Block 0233, lot 045
100 Drumm St
- City’s use
- Commercial Office
- Lot
- 10,363 sq ft
- Zoning
- C3O
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 7, 2026 | In progress issued Jul 2026 | 4 Embarcadero Center | Bcci Construction Company | 37th flr: mechanical only permit to support approved arch permit 202511059008. rework existing vav, air distriution and ductwork.Details
37th flr: mechanical only permit to support approved arch permit 202511059008. rework existing vav, air distriution and ductwork. | $161,850 |
| Apr 15, 2026 | Completed final sign-off Aug 2026 | 4 Embarcadero Center | M C S Construction Services | 8th fl - ref pa 202601204110 deferred mech & elec permit mech,. rework mechanical low side system to serve partial 8th floor layout. elec, lighting assoc circuiting/controls. power & signal devices & assoc wiringDetails
8th fl - ref pa 202601204110 deferred mech & elec permit mech,. rework mechanical low side system to serve partial 8th floor layout. elec, lighting assoc circuiting/controls. power & signal devices & assoc wiring | $150,000 |
| Apr 15, 2026 | Completed final sign-off May 2026 | 4 Embarcadero Center | M C S Construction Services | 8/f: permit ref# 202512091273 - deferred mech and electrical permit. mech: minor air distribution ungrades to the common area restrooms and corridors. electrical: new lighting fixtures, associated circuiting/controls, power devices, associated wiring.Details
8/f: permit ref# 202512091273 - deferred mech and electrical permit. mech: minor air distribution ungrades to the common area restrooms and corridors. electrical: new lighting fixtures, associated circuiting/controls, power devices, associated wiring. | $100,000 |
| Feb 5, 2026 | Completed final sign-off Apr 2026 | 4 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | sprinkler ti - relocate 28, add, 5 total 33 ref pa 202511059008Details
sprinkler ti - relocate 28, add, 5 total 33 ref pa 202511059008 | $16,995 |
| Jan 20, 2026 | Completed final sign-off Aug 2026 | 4 Embarcadero Center | M C S Construction Services | 8th floor. t.i. including building of (n) non-structural partitions. all new or separately meps, life safety work will be design-buildg and submitted separately for permit. (bldg is fully sprinklered) no demo permit scope. spaced was delivered in shell condition. (demo permit under 202512091273)Details
8th floor. t.i. including building of (n) non-structural partitions. all new or separately meps, life safety work will be design-buildg and submitted separately for permit. (bldg is fully sprinklered) no demo permit scope. spaced was delivered in shell condition. (demo permit under 202512091273) | $420,166 |
| Dec 17, 2025 | Completed final sign-off Aug 2026 | 4 Embarcadero Center | Bcci Construction Company | 8th floor: t.i. includes building of non structural partitions millwork and finishes. mep included. life safety work will be design build and submitted separetly. (building sprinklered)(demo pa #202512091273 by .Details
8th floor: t.i. includes building of non structural partitions millwork and finishes. mep included. life safety work will be design build and submitted separetly. (building sprinklered)(demo pa #202512091273 by . | $5,793,089 |
| Dec 9, 2025 | Completed final sign-off Aug 2026 | 4 Embarcadero Center | M C S Construction Services | 8th fl - interior demo non-structural partitions, doors, millwork, ceilings flooring, finishes, hvac, electrical, plumbing and equipment; build back of restroom remodel, new demising partitions and tenant doors and new common corridor and elevator lobby finishes and ceilingsDetails
8th fl - interior demo non-structural partitions, doors, millwork, ceilings flooring, finishes, hvac, electrical, plumbing and equipment; build back of restroom remodel, new demising partitions and tenant doors and new common corridor and elevator lobby finishes and ceilings | $476,317 |
| Nov 25, 2025 | In progress issued Dec 2025 | 4 Embarcadero Center | Gci, Inc | 23/fl- ref 202506108325- electrical power lighting and signalDetails
23/fl- ref 202506108325- electrical power lighting and signal | $20,000 |
| Nov 5, 2025 | In progress issued Nov 2025 | 4 Embarcadero Center | Bcci Construction Company | 37th floor: interior t.i. including selective demolition and construction of non structural partitions, ceilings, lights, doors, millwork and finishes. new drinking fountain to replace existing.mep deferred.Details
37th floor: interior t.i. including selective demolition and construction of non structural partitions, ceilings, lights, doors, millwork and finishes. new drinking fountain to replace existing.mep deferred. | $613,160 |
| Jun 10, 2025 | In progress issued Jul 2025 | 4 Embarcadero Center | Gci, Inc | 23rd floor: improvement of elevator lobbies, hallways, and restrooms. all walls to remain, ada/finish and fixture upgrades onlyDetails
23rd floor: improvement of elevator lobbies, hallways, and restrooms. all walls to remain, ada/finish and fixture upgrades only | $100,000 |
| May 6, 2025 | Completed final sign-off May 2025 | 100 Drumm St | Aaa Restaurant Fire Control Llc | reconfigure 1 existing ansul r-102, fire suprression in the main kitchen area on the ground floor. voluntary upgradeDetails
reconfigure 1 existing ansul r-102, fire suprression in the main kitchen area on the ground floor. voluntary upgrade | $14,125 |
| Aug 29, 2024 | Completed final sign-off Oct 2024 | 4 Embarcadero Center | M C S Construction Services | 36/f: deferred electrical permit. ref pa# 202402135797. common corridor, elevator lobby and restroom light fixture replacement (one for one) and power for water fountains.Details
36/f: deferred electrical permit. ref pa# 202402135797. common corridor, elevator lobby and restroom light fixture replacement (one for one) and power for water fountains. | $50,000 |
| Aug 29, 2024 | Completed final sign-off Oct 2024 | 4 Embarcadero Center | M C S Construction Services | deferred elctrical permit permit reference # 202402135791 common corridor, elevator lobby & restroom light fixtures replacement (1 for 1)Details
deferred elctrical permit permit reference # 202402135791 common corridor, elevator lobby & restroom light fixtures replacement (1 for 1) | $50,000 |
| Jun 24, 2024 | Completed final sign-off Oct 2024 | 4 Embarcadero Center | M C S Construction Services | 36/f: revision to permit 202403046974. this revision #1 is a cover page revision of 202403046974 to change the valuation of the project in part 1, line 3 of the da checklist (to be $488,906)Details
36/f: revision to permit 202403046974. this revision #1 is a cover page revision of 202403046974 to change the valuation of the project in part 1, line 3 of the da checklist (to be $488,906) | |
| Apr 3, 2024 | Completed final sign-off Oct 2024 | 4 Embarcadero Center | M C S Construction Services | deferred mechanical and electrical (ref pa# 202403046974). mechanical - hvac modifications to support interior ti. electrical - lighting fixtures and associated circuiting/controls. power and signal devices and associated wiring.Details
deferred mechanical and electrical (ref pa# 202403046974). mechanical - hvac modifications to support interior ti. electrical - lighting fixtures and associated circuiting/controls. power and signal devices and associated wiring. | $80,000 |
| Mar 28, 2024 | Completed final sign-off Apr 2024 | 4 Embarcadero Center | R L H Fire Protection Inc | 36th floor: fire sprinkler permit to relocate 3 and ad 2 upright sprinklers. ref pa#202403046974Details
36th floor: fire sprinkler permit to relocate 3 and ad 2 upright sprinklers. ref pa#202403046974 | $1,800 |
| Mar 4, 2024 | Completed final sign-off Oct 2024 | 4 Embarcadero Center | M C S Construction Services | selective demo of non struct ceilings, lights elect, millwork and finishes construction of non struct partitions lights, doors windows, elec, mill work and finishes no change in occupancy, use or areaDetails
selective demo of non struct ceilings, lights elect, millwork and finishes construction of non struct partitions lights, doors windows, elec, mill work and finishes no change in occupancy, use or area | $737,208 |
| Feb 13, 2024 | Completed final sign-off Oct 2024 | 4 Embarcadero Center | M C S Construction Services | 36/f: improvements to tbe elevator lobby, hallways, and restrooms on the 36th floor. all walls to remain. renovation to finishes and fixtures.Details
36/f: improvements to tbe elevator lobby, hallways, and restrooms on the 36th floor. all walls to remain. renovation to finishes and fixtures. | $100,000 |
| Feb 13, 2024 | Completed final sign-off Oct 2024 | 4 Embarcadero Center | M C S Construction Services | 7/f: improvement in the elevator lobbies, hallways, and restrooms on the 7th floor. all walls to remain. renovation to finishes and fixtures.Details
7/f: improvement in the elevator lobbies, hallways, and restrooms on the 7th floor. all walls to remain. renovation to finishes and fixtures. | $100,000 |
| Dec 4, 2023 | Completed final sign-off Jan 2024 | 4 Embarcadero Center | M C S Construction Services | 15th fl - deferred mechanical & electrical (permit ref pa 2023-1006-8167). mechanical - demo & revise ductwork & diffusers. relocate lienar slot diffusers; furnish & install new duct & diffusers. blance terminal units; electrical - lighting fixtures & assoc circuiting/controls. power & signal deviceDetails
15th fl - deferred mechanical & electrical (permit ref pa 2023-1006-8167). mechanical - demo & revise ductwork & diffusers. relocate lienar slot diffusers; furnish & install new duct & diffusers. blance terminal units; electrical - lighting fixtures & assoc circuiting/controls. power & signal device | $120,000 |
| Nov 9, 2023 | Completed final sign-off Dec 2023 | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 15/f: relocate 9 fire sprinkler per t.i. 2023 1006 8167. job #23-684Details
15/f: relocate 9 fire sprinkler per t.i. 2023 1006 8167. job #23-684 | $5,590 |
| Oct 6, 2023 | Completed final sign-off Jan 2024 | 4 Embarcadero Center | M C S Construction Services | 15/f/ste 1500. t.i includes building new non-structural partitions. all new or revised mep, life safety or sprinkler work will be design build and submitted seperatelly. bldg is full sprinkled.Details
15/f/ste 1500. t.i includes building new non-structural partitions. all new or revised mep, life safety or sprinkler work will be design build and submitted seperatelly. bldg is full sprinkled. | $168,871 |
| Jul 17, 2023 | Completed final sign-off Oct 2023 | 4 Embarcadero Center | M C S Construction Services | ste 710 - 7th flr: deferred mechanical + electrical (demo low pressure cooling branch ducts, exhaust fans + duct + pneumatic vav boxes, install new vav boxes, ltg, fixtures, and associated circuiting/controls, power + signal devices. ref pa# 2023-0530-8775.Details
ste 710 - 7th flr: deferred mechanical + electrical (demo low pressure cooling branch ducts, exhaust fans + duct + pneumatic vav boxes, install new vav boxes, ltg, fixtures, and associated circuiting/controls, power + signal devices. ref pa# 2023-0530-8775. | $195,000 |
| May 30, 2023 | Completed final sign-off Oct 2023 | 4 Embarcadero Center | M C S Construction Services | 13th fl, ste 1300: non-structural demolition of existing interior commercial tenant improvement. fire sprinkler under separate permit.(202305177924)Details
13th fl, ste 1300: non-structural demolition of existing interior commercial tenant improvement. fire sprinkler under separate permit.(202305177924) | $125,000 |
| May 30, 2023 | Completed final sign-off Oct 2023 | 4 Embarcadero Center | M C S Construction Services | ste 710 - interior commercial ti of existing tenant space. includes non-structural demolition of existing ti and build out of new including non-structural partitions, doors and sidelites, suspended ceiling, casework, and finishes. mep and life safety systems are design-build under a separate permiDetails
ste 710 - interior commercial ti of existing tenant space. includes non-structural demolition of existing ti and build out of new including non-structural partitions, doors and sidelites, suspended ceiling, casework, and finishes. mep and life safety systems are design-build under a separate permi | $495,000 |
| Mar 7, 2023 | Completed final sign-off May 2023 | 4 Embarcadero Center | Hp Build | 37th fl-ste 3720: non-structural demo tenant improvement (partial suite), incl non-struct partition removal & removing one door. life safety & sprinklers deferred. no ceiling work.Details
37th fl-ste 3720: non-structural demo tenant improvement (partial suite), incl non-struct partition removal & removing one door. life safety & sprinklers deferred. no ceiling work. | $85,456 |
| Feb 23, 2023 | Completed final sign-off Jun 2023 | 4 Embarcadero Center | M C S Construction Services | deferred electrical permit 202211227006Details
deferred electrical permit 202211227006 | $24,000 |
| Feb 2, 2023 | Completed final sign-off Feb 2023 | 4 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | 7th fl, ste 750 - existing fire sprinkler system - ti 5 relocated sprinklers ref pa 2022-1122-7006Details
7th fl, ste 750 - existing fire sprinkler system - ti 5 relocated sprinklers ref pa 2022-1122-7006 | $3,000 |
| Nov 22, 2022 | Completed final sign-off Jun 2023 | 4 Embarcadero Center | M C S Construction Services | non struct demo (n) non struc parttions ceilng and millwork, glazing millwork finishes, no increase in occupanxcy area no change in use mep l/s sprinkers under sep permitDetails
non struct demo (n) non struc parttions ceilng and millwork, glazing millwork finishes, no increase in occupanxcy area no change in use mep l/s sprinkers under sep permit | $199,752 |
| Oct 11, 2022 | Completed final sign-off Dec 2022 | 4 Embarcadero Center | R L H Fire Protection Inc | fire sprinkler t.i. (6) relocated pendent sprinklers. (3) added upright sprinklers. ref 202208311624.Details
fire sprinkler t.i. (6) relocated pendent sprinklers. (3) added upright sprinklers. ref 202208311624. | $1,000 |
| Oct 7, 2022 | Completed final sign-off Dec 2022 | 4 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | 37th fl fire sprinkler only. add (4) viking model "mirage" for zurich orange box pod (phone booth). ref t.i. 202209222939Details
37th fl fire sprinkler only. add (4) viking model "mirage" for zurich orange box pod (phone booth). ref t.i. 202209222939 | $2,000 |
| Sep 8, 2022 | Completed final sign-off Oct 2022 | 4 Embarcadero Center | M C S Construction Services | suite 3410: deferred mechanical and electrical title 24 compliance. ref t.i. pa 202207128225.Details
suite 3410: deferred mechanical and electrical title 24 compliance. ref t.i. pa 202207128225. | $25,000 |
| Aug 17, 2022 | Completed final sign-off Sep 2022 | 4 Embarcadero Center | R L H Fire Protection Inc | 34th floor t.i. of the (e) fire sprinkler system; 5-relocated sprinkler heads; 2- added pendent sprinkler; 2-deleted pendents sprinklers (nfpa 13)Details
34th floor t.i. of the (e) fire sprinkler system; 5-relocated sprinkler heads; 2- added pendent sprinkler; 2-deleted pendents sprinklers (nfpa 13) | $4,000 |
| Jul 12, 2022 | Completed final sign-off Oct 2022 | 4 Embarcadero Center | M C S Construction Services | non structural demo. new non structural partitions, glass, doors, millwork,finishes. mep, life safety, sprinkler under sep permitDetails
non structural demo. new non structural partitions, glass, doors, millwork,finishes. mep, life safety, sprinkler under sep permit | $169,300 |
| May 17, 2022 | Completed final sign-off Jun 2023 | 4 Embarcadero Center | Skyline Construction | 35th fl, suite 3500: deferred submittal for approved bpa#202202027136. overhead structural steel support for muraflex expo telescoping door system. fire alarm/sprinkler under sep permits.Details
35th fl, suite 3500: deferred submittal for approved bpa#202202027136. overhead structural steel support for muraflex expo telescoping door system. fire alarm/sprinkler under sep permits. | $50,000 |
| Nov 4, 2021 | Never finaled issued Dec 2021, no final | 4 Embarcadero Center | Source Planning And Construction Inc | demo of inter connecting staircase and infill slab between floors 12 & 13 no change in occupancy or useDetails
demo of inter connecting staircase and infill slab between floors 12 & 13 no change in occupancy or use | $200,000 |
| Jun 7, 2021 | Never finaled issued Jun 2021, no final | 4 Embarcadero Center | Source Planning And Construction Inc | 34th floor: select demo of non str. partitions, doors, glazing, lights and finishes. construct new non structural partition, doors/glazing lights & finishes. electrical & mech included in this permitDetails
34th floor: select demo of non str. partitions, doors, glazing, lights and finishes. construct new non structural partition, doors/glazing lights & finishes. electrical & mech included in this permit | $139,860 |
| Apr 21, 2021 | Never finaled issued Jun 2021, no final | 4 Embarcadero Center | W. Wong Construction Co. Inc. | install hydronic radiant pane (heat) and circulation pump for heating of outdoor patio area.Details
install hydronic radiant pane (heat) and circulation pump for heating of outdoor patio area. | $3,000 |
| Feb 25, 2020 | Completed final sign-off Aug 2020 | 4 Embarcadero Center | Bilcor Inc | 33rd fl - fire alarm install (1) two way call station; install 1 line fault monitor. fa monitor of call box on sep permit. ref pa 2019-1112-7069.Details
33rd fl - fire alarm install (1) two way call station; install 1 line fault monitor. fa monitor of call box on sep permit. ref pa 2019-1112-7069. | $1,320 |
| Feb 13, 2020 | Completed final sign-off Aug 2020 | 4 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | 4th fl - existing fire sprinkler system ti add 1 & relocate 7 sprinklersDetails
4th fl - existing fire sprinkler system ti add 1 & relocate 7 sprinklers | $4,000 |
| Feb 12, 2020 | Never finaled issued Feb 2020, no final | 100 Drumm St | Tracy Sign Inc | install 1 interior single faced wall sign "one medical"Details
install 1 interior single faced wall sign "one medical" | $1,500 |
| Feb 12, 2020 | Never finaled issued Feb 2020, no final | 100 Drumm St | Tracy Sign Inc | install (1) window vinly sign "one medical".Details
install (1) window vinly sign "one medical". | $1,500 |
| Feb 12, 2020 | Never finaled issued Feb 2020, no final | 100 Drumm St | Tracy Sign Inc | install (1) window vinly sign "one medical".Details
install (1) window vinly sign "one medical". | $1,500 |
| Feb 12, 2020 | Never finaled issued Feb 2020, no final | 100 Drumm St | Tracy Sign Inc | install (1) window vinly sign "one medical".Details
install (1) window vinly sign "one medical". | $1,500 |
| Feb 12, 2020 | Never finaled issued Feb 2020, no final | 100 Drumm St | Tracy Sign Inc | install 1 interior projecting sign "one medical"Details
install 1 interior projecting sign "one medical" | $1,500 |
| Feb 12, 2020 | Never finaled issued Feb 2020, no final | 100 Drumm St | Tracy Sign Inc | 1 atom logo signDetails
1 atom logo sign | $1,500 |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 4 Embarcadero Center | Bilcor Inc | fire alarm mmc temp 2 way communication, install 6 2 way call station, 1 line fault monitorDetails
fire alarm mmc temp 2 way communication, install 6 2 way call station, 1 line fault monitor | $4,620 |
| Nov 20, 2019 | Completed final sign-off Sep 2020 | 4 Embarcadero Center | Bcci Construction Company | 3rd floor: revision to pa# 2019-0528-1822: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.Details
3rd floor: revision to pa# 2019-0528-1822: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit. | $5,000 |
| Nov 20, 2019 | Completed final sign-off Sep 2020 | 4 Embarcadero Center | Bcci Construction Company | 2nd floor: revision to pa# 2019-0522-1464: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.Details
2nd floor: revision to pa# 2019-0522-1464: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit. | $5,000 |
| Nov 20, 2019 | Completed final sign-off Sep 2020 | 4 Embarcadero Center | Bcci Construction Company | 4th floor: revision to pa# 2019-0606-2703: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.Details
4th floor: revision to pa# 2019-0606-2703: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit. | $5,000 |
| Sep 5, 2019 | Completed final sign-off Dec 2020 | 4 Embarcadero Center | Bcci Construction Company | 3rd floor - structural revision to previously approved mobile partition ref 201905281822Details
3rd floor - structural revision to previously approved mobile partition ref 201905281822 | |
| Jun 19, 2019 | Completed final sign-off Dec 2019 | 4 Embarcadero Center | Principal Builders Inc. | non struct demo, (n) non sturct partitions, ceiling lights, finishes no change in occupancy use or area, mep, life sagety, & sprinklers under sep permitDetails
non struct demo, (n) non sturct partitions, ceiling lights, finishes no change in occupancy use or area, mep, life sagety, & sprinklers under sep permit | $190,000 |
| Jun 14, 2019 | Completed final sign-off Nov 2020 | 4 Embarcadero Center | Source Planning And Construction Inc | 37 & 38/f: revision to pa 2019-0509-0198 non-structural demo (n) partitions, plumbing fixtures, accessories finishes. no change in occupancy, use or area. mep, life safety & sprinklers under separate permitDetails
37 & 38/f: revision to pa 2019-0509-0198 non-structural demo (n) partitions, plumbing fixtures, accessories finishes. no change in occupancy, use or area. mep, life safety & sprinklers under separate permit | $25,000 |
| Feb 7, 2019 | Completed final sign-off Apr 2019 | 4 Embarcadero Center | Source Planning And Construction Inc | 34th fl, suite 3460: (n) nonstructural partitions, power/data, & finishes. no change in occupancy or use. no increase in footprint. mep, life safety and sprinkler under separate permit. (fully sprinkled building)Details
34th fl, suite 3460: (n) nonstructural partitions, power/data, & finishes. no change in occupancy or use. no increase in footprint. mep, life safety and sprinkler under separate permit. (fully sprinkled building) | $15,309 |
| Jan 18, 2019 | Completed final sign-off May 2019 | 4 Embarcadero Center | R L H Fire Protection Inc | 34th fl - fire sprinkler permit - relocate 1 and add 5 sprinklers. ref pa 2018-1211-8012Details
34th fl - fire sprinkler permit - relocate 1 and add 5 sprinklers. ref pa 2018-1211-8012 | $2,800 |
| Nov 20, 2018 | Completed final sign-off Nov 2018 | 4 Embarcadero Center | W. Wong Construction Co. Inc. | replace (e) gate with new gate new panic hardware and fire know box at restaurant on lobby levelDetails
replace (e) gate with new gate new panic hardware and fire know box at restaurant on lobby level | $1,000 |
| Oct 3, 2018 | Completed final sign-off Jan 2019 | 4 Embarcadero Center | Source Planning And Construction Inc | 15th flr. electrical and mechanical for t.i pa # 201808147301Details
15th flr. electrical and mechanical for t.i pa # 201808147301 | |
| Oct 3, 2018 | Completed final sign-off Jan 2019 | 4 Embarcadero Center | Source Planning And Construction Inc | suite 3460, 34th flr. electrical and mechanical work for tenant improvement. maher n/a. ref pa 201808248221Details
suite 3460, 34th flr. electrical and mechanical work for tenant improvement. maher n/a. ref pa 201808248221 | $75,000 |
| Sep 28, 2018 | Completed final sign-off Dec 2018 | 4 Embarcadero Center | Source Planning And Construction Inc | non-structural demo. (n) millwork and finishes. no change in occupancy, use or area. mep, life safety and sprinklers under separate permit.Details
non-structural demo. (n) millwork and finishes. no change in occupancy, use or area. mep, life safety and sprinklers under separate permit. | $14,449 |
| Aug 24, 2018 | Completed final sign-off Jan 2019 | 100 Drumm St | Source Planning And Construction Inc | 34th fl: non-structural demo. (n) non-structural partitions, ceiling, lights, finishes & millwork. no change in area, occupancy or use. mep, life safety & sprinklers under sep permit. maher naDetails
34th fl: non-structural demo. (n) non-structural partitions, ceiling, lights, finishes & millwork. no change in area, occupancy or use. mep, life safety & sprinklers under sep permit. maher na | $606,062 |
| Jul 19, 2018 | Never finaled filed Jul 2018, never issued | 100 Drumm St | install 4 illuminated wall signs on building exteriorDetails
install 4 illuminated wall signs on building exterior | ||
| Jul 19, 2018 | Never finaled issued Nov 2018, no final | 100 Drumm St | install 1 illuminated (blue mercury makeup skincare sap) wall sign on building interiorDetails
install 1 illuminated (blue mercury makeup skincare sap) wall sign on building interior | $3,000 | |
| Jul 19, 2018 | Never finaled issued Nov 2018, no final | 100 Drumm St | Discount Signs & Neon Inc | 4 illuminated ( blue mercury makeup skincare sap) wall signsDetails
4 illuminated ( blue mercury makeup skincare sap) wall signs | $8,000 |
| May 16, 2018 | Expired or cancelled cancelled Jan 2026 | 4 Embarcadero Center | lobby level: (n) metal exit gate at existing patio. no change in occupancy, use of area. maher naDetails
lobby level: (n) metal exit gate at existing patio. no change in occupancy, use of area. maher na | $25,000 | |
| Feb 8, 2018 | Completed final sign-off May 2018 | 4 Embarcadero Center | Hathaway Dinwiddie Co. | 26th flr - furnish and install heat pump, diffusers and ductwork as necessary ref arch 201801037736 maher naDetails
26th flr - furnish and install heat pump, diffusers and ductwork as necessary ref arch 201801037736 maher na | $20,000 |
| Jan 3, 2018 | Completed final sign-off May 2018 | 4 Embarcadero Center | Hathaway Dinwiddie Co. | 26th fl - non structural, demo. (n) non-structural partitions, doors, finishes. no change in area, occupancy or use. mep life safety, sprinklers under sep permit. maher n/aDetails
26th fl - non structural, demo. (n) non-structural partitions, doors, finishes. no change in area, occupancy or use. mep life safety, sprinklers under sep permit. maher n/a | $49,700 |
| Dec 19, 2017 | Expired or cancelled cancelled Jan 2026 | 4 Embarcadero Center | revision to 201709229282, revise exiting lan as requested sffdDetails
revision to 201709229282, revise exiting lan as requested sffd | ||
| Dec 11, 2017 | Completed final sign-off Mar 2018 | 4 Embarcadero Center | Source Planning And Construction Inc | new non structural partitions, doors, glazing, finishes. no change in occupancy, use or area, mep ls sprinklers sep permit; n/a maherDetails
new non structural partitions, doors, glazing, finishes. no change in occupancy, use or area, mep ls sprinklers sep permit; n/a maher | $76,440 |
| Sep 22, 2017 | Never finaled issued Oct 2017, no final | 4 Embarcadero Center | Bcci Construction Company | 4th fl: non-struct demo, (n) non-struct partitions, doors, finishes. mep under sep. permit. no change in area, occupancy or use. maher na. scope of work includes one new 'l' shaped wall, two new doors with card readers. area will not exceed 500 sf.Details
4th fl: non-struct demo, (n) non-struct partitions, doors, finishes. mep under sep. permit. no change in area, occupancy or use. maher na. scope of work includes one new 'l' shaped wall, two new doors with card readers. area will not exceed 500 sf. | $41,340 |
| Apr 21, 2017 | Completed final sign-off Sep 2017 | 4 Embarcadero Center | Peacock Construction | 26th floor: t-24th electrical for work under app#201702109129. n/a for maherDetails
26th floor: t-24th electrical for work under app#201702109129. n/a for maher | $13,500 |
| Apr 20, 2017 | Completed final sign-off Jun 2017 | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 6th floor - add, relocate & remove fire sprinklers per tenant improvements: add 7, relocate 146, remove 48. ref pa #201703171664.Details
6th floor - add, relocate & remove fire sprinklers per tenant improvements: add 7, relocate 146, remove 48. ref pa #201703171664. | $80,325 |
| Apr 19, 2017 | Completed final sign-off Apr 2017 | 4 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinkler only relocate 7 pendent for both restrooms on the 26th fl 201702109129. n/a for maher.Details
fire sprinkler only relocate 7 pendent for both restrooms on the 26th fl 201702109129. n/a for maher. | $1,750 |
| Mar 20, 2017 | Completed final sign-off Mar 2017 | 4 Embarcadero Center | R L H Fire Protection Inc | 13th flr: fire sprinkler - relocate 15 and delete 2 pendents sprinklers maher naDetails
13th flr: fire sprinkler - relocate 15 and delete 2 pendents sprinklers maher na | $3,500 |
| Mar 17, 2017 | Completed final sign-off Oct 2017 | 4 Embarcadero Center | Sc Builders, Inc | partial floor ti includes partition, mech/elec/plumbing, ceiling lighting and finishes. no plumbing or structural. maher naDetails
partial floor ti includes partition, mech/elec/plumbing, ceiling lighting and finishes. no plumbing or structural. maher na | $690,000 |
| Mar 17, 2017 | Completed final sign-off Jul 2017 | 4 Embarcadero Center | Sc Builders, Inc | 6th floor, full floor ti includes partition, mep's, ceiling, lighting & finishes. maher naDetails
6th floor, full floor ti includes partition, mep's, ceiling, lighting & finishes. maher na | $2,300,000 |
| Jan 19, 2017 | Completed final sign-off Mar 2018 | 4 Embarcadero Center | Peacock Construction | 26/f: relocate walls at rooms 2603/2604/2605. revision to pa#201609087034.Details
26/f: relocate walls at rooms 2603/2604/2605. revision to pa#201609087034. | |
| Dec 16, 2016 | Completed final sign-off Mar 2017 | 4 Embarcadero Center | Sc Builders, Inc | suite #2640: commercial t.i. to unoccupied suite on 26th floor. demolition of finishes, millwork, and limited ceiling demo. new non-structural partitions, glazing and millwork, includes restroom accessibility upgrades. n/a for maher.Details
suite #2640: commercial t.i. to unoccupied suite on 26th floor. demolition of finishes, millwork, and limited ceiling demo. new non-structural partitions, glazing and millwork, includes restroom accessibility upgrades. n/a for maher. | $148,407 |
| Dec 7, 2016 | Never finaled issued Dec 2016, no final | 4 Embarcadero Center | Sc Builders, Inc | 6th floor:demo of nonstructural partitions, finishes, electrical and plumbing. n/a for maher per ab17Details
6th floor:demo of nonstructural partitions, finishes, electrical and plumbing. n/a for maher per ab17 | $111,142 |
| Nov 15, 2016 | Completed final sign-off Mar 2017 | 4 Embarcadero Center | R L H Fire Protection Inc | 38th floor fire sprinkler permit. relocate 129 uprights and remove 72 pendent sprinklers. n/a for maher.Details
38th floor fire sprinkler permit. relocate 129 uprights and remove 72 pendent sprinklers. n/a for maher. | $27,000 |
| Oct 24, 2016 | Completed final sign-off Mar 2018 | 4 Embarcadero Center | R L H Fire Protection Inc | 26th floor fire sprinkler permit - relocate 58, add 18 & delete 30 pendent sprinkelrs, delete 3 sidewalls & 8 upright sprinklers. ref pa #201609087034. n/a meher ordinanceDetails
26th floor fire sprinkler permit - relocate 58, add 18 & delete 30 pendent sprinkelrs, delete 3 sidewalls & 8 upright sprinklers. ref pa #201609087034. n/a meher ordinance | $21,250 |
| Oct 19, 2016 | Completed final sign-off Nov 2016 | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 24th floor: add one, relocate 2 sprinklers to conform with the new wall/ceiling layout of the t.i. ref app201609087034. n/a for maherDetails
24th floor: add one, relocate 2 sprinklers to conform with the new wall/ceiling layout of the t.i. ref app201609087034. n/a for maher | $932 |
| Sep 8, 2016 | Completed final sign-off Mar 2018 | 4 Embarcadero Center | Peacock Construction | non struc demo new non structural partitions, glazing, ceiling, lights, elec, millwork, finishes. mep sep permitDetails
non struc demo new non structural partitions, glazing, ceiling, lights, elec, millwork, finishes. mep sep permit | $576,498 |
| Sep 2, 2016 | Completed final sign-off Sep 2016 | 4 Embarcadero Center | Golden Gate Fire Protection Inc | 3rd flr: add 2 pendents outside conference room #22 for mercer innovations ref pa 201608034086 maher naDetails
3rd flr: add 2 pendents outside conference room #22 for mercer innovations ref pa 201608034086 maher na | $1,050 |
| Aug 3, 2016 | Completed final sign-off Jun 2017 | 4 Embarcadero Center | Peacock Construction | 24 & 25 floor - demolition of (e) stair between 24th & 25th floor, infill of slab on 25, both floors unoccupied. no change in occupancy use, or area. maher ord 155-13 not required.Details
24 & 25 floor - demolition of (e) stair between 24th & 25th floor, infill of slab on 25, both floors unoccupied. no change in occupancy use, or area. maher ord 155-13 not required. | $190,000 |
| Aug 3, 2016 | Completed final sign-off Nov 2016 | 4 Embarcadero Center | Peacock Construction | 3rd floor - non-structural demo (n) glazing & doors, electrical, finishes. no change in occupancy use, or area. mep, life safety, sprinklers under separate permit.Details
3rd floor - non-structural demo (n) glazing & doors, electrical, finishes. no change in occupancy use, or area. mep, life safety, sprinklers under separate permit. | $34,398 |
| Jun 13, 2016 | Never finaled issued Jun 2016, no final | 4 Embarcadero Center | Siemens Industry, Inc. | fire alarm for the "suite 2600" ti remodl on floor 26; addition is 1 speaker/strobe. ref pa 2016-0511-7104. maher naDetails
fire alarm for the "suite 2600" ti remodl on floor 26; addition is 1 speaker/strobe. ref pa 2016-0511-7104. maher na | $510 |
| May 11, 2016 | Completed final sign-off Aug 2016 | 4 Embarcadero Center | Peacock Construction | 26th floor - non-structural demo, (n) partition, minor ceiling grid , lighting - to remain, finishes. mep under separate permit. no change in area, occupancy or use. n/a maher ordinanceDetails
26th floor - non-structural demo, (n) partition, minor ceiling grid , lighting - to remain, finishes. mep under separate permit. no change in area, occupancy or use. n/a maher ordinance | $41,580 |
| Apr 15, 2016 | Never finaled issued Apr 2016, no final | 4 Embarcadero Center | Siemens Industry, Inc. | on 34th floor- fire alarm work for the "glencore ltd" ti remodel; additions are 1 smoke detector, 1 speaker, and 2 strobes. ref pa 2016-0301-0839Details
on 34th floor- fire alarm work for the "glencore ltd" ti remodel; additions are 1 smoke detector, 1 speaker, and 2 strobes. ref pa 2016-0301-0839 | $2,200 |
| Mar 17, 2016 | Completed final sign-off Jun 2016 | 4 Embarcadero Center | Gci, Inc | structural operable partition wall 2015-0930-8413. maher naDetails
structural operable partition wall 2015-0930-8413. maher na | $5,000 |
| Mar 9, 2016 | Completed final sign-off Aug 2016 | 4 Embarcadero Center | Pioneer Fire Inc. | relocate (149) pendents, remove (32) pendents. ref pa 2015-0923-7782 maher naDetails
relocate (149) pendents, remove (32) pendents. ref pa 2015-0923-7782 maher na | $43,729 |
| Mar 9, 2016 | Never finaled issued Mar 2016, no final | 4 Embarcadero Center | Pioneer Fire Inc. | relocate (159) pendents, remove (32) pendents. ref pa 2015-0930-8413 maher naDetails
relocate (159) pendents, remove (32) pendents. ref pa 2015-0930-8413 maher na | $46,721 |
| Mar 1, 2016 | Completed final sign-off Jun 2016 | 4 Embarcadero Center | Peacock Construction | 34th floor - non-structural demo, (n) non-structural partitoins, doors, lighting, finishes. no change in occupancy , use, ore area. mep under separate permit. n/a maher ordinanceDetails
34th floor - non-structural demo, (n) non-structural partitoins, doors, lighting, finishes. no change in occupancy , use, ore area. mep under separate permit. n/a maher ordinance | $140,525 |
| Feb 12, 2016 | Expired or cancelled cancelled Jan 2026 | 4 Embarcadero Center | 2 new window lots in east fascade. no change in occupancy, use, or area. mep, ls, sprinkler deferred maher not reqDetails
2 new window lots in east fascade. no change in occupancy, use, or area. mep, ls, sprinkler deferred maher not req | $100,000 | |
| Jan 27, 2016 | Completed final sign-off Jun 2016 | 4 Embarcadero Center | Peacock Construction | non-structural demo (n) non-structural partitions ceiling, lights, electrical, millwork, toilet room upgrades. no change in use, occupancy or area. mep, sprinkler, life safety under sep permitDetails
non-structural demo (n) non-structural partitions ceiling, lights, electrical, millwork, toilet room upgrades. no change in use, occupancy or area. mep, sprinkler, life safety under sep permit | $260,260 |
| Jan 22, 2016 | Completed final sign-off Jan 2016 | 4 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinkler relocate 12 pendents on corridor 34th fl remove 1 pendent. reference ti 2015.1201.3805 n/a for maher.Details
fire sprinkler relocate 12 pendents on corridor 34th fl remove 1 pendent. reference ti 2015.1201.3805 n/a for maher. | $6,000 |
| Jan 21, 2016 | Completed final sign-off Jun 2016 | 4 Embarcadero Center | Siemens Industry, Inc. | 34th flr: fire alarm work for the "corridor" t.i. remodel on floor 34; additions are 3 smoke detectors, 4 door holders, 1 speaker, 1 strobe & the relocation of 3 strobes; ref. ti.i. 201512013805; maher n/aDetails
34th flr: fire alarm work for the "corridor" t.i. remodel on floor 34; additions are 3 smoke detectors, 4 door holders, 1 speaker, 1 strobe & the relocation of 3 strobes; ref. ti.i. 201512013805; maher n/a | $4,750 |
| Dec 30, 2015 | Completed final sign-off Jun 2016 | 4 Embarcadero Center | Peacock Construction | 34th flr: t-24 electrical for work done under pa 201512013805; maher n/aDetails
34th flr: t-24 electrical for work done under pa 201512013805; maher n/a | $16,500 |
| Dec 1, 2015 | Completed final sign-off Jun 2016 | 4 Embarcadero Center | Peacock Construction | 34th floor: ab-017. non-structural demo. (n) non-structural partitions, doors, ceiling, lights. finishes-common areas only. no change in occupancy, use or area. mep under separate permit. maher naDetails
34th floor: ab-017. non-structural demo. (n) non-structural partitions, doors, ceiling, lights. finishes-common areas only. no change in occupancy, use or area. mep under separate permit. maher na | $150,000 |
| Nov 20, 2015 | Completed final sign-off Aug 2016 | 4 Embarcadero Center | Siemens Industry, Inc. | fire alarm work for the sheppard mullin ti remodel on floor 16. additions are 9 smoke detectors, 4 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 10 speakers, 35 speaker/strobes, 1 strobe ref 201509237782Details
fire alarm work for the sheppard mullin ti remodel on floor 16. additions are 9 smoke detectors, 4 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 10 speakers, 35 speaker/strobes, 1 strobe ref 201509237782 | $34,500 |
| Nov 20, 2015 | Completed final sign-off Jan 2016 | 4 Embarcadero Center | Siemens Industry, Inc. | fire alarm work for the "shepparn mullin" ti remodel on floor 18; additions are 8 smoke detectors, 2 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 13 speakers, 32 speaker/strobes, and 2 strobes. ref pa 2015-0909-6437Details
fire alarm work for the "shepparn mullin" ti remodel on floor 18; additions are 8 smoke detectors, 2 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 13 speakers, 32 speaker/strobes, and 2 strobes. ref pa 2015-0909-6437 | $33,200 |
| Nov 20, 2015 | Completed final sign-off May 2016 | 4 Embarcadero Center | Siemens Industry, Inc. | fire alrm work for the "sheppard mullin" ti remodel on floor 17; additions are 9 smoke detectors, 3 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 11 speakers, 37 speakers/strobes, and 2 strobes. ref pa 2015-0930-8413. maher naDetails
fire alrm work for the "sheppard mullin" ti remodel on floor 17; additions are 9 smoke detectors, 3 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 11 speakers, 37 speakers/strobes, and 2 strobes. ref pa 2015-0930-8413. maher na | $35,900 |
| Nov 5, 2015 | Completed final sign-off Jan 2016 | 4 Embarcadero Center | Pioneer Fire Inc. | 18th floor - remodel of all outlined areas, consisting of 147, relocated pendents & 32 removed pendents. ref #201509096437. n/a maher ordinanceDetails
18th floor - remodel of all outlined areas, consisting of 147, relocated pendents & 32 removed pendents. ref #201509096437. n/a maher ordinance | $44,028 |
| Oct 7, 2015 | Completed final sign-off Sep 2016 | 4 Embarcadero Center | Gci, Inc | renovate and extend existing egress access stair between the 17/f & 18/f down to 16/f, removal of two (2) existing egress access stairs, all of which are not part of the required egress system. n/a ordinance #155-13Details
renovate and extend existing egress access stair between the 17/f & 18/f down to 16/f, removal of two (2) existing egress access stairs, all of which are not part of the required egress system. n/a ordinance #155-13 | $52,200 |
| Sep 30, 2015 | Completed final sign-off Jun 2016 | 4 Embarcadero Center | 17th flr: t.i. & renovation includes demo & cosntruction of non-structural partitions,millwork,doors,ceiling,lighting,elec & finishes,no change in occupancy or use,convenience stair,structural support for skyfold partion & sliding doors,fire alarm & sprinklers under separate permit;maher n/aDetails
17th flr: t.i. & renovation includes demo & cosntruction of non-structural partitions,millwork,doors,ceiling,lighting,elec & finishes,no change in occupancy or use,convenience stair,structural support for skyfold partion & sliding doors,fire alarm & sprinklers under separate permit;maher n/a | $2,092,800 | |
| Sep 23, 2015 | Completed final sign-off Sep 2016 | 4 Embarcadero Center | t.i. & renovation on the 16/f which includes demolition & construction of non structural partitions, millwork, doors, ceiling, lighting, electrical & finishes. no change in occupancy, use or area, fire alarm, sprinkler and convenience stair under seperate permit. n/a ordinance #155-13Details
t.i. & renovation on the 16/f which includes demolition & construction of non structural partitions, millwork, doors, ceiling, lighting, electrical & finishes. no change in occupancy, use or area, fire alarm, sprinkler and convenience stair under seperate permit. n/a ordinance #155-13 | $2,046,600 | |
| Sep 9, 2015 | Completed final sign-off Apr 2016 | 4 Embarcadero Center | Gci, Inc | the scope of work is for t.i. & renovation on 18/f includes: demo of non structural partitions, millwork, doors, ceiling, lighting, electrical & finishes. construct non-structural partitions, doors, glazing, ceiling, lighting, millwork & finishes. no change of occupancy. n/a ordinance #155-13Details
the scope of work is for t.i. & renovation on 18/f includes: demo of non structural partitions, millwork, doors, ceiling, lighting, electrical & finishes. construct non-structural partitions, doors, glazing, ceiling, lighting, millwork & finishes. no change of occupancy. n/a ordinance #155-13 | $2,124,000 |
| Jul 10, 2015 | Expired or cancelled cancelled Jan 2026 | 4 Embarcadero Center | verizon wireless: site modification to an (e) wireless telecommunications facility consisting of 1-dc power rack,1- 19" wide radio rac & 1 stancion for radio equipment; maher n/a verify battery totals for siteDetails
verizon wireless: site modification to an (e) wireless telecommunications facility consisting of 1-dc power rack,1- 19" wide radio rac & 1 stancion for radio equipment; maher n/a verify battery totals for site | $35,000 | |
| Jun 12, 2015 | Never finaled issued Jun 2015, no final | 4 Embarcadero Center | Siemens Industry, Inc. | fire alarm work for the floor 26 "prudential" t.i. remodel; addition of 1 speaker strobe for copy/print room. ref pa 201504234388Details
fire alarm work for the floor 26 "prudential" t.i. remodel; addition of 1 speaker strobe for copy/print room. ref pa 201504234388 | $500 |
| May 28, 2015 | Completed final sign-off Apr 2016 | 4 Embarcadero Center | Skyline Construction | mechanical and electrical work for ti ref pa # 2015 0506 5483. maher naDetails
mechanical and electrical work for ti ref pa # 2015 0506 5483. maher na | $15,000 |
| Apr 23, 2015 | Completed final sign-off Apr 2016 | 4 Embarcadero Center | Siemens Industry, Inc. | 21st flr: fire alarm work for ti: additions are 4 smoke detectors, 1 module, 1 strobe power supply, 17 speakers, 34 speaker/strobes. 3 strobes and 4 door hangers. maher naDetails
21st flr: fire alarm work for ti: additions are 4 smoke detectors, 1 module, 1 strobe power supply, 17 speakers, 34 speaker/strobes. 3 strobes and 4 door hangers. maher na | $32,200 |
| Apr 23, 2015 | Completed final sign-off Aug 2015 | 4 Embarcadero Center | Peacock Construction | 26th flr: demo (n) non structural partitions, electrical, finishes. no change in charge in occupancy, use or area. maher naDetails
26th flr: demo (n) non structural partitions, electrical, finishes. no change in charge in occupancy, use or area. maher na | $50,000 |
| Apr 8, 2015 | Completed final sign-off Jan 2016 | 4 Embarcadero Center | Peacock Construction | mechanical work for construction 201412012670- in lobbyDetails
mechanical work for construction 201412012670- in lobby | $37,000 |
| Apr 2, 2015 | Never finaled issued Apr 2015, no final | 4 Embarcadero Center | Golden Gate Fire Protection Inc | 2nd floor fire sprinkler only - relcoate 13 sprinkler pendents, add 2 pendent, plug off 4 outlets, total 15 sprinkler heads . ref pa #201501135575. n/a maher ordinanceDetails
2nd floor fire sprinkler only - relcoate 13 sprinkler pendents, add 2 pendent, plug off 4 outlets, total 15 sprinkler heads . ref pa #201501135575. n/a maher ordinance | $7,500 |
| Mar 24, 2015 | Completed final sign-off Jan 2016 | 4 Embarcadero Center | Peacock Construction | title 24 electrical for work done under 201412012670 maher not reqDetails
title 24 electrical for work done under 201412012670 maher not req | $12,000 |
| Mar 17, 2015 | Never finaled issued Mar 2015, no final | 4 Embarcadero Center | Vanir Construction Mgmt | remodel existing break room, conference room, add closet. 7th floor. remodel restroom. l/s under separate permit. mepDetails
remodel existing break room, conference room, add closet. 7th floor. remodel restroom. l/s under separate permit. mep | $198,000 |
| Mar 9, 2015 | Completed final sign-off Apr 2016 | 4 Embarcadero Center | Skyline Construction | mech & electirical work for tenant. 21st for pa ref # 2015 0227 9560Details
mech & electirical work for tenant. 21st for pa ref # 2015 0227 9560 | $400,000 |
| Feb 27, 2015 | Completed final sign-off Jul 2015 | 4 Embarcadero Center | Skyline Construction | 21st floor:interior t. i. new non-structural parttions new doors and hardware. new finishes. mep & life safety under seperate permit. n/a for the maherDetails
21st floor:interior t. i. new non-structural parttions new doors and hardware. new finishes. mep & life safety under seperate permit. n/a for the maher | $2,500,000 |
| Feb 10, 2015 | Completed final sign-off May 2015 | 4 Embarcadero Center | Siemens Industry, Inc. | fire alarm work for the "boston properties" office" remodel t.i. floor 1; additions are 5 speakers and 4 strobes. ref pa 201412012670. n/a for maher.Details
fire alarm work for the "boston properties" office" remodel t.i. floor 1; additions are 5 speakers and 4 strobes. ref pa 201412012670. n/a for maher. | $4,500 |
| Jan 13, 2015 | Completed final sign-off Aug 2016 | 4 Embarcadero Center | Peacock Construction | lobby level (2nd floor) - demo of a portion of (e) pre-cast pnl for (n) window, install (n) window, total of 2 windows. no change in occupany, use or area. n/a ordinance #155-13Details
lobby level (2nd floor) - demo of a portion of (e) pre-cast pnl for (n) window, install (n) window, total of 2 windows. no change in occupany, use or area. n/a ordinance #155-13 | $100,000 |
| Dec 23, 2014 | Completed final sign-off Mar 2015 | 4 Embarcadero Center | Field Construction Inc. | 36th floor - (n) ceiling high partition, (n) finishes to match existing. n/a maher ordinanceDetails
36th floor - (n) ceiling high partition, (n) finishes to match existing. n/a maher ordinance | $2,500 |
| Dec 1, 2014 | Completed final sign-off Jul 2015 | 4 Embarcadero Center | Peacock Construction | lobby level - non-structural demo work. new partitions, lighting, electrical and finishes. no change in occupancy, use area. mep, sprinkler and life safety - under separate permit.Details
lobby level - non-structural demo work. new partitions, lighting, electrical and finishes. no change in occupancy, use area. mep, sprinkler and life safety - under separate permit. | $100,000 |
| Oct 21, 2014 | Completed final sign-off Nov 2014 | 4 Embarcadero Center | Certified Fire & Safety Co | lobby level - as built ul300 ansul fire systems. ref #2014.0923.7001. n/a maher ordinanceDetails
lobby level - as built ul300 ansul fire systems. ref #2014.0923.7001. n/a maher ordinance | $4,000 |
| Oct 2, 2014 | Never finaled issued Oct 2014, no final | 4 Embarcadero Center | Thomas Swan Sign Co Inc | erect an electric single faced wall sign. n/a maher ordinance (sign #1)Details
erect an electric single faced wall sign. n/a maher ordinance (sign #1) | $5,000 |
| Oct 2, 2014 | Completed final sign-off Dec 2014 | 4 Embarcadero Center | Thomas Swan Sign Co Inc | erect an electric single faced wall sign #2. n/a maher ordinanceDetails
erect an electric single faced wall sign #2. n/a maher ordinance | $8,000 |
| Sep 23, 2014 | Completed final sign-off Nov 2014 | 4 Embarcadero Center | Certified Fire & Safety Co | install ul300 ansul fire systems to protect 5 kitchen hoods and cooking equipment and 3 air pollution control units on common exhaust ducts- mechanical plan 201312204769Details
install ul300 ansul fire systems to protect 5 kitchen hoods and cooking equipment and 3 air pollution control units on common exhaust ducts- mechanical plan 201312204769 | $20,000 |
| Sep 17, 2014 | Never finaled issued Sep 2014, no final | 4 Embarcadero Center | C B F Inc | furnish & install (4) light fixtures, relocate (1) light fixture, relocate (1) receptacle. ref. to t.i. pa#201406300040. n/a ordinance #155-13Details
furnish & install (4) light fixtures, relocate (1) light fixture, relocate (1) receptacle. ref. to t.i. pa#201406300040. n/a ordinance #155-13 | $2,000 |
| Jul 22, 2014 | Completed final sign-off Aug 2014 | 4 Embarcadero Center | Peacock Construction | 26th floor - (n) non structural partition, doors, outlets, finishes. no change in occupancy, use, or area. mep under mep permit.Details
26th floor - (n) non structural partition, doors, outlets, finishes. no change in occupancy, use, or area. mep under mep permit. | $30,000 |
| Jun 30, 2014 | Completed final sign-off Oct 2014 | 4 Embarcadero Center | Field Construction Inc. | 4th flr: non structural demo (n) non-structural partitions, lighting, electrical mill work, finishes, no change in occupancy, use, areaDetails
4th flr: non structural demo (n) non-structural partitions, lighting, electrical mill work, finishes, no change in occupancy, use, area | $40,000 |
| Jan 17, 2014 | Never finaled issued Feb 2014, no final | 4 Embarcadero Center | Gci, Inc | 20th floor:demolition only of all t.i. ab-17. no change in occupancy, use or area. n/a for 155-13 ordinance.Details
20th floor:demolition only of all t.i. ab-17. no change in occupancy, use or area. n/a for 155-13 ordinance. | $100,000 |
| Jan 10, 2014 | Never finaled issued Jan 2014, no final | 100 Drumm St | Build Group Inc. | structural demo for new floor opening, stairs and future elevator, upgrade (e) structural system for work per structural drawings, t.i. for future restaurant under seperate permit, no work to (e) sprinkler and fir protection system. per ab-017Details
structural demo for new floor opening, stairs and future elevator, upgrade (e) structural system for work per structural drawings, t.i. for future restaurant under seperate permit, no work to (e) sprinkler and fir protection system. per ab-017 | $80,000 |
| Dec 20, 2013 | Never finaled issued Jun 2014, no final | 100 Drumm St | Build Group Inc. | full t.i. build out of (e) g/f and 2/f restaurant space w/in (e) mall bldg (embarcadero #4) t.i. to include (n) comm'l kitchen, (n) indoor & outdoor bars, dining rm w/private dining facilities, g/f to go area, renovation of (e)outdoor patio area w/(n) retrackable skylight. install (n)limited use/Details
full t.i. build out of (e) g/f and 2/f restaurant space w/in (e) mall bldg (embarcadero #4) t.i. to include (n) comm'l kitchen, (n) indoor & outdoor bars, dining rm w/private dining facilities, g/f to go area, renovation of (e)outdoor patio area w/(n) retrackable skylight. install (n)limited use/ | $1,500,000 |
| Jul 31, 2013 | Never finaled issued Aug 2013, no final | 100 Drumm St | Peacock Construction Inc | 1st & 2nd floors-exploratory soft demo of inter non structural partitions & abandoned mechanical equipment within (e) vacant tenant suites. future t.i for restuarant under seperate permit. no work to (e) sprinkler & fire protection system or base building structural elements-per ab-017Details
1st & 2nd floors-exploratory soft demo of inter non structural partitions & abandoned mechanical equipment within (e) vacant tenant suites. future t.i for restuarant under seperate permit. no work to (e) sprinkler & fire protection system or base building structural elements-per ab-017 | $17,000 |
| Jul 17, 2013 | Completed final sign-off Aug 2015 | 4 Embarcadero Center | Gci, Inc | 37th floor-demo of non structural partitions, new non structural partitions, lighting, power/data, electrical, millwork & finishesDetails
37th floor-demo of non structural partitions, new non structural partitions, lighting, power/data, electrical, millwork & finishes | $60,000 |
| Jul 12, 2013 | Never finaled issued Jul 2013, no final | 4 Embarcadero Center | Source Planning And Construction Inc | mechanical electrical for ti on 27th floor to install and relocate new equipment. please refer to app#201303263010 for referance.Details
mechanical electrical for ti on 27th floor to install and relocate new equipment. please refer to app#201303263010 for referance. | $50,000 |
| Jun 21, 2013 | Completed final sign-off Oct 2013 | 4 Embarcadero Center | Peacock Construction Inc | non-structural demo, new non-structural partions and new retail entry door. no change in occupancy, use or footprint, mep, sprinkers, life safety under sep permit.Details
non-structural demo, new non-structural partions and new retail entry door. no change in occupancy, use or footprint, mep, sprinkers, life safety under sep permit. | $40,000 |
| Jun 12, 2013 | Completed final sign-off Oct 2013 | 4 Embarcadero Center | Peacock Construction Inc | revision to 2013-0215-0335. add main entry upgrade with an automatic door openerDetails
revision to 2013-0215-0335. add main entry upgrade with an automatic door opener | $14,675 |
| Mar 26, 2013 | Completed final sign-off Oct 2013 | 4 Embarcadero Center | Source Planning And Construction Inc | 27th floor:non-structural demo. new structural partitions, glazing, electrical, lighting, millwork carpet and paint. no change in area, occupancy or use. mep, l/s, sprinklers under seperate permit.Details
27th floor:non-structural demo. new structural partitions, glazing, electrical, lighting, millwork carpet and paint. no change in area, occupancy or use. mep, l/s, sprinklers under seperate permit. | $250,000 |
| Feb 15, 2013 | Completed final sign-off Oct 2013 | 4 Embarcadero Center | Peacock Construction Inc | ground floor - demo & construction of non-structural partitions, new lighting to meet new layout (lighting under separate permit, no mechanical work). new occupant load of 96.Details
ground floor - demo & construction of non-structural partitions, new lighting to meet new layout (lighting under separate permit, no mechanical work). new occupant load of 96. | $68,000 |
| Oct 4, 2012 | Never finaled issued Oct 2012, no final | 4 Embarcadero Center | Gci, Inc | 22nd floor:structural work to secure high density shelving on 22nd floor. please to refer to ti work under app#201204309419 and calcs for stair guard railDetails
22nd floor:structural work to secure high density shelving on 22nd floor. please to refer to ti work under app#201204309419 and calcs for stair guard rail | $15,000 |
| Sep 20, 2012 | Completed final sign-off Nov 2012 | 4 Embarcadero Center | non structural demo. new non structural partition. no change in occupancy, use, or areaDetails
non structural demo. new non structural partition. no change in occupancy, use, or area | $9,000 | |
| Aug 15, 2012 | Completed final sign-off Feb 2013 | 4 Embarcadero Center | Gci, Inc | mechanical, electrical, plumbing for ti on the 22nd floor to relocate and add new equipment. refer to 201204309419 for ti permitDetails
mechanical, electrical, plumbing for ti on the 22nd floor to relocate and add new equipment. refer to 201204309419 for ti permit | $600,000 |
| Aug 15, 2012 | Completed final sign-off Feb 2013 | 4 Embarcadero Center | Gci, Inc | mechanical, electrical, plumbing ti on the 22nd floor to relocate and add new equipment. refer to 201204309421 for ti permitDetails
mechanical, electrical, plumbing ti on the 22nd floor to relocate and add new equipment. refer to 201204309421 for ti permit | $600,000 |
| Jun 13, 2012 | Completed final sign-off Aug 2012 | 4 Embarcadero Center | Source Planning And Construction Inc | mech and electrical for partial floor t.i on 37th floor to remove and replace equipment and fixtures. pls refer to pa# 201204057655 for ti work.Details
mech and electrical for partial floor t.i on 37th floor to remove and replace equipment and fixtures. pls refer to pa# 201204057655 for ti work. | $65,000 |
| Apr 5, 2012 | Completed final sign-off Aug 2012 | 4 Embarcadero Center | Source Planning And Construction Inc | non structural demo, new non structural partitions, ceiling, lighting, electerical, millwork, finishe. no increase in footprint. no change in occupancy or use. mep sep permitDetails
non structural demo, new non structural partitions, ceiling, lighting, electerical, millwork, finishe. no increase in footprint. no change in occupancy or use. mep sep permit | $200,000 |
| Aug 12, 2011 | Never finaled issued Aug 2011, no final | 4 Embarcadero Center | street space & mtaDetails
street space & mta | ||
| Aug 9, 2011 | Completed final sign-off Dec 2011 | 4 Embarcadero Center | Gci, Inc | mech anical work only to retail tenant space. arch permit approved -#2011/0729/1284-attached for reference.Details
mech anical work only to retail tenant space. arch permit approved -#2011/0729/1284-attached for reference. | $100,000 |
| Jul 29, 2011 | Completed final sign-off Dec 2011 | 4 Embarcadero Center | Gci, Inc | new non structural partitions,ceiling, lights, outlets,millwork, finishes,fixtures. demo under permit# 201107220871. no change in occupancy or use. mep under separate permit.Details
new non structural partitions,ceiling, lights, outlets,millwork, finishes,fixtures. demo under permit# 201107220871. no change in occupancy or use. mep under separate permit. | $793,636 |
| Jul 22, 2011 | Completed final sign-off Aug 2011 | 4 Embarcadero Center | Gci, Inc | demo only. non structural partitions, finishes, millwork, lighting, ceilings, outlets, mech equip. no build back at this timeDetails
demo only. non structural partitions, finishes, millwork, lighting, ceilings, outlets, mech equip. no build back at this time | $75,000 |
| Feb 15, 2011 | Completed final sign-off Mar 2011 | 4 Embarcadero Center | Gci, Inc | 14th floor - replace evacuation signage with compliant signage per field inspector.Details
14th floor - replace evacuation signage with compliant signage per field inspector. | $3,000 |
| Sep 28, 2010 | Completed final sign-off Jan 2011 | 4 Embarcadero Center | J. M. Maita Construction Inc. | suite #1, lobby: minor tenant improvevements to existing restaurant space. to include minor elec, plumbing, flooring, cabinets, tops no hvac changes.Details
suite #1, lobby: minor tenant improvevements to existing restaurant space. to include minor elec, plumbing, flooring, cabinets, tops no hvac changes. | $130,000 |
| Dec 21, 2009 | Completed final sign-off Jun 2010 | 4 Embarcadero Center | Field Construction Inc., Bcci Construction Company | remove revolving doors & replace w/ (n) glass swinging doors. patch (e) stone floor & soffit. remove & replace (e) path of travel signage w/ (n) expanded signage. add destination based elevator info. to path of travel drawings barrier removal.Details
remove revolving doors & replace w/ (n) glass swinging doors. patch (e) stone floor & soffit. remove & replace (e) path of travel signage w/ (n) expanded signage. add destination based elevator info. to path of travel drawings barrier removal. | $150,000 |
| Aug 13, 2009 | Never finaled issued Aug 2009, no final | 4 Embarcadero Center | Rossi Builders Inc. | 2nd floor: tenant improvement. build 1 new office, 1 new wall. new light fixtures i office area.Details
2nd floor: tenant improvement. build 1 new office, 1 new wall. new light fixtures i office area. | $54,000 |
| Jul 27, 2009 | Completed final sign-off Oct 2009 | 4 Embarcadero Center | Peacock Construction Inc | 6th fl.demoliton of e outlets. construction of new door and partition new outlets. no increase in occupancy load or area. no change in occupancy or use.Details
6th fl.demoliton of e outlets. construction of new door and partition new outlets. no increase in occupancy load or area. no change in occupancy or use. | $27,000 |
| Mar 9, 2009 | Expired or cancelled cancelled Jan 2026 | 4 Embarcadero Center | Young Electric Sign Co. | erect a non-illuminated, single faced banner frame system (overpass ped. walkway).Details
erect a non-illuminated, single faced banner frame system (overpass ped. walkway). | $20,000 |
| Jan 29, 2009 | Completed final sign-off Apr 2009 | 4 Embarcadero Center | Peacock Construction Inc | street level - revision to permit 200810295353. revised exiting & swing door out, add ext signs.Details
street level - revision to permit 200810295353. revised exiting & swing door out, add ext signs. | |
| Sep 26, 2008 | Completed final sign-off Jan 2009 | 4 Embarcadero Center | Ward Alan Emery Construction Inc. | 6th floor - to obtain final inspection for work approved under pa #200608210086. all work has been completed.Details
6th floor - to obtain final inspection for work approved under pa #200608210086. all work has been completed. | |
| Sep 26, 2008 | Completed final sign-off Jan 2009 | 4 Embarcadero Center | Ward Alan Emery Construction Inc. | 6th floor - to obtain final inspection for work approved under pa #200610064376. all work has been completed.Details
6th floor - to obtain final inspection for work approved under pa #200610064376. all work has been completed. | |
| Jul 30, 2008 | Never finaled issued Aug 2008, no final | 4 Embarcadero Center | Street Graphics Dba Delta | space r4106: install 1 new illuminated interior wall signDetails
space r4106: install 1 new illuminated interior wall sign | |
| Jul 17, 2008 | Never finaled issued Jul 2008, no final | 4 Embarcadero Center | Ward Alan Emery Construction Inc. | renew pa#200608149395 for final inspection.Details
renew pa#200608149395 for final inspection. | |
| Jun 4, 2008 | Completed final sign-off Oct 2008 | 4 Embarcadero Center | street level - mep permit only - new hvac, electrical, plumbing.Details
street level - mep permit only - new hvac, electrical, plumbing. | $90,000 | |
| May 8, 2008 | Completed final sign-off Oct 2008 | 4 Embarcadero Center | non-structural demolition of interior partition and ceil. new non-structural partition ceil, lights, millwork. replace extg storefront. no increase in squrar footage. no change in occupancy. (street level)Details
non-structural demolition of interior partition and ceil. new non-structural partition ceil, lights, millwork. replace extg storefront. no increase in squrar footage. no change in occupancy. (street level) | $90,000 | |
| Apr 24, 2008 | Completed final sign-off Jan 2009 | 4 Embarcadero Center | non structural demo. (n) partitions, ceiling lights, mech, elec finishes. all interior tenant work. no change in area, use, occupancy.Details
non structural demo. (n) partitions, ceiling lights, mech, elec finishes. all interior tenant work. no change in area, use, occupancy. | $900,000 | |
| Jan 31, 2008 | Completed final sign-off Mar 2008 | 4 Embarcadero Center | Field Construction Inc. | ti for fire alarm on the 26th floor. install 1 speaker and 1 strobeDetails
ti for fire alarm on the 26th floor. install 1 speaker and 1 strobe | $2,000 |
| Jan 31, 2008 | Completed final sign-off Mar 2008 | 4 Embarcadero Center | Field Construction Inc. | ti for lighting on the 26th floor. relocate ex. lighting switches, relocate ex. lighting fixtures and furnish and install new exit sign.Details
ti for lighting on the 26th floor. relocate ex. lighting switches, relocate ex. lighting fixtures and furnish and install new exit sign. | $2,000 |
| Jan 25, 2008 | Completed final sign-off Apr 2008 | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 2nd floor - relocate fire sprinkler heads per tenant improvement, total 8 heads.Details
2nd floor - relocate fire sprinkler heads per tenant improvement, total 8 heads. | $1,600 |
| Jan 23, 2008 | Completed final sign-off Apr 2008 | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 4th floor - relocate fire sprinkler heads per t.i. - total 7 heads.Details
4th floor - relocate fire sprinkler heads per t.i. - total 7 heads. | $1,400 |
| Jan 23, 2008 | Completed final sign-off Apr 2008 | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 3rd floor relocate fire sprinkler heads per t.i. - total 7 heads.Details
3rd floor relocate fire sprinkler heads per t.i. - total 7 heads. | $1,400 |
| Dec 21, 2007 | Completed final sign-off Jun 2008 | 4 Embarcadero Center | Gci, Inc | 2nd, 3rd, 4th floors - mechanical/electrical & plumbing work for three new floors of office space,. ref. #200711279018 for architectural work.Details
2nd, 3rd, 4th floors - mechanical/electrical & plumbing work for three new floors of office space,. ref. #200711279018 for architectural work. | $1,500,000 |
| Dec 20, 2007 | Completed final sign-off Apr 2008 | 4 Embarcadero Center | 8 speakers, 4 strobe for life safety & fire alarm system.Details
8 speakers, 4 strobe for life safety & fire alarm system. | $13,000 | |
| Dec 19, 2007 | Completed final sign-off Mar 2008 | 4 Embarcadero Center | Peacock Construction Inc | life safety - 5 duct detectors, 6 strobes, 8 speakers.Details
life safety - 5 duct detectors, 6 strobes, 8 speakers. | $15,000 |
| Dec 4, 2007 | Completed final sign-off Mar 2008 | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | ground floor: relocate fire sprinkler heads per tenant improvement 35 relos.Details
ground floor: relocate fire sprinkler heads per tenant improvement 35 relos. | $7,000 |
| Nov 6, 2007 | Completed final sign-off Apr 2008 | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 25th floor: relocate fire sprinkler heads per tenant improvement, 15 relos.Details
25th floor: relocate fire sprinkler heads per tenant improvement, 15 relos. | $3,500 |
| Oct 24, 2007 | Completed final sign-off Mar 2008 | 4 Embarcadero Center | revision to app #200709172868. revise kitchen layout & associated mech. & elec. no change in floor space. no structural work.Details
revision to app #200709172868. revise kitchen layout & associated mech. & elec. no change in floor space. no structural work. | ||
| Oct 5, 2007 | Completed final sign-off Apr 2008 | 4 Embarcadero Center | non structural demo and tenant improvement of office use on 25th floor including drywall, ceiling, lighting, toilet /sink/shower, finishes. no increase in floor space.no change in use. no exterior work.Details
non structural demo and tenant improvement of office use on 25th floor including drywall, ceiling, lighting, toilet /sink/shower, finishes. no increase in floor space.no change in use. no exterior work. | $200,000 | |
| Sep 17, 2007 | Completed final sign-off Mar 2008 | 4 Embarcadero Center | (street level).interior non structural remodel of (e) restuarant demo. drywall partitions millwork finishes, electrical, mechanical, plumbing. no increase in floor area.Details
(street level).interior non structural remodel of (e) restuarant demo. drywall partitions millwork finishes, electrical, mechanical, plumbing. no increase in floor area. | $200,000 | |
| Aug 8, 2007 | Completed final sign-off Feb 2008 | 4 Embarcadero Center | Hathaway Dinwiddie Co. | 7th floor-oti-2, minor modification to an existing fire alarm system to support oti#1 2007-0606-3207 and 2 speakers and 2 strobes work on 7th floor.Details
7th floor-oti-2, minor modification to an existing fire alarm system to support oti#1 2007-0606-3207 and 2 speakers and 2 strobes work on 7th floor. | $1,200 |
| Jan 16, 2007 | Completed final sign-off Mar 2007 | 4 Embarcadero Center | C B F Inc | life safety modifications at 4 embarcadero, 31st floor #3150- sandler foundation install approx 3 l/s devices. 1 smoke det,2 strobe lightsDetails
life safety modifications at 4 embarcadero, 31st floor #3150- sandler foundation install approx 3 l/s devices. 1 smoke det,2 strobe lights | $2,500 |
| Nov 13, 2006 | Completed final sign-off Jun 2007 | 4 Embarcadero Center | install camera/door release/intercom system for toilet room accessDetails
install camera/door release/intercom system for toilet room access | $10,000 | |
| Oct 6, 2006 | Completed final sign-off May 2007 | 100 Drumm St | Principal Builders Inc. | oti-2 34th floor el, me, ls, spDetails
oti-2 34th floor el, me, ls, sp | $750,000 |
| Oct 5, 2006 | Never finaled issued Oct 2006, no final | 4 Embarcadero Center | street space permit only.Details
street space permit only. | ||
| Sep 8, 2006 | Completed final sign-off May 2007 | 100 Drumm St | Principal Builders Inc. | oti-1, 34th fl, el, ls, sp,meDetails
oti-1, 34th fl, el, ls, sp,me | $750,000 |
| Aug 18, 2006 | Expired or cancelled withdrawn Jun 2007 | 4 Embarcadero Center | cut architectural opening in 13th floor slab. provide glass railing and glass smoke stop. in fill abandond internal stair 13th fl slab. refer to: 12th floor app#200608169647 & 13th fl app#200608169650.Details
cut architectural opening in 13th floor slab. provide glass railing and glass smoke stop. in fill abandond internal stair 13th fl slab. refer to: 12th floor app#200608169647 & 13th fl app#200608169650. | $524,641 | |
| Aug 15, 2006 | Completed final sign-off Sep 2006 | 4 Embarcadero Center | Gci, Inc | oti-2 31st fl-el,me.Details
oti-2 31st fl-el,me. | $105,000 |
| Aug 14, 2006 | Expired or cancelled expired Apr 2008 | 4 Embarcadero Center | Ward Alan Emery Construction Inc. | t.i. (architectural only). non-structural drywall partitions, acoustic ceiling, doors ,cabinetry and finishes.Details
t.i. (architectural only). non-structural drywall partitions, acoustic ceiling, doors ,cabinetry and finishes. | $234,000 |
| Aug 1, 2006 | Completed final sign-off Aug 2006 | 4 Embarcadero Center | Bcci Construction Company | renew pa#200508119984,#200508019076,#200505263537 for final inspection.Details
renew pa#200508119984,#200508019076,#200505263537 for final inspection. | |
| Jul 28, 2006 | Completed final sign-off Feb 2007 | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | relocated (e) sprinkler system in the restaurant total 54Details
relocated (e) sprinkler system in the restaurant total 54 | $20,000 |
| Jun 1, 2006 | Completed final sign-off Aug 2006 | 4 Embarcadero Center | Bcci Construction Company | oti-1r, 24th floor elDetails
oti-1r, 24th floor el | $5,000 |
| May 23, 2006 | Completed final sign-off Nov 2006 | 4 Embarcadero Center | Fire Safety Supply Inc | install fire supression in kitchen hood and smog hog. (on 1st floor) heads onlyDetails
install fire supression in kitchen hood and smog hog. (on 1st floor) heads only | $4,000 |
| Feb 28, 2006 | Never finaled issued Feb 2006, no final | 4 Embarcadero Center | barrier removal only. drywall, plumb, elec, painting. replace door closers in stairwell, verify that new door closers do not "hold open" stairwell doors. no increase in office spaceDetails
barrier removal only. drywall, plumb, elec, painting. replace door closers in stairwell, verify that new door closers do not "hold open" stairwell doors. no increase in office space | $75,000 | |
| Feb 10, 2006 | Completed final sign-off Feb 2006 | 4 Embarcadero Center | Turner Construction Co | renewal for fi9nal 200111273987 and 200110231463Details
renewal for fi9nal 200111273987 and 200110231463 | |
| Feb 6, 2006 | Completed final sign-off Feb 2007 | 4 Embarcadero Center | Bcci Construction Company | oti-1 32 floor el me ls sp work includes demolition of walls and some affected ceiling system. power & communication outlets.new walls,down & electrical works.Details
oti-1 32 floor el me ls sp work includes demolition of walls and some affected ceiling system. power & communication outlets.new walls,down & electrical works. | $450,000 |
| Jan 19, 2006 | Expired or cancelled expired Dec 2006 | 4 Embarcadero Center | Peacock Construction Inc | to renew for final only. pa# 2004/10/01/5784.Details
to renew for final only. pa# 2004/10/01/5784. | |
| Nov 29, 2005 | Completed final sign-off Nov 2006 | 4 Embarcadero Center | Field Construction Inc. | interior improvements within a portion of (e) 1/f envelope of bldg. work includes 812 sf of interior improvement & 406 sf of exterior improvement.restroom facilities are already in place as part of embarcadero center.alterations to interior space are to be limited to removal of (e)interior walls &Details
interior improvements within a portion of (e) 1/f envelope of bldg. work includes 812 sf of interior improvement & 406 sf of exterior improvement.restroom facilities are already in place as part of embarcadero center.alterations to interior space are to be limited to removal of (e)interior walls & | $170,000 |
| Nov 17, 2005 | Completed final sign-off Nov 2006 | 4 Embarcadero Center | Bcci Construction Company | oti-2, 6th/fl-me,el.Details
oti-2, 6th/fl-me,el. | $85,000 |
| Nov 15, 2005 | Completed final sign-off Aug 2006 | 4 Embarcadero Center | Turner Construction Co | oti-3 7th/fl-ls.Details
oti-3 7th/fl-ls. | $16,000 |
| Oct 26, 2005 | Completed final sign-off Aug 2006 | 4 Embarcadero Center | R L H Fire Protection Inc | fire spkr upgrade (t/i) for trammell crow 7th flr of 4 embarcadero ctr 73 spkr hd total. 4 adds & 69 relocate.7,Details
fire spkr upgrade (t/i) for trammell crow 7th flr of 4 embarcadero ctr 73 spkr hd total. 4 adds & 69 relocate.7, | $9,100 |
| Oct 24, 2005 | Completed final sign-off Nov 2006 | 4 Embarcadero Center | Bcci Construction Company | oti-1, 6th floor, el, me, ls, sp.Details
oti-1, 6th floor, el, me, ls, sp. | $100,000 |
| Oct 11, 2005 | Completed final sign-off Dec 2005 | 4 Embarcadero Center | demolitions only. all fixtures, finishes, equipments,hvac, ceiling & grid.Details
demolitions only. all fixtures, finishes, equipments,hvac, ceiling & grid. | $50,000 | |
| Oct 11, 2005 | Completed final sign-off Dec 2005 | 4 Embarcadero Center | demolition only. all fixtures, equipment, finishes, hvac, ceiling & grip.Details
demolition only. all fixtures, equipment, finishes, hvac, ceiling & grip. | $50,000 | |
| Sep 19, 2005 | Completed final sign-off Aug 2006 | 4 Embarcadero Center | Turner Construction Co | oti-1, 7th floor, el, me, ls, sp.Details
oti-1, 7th floor, el, me, ls, sp. | $300,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.