632 45th Av | provide underpinning to allow excavation at 634 45th ave.Details
provide underpinning to allow excavation at 634 45th ave. | $20,000 |
| Jul 2, 2015 | Completed final sign-off Oct 2015 | 5238 Diamond Heights Bl | comply with nov #201552665 - change of ownership for restaurant. add rice cooker & type 11 hood installation.Details
comply with nov #201552665 - change of ownership for restaurant. add rice cooker & type 11 hood installation. | $6,000 |
| May 18, 2015 | Completed final sign-off Dec 2015 | 730 Sacramento St | tenant improvement per plan, no structural work. n/a maher ord. # 155-13Details
tenant improvement per plan, no structural work. n/a maher ord. # 155-13 | $70,000 |
| Apr 7, 2015 | Completed final sign-off Jun 2015 | 2550 Van Ness Av | to obtain final inspection for work approved under pa#201012227196. all work is complete.Details
to obtain final inspection for work approved under pa#201012227196. all work is complete. | |
| Apr 7, 2015 | Completed final sign-off Nov 2015 | 2550 Van Ness Av | to obtain final inspection for work approved under pa# 201105035236. all work is complete.Details
to obtain final inspection for work approved under pa# 201105035236. all work is complete. | |
| Apr 7, 2015 | Completed final sign-off Nov 2015 | 2550 Van Ness Av | to obtain final inspection for work approved under pa# 201012176961. all work is complete.Details
to obtain final inspection for work approved under pa# 201012176961. all work is complete. | |
| Feb 2, 2015 | Completed final sign-off Feb 2015 | 2550 Van Ness Av | renew pa# 201012317682 for final inspection. all work were done.Details
renew pa# 201012317682 for final inspection. all work were done. | |
| Feb 2, 2015 | Completed final sign-off Feb 2015 | 2550 Van Ness Av | revise foundation detail to approved pa#201012317682 for final inspection and comply nov# 2014110022, #201163688. n/a ordinance #155-13Details
revise foundation detail to approved pa#201012317682 for final inspection and comply nov# 2014110022, #201163688. n/a ordinance #155-13 | |
| Jan 14, 2015 | Never finaled issued Jan 2015, no final | 1950 Mission St | replace (e) bathroom, shower and laundry room fixtures.Details
replace (e) bathroom, shower and laundry room fixtures. | $30,000 |
| Dec 17, 2014 | Completed final sign-off Oct 2015 | 182 Jordan Av | recomencement and completion of work approved under pa# 9511194.Details
recomencement and completion of work approved under pa# 9511194. | |
| Dec 17, 2014 | Completed final sign-off Oct 2015 | 182 Jordan Av | recomencement and completion of work approved under pa# 9307312.Details
recomencement and completion of work approved under pa# 9307312. | $100,000 |
| Oct 31, 2014 | Never finaled issued Oct 2014, no final | 1401 Polk St | submit title 24 for p.a.# 2012.1101.3355.Details
submit title 24 for p.a.# 2012.1101.3355. | |
| Sep 10, 2014 | Completed final sign-off Oct 2014 | 4489 17th St | work @ unit# 3 only. remodel kitchen, replace cabinet, countertop, and floor tile. remodel bathroom, replace plumbing fixtures.Details
work @ unit# 3 only. remodel kitchen, replace cabinet, countertop, and floor tile. remodel bathroom, replace plumbing fixtures. | $8,000 |
| Aug 22, 2014 | Never finaled issued Aug 2014, no final | 750 Kearny St | 5th flr: remodel (e) fitness center, remodel (e) sales office become spa treatment center, works include demolition, new walls, and ceiling, new cabinet, new ada bathroom, mepp and fire sprinkler, fire alarm under separate permit. maher n/aDetails
5th flr: remodel (e) fitness center, remodel (e) sales office become spa treatment center, works include demolition, new walls, and ceiling, new cabinet, new ada bathroom, mepp and fire sprinkler, fire alarm under separate permit. maher n/a | $100,000 |
| Jul 29, 2014 | Never finaled issued Aug 2014, no final | 1401 Polk St | propose hvac system and kitchen hood and duct system to tenant improvement work under pa#201211013355Details
propose hvac system and kitchen hood and duct system to tenant improvement work under pa#201211013355 | $20,000 |
| Jul 15, 2014 | Never finaled issued Aug 2014, no final | 5400 Geary Bl | install 8'-0" tall iron fence (temporary) and gate at main entrance to comply with planning dept. nov. #12744.Details
install 8'-0" tall iron fence (temporary) and gate at main entrance to comply with planning dept. nov. #12744. | $2,000 |
| Jun 10, 2014 | Never finaled issued Jul 2014, no final | 750 Kearny St | provide, mechanical, electrical layout for remodelling of (e) spa to change to new meeting rooms and office; ref pa 201312164313.Details
provide, mechanical, electrical layout for remodelling of (e) spa to change to new meeting rooms and office; ref pa 201312164313. | $10,000 |
| Jun 6, 2014 | Never finaled issued Jun 2014, no final | 1143 Potrero Av | replace exterior stucco to repair leakage. the new stucco will be in kind, visible from street.Details
replace exterior stucco to repair leakage. the new stucco will be in kind, visible from street. | $4,000 |
| Jun 6, 2014 | Never finaled issued Jun 2014, no final | 1149 Potrero Av | repalce exterior stucco in kind to repair leakage, visible from street. n/a maher ordinance 155-13Details
repalce exterior stucco in kind to repair leakage, visible from street. n/a maher ordinance 155-13 | $4,000 |
| Mar 4, 2014 | Never finaled issued Mar 2014, no final | 112 07th St | provide details of structure for accomodate site condition. revision to pa# 201307010920. na compliance #155-13.Details
provide details of structure for accomodate site condition. revision to pa# 201307010920. na compliance #155-13. | $4,000 |
| Feb 5, 2014 | Never finaled issued Feb 2014, no final | 1253 Exposition Dr | unit c: remodel kitchen, replace cabinet, replace electrical outlets to gfi, replace kitchen sink, no layout change, patch 2/f gypsum wall board, painting; compliance with ord 155-13 not requiredDetails
unit c: remodel kitchen, replace cabinet, replace electrical outlets to gfi, replace kitchen sink, no layout change, patch 2/f gypsum wall board, painting; compliance with ord 155-13 not required | $7,500 |
| Jan 28, 2014 | Completed final sign-off Feb 2015 | 1355 Market St | ground floor interior remodel to include select areas of demolition, general retail tenant improvement, new handicap accessible toilet room. exterior & mep work under separate permits. ** maher: compliance with ordinance no# 155-13 not required **Details
ground floor interior remodel to include select areas of demolition, general retail tenant improvement, new handicap accessible toilet room. exterior & mep work under separate permits. ** maher: compliance with ordinance no# 155-13 not required ** | $1,200,000 |
| Jan 24, 2014 | Never finaled issued Jan 2014, no final | 884 North Point St | revision to app#201312194665. revise layout of bathroom and bedroom to reflect building condition. n/a for maher ordinance no. 155-13Details
revision to app#201312194665. revise layout of bathroom and bedroom to reflect building condition. n/a for maher ordinance no. 155-13 | |
| Jan 23, 2014 | Completed final sign-off Mar 2015 | 1 Shrader St | #578, #510- correct code violation #nov# 200726836 dated 4/25/12 remodel office.Details
#578, #510- correct code violation #nov# 200726836 dated 4/25/12 remodel office. | $10,000 |
| Jan 6, 2014 | Never finaled issued Jan 2014, no final | 2550 Van Ness Av | work is done. to obtain final inspection for work approved under pa# 201110217343.Details
work is done. to obtain final inspection for work approved under pa# 201110217343. | |
| Dec 16, 2013 | Never finaled issued Apr 2014, no final | 750 Kearny St | ground floor - demolish (e) spa area on ground floor. install (n) walls, ceilings, lighting and cabinetry. electrical, plumbing and sprinkler modifications will be performed under separate permits. ** maher: compliance with ordinance no# 155-13 not required **Details
ground floor - demolish (e) spa area on ground floor. install (n) walls, ceilings, lighting and cabinetry. electrical, plumbing and sprinkler modifications will be performed under separate permits. ** maher: compliance with ordinance no# 155-13 not required ** | $290,000 |
| Dec 12, 2013 | Never finaled issued May 2014, no final | 101 Duboce Av | to comply with planning complaint# 12745. to erect electric, projecting, double faced sign.Details
to comply with planning complaint# 12745. to erect electric, projecting, double faced sign. | $5,000 |
| Dec 12, 2013 | Never finaled issued May 2014, no final | 101 Duboce Av | to comply with planning complaint# 12745. 2 identical sign. to erect electric, wall, single faced sign.Details
to comply with planning complaint# 12745. 2 identical sign. to erect electric, wall, single faced sign. | $4,000 |
| Dec 12, 2013 | Expired or cancelled cancelled Nov 2016 | 101 Duboce Av | to comply planning complaint# 12745. revision to pa# 2012/08/28/8439. exterior revision for planning enforcement notification.Details
to comply planning complaint# 12745. revision to pa# 2012/08/28/8439. exterior revision for planning enforcement notification. | |
| Dec 2, 2013 | Completed final sign-off Apr 2014 | 1806 38th Av | install 4 windows (aluminium wood clad double glazed as in kind to the original windows to abate notice of violations # 201331331. see reverse side for bedroom window requirements.Details
install 4 windows (aluminium wood clad double glazed as in kind to the original windows to abate notice of violations # 201331331. see reverse side for bedroom window requirements. | $3,000 |
| Nov 26, 2013 | Never finaled issued Nov 2013, no final | 851 11th Ti St | emergency order to demo a one story warehouse property.Details
emergency order to demo a one story warehouse property. | $10,000 |
| Nov 22, 2013 | Completed final sign-off Feb 2014 | 1409 Sutter St | to establish a 10 room tourist hotel and full service restaurant as set forth in motion 19016 approved by the city planning commission on 11-7-2013 (case 2013.0361c). plans include reconfiguration of 3rd and 4th floor.Details
to establish a 10 room tourist hotel and full service restaurant as set forth in motion 19016 approved by the city planning commission on 11-7-2013 (case 2013.0361c). plans include reconfiguration of 3rd and 4th floor. | $200,000 |
| Nov 7, 2013 | Never finaled issued Dec 2013, no final | 1115 Keppler Ct | restore facade siding, window and roof after fire damage. this permit is for weather protection of the building only and no interior work to be performed.Details
restore facade siding, window and roof after fire damage. this permit is for weather protection of the building only and no interior work to be performed. | $25,000 |
| Oct 29, 2013 | Completed final sign-off Mar 2014 | 2809 San Bruno Av | to convert extg retail space to state licensed medical massage therapy establishment. remove non load bearing wall, install, h c bathroom, shower room, therapy rooms.Details
to convert extg retail space to state licensed medical massage therapy establishment. remove non load bearing wall, install, h c bathroom, shower room, therapy rooms. | $60,000 |
| Oct 17, 2013 | Never finaled issued Oct 2013, no final | 1223 Mariner Dr | to provide additional roof truss detail to revised building pa#201309106434 - structural only.Details
to provide additional roof truss detail to revised building pa#201309106434 - structural only. | |
| Sep 24, 2013 | Never finaled issued Sep 2013, no final | 2550 Van Ness Av | to obatin final inspection for work approved under pa#201110257543. all work is completeDetails
to obatin final inspection for work approved under pa#201110257543. all work is complete | |
| Sep 10, 2013 | Completed final sign-off Feb 2014 | 1223 Mariner Dr | reconstruct fire damaged unit c in-kind. repair fire damage for units b & d. remodel for units a, e & f.Details
reconstruct fire damaged unit c in-kind. repair fire damage for units b & d. remodel for units a, e & f. | $350,000 |
| Sep 5, 2013 | Completed final sign-off Jun 2014 | 2620 Jones St | fitness center addition.2nd level guest room conversion to a club lounge at 3rd floor. sprinkler separate permitDetails
fitness center addition.2nd level guest room conversion to a club lounge at 3rd floor. sprinkler separate permit | $184,000 |
| Jun 20, 2013 | Never finaled issued Jun 2013, no final | 1149 Potrero Av | replace dry rot siding in kind in rearDetails
replace dry rot siding in kind in rear | $2,000 |
| May 30, 2013 | Never finaled issued May 2013, no final | 750 Kearny St | install partition wall & door for storage room on 3rd floor mezzanine plan.Details
install partition wall & door for storage room on 3rd floor mezzanine plan. | $1,500 |
| May 29, 2013 | Completed final sign-off Jun 2013 | 7 Lake Forest Ct | to comply with nov #201198667. remove porch enclosure at the rear of the bldg.Details
to comply with nov #201198667. remove porch enclosure at the rear of the bldg. | $1,000 |
| Apr 30, 2013 | Never finaled issued Apr 2013, no final | 1327 Noriega St | modify and correction of plumbing fixtures to comply with nov. #201385578. install grease interceptor.Details
modify and correction of plumbing fixtures to comply with nov. #201385578. install grease interceptor. | $4,000 |
| Apr 26, 2013 | Completed final sign-off Apr 2014 | 2817 San Bruno Av | abate nov# 201238223-repair fire damage buildingDetails
abate nov# 201238223-repair fire damage building | $70,000 |
| Apr 5, 2013 | Never finaled issued Apr 2013, no final | 1409 Sutter St | replace steel beam in kitchen. replace a section of wall between dining room in basement with new steel beam. lower slab at front portion of existing basement within the dining room with raised curb and new slab.Details
replace steel beam in kitchen. replace a section of wall between dining room in basement with new steel beam. lower slab at front portion of existing basement within the dining room with raised curb and new slab. | $30,000 |
| Apr 2, 2013 | Completed final sign-off Jun 2013 | 882 North Point St | revision to appl #2013.02.22.0777 - install type 1 hood at ground floor cafe.Details
revision to appl #2013.02.22.0777 - install type 1 hood at ground floor cafe. | $3,000 |
| Apr 2, 2013 | Completed final sign-off Apr 2013 | 1810 Union St | to obtain final inspection for work approved under pa 201101218761, all work is completed.Details
to obtain final inspection for work approved under pa 201101218761, all work is completed. | |
| Mar 14, 2013 | Completed final sign-off Oct 2013 | 750 Kearny St | to comply with nov 201259521. convert 3rd fl bath to storage room. enlarge electrical closet at 5th flDetails
to comply with nov 201259521. convert 3rd fl bath to storage room. enlarge electrical closet at 5th fl | $5,000 |
| Feb 22, 2013 | Completed final sign-off Jun 2013 | 882 North Point St | install range at ground floor cafe,install interior deck (45 sf). mep & hood under separate permit per plan.Details
install range at ground floor cafe,install interior deck (45 sf). mep & hood under separate permit per plan. | $10,000 |
| Jan 29, 2013 | Completed final sign-off Feb 2014 | 1409 Sutter St | renovate (e) kitchen & dining rooms. provide lodging for (e) private club change of use to r-1 occupancy. upgrade exist ground level bathrms to accessible. provide upgraded rescue windows to comply with sec 1029 & 715. no details or sched provided. sprinkler, life safty, hood sys under sep permitDetails
renovate (e) kitchen & dining rooms. provide lodging for (e) private club change of use to r-1 occupancy. upgrade exist ground level bathrms to accessible. provide upgraded rescue windows to comply with sec 1029 & 715. no details or sched provided. sprinkler, life safty, hood sys under sep permit | $350,000 |
| Dec 13, 2012 | Never finaled issued Jan 2013, no final | 101 Duboce Av | revision to pa#2012-0724-5570. foundation walls to be shotcrete. special inspection on item#12Details
revision to pa#2012-0724-5570. foundation walls to be shotcrete. special inspection on item#12 | |
| Dec 6, 2012 | Never finaled issued Dec 2012, no final | 165 Jefferson St | install new marquee at front of building. install new storefront at front of building. refer to ti pa# 2012-1102-3470Details
install new marquee at front of building. install new storefront at front of building. refer to ti pa# 2012-1102-3470 | $20,000 |
| Dec 6, 2012 | Never finaled issued Dec 2012, no final | 165 Jefferson St | erect a non electric single faced marquee new signDetails
erect a non electric single faced marquee new sign | $1,000 |
| Nov 21, 2012 | Never finaled issued Nov 2012, no final | 634 45th Av | secure doors and windows with plywood, alteration permit will be under peperate permit.Details
secure doors and windows with plywood, alteration permit will be under peperate permit. | $2,000 |
| Nov 2, 2012 | Completed final sign-off Feb 2013 | 165 Jefferson St | change of use. convert existing retail (m) to bar (a-2). install new non load bearing partitons, accessible mens and womens bathrooms, storage area and counters. storefront on separate permit. sffd public assembly permit is required for 163 persons.Details
change of use. convert existing retail (m) to bar (a-2). install new non load bearing partitons, accessible mens and womens bathrooms, storage area and counters. storefront on separate permit. sffd public assembly permit is required for 163 persons. | $350,000 |
| Nov 1, 2012 | Never finaled issued Nov 2012, no final | 165 Jefferson St | remove interior finishes, shelving prepare for future tenant improvement. no demolition.Details
remove interior finishes, shelving prepare for future tenant improvement. no demolition. | $2,000 |
| Nov 1, 2012 | Completed final sign-off Nov 2014 | 1401 Polk St | change of use per planning #2000297. new kichen, handicap bathroom, counter, walkin cooler, equipment hookup.Details
change of use per planning #2000297. new kichen, handicap bathroom, counter, walkin cooler, equipment hookup. | $150,000 |
| Aug 28, 2012 | Completed final sign-off Aug 2014 | 101 Duboce Av | 4th floor vertical addition of 2 dwelling units.Details
4th floor vertical addition of 2 dwelling units. | $250,000 |
| Aug 28, 2012 | Never finaled issued Sep 2012, no final | 101 Duboce Av | remodel (e) liquor store w/ground floor lightwell infill. remodel (e) 5 residential units, remove 2nd stair, upgrade to type 5a construction. partial voluntary seismic strengthening. bldg to be fully sprinklerd under separate permit.Details
remodel (e) liquor store w/ground floor lightwell infill. remodel (e) 5 residential units, remove 2nd stair, upgrade to type 5a construction. partial voluntary seismic strengthening. bldg to be fully sprinklerd under separate permit. | $1,000,000 |
| Jul 24, 2012 | Never finaled issued Aug 2012, no final | 101 Duboce Av | comply w/nov #201225163 - remove all debris, repair fiew damaged bldg. shore existing floors + walls as required by inspector. shore (e) foundation w/new concrete beams, walls + footings.Details
comply w/nov #201225163 - remove all debris, repair fiew damaged bldg. shore existing floors + walls as required by inspector. shore (e) foundation w/new concrete beams, walls + footings. | $150,000 |
| Jun 1, 2012 | Completed final sign-off Jan 2014 | 100 Van Ness Av | abate complaint no. 201227241. exploratory demolition on levels 3,5,7,11,13,17,20,22,24,25, and 28.Details
abate complaint no. 201227241. exploratory demolition on levels 3,5,7,11,13,17,20,22,24,25, and 28. | $10,000 |
| May 4, 2012 | Never finaled issued Jun 2012, no final | 491 Post St | no work to be done under this permit. establish occupancy load for assembly occupancy onlyDetails
no work to be done under this permit. establish occupancy load for assembly occupancy only |