Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 7, 2026In progress
issued Jul 2026
4 Embarcadero CenterBcci Construction Company37th flr: mechanical only permit to support approved arch permit 202511059008. rework existing vav, air distriution and ductwork.
Details
Permit
202607074655
Status
issued
Filed
Jul 7, 2026
Permit issued
Jul 9, 2026
Declared cost
$161,850
Address
4 Embarcadero Center

37th flr: mechanical only permit to support approved arch permit 202511059008. rework existing vav, air distriution and ductwork.

Open the permit page

$161,850
Apr 15, 2026Completed
final sign-off Aug 2026
4 Embarcadero CenterM C S Construction Services8th fl - ref pa 202601204110 deferred mech & elec permit mech,. rework mechanical low side system to serve partial 8th floor layout. elec, lighting assoc circuiting/controls. power & signal devices & assoc wiring
Details
Permit
202604159517
Status
complete
Filed
Apr 15, 2026
Permit issued
Apr 21, 2026
Final sign-off
Aug 13, 2026
Declared cost
$150,000
Address
4 Embarcadero Center

8th fl - ref pa 202601204110 deferred mech & elec permit mech,. rework mechanical low side system to serve partial 8th floor layout. elec, lighting assoc circuiting/controls. power & signal devices & assoc wiring

Open the permit page

$150,000
Apr 15, 2026Completed
final sign-off May 2026
4 Embarcadero CenterM C S Construction Services8/f: permit ref# 202512091273 - deferred mech and electrical permit. mech: minor air distribution ungrades to the common area restrooms and corridors. electrical: new lighting fixtures, associated circuiting/controls, power devices, associated wiring.
Details
Permit
202604159468
Status
complete
Filed
Apr 15, 2026
Permit issued
Apr 21, 2026
Final sign-off
May 29, 2026
Declared cost
$100,000
Address
4 Embarcadero Center

8/f: permit ref# 202512091273 - deferred mech and electrical permit. mech: minor air distribution ungrades to the common area restrooms and corridors. electrical: new lighting fixtures, associated circuiting/controls, power devices, associated wiring.

Open the permit page

$100,000
Feb 5, 2026Completed
final sign-off Apr 2026
4 Embarcadero CenterAnderson, Rowe & Buckley, Inc.sprinkler ti - relocate 28, add, 5 total 33 ref pa 202511059008
Details
Permit
202602055273
Status
complete
Filed
Feb 5, 2026
Permit issued
Feb 5, 2026
Final sign-off
Apr 21, 2026
Declared cost
$16,995
Address
4 Embarcadero Center

sprinkler ti - relocate 28, add, 5 total 33 ref pa 202511059008

Open the permit page

$16,995
Jan 20, 2026Completed
final sign-off Aug 2026
4 Embarcadero CenterM C S Construction Services8th floor. t.i. including building of (n) non-structural partitions. all new or separately meps, life safety work will be design-buildg and submitted separately for permit. (bldg is fully sprinklered) no demo permit scope. spaced was delivered in shell condition. (demo permit under 202512091273)
Details
Permit
202601204110
Status
complete
Filed
Jan 20, 2026
Permit issued
Feb 10, 2026
Final sign-off
Aug 13, 2026
Declared cost
$420,166
Address
4 Embarcadero Center

8th floor. t.i. including building of (n) non-structural partitions. all new or separately meps, life safety work will be design-buildg and submitted separately for permit. (bldg is fully sprinklered) no demo permit scope. spaced was delivered in shell condition. (demo permit under 202512091273)

Open the permit page

$420,166
Dec 17, 2025Completed
final sign-off Aug 2026
4 Embarcadero CenterBcci Construction Company8th floor: t.i. includes building of non structural partitions millwork and finishes. mep included. life safety work will be design build and submitted separetly. (building sprinklered)(demo pa #202512091273 by .
Details
Permit
202512171991
Status
complete
Filed
Dec 17, 2025
Permit issued
Feb 11, 2026
Final sign-off
Aug 13, 2026
Declared cost
$5,793,089
Address
4 Embarcadero Center

8th floor: t.i. includes building of non structural partitions millwork and finishes. mep included. life safety work will be design build and submitted separetly. (building sprinklered)(demo pa #202512091273 by .

Open the permit page

$5,793,089
Dec 9, 2025Completed
final sign-off Aug 2026
4 Embarcadero CenterM C S Construction Services8th fl - interior demo non-structural partitions, doors, millwork, ceilings flooring, finishes, hvac, electrical, plumbing and equipment; build back of restroom remodel, new demising partitions and tenant doors and new common corridor and elevator lobby finishes and ceilings
Details
Permit
202512091273
Status
complete
Filed
Dec 9, 2025
Permit issued
Dec 18, 2025
Final sign-off
Aug 13, 2026
Declared cost
$476,317
Address
4 Embarcadero Center

8th fl - interior demo non-structural partitions, doors, millwork, ceilings flooring, finishes, hvac, electrical, plumbing and equipment; build back of restroom remodel, new demising partitions and tenant doors and new common corridor and elevator lobby finishes and ceilings

Open the permit page

$476,317
Nov 25, 2025In progress
issued Dec 2025
4 Embarcadero CenterGci, Inc23/fl- ref 202506108325- electrical power lighting and signal
Details
Permit
202511250459
Status
issued
Filed
Nov 25, 2025
Permit issued
Dec 9, 2025
Declared cost
$20,000
Address
4 Embarcadero Center

23/fl- ref 202506108325- electrical power lighting and signal

Open the permit page

$20,000
Nov 5, 2025In progress
issued Nov 2025
4 Embarcadero CenterBcci Construction Company37th floor: interior t.i. including selective demolition and construction of non structural partitions, ceilings, lights, doors, millwork and finishes. new drinking fountain to replace existing.mep deferred.
Details
Permit
202511059008
Status
issued
Filed
Nov 5, 2025
Permit issued
Nov 18, 2025
Declared cost
$613,160
Address
4 Embarcadero Center

37th floor: interior t.i. including selective demolition and construction of non structural partitions, ceilings, lights, doors, millwork and finishes. new drinking fountain to replace existing.mep deferred.

Open the permit page

$613,160
Jun 10, 2025In progress
issued Jul 2025
4 Embarcadero CenterGci, Inc23rd floor: improvement of elevator lobbies, hallways, and restrooms. all walls to remain, ada/finish and fixture upgrades only
Details
Permit
202506108325
Status
issued
Filed
Jun 10, 2025
Permit issued
Jul 10, 2025
Declared cost
$100,000
Address
4 Embarcadero Center

23rd floor: improvement of elevator lobbies, hallways, and restrooms. all walls to remain, ada/finish and fixture upgrades only

Open the permit page

$100,000
May 6, 2025Completed
final sign-off May 2025
100 Drumm StAaa Restaurant Fire Control Llcreconfigure 1 existing ansul r-102, fire suprression in the main kitchen area on the ground floor. voluntary upgrade
Details
Permit
202505065850
Status
complete
Filed
May 6, 2025
Permit issued
May 6, 2025
Final sign-off
May 28, 2025
Declared cost
$14,125
Address
100 Drumm St

reconfigure 1 existing ansul r-102, fire suprression in the main kitchen area on the ground floor. voluntary upgrade

Open the permit page

$14,125
Aug 29, 2024Completed
final sign-off Oct 2024
4 Embarcadero CenterM C S Construction Services36/f: deferred electrical permit. ref pa# 202402135797. common corridor, elevator lobby and restroom light fixture replacement (one for one) and power for water fountains.
Details
Permit
202408299716
Status
complete
Filed
Aug 29, 2024
Permit issued
Sep 10, 2024
Final sign-off
Oct 11, 2024
Declared cost
$50,000
Address
4 Embarcadero Center

36/f: deferred electrical permit. ref pa# 202402135797. common corridor, elevator lobby and restroom light fixture replacement (one for one) and power for water fountains.

Open the permit page

$50,000
Aug 29, 2024Completed
final sign-off Oct 2024
4 Embarcadero CenterM C S Construction Servicesdeferred elctrical permit permit reference # 202402135791 common corridor, elevator lobby & restroom light fixtures replacement (1 for 1)
Details
Permit
202408299691
Status
complete
Filed
Aug 29, 2024
Permit issued
Sep 10, 2024
Final sign-off
Oct 11, 2024
Declared cost
$50,000
Address
4 Embarcadero Center

deferred elctrical permit permit reference # 202402135791 common corridor, elevator lobby & restroom light fixtures replacement (1 for 1)

Open the permit page

$50,000
Jun 24, 2024Completed
final sign-off Oct 2024
4 Embarcadero CenterM C S Construction Services36/f: revision to permit 202403046974. this revision #1 is a cover page revision of 202403046974 to change the valuation of the project in part 1, line 3 of the da checklist (to be $488,906)
Details
Permit
202406245108
Status
complete
Filed
Jun 24, 2024
Permit issued
Jul 2, 2024
Final sign-off
Oct 11, 2024
Address
4 Embarcadero Center

36/f: revision to permit 202403046974. this revision #1 is a cover page revision of 202403046974 to change the valuation of the project in part 1, line 3 of the da checklist (to be $488,906)

Open the permit page

Apr 3, 2024Completed
final sign-off Oct 2024
4 Embarcadero CenterM C S Construction Servicesdeferred mechanical and electrical (ref pa# 202403046974). mechanical - hvac modifications to support interior ti. electrical - lighting fixtures and associated circuiting/controls. power and signal devices and associated wiring.
Details
Permit
202404039203
Status
complete
Filed
Apr 3, 2024
Permit issued
Apr 3, 2024
Final sign-off
Oct 11, 2024
Declared cost
$80,000
Address
4 Embarcadero Center

deferred mechanical and electrical (ref pa# 202403046974). mechanical - hvac modifications to support interior ti. electrical - lighting fixtures and associated circuiting/controls. power and signal devices and associated wiring.

Open the permit page

$80,000
Mar 28, 2024Completed
final sign-off Apr 2024
4 Embarcadero CenterR L H Fire Protection Inc36th floor: fire sprinkler permit to relocate 3 and ad 2 upright sprinklers. ref pa#202403046974
Details
Permit
202403288806
Status
complete
Filed
Mar 28, 2024
Permit issued
Mar 28, 2024
Final sign-off
Apr 11, 2024
Declared cost
$1,800
Address
4 Embarcadero Center

36th floor: fire sprinkler permit to relocate 3 and ad 2 upright sprinklers. ref pa#202403046974

Open the permit page

$1,800
Mar 4, 2024Completed
final sign-off Oct 2024
4 Embarcadero CenterM C S Construction Servicesselective demo of non struct ceilings, lights elect, millwork and finishes construction of non struct partitions lights, doors windows, elec, mill work and finishes no change in occupancy, use or area
Details
Permit
202403046974
Status
complete
Filed
Mar 4, 2024
Permit issued
Mar 19, 2024
Final sign-off
Oct 11, 2024
Declared cost
$737,208
Address
4 Embarcadero Center

selective demo of non struct ceilings, lights elect, millwork and finishes construction of non struct partitions lights, doors windows, elec, mill work and finishes no change in occupancy, use or area

Open the permit page

$737,208
Feb 13, 2024Completed
final sign-off Oct 2024
4 Embarcadero CenterM C S Construction Services36/f: improvements to tbe elevator lobby, hallways, and restrooms on the 36th floor. all walls to remain. renovation to finishes and fixtures.
Details
Permit
202402135797
Status
complete
Filed
Feb 13, 2024
Permit issued
Jun 20, 2024
Final sign-off
Oct 11, 2024
Declared cost
$100,000
Address
4 Embarcadero Center

36/f: improvements to tbe elevator lobby, hallways, and restrooms on the 36th floor. all walls to remain. renovation to finishes and fixtures.

Open the permit page

$100,000
Feb 13, 2024Completed
final sign-off Oct 2024
4 Embarcadero CenterM C S Construction Services7/f: improvement in the elevator lobbies, hallways, and restrooms on the 7th floor. all walls to remain. renovation to finishes and fixtures.
Details
Permit
202402135791
Status
complete
Filed
Feb 13, 2024
Permit issued
Jun 20, 2024
Final sign-off
Oct 11, 2024
Declared cost
$100,000
Address
4 Embarcadero Center

7/f: improvement in the elevator lobbies, hallways, and restrooms on the 7th floor. all walls to remain. renovation to finishes and fixtures.

Open the permit page

$100,000
Dec 4, 2023Completed
final sign-off Jan 2024
4 Embarcadero CenterM C S Construction Services15th fl - deferred mechanical & electrical (permit ref pa 2023-1006-8167). mechanical - demo & revise ductwork & diffusers. relocate lienar slot diffusers; furnish & install new duct & diffusers. blance terminal units; electrical - lighting fixtures & assoc circuiting/controls. power & signal device
Details
Permit
202312041842
Status
complete
Filed
Dec 4, 2023
Permit issued
Dec 4, 2023
Final sign-off
Jan 11, 2024
Declared cost
$120,000
Address
4 Embarcadero Center

15th fl - deferred mechanical & electrical (permit ref pa 2023-1006-8167). mechanical - demo & revise ductwork & diffusers. relocate lienar slot diffusers; furnish & install new duct & diffusers. blance terminal units; electrical - lighting fixtures & assoc circuiting/controls. power & signal device

Open the permit page

$120,000
Nov 9, 2023Completed
final sign-off Dec 2023
4 Embarcadero CenterAyoob & Peery Plumbing Co Inc15/f: relocate 9 fire sprinkler per t.i. 2023 1006 8167. job #23-684
Details
Permit
202311090578
Status
complete
Filed
Nov 9, 2023
Permit issued
Nov 10, 2023
Final sign-off
Dec 11, 2023
Declared cost
$5,590
Address
4 Embarcadero Center

15/f: relocate 9 fire sprinkler per t.i. 2023 1006 8167. job #23-684

Open the permit page

$5,590
Oct 6, 2023Completed
final sign-off Jan 2024
4 Embarcadero CenterM C S Construction Services15/f/ste 1500. t.i includes building new non-structural partitions. all new or revised mep, life safety or sprinkler work will be design build and submitted seperatelly. bldg is full sprinkled.
Details
Permit
202310068167
Status
complete
Filed
Oct 6, 2023
Permit issued
Oct 18, 2023
Final sign-off
Jan 11, 2024
Declared cost
$168,871
Address
4 Embarcadero Center

15/f/ste 1500. t.i includes building new non-structural partitions. all new or revised mep, life safety or sprinkler work will be design build and submitted seperatelly. bldg is full sprinkled.

Open the permit page

$168,871
Jul 17, 2023Completed
final sign-off Oct 2023
4 Embarcadero CenterM C S Construction Servicesste 710 - 7th flr: deferred mechanical + electrical (demo low pressure cooling branch ducts, exhaust fans + duct + pneumatic vav boxes, install new vav boxes, ltg, fixtures, and associated circuiting/controls, power + signal devices. ref pa# 2023-0530-8775.
Details
Permit
202307172304
Status
complete
Filed
Jul 17, 2023
Permit issued
Jul 18, 2023
Final sign-off
Oct 6, 2023
Declared cost
$195,000
Address
4 Embarcadero Center

ste 710 - 7th flr: deferred mechanical + electrical (demo low pressure cooling branch ducts, exhaust fans + duct + pneumatic vav boxes, install new vav boxes, ltg, fixtures, and associated circuiting/controls, power + signal devices. ref pa# 2023-0530-8775.

Open the permit page

$195,000
May 30, 2023Completed
final sign-off Oct 2023
4 Embarcadero CenterM C S Construction Services13th fl, ste 1300: non-structural demolition of existing interior commercial tenant improvement. fire sprinkler under separate permit.(202305177924)
Details
Permit
202305308811
Status
complete
Filed
May 30, 2023
Permit issued
Jun 21, 2023
Final sign-off
Oct 6, 2023
Declared cost
$125,000
Address
4 Embarcadero Center

13th fl, ste 1300: non-structural demolition of existing interior commercial tenant improvement. fire sprinkler under separate permit.(202305177924)

Open the permit page

$125,000
May 30, 2023Completed
final sign-off Oct 2023
4 Embarcadero CenterM C S Construction Servicesste 710 - interior commercial ti of existing tenant space. includes non-structural demolition of existing ti and build out of new including non-structural partitions, doors and sidelites, suspended ceiling, casework, and finishes. mep and life safety systems are design-build under a separate permi
Details
Permit
202305308775
Status
complete
Filed
May 30, 2023
Permit issued
Jun 5, 2023
Final sign-off
Oct 4, 2023
Declared cost
$495,000
Address
4 Embarcadero Center

ste 710 - interior commercial ti of existing tenant space. includes non-structural demolition of existing ti and build out of new including non-structural partitions, doors and sidelites, suspended ceiling, casework, and finishes. mep and life safety systems are design-build under a separate permi

Open the permit page

$495,000
Mar 7, 2023Completed
final sign-off May 2023
4 Embarcadero CenterHp Build37th fl-ste 3720: non-structural demo tenant improvement (partial suite), incl non-struct partition removal & removing one door. life safety & sprinklers deferred. no ceiling work.
Details
Permit
202303073123
Status
complete
Filed
Mar 7, 2023
Permit issued
Mar 28, 2023
Final sign-off
May 15, 2023
Declared cost
$85,456
Address
4 Embarcadero Center

37th fl-ste 3720: non-structural demo tenant improvement (partial suite), incl non-struct partition removal & removing one door. life safety & sprinklers deferred. no ceiling work.

Open the permit page

$85,456
Feb 23, 2023Completed
final sign-off Jun 2023
4 Embarcadero CenterM C S Construction Servicesdeferred electrical permit 202211227006
Details
Permit
202302232434
Status
complete
Filed
Feb 23, 2023
Permit issued
Feb 23, 2023
Final sign-off
Jun 1, 2023
Declared cost
$24,000
Address
4 Embarcadero Center

deferred electrical permit 202211227006

Open the permit page

$24,000
Feb 2, 2023Completed
final sign-off Feb 2023
4 Embarcadero CenterAnderson, Rowe & Buckley, Inc.7th fl, ste 750 - existing fire sprinkler system - ti 5 relocated sprinklers ref pa 2022-1122-7006
Details
Permit
202302021212
Status
complete
Filed
Feb 2, 2023
Permit issued
Feb 2, 2023
Final sign-off
Feb 21, 2023
Declared cost
$3,000
Address
4 Embarcadero Center

7th fl, ste 750 - existing fire sprinkler system - ti 5 relocated sprinklers ref pa 2022-1122-7006

Open the permit page

$3,000
Nov 22, 2022Completed
final sign-off Jun 2023
4 Embarcadero CenterM C S Construction Servicesnon struct demo (n) non struc parttions ceilng and millwork, glazing millwork finishes, no increase in occupanxcy area no change in use mep l/s sprinkers under sep permit
Details
Permit
202211227006
Status
complete
Filed
Nov 22, 2022
Permit issued
Jan 24, 2023
Final sign-off
Jun 1, 2023
Declared cost
$199,752
Address
4 Embarcadero Center

non struct demo (n) non struc parttions ceilng and millwork, glazing millwork finishes, no increase in occupanxcy area no change in use mep l/s sprinkers under sep permit

Open the permit page

$199,752
Oct 11, 2022Completed
final sign-off Dec 2022
4 Embarcadero CenterR L H Fire Protection Incfire sprinkler t.i. (6) relocated pendent sprinklers. (3) added upright sprinklers. ref 202208311624.
Details
Permit
202210114102
Status
complete
Filed
Oct 11, 2022
Permit issued
Oct 13, 2022
Final sign-off
Dec 30, 2022
Declared cost
$1,000
Address
4 Embarcadero Center

fire sprinkler t.i. (6) relocated pendent sprinklers. (3) added upright sprinklers. ref 202208311624.

Open the permit page

$1,000
Oct 7, 2022Completed
final sign-off Dec 2022
4 Embarcadero CenterAnderson, Rowe & Buckley, Inc.37th fl fire sprinkler only. add (4) viking model "mirage" for zurich orange box pod (phone booth). ref t.i. 202209222939
Details
Permit
202210073948
Status
complete
Filed
Oct 7, 2022
Permit issued
Nov 1, 2022
Final sign-off
Dec 16, 2022
Declared cost
$2,000
Address
4 Embarcadero Center

37th fl fire sprinkler only. add (4) viking model "mirage" for zurich orange box pod (phone booth). ref t.i. 202209222939

Open the permit page

$2,000
Sep 8, 2022Completed
final sign-off Oct 2022
4 Embarcadero CenterM C S Construction Servicessuite 3410: deferred mechanical and electrical title 24 compliance. ref t.i. pa 202207128225.
Details
Permit
202209082084
Status
complete
Filed
Sep 8, 2022
Permit issued
Sep 8, 2022
Final sign-off
Oct 6, 2022
Declared cost
$25,000
Address
4 Embarcadero Center

suite 3410: deferred mechanical and electrical title 24 compliance. ref t.i. pa 202207128225.

Open the permit page

$25,000
Aug 17, 2022Completed
final sign-off Sep 2022
4 Embarcadero CenterR L H Fire Protection Inc34th floor t.i. of the (e) fire sprinkler system; 5-relocated sprinkler heads; 2- added pendent sprinkler; 2-deleted pendents sprinklers (nfpa 13)
Details
Permit
202208170741
Status
complete
Filed
Aug 17, 2022
Permit issued
Aug 17, 2022
Final sign-off
Sep 2, 2022
Declared cost
$4,000
Address
4 Embarcadero Center

34th floor t.i. of the (e) fire sprinkler system; 5-relocated sprinkler heads; 2- added pendent sprinkler; 2-deleted pendents sprinklers (nfpa 13)

Open the permit page

$4,000
Jul 12, 2022Completed
final sign-off Oct 2022
4 Embarcadero CenterM C S Construction Servicesnon structural demo. new non structural partitions, glass, doors, millwork,finishes. mep, life safety, sprinkler under sep permit
Details
Permit
202207128225
Status
complete
Filed
Jul 12, 2022
Permit issued
Jul 19, 2022
Final sign-off
Oct 6, 2022
Declared cost
$169,300
Address
4 Embarcadero Center

non structural demo. new non structural partitions, glass, doors, millwork,finishes. mep, life safety, sprinkler under sep permit

Open the permit page

$169,300
May 17, 2022Completed
final sign-off Jun 2023
4 Embarcadero CenterSkyline Construction35th fl, suite 3500: deferred submittal for approved bpa#202202027136. overhead structural steel support for muraflex expo telescoping door system. fire alarm/sprinkler under sep permits.
Details
Permit
202205174425
Status
complete
Filed
May 17, 2022
Permit issued
May 20, 2022
Final sign-off
Jun 2, 2023
Declared cost
$50,000
Address
4 Embarcadero Center

35th fl, suite 3500: deferred submittal for approved bpa#202202027136. overhead structural steel support for muraflex expo telescoping door system. fire alarm/sprinkler under sep permits.

Open the permit page

$50,000
Nov 4, 2021Never finaled
issued Dec 2021, no final
4 Embarcadero CenterSource Planning And Construction Incdemo of inter connecting staircase and infill slab between floors 12 & 13 no change in occupancy or use
Details
Permit
202111041782
Status
issued
Filed
Nov 4, 2021
Permit issued
Dec 9, 2021
Declared cost
$200,000
Address
4 Embarcadero Center

demo of inter connecting staircase and infill slab between floors 12 & 13 no change in occupancy or use

Open the permit page

$200,000
Jun 7, 2021Never finaled
issued Jun 2021, no final
4 Embarcadero CenterSource Planning And Construction Inc34th floor: select demo of non str. partitions, doors, glazing, lights and finishes. construct new non structural partition, doors/glazing lights & finishes. electrical & mech included in this permit
Details
Permit
202106071844
Status
issued
Filed
Jun 7, 2021
Permit issued
Jun 29, 2021
Declared cost
$139,860
Address
4 Embarcadero Center

34th floor: select demo of non str. partitions, doors, glazing, lights and finishes. construct new non structural partition, doors/glazing lights & finishes. electrical & mech included in this permit

Open the permit page

$139,860
Apr 21, 2021Never finaled
issued Jun 2021, no final
4 Embarcadero CenterW. Wong Construction Co. Inc.install hydronic radiant pane (heat) and circulation pump for heating of outdoor patio area.
Details
Permit
202104219054
Status
issued
Filed
Apr 21, 2021
Permit issued
Jun 4, 2021
Declared cost
$3,000
Address
4 Embarcadero Center

install hydronic radiant pane (heat) and circulation pump for heating of outdoor patio area.

Open the permit page

$3,000
Feb 25, 2020Completed
final sign-off Aug 2020
4 Embarcadero CenterBilcor Inc33rd fl - fire alarm install (1) two way call station; install 1 line fault monitor. fa monitor of call box on sep permit. ref pa 2019-1112-7069.
Details
Permit
202002255267
Status
complete
Filed
Feb 25, 2020
Permit issued
Feb 25, 2020
Final sign-off
Aug 11, 2020
Declared cost
$1,320
Address
4 Embarcadero Center

33rd fl - fire alarm install (1) two way call station; install 1 line fault monitor. fa monitor of call box on sep permit. ref pa 2019-1112-7069.

Open the permit page

$1,320
Feb 13, 2020Completed
final sign-off Aug 2020
4 Embarcadero CenterAnderson, Rowe & Buckley, Inc.4th fl - existing fire sprinkler system ti add 1 & relocate 7 sprinklers
Details
Permit
202002134351
Status
complete
Filed
Feb 13, 2020
Permit issued
Feb 13, 2020
Final sign-off
Aug 10, 2020
Declared cost
$4,000
Address
4 Embarcadero Center

4th fl - existing fire sprinkler system ti add 1 & relocate 7 sprinklers

Open the permit page

$4,000
Feb 12, 2020Never finaled
issued Feb 2020, no final
100 Drumm StTracy Sign Incinstall 1 interior single faced wall sign "one medical"
Details
Permit
202002124257
Status
issued
Filed
Feb 12, 2020
Permit issued
Feb 13, 2020
Declared cost
$1,500
Address
100 Drumm St

install 1 interior single faced wall sign "one medical"

Open the permit page

$1,500
Feb 12, 2020Never finaled
issued Feb 2020, no final
100 Drumm StTracy Sign Incinstall (1) window vinly sign "one medical".
Details
Permit
202002124260
Status
issued
Filed
Feb 12, 2020
Permit issued
Feb 13, 2020
Declared cost
$1,500
Address
100 Drumm St

install (1) window vinly sign "one medical".

Open the permit page

$1,500
Feb 12, 2020Never finaled
issued Feb 2020, no final
100 Drumm StTracy Sign Incinstall (1) window vinly sign "one medical".
Details
Permit
202002124256
Status
issued
Filed
Feb 12, 2020
Permit issued
Feb 13, 2020
Declared cost
$1,500
Address
100 Drumm St

install (1) window vinly sign "one medical".

Open the permit page

$1,500
Feb 12, 2020Never finaled
issued Feb 2020, no final
100 Drumm StTracy Sign Incinstall (1) window vinly sign "one medical".
Details
Permit
202002124262
Status
issued
Filed
Feb 12, 2020
Permit issued
Feb 13, 2020
Declared cost
$1,500
Address
100 Drumm St

install (1) window vinly sign "one medical".

Open the permit page

$1,500
Feb 12, 2020Never finaled
issued Feb 2020, no final
100 Drumm StTracy Sign Incinstall 1 interior projecting sign "one medical"
Details
Permit
202002124255
Status
issued
Filed
Feb 12, 2020
Permit issued
Feb 13, 2020
Declared cost
$1,500
Address
100 Drumm St

install 1 interior projecting sign "one medical"

Open the permit page

$1,500
Feb 12, 2020Never finaled
issued Feb 2020, no final
100 Drumm StTracy Sign Inc1 atom logo sign
Details
Permit
202002124258
Status
issued
Filed
Feb 12, 2020
Permit issued
Feb 13, 2020
Declared cost
$1,500
Address
100 Drumm St

1 atom logo sign

Open the permit page

$1,500
Jan 21, 2020Never finaled
issued Jan 2020, no final
4 Embarcadero CenterBilcor Incfire alarm mmc temp 2 way communication, install 6 2 way call station, 1 line fault monitor
Details
Permit
202001212295
Status
issued
Filed
Jan 21, 2020
Permit issued
Jan 22, 2020
Declared cost
$4,620
Address
4 Embarcadero Center

fire alarm mmc temp 2 way communication, install 6 2 way call station, 1 line fault monitor

Open the permit page

$4,620
Nov 20, 2019Completed
final sign-off Sep 2020
4 Embarcadero CenterBcci Construction Company3rd floor: revision to pa# 2019-0528-1822: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.
Details
Permit
201911207720
Status
complete
Filed
Nov 20, 2019
Permit issued
Nov 25, 2019
Final sign-off
Sep 2, 2020
Declared cost
$5,000
Address
4 Embarcadero Center

3rd floor: revision to pa# 2019-0528-1822: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.

Open the permit page

$5,000
Nov 20, 2019Completed
final sign-off Sep 2020
4 Embarcadero CenterBcci Construction Company2nd floor: revision to pa# 2019-0522-1464: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.
Details
Permit
201911207719
Status
complete
Filed
Nov 20, 2019
Permit issued
Nov 25, 2019
Final sign-off
Sep 2, 2020
Declared cost
$5,000
Address
4 Embarcadero Center

2nd floor: revision to pa# 2019-0522-1464: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.

Open the permit page

$5,000
Nov 20, 2019Completed
final sign-off Sep 2020
4 Embarcadero CenterBcci Construction Company4th floor: revision to pa# 2019-0606-2703: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.
Details
Permit
201911207722
Status
complete
Filed
Nov 20, 2019
Permit issued
Nov 25, 2019
Final sign-off
Sep 2, 2020
Declared cost
$5,000
Address
4 Embarcadero Center

4th floor: revision to pa# 2019-0606-2703: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.

Open the permit page

$5,000
Sep 5, 2019Completed
final sign-off Dec 2020
4 Embarcadero CenterBcci Construction Company3rd floor - structural revision to previously approved mobile partition ref 201905281822
Details
Permit
201909050721
Status
complete
Filed
Sep 5, 2019
Permit issued
Sep 6, 2019
Final sign-off
Dec 21, 2020
Address
4 Embarcadero Center

3rd floor - structural revision to previously approved mobile partition ref 201905281822

Open the permit page

Jun 19, 2019Completed
final sign-off Dec 2019
4 Embarcadero CenterPrincipal Builders Inc.non struct demo, (n) non sturct partitions, ceiling lights, finishes no change in occupancy use or area, mep, life sagety, & sprinklers under sep permit
Details
Permit
201906193813
Status
complete
Filed
Jun 19, 2019
Permit issued
Jun 20, 2019
Final sign-off
Dec 3, 2019
Declared cost
$190,000
Address
4 Embarcadero Center

non struct demo, (n) non sturct partitions, ceiling lights, finishes no change in occupancy use or area, mep, life sagety, & sprinklers under sep permit

Open the permit page

$190,000
Jun 14, 2019Completed
final sign-off Nov 2020
4 Embarcadero CenterSource Planning And Construction Inc37 & 38/f: revision to pa 2019-0509-0198 non-structural demo (n) partitions, plumbing fixtures, accessories finishes. no change in occupancy, use or area. mep, life safety & sprinklers under separate permit
Details
Permit
201906143420
Status
complete
Filed
Jun 14, 2019
Permit issued
Jul 17, 2019
Final sign-off
Nov 5, 2020
Declared cost
$25,000
Address
4 Embarcadero Center

37 & 38/f: revision to pa 2019-0509-0198 non-structural demo (n) partitions, plumbing fixtures, accessories finishes. no change in occupancy, use or area. mep, life safety & sprinklers under separate permit

Open the permit page

$25,000
Feb 7, 2019Completed
final sign-off Apr 2019
4 Embarcadero CenterSource Planning And Construction Inc34th fl, suite 3460: (n) nonstructural partitions, power/data, & finishes. no change in occupancy or use. no increase in footprint. mep, life safety and sprinkler under separate permit. (fully sprinkled building)
Details
Permit
201902072382
Status
complete
Filed
Feb 7, 2019
Permit issued
Feb 12, 2019
Final sign-off
Apr 17, 2019
Declared cost
$15,309
Address
4 Embarcadero Center

34th fl, suite 3460: (n) nonstructural partitions, power/data, & finishes. no change in occupancy or use. no increase in footprint. mep, life safety and sprinkler under separate permit. (fully sprinkled building)

Open the permit page

$15,309
Jan 18, 2019Completed
final sign-off May 2019
4 Embarcadero CenterR L H Fire Protection Inc34th fl - fire sprinkler permit - relocate 1 and add 5 sprinklers. ref pa 2018-1211-8012
Details
Permit
201901180702
Status
complete
Filed
Jan 18, 2019
Permit issued
Jan 18, 2019
Final sign-off
May 20, 2019
Declared cost
$2,800
Address
4 Embarcadero Center

34th fl - fire sprinkler permit - relocate 1 and add 5 sprinklers. ref pa 2018-1211-8012

Open the permit page

$2,800
Nov 20, 2018Completed
final sign-off Nov 2018
4 Embarcadero CenterW. Wong Construction Co. Inc.replace (e) gate with new gate new panic hardware and fire know box at restaurant on lobby level
Details
Permit
201811206380
Status
complete
Filed
Nov 20, 2018
Permit issued
Nov 21, 2018
Final sign-off
Nov 29, 2018
Declared cost
$1,000
Address
4 Embarcadero Center

replace (e) gate with new gate new panic hardware and fire know box at restaurant on lobby level

Open the permit page

$1,000
Oct 3, 2018Completed
final sign-off Jan 2019
4 Embarcadero CenterSource Planning And Construction Inc15th flr. electrical and mechanical for t.i pa # 201808147301
Details
Permit
201810032140
Status
complete
Filed
Oct 3, 2018
Permit issued
Oct 10, 2018
Final sign-off
Jan 28, 2019
Address
4 Embarcadero Center

15th flr. electrical and mechanical for t.i pa # 201808147301

Open the permit page

Oct 3, 2018Completed
final sign-off Jan 2019
4 Embarcadero CenterSource Planning And Construction Incsuite 3460, 34th flr. electrical and mechanical work for tenant improvement. maher n/a. ref pa 201808248221
Details
Permit
201810032184
Status
complete
Filed
Oct 3, 2018
Permit issued
Oct 12, 2018
Final sign-off
Jan 24, 2019
Declared cost
$75,000
Address
4 Embarcadero Center

suite 3460, 34th flr. electrical and mechanical work for tenant improvement. maher n/a. ref pa 201808248221

Open the permit page

$75,000
Sep 28, 2018Completed
final sign-off Dec 2018
4 Embarcadero CenterSource Planning And Construction Incnon-structural demo. (n) millwork and finishes. no change in occupancy, use or area. mep, life safety and sprinklers under separate permit.
Details
Permit
201809281702
Status
complete
Filed
Sep 28, 2018
Permit issued
Nov 19, 2018
Final sign-off
Dec 19, 2018
Declared cost
$14,449
Address
4 Embarcadero Center

non-structural demo. (n) millwork and finishes. no change in occupancy, use or area. mep, life safety and sprinklers under separate permit.

Open the permit page

$14,449
Aug 24, 2018Completed
final sign-off Jan 2019
100 Drumm StSource Planning And Construction Inc34th fl: non-structural demo. (n) non-structural partitions, ceiling, lights, finishes & millwork. no change in area, occupancy or use. mep, life safety & sprinklers under sep permit. maher na
Details
Permit
201808248221
Status
complete
Filed
Aug 24, 2018
Permit issued
Sep 10, 2018
Final sign-off
Jan 24, 2019
Declared cost
$606,062
Address
100 Drumm St

34th fl: non-structural demo. (n) non-structural partitions, ceiling, lights, finishes & millwork. no change in area, occupancy or use. mep, life safety & sprinklers under sep permit. maher na

Open the permit page

$606,062
Jul 19, 2018Never finaled
filed Jul 2018, never issued
100 Drumm Stinstall 4 illuminated wall signs on building exterior
Details
Permit
201807194943
Status
filed
Filed
Jul 19, 2018
Address
100 Drumm St

install 4 illuminated wall signs on building exterior

Open the permit page

Jul 19, 2018Never finaled
issued Nov 2018, no final
100 Drumm Stinstall 1 illuminated (blue mercury makeup skincare sap) wall sign on building interior
Details
Permit
201807194947
Status
issued
Filed
Jul 19, 2018
Permit issued
Nov 16, 2018
Declared cost
$3,000
Address
100 Drumm St

install 1 illuminated (blue mercury makeup skincare sap) wall sign on building interior

Open the permit page

$3,000
Jul 19, 2018Never finaled
issued Nov 2018, no final
100 Drumm StDiscount Signs & Neon Inc4 illuminated ( blue mercury makeup skincare sap) wall signs
Details
Permit
201807194944
Status
issued
Filed
Jul 19, 2018
Permit issued
Nov 16, 2018
Declared cost
$8,000
Address
100 Drumm St

4 illuminated ( blue mercury makeup skincare sap) wall signs

Open the permit page

$8,000
May 16, 2018Expired or cancelled
cancelled Jan 2026
4 Embarcadero Centerlobby level: (n) metal exit gate at existing patio. no change in occupancy, use of area. maher na
Details
Permit
201805169217
Status
cancelled
Filed
May 16, 2018
Declared cost
$25,000
Address
4 Embarcadero Center

lobby level: (n) metal exit gate at existing patio. no change in occupancy, use of area. maher na

Open the permit page

$25,000
Feb 8, 2018Completed
final sign-off May 2018
4 Embarcadero CenterHathaway Dinwiddie Co.26th flr - furnish and install heat pump, diffusers and ductwork as necessary ref arch 201801037736 maher na
Details
Permit
201802080715
Status
complete
Filed
Feb 8, 2018
Permit issued
Feb 8, 2018
Final sign-off
May 8, 2018
Declared cost
$20,000
Address
4 Embarcadero Center

26th flr - furnish and install heat pump, diffusers and ductwork as necessary ref arch 201801037736 maher na

Open the permit page

$20,000
Jan 3, 2018Completed
final sign-off May 2018
4 Embarcadero CenterHathaway Dinwiddie Co.26th fl - non structural, demo. (n) non-structural partitions, doors, finishes. no change in area, occupancy or use. mep life safety, sprinklers under sep permit. maher n/a
Details
Permit
201801037736
Status
complete
Filed
Jan 3, 2018
Permit issued
Jan 24, 2018
Final sign-off
May 8, 2018
Declared cost
$49,700
Address
4 Embarcadero Center

26th fl - non structural, demo. (n) non-structural partitions, doors, finishes. no change in area, occupancy or use. mep life safety, sprinklers under sep permit. maher n/a

Open the permit page

$49,700
Dec 19, 2017Expired or cancelled
cancelled Jan 2026
4 Embarcadero Centerrevision to 201709229282, revise exiting lan as requested sffd
Details
Permit
201712196897
Status
cancelled
Filed
Dec 19, 2017
Address
4 Embarcadero Center

revision to 201709229282, revise exiting lan as requested sffd

Open the permit page

Dec 11, 2017Completed
final sign-off Mar 2018
4 Embarcadero CenterSource Planning And Construction Incnew non structural partitions, doors, glazing, finishes. no change in occupancy, use or area, mep ls sprinklers sep permit; n/a maher
Details
Permit
201712116014
Status
complete
Filed
Dec 11, 2017
Permit issued
Dec 27, 2017
Final sign-off
Mar 29, 2018
Declared cost
$76,440
Address
4 Embarcadero Center

new non structural partitions, doors, glazing, finishes. no change in occupancy, use or area, mep ls sprinklers sep permit; n/a maher

Open the permit page

$76,440
Sep 22, 2017Never finaled
issued Oct 2017, no final
4 Embarcadero CenterBcci Construction Company4th fl: non-struct demo, (n) non-struct partitions, doors, finishes. mep under sep. permit. no change in area, occupancy or use. maher na. scope of work includes one new 'l' shaped wall, two new doors with card readers. area will not exceed 500 sf.
Details
Permit
201709229282
Status
issued
Filed
Sep 22, 2017
Permit issued
Oct 17, 2017
Declared cost
$41,340
Address
4 Embarcadero Center

4th fl: non-struct demo, (n) non-struct partitions, doors, finishes. mep under sep. permit. no change in area, occupancy or use. maher na. scope of work includes one new 'l' shaped wall, two new doors with card readers. area will not exceed 500 sf.

Open the permit page

$41,340
Apr 21, 2017Completed
final sign-off Sep 2017
4 Embarcadero CenterPeacock Construction26th floor: t-24th electrical for work under app#201702109129. n/a for maher
Details
Permit
201704214567
Status
complete
Filed
Apr 21, 2017
Permit issued
Apr 21, 2017
Final sign-off
Sep 8, 2017
Declared cost
$13,500
Address
4 Embarcadero Center

26th floor: t-24th electrical for work under app#201702109129. n/a for maher

Open the permit page

$13,500
Apr 20, 2017Completed
final sign-off Jun 2017
4 Embarcadero CenterAyoob & Peery Plumbing Co Inc6th floor - add, relocate & remove fire sprinklers per tenant improvements: add 7, relocate 146, remove 48. ref pa #201703171664.
Details
Permit
201704204434
Status
complete
Filed
Apr 20, 2017
Permit issued
Apr 20, 2017
Final sign-off
Jun 8, 2017
Declared cost
$80,325
Address
4 Embarcadero Center

6th floor - add, relocate & remove fire sprinklers per tenant improvements: add 7, relocate 146, remove 48. ref pa #201703171664.

Open the permit page

$80,325
Apr 19, 2017Completed
final sign-off Apr 2017
4 Embarcadero CenterGolden Gate Fire Protection Incfire sprinkler only relocate 7 pendent for both restrooms on the 26th fl 201702109129. n/a for maher.
Details
Permit
201704194321
Status
complete
Filed
Apr 19, 2017
Permit issued
Apr 19, 2017
Final sign-off
Apr 28, 2017
Declared cost
$1,750
Address
4 Embarcadero Center

fire sprinkler only relocate 7 pendent for both restrooms on the 26th fl 201702109129. n/a for maher.

Open the permit page

$1,750
Mar 20, 2017Completed
final sign-off Mar 2017
4 Embarcadero CenterR L H Fire Protection Inc13th flr: fire sprinkler - relocate 15 and delete 2 pendents sprinklers maher na
Details
Permit
201703201810
Status
complete
Filed
Mar 20, 2017
Permit issued
Mar 20, 2017
Final sign-off
Mar 22, 2017
Declared cost
$3,500
Address
4 Embarcadero Center

13th flr: fire sprinkler - relocate 15 and delete 2 pendents sprinklers maher na

Open the permit page

$3,500
Mar 17, 2017Completed
final sign-off Oct 2017
4 Embarcadero CenterSc Builders, Incpartial floor ti includes partition, mech/elec/plumbing, ceiling lighting and finishes. no plumbing or structural. maher na
Details
Permit
201703171663
Status
complete
Filed
Mar 17, 2017
Permit issued
May 11, 2017
Final sign-off
Oct 2, 2017
Declared cost
$690,000
Address
4 Embarcadero Center

partial floor ti includes partition, mech/elec/plumbing, ceiling lighting and finishes. no plumbing or structural. maher na

Open the permit page

$690,000
Mar 17, 2017Completed
final sign-off Jul 2017
4 Embarcadero CenterSc Builders, Inc6th floor, full floor ti includes partition, mep's, ceiling, lighting & finishes. maher na
Details
Permit
201703171664
Status
complete
Filed
Mar 17, 2017
Permit issued
Mar 28, 2017
Final sign-off
Jul 17, 2017
Declared cost
$2,300,000
Address
4 Embarcadero Center

6th floor, full floor ti includes partition, mep's, ceiling, lighting & finishes. maher na

Open the permit page

$2,300,000
Jan 19, 2017Completed
final sign-off Mar 2018
4 Embarcadero CenterPeacock Construction26/f: relocate walls at rooms 2603/2604/2605. revision to pa#201609087034.
Details
Permit
201701197462
Status
complete
Filed
Jan 19, 2017
Permit issued
Jan 19, 2017
Final sign-off
Mar 23, 2018
Address
4 Embarcadero Center

26/f: relocate walls at rooms 2603/2604/2605. revision to pa#201609087034.

Open the permit page

Dec 16, 2016Completed
final sign-off Mar 2017
4 Embarcadero CenterSc Builders, Incsuite #2640: commercial t.i. to unoccupied suite on 26th floor. demolition of finishes, millwork, and limited ceiling demo. new non-structural partitions, glazing and millwork, includes restroom accessibility upgrades. n/a for maher.
Details
Permit
201612165257
Status
complete
Filed
Dec 16, 2016
Permit issued
Jan 12, 2017
Final sign-off
Mar 31, 2017
Declared cost
$148,407
Address
4 Embarcadero Center

suite #2640: commercial t.i. to unoccupied suite on 26th floor. demolition of finishes, millwork, and limited ceiling demo. new non-structural partitions, glazing and millwork, includes restroom accessibility upgrades. n/a for maher.

Open the permit page

$148,407
Dec 7, 2016Never finaled
issued Dec 2016, no final
4 Embarcadero CenterSc Builders, Inc6th floor:demo of nonstructural partitions, finishes, electrical and plumbing. n/a for maher per ab17
Details
Permit
201612074353
Status
issued
Filed
Dec 7, 2016
Permit issued
Dec 28, 2016
Declared cost
$111,142
Address
4 Embarcadero Center

6th floor:demo of nonstructural partitions, finishes, electrical and plumbing. n/a for maher per ab17

Open the permit page

$111,142
Nov 15, 2016Completed
final sign-off Mar 2017
4 Embarcadero CenterR L H Fire Protection Inc38th floor fire sprinkler permit. relocate 129 uprights and remove 72 pendent sprinklers. n/a for maher.
Details
Permit
201611152758
Status
complete
Filed
Nov 15, 2016
Permit issued
Nov 15, 2016
Final sign-off
Mar 8, 2017
Declared cost
$27,000
Address
4 Embarcadero Center

38th floor fire sprinkler permit. relocate 129 uprights and remove 72 pendent sprinklers. n/a for maher.

Open the permit page

$27,000
Oct 24, 2016Completed
final sign-off Mar 2018
4 Embarcadero CenterR L H Fire Protection Inc26th floor fire sprinkler permit - relocate 58, add 18 & delete 30 pendent sprinkelrs, delete 3 sidewalls & 8 upright sprinklers. ref pa #201609087034. n/a meher ordinance
Details
Permit
201610240977
Status
complete
Filed
Oct 24, 2016
Permit issued
Oct 24, 2016
Final sign-off
Mar 23, 2018
Declared cost
$21,250
Address
4 Embarcadero Center

26th floor fire sprinkler permit - relocate 58, add 18 & delete 30 pendent sprinkelrs, delete 3 sidewalls & 8 upright sprinklers. ref pa #201609087034. n/a meher ordinance

Open the permit page

$21,250
Oct 19, 2016Completed
final sign-off Nov 2016
4 Embarcadero CenterAyoob & Peery Plumbing Co Inc24th floor: add one, relocate 2 sprinklers to conform with the new wall/ceiling layout of the t.i. ref app201609087034. n/a for maher
Details
Permit
201610190704
Status
complete
Filed
Oct 19, 2016
Permit issued
Oct 19, 2016
Final sign-off
Nov 2, 2016
Declared cost
$932
Address
4 Embarcadero Center

24th floor: add one, relocate 2 sprinklers to conform with the new wall/ceiling layout of the t.i. ref app201609087034. n/a for maher

Open the permit page

$932
Sep 8, 2016Completed
final sign-off Mar 2018
4 Embarcadero CenterPeacock Constructionnon struc demo new non structural partitions, glazing, ceiling, lights, elec, millwork, finishes. mep sep permit
Details
Permit
201609087034
Status
complete
Filed
Sep 8, 2016
Permit issued
Sep 26, 2016
Final sign-off
Mar 16, 2018
Declared cost
$576,498
Address
4 Embarcadero Center

non struc demo new non structural partitions, glazing, ceiling, lights, elec, millwork, finishes. mep sep permit

Open the permit page

$576,498
Sep 2, 2016Completed
final sign-off Sep 2016
4 Embarcadero CenterGolden Gate Fire Protection Inc3rd flr: add 2 pendents outside conference room #22 for mercer innovations ref pa 201608034086 maher na
Details
Permit
201609026656
Status
complete
Filed
Sep 2, 2016
Permit issued
Sep 2, 2016
Final sign-off
Sep 13, 2016
Declared cost
$1,050
Address
4 Embarcadero Center

3rd flr: add 2 pendents outside conference room #22 for mercer innovations ref pa 201608034086 maher na

Open the permit page

$1,050
Aug 3, 2016Completed
final sign-off Jun 2017
4 Embarcadero CenterPeacock Construction24 & 25 floor - demolition of (e) stair between 24th & 25th floor, infill of slab on 25, both floors unoccupied. no change in occupancy use, or area. maher ord 155-13 not required.
Details
Permit
201608034084
Status
complete
Filed
Aug 3, 2016
Permit issued
Aug 23, 2016
Final sign-off
Jun 7, 2017
Declared cost
$190,000
Address
4 Embarcadero Center

24 & 25 floor - demolition of (e) stair between 24th & 25th floor, infill of slab on 25, both floors unoccupied. no change in occupancy use, or area. maher ord 155-13 not required.

Open the permit page

$190,000
Aug 3, 2016Completed
final sign-off Nov 2016
4 Embarcadero CenterPeacock Construction3rd floor - non-structural demo (n) glazing & doors, electrical, finishes. no change in occupancy use, or area. mep, life safety, sprinklers under separate permit.
Details
Permit
201608034086
Status
complete
Filed
Aug 3, 2016
Permit issued
Aug 4, 2016
Final sign-off
Nov 29, 2016
Declared cost
$34,398
Address
4 Embarcadero Center

3rd floor - non-structural demo (n) glazing & doors, electrical, finishes. no change in occupancy use, or area. mep, life safety, sprinklers under separate permit.

Open the permit page

$34,398
Jun 13, 2016Never finaled
issued Jun 2016, no final
4 Embarcadero CenterSiemens Industry, Inc.fire alarm for the "suite 2600" ti remodl on floor 26; addition is 1 speaker/strobe. ref pa 2016-0511-7104. maher na
Details
Permit
201606139722
Status
issued
Filed
Jun 13, 2016
Permit issued
Jun 13, 2016
Declared cost
$510
Address
4 Embarcadero Center

fire alarm for the "suite 2600" ti remodl on floor 26; addition is 1 speaker/strobe. ref pa 2016-0511-7104. maher na

Open the permit page

$510
May 11, 2016Completed
final sign-off Aug 2016
4 Embarcadero CenterPeacock Construction26th floor - non-structural demo, (n) partition, minor ceiling grid , lighting - to remain, finishes. mep under separate permit. no change in area, occupancy or use. n/a maher ordinance
Details
Permit
201605117104
Status
complete
Filed
May 11, 2016
Permit issued
Jun 6, 2016
Final sign-off
Aug 26, 2016
Declared cost
$41,580
Address
4 Embarcadero Center

26th floor - non-structural demo, (n) partition, minor ceiling grid , lighting - to remain, finishes. mep under separate permit. no change in area, occupancy or use. n/a maher ordinance

Open the permit page

$41,580
Apr 15, 2016Never finaled
issued Apr 2016, no final
4 Embarcadero CenterSiemens Industry, Inc.on 34th floor- fire alarm work for the "glencore ltd" ti remodel; additions are 1 smoke detector, 1 speaker, and 2 strobes. ref pa 2016-0301-0839
Details
Permit
201604154839
Status
issued
Filed
Apr 15, 2016
Permit issued
Apr 15, 2016
Declared cost
$2,200
Address
4 Embarcadero Center

on 34th floor- fire alarm work for the "glencore ltd" ti remodel; additions are 1 smoke detector, 1 speaker, and 2 strobes. ref pa 2016-0301-0839

Open the permit page

$2,200
Mar 17, 2016Completed
final sign-off Jun 2016
4 Embarcadero CenterGci, Incstructural operable partition wall 2015-0930-8413. maher na
Details
Permit
201603172283
Status
complete
Filed
Mar 17, 2016
Permit issued
Mar 21, 2016
Final sign-off
Jun 13, 2016
Declared cost
$5,000
Address
4 Embarcadero Center

structural operable partition wall 2015-0930-8413. maher na

Open the permit page

$5,000
Mar 9, 2016Completed
final sign-off Aug 2016
4 Embarcadero CenterPioneer Fire Inc.relocate (149) pendents, remove (32) pendents. ref pa 2015-0923-7782 maher na
Details
Permit
201603091592
Status
complete
Filed
Mar 9, 2016
Permit issued
Mar 9, 2016
Final sign-off
Aug 9, 2016
Declared cost
$43,729
Address
4 Embarcadero Center

relocate (149) pendents, remove (32) pendents. ref pa 2015-0923-7782 maher na

Open the permit page

$43,729
Mar 9, 2016Never finaled
issued Mar 2016, no final
4 Embarcadero CenterPioneer Fire Inc.relocate (159) pendents, remove (32) pendents. ref pa 2015-0930-8413 maher na
Details
Permit
201603091594
Status
issued
Filed
Mar 9, 2016
Permit issued
Mar 9, 2016
Declared cost
$46,721
Address
4 Embarcadero Center

relocate (159) pendents, remove (32) pendents. ref pa 2015-0930-8413 maher na

Open the permit page

$46,721
Mar 1, 2016Completed
final sign-off Jun 2016
4 Embarcadero CenterPeacock Construction34th floor - non-structural demo, (n) non-structural partitoins, doors, lighting, finishes. no change in occupancy , use, ore area. mep under separate permit. n/a maher ordinance
Details
Permit
201603010839
Status
complete
Filed
Mar 1, 2016
Permit issued
Apr 18, 2016
Final sign-off
Jun 20, 2016
Declared cost
$140,525
Address
4 Embarcadero Center

34th floor - non-structural demo, (n) non-structural partitoins, doors, lighting, finishes. no change in occupancy , use, ore area. mep under separate permit. n/a maher ordinance

Open the permit page

$140,525
Feb 12, 2016Expired or cancelled
cancelled Jan 2026
4 Embarcadero Center2 new window lots in east fascade. no change in occupancy, use, or area. mep, ls, sprinkler deferred maher not req
Details
Permit
201602129469
Status
cancelled
Filed
Feb 12, 2016
Declared cost
$100,000
Address
4 Embarcadero Center

2 new window lots in east fascade. no change in occupancy, use, or area. mep, ls, sprinkler deferred maher not req

Open the permit page

$100,000
Jan 27, 2016Completed
final sign-off Jun 2016
4 Embarcadero CenterPeacock Constructionnon-structural demo (n) non-structural partitions ceiling, lights, electrical, millwork, toilet room upgrades. no change in use, occupancy or area. mep, sprinkler, life safety under sep permit
Details
Permit
201601278063
Status
complete
Filed
Jan 27, 2016
Permit issued
Feb 2, 2016
Final sign-off
Jun 20, 2016
Declared cost
$260,260
Address
4 Embarcadero Center

non-structural demo (n) non-structural partitions ceiling, lights, electrical, millwork, toilet room upgrades. no change in use, occupancy or area. mep, sprinkler, life safety under sep permit

Open the permit page

$260,260
Jan 22, 2016Completed
final sign-off Jan 2016
4 Embarcadero CenterGolden Gate Fire Protection Incfire sprinkler relocate 12 pendents on corridor 34th fl remove 1 pendent. reference ti 2015.1201.3805 n/a for maher.
Details
Permit
201601227688
Status
complete
Filed
Jan 22, 2016
Permit issued
Jan 22, 2016
Final sign-off
Jan 29, 2016
Declared cost
$6,000
Address
4 Embarcadero Center

fire sprinkler relocate 12 pendents on corridor 34th fl remove 1 pendent. reference ti 2015.1201.3805 n/a for maher.

Open the permit page

$6,000
Jan 21, 2016Completed
final sign-off Jun 2016
4 Embarcadero CenterSiemens Industry, Inc.34th flr: fire alarm work for the "corridor" t.i. remodel on floor 34; additions are 3 smoke detectors, 4 door holders, 1 speaker, 1 strobe & the relocation of 3 strobes; ref. ti.i. 201512013805; maher n/a
Details
Permit
201601217645
Status
complete
Filed
Jan 21, 2016
Permit issued
Jan 22, 2016
Final sign-off
Jun 20, 2016
Declared cost
$4,750
Address
4 Embarcadero Center

34th flr: fire alarm work for the "corridor" t.i. remodel on floor 34; additions are 3 smoke detectors, 4 door holders, 1 speaker, 1 strobe & the relocation of 3 strobes; ref. ti.i. 201512013805; maher n/a

Open the permit page

$4,750
Dec 30, 2015Completed
final sign-off Jun 2016
4 Embarcadero CenterPeacock Construction34th flr: t-24 electrical for work done under pa 201512013805; maher n/a
Details
Permit
201512306174
Status
complete
Filed
Dec 30, 2015
Permit issued
Dec 30, 2015
Final sign-off
Jun 20, 2016
Declared cost
$16,500
Address
4 Embarcadero Center

34th flr: t-24 electrical for work done under pa 201512013805; maher n/a

Open the permit page

$16,500
Dec 1, 2015Completed
final sign-off Jun 2016
4 Embarcadero CenterPeacock Construction34th floor: ab-017. non-structural demo. (n) non-structural partitions, doors, ceiling, lights. finishes-common areas only. no change in occupancy, use or area. mep under separate permit. maher na
Details
Permit
201512013805
Status
complete
Filed
Dec 1, 2015
Permit issued
Dec 4, 2015
Final sign-off
Jun 20, 2016
Declared cost
$150,000
Address
4 Embarcadero Center

34th floor: ab-017. non-structural demo. (n) non-structural partitions, doors, ceiling, lights. finishes-common areas only. no change in occupancy, use or area. mep under separate permit. maher na

Open the permit page

$150,000
Nov 20, 2015Completed
final sign-off Aug 2016
4 Embarcadero CenterSiemens Industry, Inc.fire alarm work for the sheppard mullin ti remodel on floor 16. additions are 9 smoke detectors, 4 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 10 speakers, 35 speaker/strobes, 1 strobe ref 201509237782
Details
Permit
201511203188
Status
complete
Filed
Nov 20, 2015
Permit issued
Nov 23, 2015
Final sign-off
Aug 26, 2016
Declared cost
$34,500
Address
4 Embarcadero Center

fire alarm work for the sheppard mullin ti remodel on floor 16. additions are 9 smoke detectors, 4 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 10 speakers, 35 speaker/strobes, 1 strobe ref 201509237782

Open the permit page

$34,500
Nov 20, 2015Completed
final sign-off Jan 2016
4 Embarcadero CenterSiemens Industry, Inc.fire alarm work for the "shepparn mullin" ti remodel on floor 18; additions are 8 smoke detectors, 2 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 13 speakers, 32 speaker/strobes, and 2 strobes. ref pa 2015-0909-6437
Details
Permit
201511203189
Status
complete
Filed
Nov 20, 2015
Permit issued
Nov 23, 2015
Final sign-off
Jan 15, 2016
Declared cost
$33,200
Address
4 Embarcadero Center

fire alarm work for the "shepparn mullin" ti remodel on floor 18; additions are 8 smoke detectors, 2 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 13 speakers, 32 speaker/strobes, and 2 strobes. ref pa 2015-0909-6437

Open the permit page

$33,200
Nov 20, 2015Completed
final sign-off May 2016
4 Embarcadero CenterSiemens Industry, Inc.fire alrm work for the "sheppard mullin" ti remodel on floor 17; additions are 9 smoke detectors, 3 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 11 speakers, 37 speakers/strobes, and 2 strobes. ref pa 2015-0930-8413. maher na
Details
Permit
201511203190
Status
complete
Filed
Nov 20, 2015
Permit issued
Nov 23, 2015
Final sign-off
May 18, 2016
Declared cost
$35,900
Address
4 Embarcadero Center

fire alrm work for the "sheppard mullin" ti remodel on floor 17; additions are 9 smoke detectors, 3 duct detectors, 1 module, 1 strobe power supply, 2 pull stations, 11 speakers, 37 speakers/strobes, and 2 strobes. ref pa 2015-0930-8413. maher na

Open the permit page

$35,900
Nov 5, 2015Completed
final sign-off Jan 2016
4 Embarcadero CenterPioneer Fire Inc.18th floor - remodel of all outlined areas, consisting of 147, relocated pendents & 32 removed pendents. ref #201509096437. n/a maher ordinance
Details
Permit
201511051855
Status
complete
Filed
Nov 5, 2015
Permit issued
Nov 17, 2015
Final sign-off
Jan 13, 2016
Declared cost
$44,028
Address
4 Embarcadero Center

18th floor - remodel of all outlined areas, consisting of 147, relocated pendents & 32 removed pendents. ref #201509096437. n/a maher ordinance

Open the permit page

$44,028
Oct 7, 2015Completed
final sign-off Sep 2016
4 Embarcadero CenterGci, Increnovate and extend existing egress access stair between the 17/f & 18/f down to 16/f, removal of two (2) existing egress access stairs, all of which are not part of the required egress system. n/a ordinance #155-13
Details
Permit
201510079050
Status
complete
Filed
Oct 7, 2015
Permit issued
Oct 9, 2015
Final sign-off
Sep 27, 2016
Declared cost
$52,200
Address
4 Embarcadero Center

renovate and extend existing egress access stair between the 17/f & 18/f down to 16/f, removal of two (2) existing egress access stairs, all of which are not part of the required egress system. n/a ordinance #155-13

Open the permit page

$52,200
Sep 30, 2015Completed
final sign-off Jun 2016
4 Embarcadero Center17th flr: t.i. & renovation includes demo & cosntruction of non-structural partitions,millwork,doors,ceiling,lighting,elec & finishes,no change in occupancy or use,convenience stair,structural support for skyfold partion & sliding doors,fire alarm & sprinklers under separate permit;maher n/a
Details
Permit
201509308413
Status
complete
Filed
Sep 30, 2015
Permit issued
Oct 2, 2015
Final sign-off
Jun 14, 2016
Declared cost
$2,092,800
Address
4 Embarcadero Center

17th flr: t.i. & renovation includes demo & cosntruction of non-structural partitions,millwork,doors,ceiling,lighting,elec & finishes,no change in occupancy or use,convenience stair,structural support for skyfold partion & sliding doors,fire alarm & sprinklers under separate permit;maher n/a

Open the permit page

$2,092,800
Sep 23, 2015Completed
final sign-off Sep 2016
4 Embarcadero Centert.i. & renovation on the 16/f which includes demolition & construction of non structural partitions, millwork, doors, ceiling, lighting, electrical & finishes. no change in occupancy, use or area, fire alarm, sprinkler and convenience stair under seperate permit. n/a ordinance #155-13
Details
Permit
201509237782
Status
complete
Filed
Sep 23, 2015
Permit issued
Sep 28, 2015
Final sign-off
Sep 26, 2016
Declared cost
$2,046,600
Address
4 Embarcadero Center

t.i. & renovation on the 16/f which includes demolition & construction of non structural partitions, millwork, doors, ceiling, lighting, electrical & finishes. no change in occupancy, use or area, fire alarm, sprinkler and convenience stair under seperate permit. n/a ordinance #155-13

Open the permit page

$2,046,600
Sep 9, 2015Completed
final sign-off Apr 2016
4 Embarcadero CenterGci, Incthe scope of work is for t.i. & renovation on 18/f includes: demo of non structural partitions, millwork, doors, ceiling, lighting, electrical & finishes. construct non-structural partitions, doors, glazing, ceiling, lighting, millwork & finishes. no change of occupancy. n/a ordinance #155-13
Details
Permit
201509096437
Status
complete
Filed
Sep 9, 2015
Permit issued
Sep 9, 2015
Final sign-off
Apr 8, 2016
Declared cost
$2,124,000
Address
4 Embarcadero Center

the scope of work is for t.i. & renovation on 18/f includes: demo of non structural partitions, millwork, doors, ceiling, lighting, electrical & finishes. construct non-structural partitions, doors, glazing, ceiling, lighting, millwork & finishes. no change of occupancy. n/a ordinance #155-13

Open the permit page

$2,124,000
Jul 10, 2015Expired or cancelled
cancelled Jan 2026
4 Embarcadero Centerverizon wireless: site modification to an (e) wireless telecommunications facility consisting of 1-dc power rack,1- 19" wide radio rac & 1 stancion for radio equipment; maher n/a verify battery totals for site
Details
Permit
201507101228
Status
cancelled
Filed
Jul 10, 2015
Declared cost
$35,000
Address
4 Embarcadero Center

verizon wireless: site modification to an (e) wireless telecommunications facility consisting of 1-dc power rack,1- 19" wide radio rac & 1 stancion for radio equipment; maher n/a verify battery totals for site

Open the permit page

$35,000
Jun 12, 2015Never finaled
issued Jun 2015, no final
4 Embarcadero CenterSiemens Industry, Inc.fire alarm work for the floor 26 "prudential" t.i. remodel; addition of 1 speaker strobe for copy/print room. ref pa 201504234388
Details
Permit
201506128806
Status
issued
Filed
Jun 12, 2015
Permit issued
Jun 12, 2015
Declared cost
$500
Address
4 Embarcadero Center

fire alarm work for the floor 26 "prudential" t.i. remodel; addition of 1 speaker strobe for copy/print room. ref pa 201504234388

Open the permit page

$500
May 28, 2015Completed
final sign-off Apr 2016
4 Embarcadero CenterSkyline Constructionmechanical and electrical work for ti ref pa # 2015 0506 5483. maher na
Details
Permit
201505287331
Status
complete
Filed
May 28, 2015
Permit issued
Jun 11, 2015
Final sign-off
Apr 13, 2016
Declared cost
$15,000
Address
4 Embarcadero Center

mechanical and electrical work for ti ref pa # 2015 0506 5483. maher na

Open the permit page

$15,000
Apr 23, 2015Completed
final sign-off Apr 2016
4 Embarcadero CenterSiemens Industry, Inc.21st flr: fire alarm work for ti: additions are 4 smoke detectors, 1 module, 1 strobe power supply, 17 speakers, 34 speaker/strobes. 3 strobes and 4 door hangers. maher na
Details
Permit
201504234373
Status
complete
Filed
Apr 23, 2015
Permit issued
Apr 23, 2015
Final sign-off
Apr 13, 2016
Declared cost
$32,200
Address
4 Embarcadero Center

21st flr: fire alarm work for ti: additions are 4 smoke detectors, 1 module, 1 strobe power supply, 17 speakers, 34 speaker/strobes. 3 strobes and 4 door hangers. maher na

Open the permit page

$32,200
Apr 23, 2015Completed
final sign-off Aug 2015
4 Embarcadero CenterPeacock Construction26th flr: demo (n) non structural partitions, electrical, finishes. no change in charge in occupancy, use or area. maher na
Details
Permit
201504234388
Status
complete
Filed
Apr 23, 2015
Permit issued
Jun 3, 2015
Final sign-off
Aug 3, 2015
Declared cost
$50,000
Address
4 Embarcadero Center

26th flr: demo (n) non structural partitions, electrical, finishes. no change in charge in occupancy, use or area. maher na

Open the permit page

$50,000
Apr 8, 2015Completed
final sign-off Jan 2016
4 Embarcadero CenterPeacock Constructionmechanical work for construction 201412012670- in lobby
Details
Permit
201504083143
Status
complete
Filed
Apr 8, 2015
Permit issued
Apr 8, 2015
Final sign-off
Jan 20, 2016
Declared cost
$37,000
Address
4 Embarcadero Center

mechanical work for construction 201412012670- in lobby

Open the permit page

$37,000
Apr 2, 2015Never finaled
issued Apr 2015, no final
4 Embarcadero CenterGolden Gate Fire Protection Inc2nd floor fire sprinkler only - relcoate 13 sprinkler pendents, add 2 pendent, plug off 4 outlets, total 15 sprinkler heads . ref pa #201501135575. n/a maher ordinance
Details
Permit
201504022597
Status
issued
Filed
Apr 2, 2015
Permit issued
Apr 2, 2015
Declared cost
$7,500
Address
4 Embarcadero Center

2nd floor fire sprinkler only - relcoate 13 sprinkler pendents, add 2 pendent, plug off 4 outlets, total 15 sprinkler heads . ref pa #201501135575. n/a maher ordinance

Open the permit page

$7,500
Mar 24, 2015Completed
final sign-off Jan 2016
4 Embarcadero CenterPeacock Constructiontitle 24 electrical for work done under 201412012670 maher not req
Details
Permit
201503241754
Status
complete
Filed
Mar 24, 2015
Permit issued
Mar 24, 2015
Final sign-off
Jan 20, 2016
Declared cost
$12,000
Address
4 Embarcadero Center

title 24 electrical for work done under 201412012670 maher not req

Open the permit page

$12,000
Mar 17, 2015Never finaled
issued Mar 2015, no final
4 Embarcadero CenterVanir Construction Mgmtremodel existing break room, conference room, add closet. 7th floor. remodel restroom. l/s under separate permit. mep
Details
Permit
201503171044
Status
issued
Filed
Mar 17, 2015
Permit issued
Mar 23, 2015
Declared cost
$198,000
Address
4 Embarcadero Center

remodel existing break room, conference room, add closet. 7th floor. remodel restroom. l/s under separate permit. mep

Open the permit page

$198,000
Mar 9, 2015Completed
final sign-off Apr 2016
4 Embarcadero CenterSkyline Constructionmech & electirical work for tenant. 21st for pa ref # 2015 0227 9560
Details
Permit
201503090274
Status
complete
Filed
Mar 9, 2015
Permit issued
Mar 20, 2015
Final sign-off
Apr 13, 2016
Declared cost
$400,000
Address
4 Embarcadero Center

mech & electirical work for tenant. 21st for pa ref # 2015 0227 9560

Open the permit page

$400,000
Feb 27, 2015Completed
final sign-off Jul 2015
4 Embarcadero CenterSkyline Construction21st floor:interior t. i. new non-structural parttions new doors and hardware. new finishes. mep & life safety under seperate permit. n/a for the maher
Details
Permit
201502279560
Status
complete
Filed
Feb 27, 2015
Permit issued
Mar 3, 2015
Final sign-off
Jul 28, 2015
Declared cost
$2,500,000
Address
4 Embarcadero Center

21st floor:interior t. i. new non-structural parttions new doors and hardware. new finishes. mep & life safety under seperate permit. n/a for the maher

Open the permit page

$2,500,000
Feb 10, 2015Completed
final sign-off May 2015
4 Embarcadero CenterSiemens Industry, Inc.fire alarm work for the "boston properties" office" remodel t.i. floor 1; additions are 5 speakers and 4 strobes. ref pa 201412012670. n/a for maher.
Details
Permit
201502107864
Status
complete
Filed
Feb 10, 2015
Permit issued
Feb 10, 2015
Final sign-off
May 1, 2015
Declared cost
$4,500
Address
4 Embarcadero Center

fire alarm work for the "boston properties" office" remodel t.i. floor 1; additions are 5 speakers and 4 strobes. ref pa 201412012670. n/a for maher.

Open the permit page

$4,500
Jan 13, 2015Completed
final sign-off Aug 2016
4 Embarcadero CenterPeacock Constructionlobby level (2nd floor) - demo of a portion of (e) pre-cast pnl for (n) window, install (n) window, total of 2 windows. no change in occupany, use or area. n/a ordinance #155-13
Details
Permit
201501135575
Status
complete
Filed
Jan 13, 2015
Permit issued
Feb 23, 2015
Final sign-off
Aug 11, 2016
Declared cost
$100,000
Address
4 Embarcadero Center

lobby level (2nd floor) - demo of a portion of (e) pre-cast pnl for (n) window, install (n) window, total of 2 windows. no change in occupany, use or area. n/a ordinance #155-13

Open the permit page

$100,000
Dec 23, 2014Completed
final sign-off Mar 2015
4 Embarcadero CenterField Construction Inc.36th floor - (n) ceiling high partition, (n) finishes to match existing. n/a maher ordinance
Details
Permit
201412234340
Status
complete
Filed
Dec 23, 2014
Permit issued
Dec 31, 2014
Final sign-off
Mar 10, 2015
Declared cost
$2,500
Address
4 Embarcadero Center

36th floor - (n) ceiling high partition, (n) finishes to match existing. n/a maher ordinance

Open the permit page

$2,500
Dec 1, 2014Completed
final sign-off Jul 2015
4 Embarcadero CenterPeacock Constructionlobby level - non-structural demo work. new partitions, lighting, electrical and finishes. no change in occupancy, use area. mep, sprinkler and life safety - under separate permit.
Details
Permit
201412012670
Status
complete
Filed
Dec 1, 2014
Permit issued
Jan 8, 2015
Final sign-off
Jul 28, 2015
Declared cost
$100,000
Address
4 Embarcadero Center

lobby level - non-structural demo work. new partitions, lighting, electrical and finishes. no change in occupancy, use area. mep, sprinkler and life safety - under separate permit.

Open the permit page

$100,000
Oct 21, 2014Completed
final sign-off Nov 2014
4 Embarcadero CenterCertified Fire & Safety Colobby level - as built ul300 ansul fire systems. ref #2014.0923.7001. n/a maher ordinance
Details
Permit
201410219423
Status
complete
Filed
Oct 21, 2014
Permit issued
Oct 21, 2014
Final sign-off
Nov 12, 2014
Declared cost
$4,000
Address
4 Embarcadero Center

lobby level - as built ul300 ansul fire systems. ref #2014.0923.7001. n/a maher ordinance

Open the permit page

$4,000
Oct 2, 2014Never finaled
issued Oct 2014, no final
4 Embarcadero CenterThomas Swan Sign Co Incerect an electric single faced wall sign. n/a maher ordinance (sign #1)
Details
Permit
201410027862
Status
issued
Filed
Oct 2, 2014
Permit issued
Oct 2, 2014
Declared cost
$5,000
Address
4 Embarcadero Center

erect an electric single faced wall sign. n/a maher ordinance (sign #1)

Open the permit page

$5,000
Oct 2, 2014Completed
final sign-off Dec 2014
4 Embarcadero CenterThomas Swan Sign Co Incerect an electric single faced wall sign #2. n/a maher ordinance
Details
Permit
201410027864
Status
complete
Filed
Oct 2, 2014
Permit issued
Oct 2, 2014
Final sign-off
Dec 18, 2014
Declared cost
$8,000
Address
4 Embarcadero Center

erect an electric single faced wall sign #2. n/a maher ordinance

Open the permit page

$8,000
Sep 23, 2014Completed
final sign-off Nov 2014
4 Embarcadero CenterCertified Fire & Safety Coinstall ul300 ansul fire systems to protect 5 kitchen hoods and cooking equipment and 3 air pollution control units on common exhaust ducts- mechanical plan 201312204769
Details
Permit
201409237001
Status
complete
Filed
Sep 23, 2014
Permit issued
Sep 24, 2014
Final sign-off
Nov 12, 2014
Declared cost
$20,000
Address
4 Embarcadero Center

install ul300 ansul fire systems to protect 5 kitchen hoods and cooking equipment and 3 air pollution control units on common exhaust ducts- mechanical plan 201312204769

Open the permit page

$20,000
Sep 17, 2014Never finaled
issued Sep 2014, no final
4 Embarcadero CenterC B F Incfurnish & install (4) light fixtures, relocate (1) light fixture, relocate (1) receptacle. ref. to t.i. pa#201406300040. n/a ordinance #155-13
Details
Permit
201409176561
Status
issued
Filed
Sep 17, 2014
Permit issued
Sep 18, 2014
Declared cost
$2,000
Address
4 Embarcadero Center

furnish & install (4) light fixtures, relocate (1) light fixture, relocate (1) receptacle. ref. to t.i. pa#201406300040. n/a ordinance #155-13

Open the permit page

$2,000
Jul 22, 2014Completed
final sign-off Aug 2014
4 Embarcadero CenterPeacock Construction26th floor - (n) non structural partition, doors, outlets, finishes. no change in occupancy, use, or area. mep under mep permit.
Details
Permit
201407221779
Status
complete
Filed
Jul 22, 2014
Permit issued
Jul 24, 2014
Final sign-off
Aug 15, 2014
Declared cost
$30,000
Address
4 Embarcadero Center

26th floor - (n) non structural partition, doors, outlets, finishes. no change in occupancy, use, or area. mep under mep permit.

Open the permit page

$30,000
Jun 30, 2014Completed
final sign-off Oct 2014
4 Embarcadero CenterField Construction Inc.4th flr: non structural demo (n) non-structural partitions, lighting, electrical mill work, finishes, no change in occupancy, use, area
Details
Permit
201406300040
Status
complete
Filed
Jun 30, 2014
Permit issued
Jun 30, 2014
Final sign-off
Oct 22, 2014
Declared cost
$40,000
Address
4 Embarcadero Center

4th flr: non structural demo (n) non-structural partitions, lighting, electrical mill work, finishes, no change in occupancy, use, area

Open the permit page

$40,000
Jan 17, 2014Never finaled
issued Feb 2014, no final
4 Embarcadero CenterGci, Inc20th floor:demolition only of all t.i. ab-17. no change in occupancy, use or area. n/a for 155-13 ordinance.
Details
Permit
201401176509
Status
issued
Filed
Jan 17, 2014
Permit issued
Feb 11, 2014
Declared cost
$100,000
Address
4 Embarcadero Center

20th floor:demolition only of all t.i. ab-17. no change in occupancy, use or area. n/a for 155-13 ordinance.

Open the permit page

$100,000
Jan 10, 2014Never finaled
issued Jan 2014, no final
100 Drumm StBuild Group Inc.structural demo for new floor opening, stairs and future elevator, upgrade (e) structural system for work per structural drawings, t.i. for future restaurant under seperate permit, no work to (e) sprinkler and fir protection system. per ab-017
Details
Permit
201401106049
Status
issued
Filed
Jan 10, 2014
Permit issued
Jan 22, 2014
Declared cost
$80,000
Address
100 Drumm St

structural demo for new floor opening, stairs and future elevator, upgrade (e) structural system for work per structural drawings, t.i. for future restaurant under seperate permit, no work to (e) sprinkler and fir protection system. per ab-017

Open the permit page

$80,000
Dec 20, 2013Never finaled
issued Jun 2014, no final
100 Drumm StBuild Group Inc.full t.i. build out of (e) g/f and 2/f restaurant space w/in (e) mall bldg (embarcadero #4) t.i. to include (n) comm'l kitchen, (n) indoor & outdoor bars, dining rm w/private dining facilities, g/f to go area, renovation of (e)outdoor patio area w/(n) retrackable skylight. install (n)limited use/
Details
Permit
201312204769
Status
issued
Filed
Dec 20, 2013
Permit issued
Jun 4, 2014
Declared cost
$1,500,000
Address
100 Drumm St

full t.i. build out of (e) g/f and 2/f restaurant space w/in (e) mall bldg (embarcadero #4) t.i. to include (n) comm'l kitchen, (n) indoor & outdoor bars, dining rm w/private dining facilities, g/f to go area, renovation of (e)outdoor patio area w/(n) retrackable skylight. install (n)limited use/

Open the permit page

$1,500,000
Jul 31, 2013Never finaled
issued Aug 2013, no final
100 Drumm StPeacock Construction Inc1st & 2nd floors-exploratory soft demo of inter non structural partitions & abandoned mechanical equipment within (e) vacant tenant suites. future t.i for restuarant under seperate permit. no work to (e) sprinkler & fire protection system or base building structural elements-per ab-017
Details
Permit
201307313253
Status
issued
Filed
Jul 31, 2013
Permit issued
Aug 27, 2013
Declared cost
$17,000
Address
100 Drumm St

1st & 2nd floors-exploratory soft demo of inter non structural partitions & abandoned mechanical equipment within (e) vacant tenant suites. future t.i for restuarant under seperate permit. no work to (e) sprinkler & fire protection system or base building structural elements-per ab-017

Open the permit page

$17,000
Jul 17, 2013Completed
final sign-off Aug 2015
4 Embarcadero CenterGci, Inc37th floor-demo of non structural partitions, new non structural partitions, lighting, power/data, electrical, millwork & finishes
Details
Permit
201307172006
Status
complete
Filed
Jul 17, 2013
Permit issued
Aug 1, 2013
Final sign-off
Aug 25, 2015
Declared cost
$60,000
Address
4 Embarcadero Center

37th floor-demo of non structural partitions, new non structural partitions, lighting, power/data, electrical, millwork & finishes

Open the permit page

$60,000
Jul 12, 2013Never finaled
issued Jul 2013, no final
4 Embarcadero CenterSource Planning And Construction Incmechanical electrical for ti on 27th floor to install and relocate new equipment. please refer to app#201303263010 for referance.
Details
Permit
201307121761
Status
issued
Filed
Jul 12, 2013
Permit issued
Jul 22, 2013
Declared cost
$50,000
Address
4 Embarcadero Center

mechanical electrical for ti on 27th floor to install and relocate new equipment. please refer to app#201303263010 for referance.

Open the permit page

$50,000
Jun 21, 2013Completed
final sign-off Oct 2013
4 Embarcadero CenterPeacock Construction Incnon-structural demo, new non-structural partions and new retail entry door. no change in occupancy, use or footprint, mep, sprinkers, life safety under sep permit.
Details
Permit
201306210178
Status
complete
Filed
Jun 21, 2013
Permit issued
Jun 25, 2013
Final sign-off
Oct 10, 2013
Declared cost
$40,000
Address
4 Embarcadero Center

non-structural demo, new non-structural partions and new retail entry door. no change in occupancy, use or footprint, mep, sprinkers, life safety under sep permit.

Open the permit page

$40,000
Jun 12, 2013Completed
final sign-off Oct 2013
4 Embarcadero CenterPeacock Construction Increvision to 2013-0215-0335. add main entry upgrade with an automatic door opener
Details
Permit
201306129323
Status
complete
Filed
Jun 12, 2013
Permit issued
Jun 18, 2013
Final sign-off
Oct 10, 2013
Declared cost
$14,675
Address
4 Embarcadero Center

revision to 2013-0215-0335. add main entry upgrade with an automatic door opener

Open the permit page

$14,675
Mar 26, 2013Completed
final sign-off Oct 2013
4 Embarcadero CenterSource Planning And Construction Inc27th floor:non-structural demo. new structural partitions, glazing, electrical, lighting, millwork carpet and paint. no change in area, occupancy or use. mep, l/s, sprinklers under seperate permit.
Details
Permit
201303263010
Status
complete
Filed
Mar 26, 2013
Permit issued
May 20, 2013
Final sign-off
Oct 3, 2013
Declared cost
$250,000
Address
4 Embarcadero Center

27th floor:non-structural demo. new structural partitions, glazing, electrical, lighting, millwork carpet and paint. no change in area, occupancy or use. mep, l/s, sprinklers under seperate permit.

Open the permit page

$250,000
Feb 15, 2013Completed
final sign-off Oct 2013
4 Embarcadero CenterPeacock Construction Incground floor - demo & construction of non-structural partitions, new lighting to meet new layout (lighting under separate permit, no mechanical work). new occupant load of 96.
Details
Permit
201302150335
Status
complete
Filed
Feb 15, 2013
Permit issued
Feb 26, 2013
Final sign-off
Oct 9, 2013
Declared cost
$68,000
Address
4 Embarcadero Center

ground floor - demo & construction of non-structural partitions, new lighting to meet new layout (lighting under separate permit, no mechanical work). new occupant load of 96.

Open the permit page

$68,000
Oct 4, 2012Never finaled
issued Oct 2012, no final
4 Embarcadero CenterGci, Inc22nd floor:structural work to secure high density shelving on 22nd floor. please to refer to ti work under app#201204309419 and calcs for stair guard rail
Details
Permit
201210041303
Status
issued
Filed
Oct 4, 2012
Permit issued
Oct 9, 2012
Declared cost
$15,000
Address
4 Embarcadero Center

22nd floor:structural work to secure high density shelving on 22nd floor. please to refer to ti work under app#201204309419 and calcs for stair guard rail

Open the permit page

$15,000
Sep 20, 2012Completed
final sign-off Nov 2012
4 Embarcadero Centernon structural demo. new non structural partition. no change in occupancy, use, or area
Details
Permit
201209200205
Status
complete
Filed
Sep 20, 2012
Permit issued
Sep 21, 2012
Final sign-off
Nov 19, 2012
Declared cost
$9,000
Address
4 Embarcadero Center

non structural demo. new non structural partition. no change in occupancy, use, or area

Open the permit page

$9,000
Aug 15, 2012Completed
final sign-off Feb 2013
4 Embarcadero CenterGci, Incmechanical, electrical, plumbing for ti on the 22nd floor to relocate and add new equipment. refer to 201204309419 for ti permit
Details
Permit
201208157447
Status
complete
Filed
Aug 15, 2012
Permit issued
Aug 16, 2012
Final sign-off
Feb 14, 2013
Declared cost
$600,000
Address
4 Embarcadero Center

mechanical, electrical, plumbing for ti on the 22nd floor to relocate and add new equipment. refer to 201204309419 for ti permit

Open the permit page

$600,000
Aug 15, 2012Completed
final sign-off Feb 2013
4 Embarcadero CenterGci, Incmechanical, electrical, plumbing ti on the 22nd floor to relocate and add new equipment. refer to 201204309421 for ti permit
Details
Permit
201208157448
Status
complete
Filed
Aug 15, 2012
Permit issued
Aug 16, 2012
Final sign-off
Feb 14, 2013
Declared cost
$600,000
Address
4 Embarcadero Center

mechanical, electrical, plumbing ti on the 22nd floor to relocate and add new equipment. refer to 201204309421 for ti permit

Open the permit page

$600,000
Jun 13, 2012Completed
final sign-off Aug 2012
4 Embarcadero CenterSource Planning And Construction Incmech and electrical for partial floor t.i on 37th floor to remove and replace equipment and fixtures. pls refer to pa# 201204057655 for ti work.
Details
Permit
201206132482
Status
complete
Filed
Jun 13, 2012
Permit issued
Jun 14, 2012
Final sign-off
Aug 6, 2012
Declared cost
$65,000
Address
4 Embarcadero Center

mech and electrical for partial floor t.i on 37th floor to remove and replace equipment and fixtures. pls refer to pa# 201204057655 for ti work.

Open the permit page

$65,000
Apr 5, 2012Completed
final sign-off Aug 2012
4 Embarcadero CenterSource Planning And Construction Incnon structural demo, new non structural partitions, ceiling, lighting, electerical, millwork, finishe. no increase in footprint. no change in occupancy or use. mep sep permit
Details
Permit
201204057653
Status
complete
Filed
Apr 5, 2012
Permit issued
May 4, 2012
Final sign-off
Aug 6, 2012
Declared cost
$200,000
Address
4 Embarcadero Center

non structural demo, new non structural partitions, ceiling, lighting, electerical, millwork, finishe. no increase in footprint. no change in occupancy or use. mep sep permit

Open the permit page

$200,000
Aug 12, 2011Never finaled
issued Aug 2011, no final
4 Embarcadero Centerstreet space & mta
Details
Permit
M275086
Status
issued
Filed
Aug 12, 2011
Permit issued
Aug 12, 2011
Address
4 Embarcadero Center

street space & mta

Open the permit page

Aug 9, 2011Completed
final sign-off Dec 2011
4 Embarcadero CenterGci, Incmech anical work only to retail tenant space. arch permit approved -#2011/0729/1284-attached for reference.
Details
Permit
201108092111
Status
complete
Filed
Aug 9, 2011
Permit issued
Aug 12, 2011
Final sign-off
Dec 6, 2011
Declared cost
$100,000
Address
4 Embarcadero Center

mech anical work only to retail tenant space. arch permit approved -#2011/0729/1284-attached for reference.

Open the permit page

$100,000
Jul 29, 2011Completed
final sign-off Dec 2011
4 Embarcadero CenterGci, Incnew non structural partitions,ceiling, lights, outlets,millwork, finishes,fixtures. demo under permit# 201107220871. no change in occupancy or use. mep under separate permit.
Details
Permit
201107291284
Status
complete
Filed
Jul 29, 2011
Permit issued
Aug 12, 2011
Final sign-off
Dec 6, 2011
Declared cost
$793,636
Address
4 Embarcadero Center

new non structural partitions,ceiling, lights, outlets,millwork, finishes,fixtures. demo under permit# 201107220871. no change in occupancy or use. mep under separate permit.

Open the permit page

$793,636
Jul 22, 2011Completed
final sign-off Aug 2011
4 Embarcadero CenterGci, Incdemo only. non structural partitions, finishes, millwork, lighting, ceilings, outlets, mech equip. no build back at this time
Details
Permit
201107220871
Status
complete
Filed
Jul 22, 2011
Permit issued
Jul 29, 2011
Final sign-off
Aug 24, 2011
Declared cost
$75,000
Address
4 Embarcadero Center

demo only. non structural partitions, finishes, millwork, lighting, ceilings, outlets, mech equip. no build back at this time

Open the permit page

$75,000
Feb 15, 2011Completed
final sign-off Mar 2011
4 Embarcadero CenterGci, Inc14th floor - replace evacuation signage with compliant signage per field inspector.
Details
Permit
201102150301
Status
complete
Filed
Feb 15, 2011
Permit issued
Feb 15, 2011
Final sign-off
Mar 29, 2011
Declared cost
$3,000
Address
4 Embarcadero Center

14th floor - replace evacuation signage with compliant signage per field inspector.

Open the permit page

$3,000
Sep 28, 2010Completed
final sign-off Jan 2011
4 Embarcadero CenterJ. M. Maita Construction Inc.suite #1, lobby: minor tenant improvevements to existing restaurant space. to include minor elec, plumbing, flooring, cabinets, tops no hvac changes.
Details
Permit
201009281816
Status
complete
Filed
Sep 28, 2010
Permit issued
Oct 7, 2010
Final sign-off
Jan 21, 2011
Declared cost
$130,000
Address
4 Embarcadero Center

suite #1, lobby: minor tenant improvevements to existing restaurant space. to include minor elec, plumbing, flooring, cabinets, tops no hvac changes.

Open the permit page

$130,000
Dec 21, 2009Completed
final sign-off Jun 2010
4 Embarcadero CenterField Construction Inc., Bcci Construction Companyremove revolving doors & replace w/ (n) glass swinging doors. patch (e) stone floor & soffit. remove & replace (e) path of travel signage w/ (n) expanded signage. add destination based elevator info. to path of travel drawings barrier removal.
Details
Permit
200912213602
Status
complete
Filed
Dec 21, 2009
Permit issued
Jan 7, 2010
Final sign-off
Jun 17, 2010
Declared cost
$150,000
Address
4 Embarcadero Center

remove revolving doors & replace w/ (n) glass swinging doors. patch (e) stone floor & soffit. remove & replace (e) path of travel signage w/ (n) expanded signage. add destination based elevator info. to path of travel drawings barrier removal.

Open the permit page

$150,000
Aug 13, 2009Never finaled
issued Aug 2009, no final
4 Embarcadero CenterRossi Builders Inc.2nd floor: tenant improvement. build 1 new office, 1 new wall. new light fixtures i office area.
Details
Permit
200908134738
Status
issued
Filed
Aug 13, 2009
Permit issued
Aug 13, 2009
Declared cost
$54,000
Address
4 Embarcadero Center

2nd floor: tenant improvement. build 1 new office, 1 new wall. new light fixtures i office area.

Open the permit page

$54,000
Jul 27, 2009Completed
final sign-off Oct 2009
4 Embarcadero CenterPeacock Construction Inc6th fl.demoliton of e outlets. construction of new door and partition new outlets. no increase in occupancy load or area. no change in occupancy or use.
Details
Permit
200907273454
Status
complete
Filed
Jul 27, 2009
Permit issued
Jul 29, 2009
Final sign-off
Oct 16, 2009
Declared cost
$27,000
Address
4 Embarcadero Center

6th fl.demoliton of e outlets. construction of new door and partition new outlets. no increase in occupancy load or area. no change in occupancy or use.

Open the permit page

$27,000
Mar 9, 2009Expired or cancelled
cancelled Jan 2026
4 Embarcadero CenterYoung Electric Sign Co.erect a non-illuminated, single faced banner frame system (overpass ped. walkway).
Details
Permit
200903093654
Status
cancelled
Filed
Mar 9, 2009
Declared cost
$20,000
Address
4 Embarcadero Center

erect a non-illuminated, single faced banner frame system (overpass ped. walkway).

Open the permit page

$20,000
Jan 29, 2009Completed
final sign-off Apr 2009
4 Embarcadero CenterPeacock Construction Incstreet level - revision to permit 200810295353. revised exiting & swing door out, add ext signs.
Details
Permit
200901291014
Status
complete
Filed
Jan 29, 2009
Permit issued
Jan 29, 2009
Final sign-off
Apr 2, 2009
Address
4 Embarcadero Center

street level - revision to permit 200810295353. revised exiting & swing door out, add ext signs.

Open the permit page

Sep 26, 2008Completed
final sign-off Jan 2009
4 Embarcadero CenterWard Alan Emery Construction Inc.6th floor - to obtain final inspection for work approved under pa #200608210086. all work has been completed.
Details
Permit
200809262786
Status
complete
Filed
Sep 26, 2008
Permit issued
Sep 26, 2008
Final sign-off
Jan 22, 2009
Address
4 Embarcadero Center

6th floor - to obtain final inspection for work approved under pa #200608210086. all work has been completed.

Open the permit page

Sep 26, 2008Completed
final sign-off Jan 2009
4 Embarcadero CenterWard Alan Emery Construction Inc.6th floor - to obtain final inspection for work approved under pa #200610064376. all work has been completed.
Details
Permit
200809262787
Status
complete
Filed
Sep 26, 2008
Permit issued
Sep 26, 2008
Final sign-off
Jan 22, 2009
Address
4 Embarcadero Center

6th floor - to obtain final inspection for work approved under pa #200610064376. all work has been completed.

Open the permit page

Jul 30, 2008Never finaled
issued Aug 2008, no final
4 Embarcadero CenterStreet Graphics Dba Deltaspace r4106: install 1 new illuminated interior wall sign
Details
Permit
200807308041
Status
issued
Filed
Jul 30, 2008
Permit issued
Aug 6, 2008
Address
4 Embarcadero Center

space r4106: install 1 new illuminated interior wall sign

Open the permit page

Jul 17, 2008Never finaled
issued Jul 2008, no final
4 Embarcadero CenterWard Alan Emery Construction Inc.renew pa#200608149395 for final inspection.
Details
Permit
200807176950
Status
issued
Filed
Jul 17, 2008
Permit issued
Jul 17, 2008
Address
4 Embarcadero Center

renew pa#200608149395 for final inspection.

Open the permit page

Jun 4, 2008Completed
final sign-off Oct 2008
4 Embarcadero Centerstreet level - mep permit only - new hvac, electrical, plumbing.
Details
Permit
200806043601
Status
complete
Filed
Jun 4, 2008
Permit issued
Jun 4, 2008
Final sign-off
Oct 7, 2008
Declared cost
$90,000
Address
4 Embarcadero Center

street level - mep permit only - new hvac, electrical, plumbing.

Open the permit page

$90,000
May 8, 2008Completed
final sign-off Oct 2008
4 Embarcadero Centernon-structural demolition of interior partition and ceil. new non-structural partition ceil, lights, millwork. replace extg storefront. no increase in squrar footage. no change in occupancy. (street level)
Details
Permit
200805081596
Status
complete
Filed
May 8, 2008
Permit issued
May 8, 2008
Final sign-off
Oct 7, 2008
Declared cost
$90,000
Address
4 Embarcadero Center

non-structural demolition of interior partition and ceil. new non-structural partition ceil, lights, millwork. replace extg storefront. no increase in squrar footage. no change in occupancy. (street level)

Open the permit page

$90,000
Apr 24, 2008Completed
final sign-off Jan 2009
4 Embarcadero Centernon structural demo. (n) partitions, ceiling lights, mech, elec finishes. all interior tenant work. no change in area, use, occupancy.
Details
Permit
200804240492
Status
complete
Filed
Apr 24, 2008
Permit issued
Apr 24, 2008
Final sign-off
Jan 27, 2009
Declared cost
$900,000
Address
4 Embarcadero Center

non structural demo. (n) partitions, ceiling lights, mech, elec finishes. all interior tenant work. no change in area, use, occupancy.

Open the permit page

$900,000
Jan 31, 2008Completed
final sign-off Mar 2008
4 Embarcadero CenterField Construction Inc.ti for fire alarm on the 26th floor. install 1 speaker and 1 strobe
Details
Permit
200801313669
Status
complete
Filed
Jan 31, 2008
Permit issued
Jan 31, 2008
Final sign-off
Mar 3, 2008
Declared cost
$2,000
Address
4 Embarcadero Center

ti for fire alarm on the 26th floor. install 1 speaker and 1 strobe

Open the permit page

$2,000
Jan 31, 2008Completed
final sign-off Mar 2008
4 Embarcadero CenterField Construction Inc.ti for lighting on the 26th floor. relocate ex. lighting switches, relocate ex. lighting fixtures and furnish and install new exit sign.
Details
Permit
200801313672
Status
complete
Filed
Jan 31, 2008
Permit issued
Jan 31, 2008
Final sign-off
Mar 3, 2008
Declared cost
$2,000
Address
4 Embarcadero Center

ti for lighting on the 26th floor. relocate ex. lighting switches, relocate ex. lighting fixtures and furnish and install new exit sign.

Open the permit page

$2,000
Jan 25, 2008Completed
final sign-off Apr 2008
4 Embarcadero CenterAyoob & Peery Plumbing Co Inc2nd floor - relocate fire sprinkler heads per tenant improvement, total 8 heads.
Details
Permit
200801253283
Status
complete
Filed
Jan 25, 2008
Permit issued
Jan 28, 2008
Final sign-off
Apr 7, 2008
Declared cost
$1,600
Address
4 Embarcadero Center

2nd floor - relocate fire sprinkler heads per tenant improvement, total 8 heads.

Open the permit page

$1,600
Jan 23, 2008Completed
final sign-off Apr 2008
4 Embarcadero CenterAyoob & Peery Plumbing Co Inc4th floor - relocate fire sprinkler heads per t.i. - total 7 heads.
Details
Permit
200801233079
Status
complete
Filed
Jan 23, 2008
Permit issued
Jan 28, 2008
Final sign-off
Apr 7, 2008
Declared cost
$1,400
Address
4 Embarcadero Center

4th floor - relocate fire sprinkler heads per t.i. - total 7 heads.

Open the permit page

$1,400
Jan 23, 2008Completed
final sign-off Apr 2008
4 Embarcadero CenterAyoob & Peery Plumbing Co Inc3rd floor relocate fire sprinkler heads per t.i. - total 7 heads.
Details
Permit
200801233078
Status
complete
Filed
Jan 23, 2008
Permit issued
Jan 28, 2008
Final sign-off
Apr 7, 2008
Declared cost
$1,400
Address
4 Embarcadero Center

3rd floor relocate fire sprinkler heads per t.i. - total 7 heads.

Open the permit page

$1,400
Dec 21, 2007Completed
final sign-off Jun 2008
4 Embarcadero CenterGci, Inc2nd, 3rd, 4th floors - mechanical/electrical & plumbing work for three new floors of office space,. ref. #200711279018 for architectural work.
Details
Permit
200712211065
Status
complete
Filed
Dec 21, 2007
Permit issued
Jan 23, 2008
Final sign-off
Jun 24, 2008
Declared cost
$1,500,000
Address
4 Embarcadero Center

2nd, 3rd, 4th floors - mechanical/electrical & plumbing work for three new floors of office space,. ref. #200711279018 for architectural work.

Open the permit page

$1,500,000
Dec 20, 2007Completed
final sign-off Apr 2008
4 Embarcadero Center8 speakers, 4 strobe for life safety & fire alarm system.
Details
Permit
200712201005
Status
complete
Filed
Dec 20, 2007
Permit issued
Dec 20, 2007
Final sign-off
Apr 3, 2008
Declared cost
$13,000
Address
4 Embarcadero Center

8 speakers, 4 strobe for life safety & fire alarm system.

Open the permit page

$13,000
Dec 19, 2007Completed
final sign-off Mar 2008
4 Embarcadero CenterPeacock Construction Inclife safety - 5 duct detectors, 6 strobes, 8 speakers.
Details
Permit
200712190832
Status
complete
Filed
Dec 19, 2007
Permit issued
Dec 19, 2007
Final sign-off
Mar 14, 2008
Declared cost
$15,000
Address
4 Embarcadero Center

life safety - 5 duct detectors, 6 strobes, 8 speakers.

Open the permit page

$15,000
Dec 4, 2007Completed
final sign-off Mar 2008
4 Embarcadero CenterAyoob & Peery Plumbing Co Incground floor: relocate fire sprinkler heads per tenant improvement 35 relos.
Details
Permit
200712049606
Status
complete
Filed
Dec 4, 2007
Permit issued
Dec 5, 2007
Final sign-off
Mar 14, 2008
Declared cost
$7,000
Address
4 Embarcadero Center

ground floor: relocate fire sprinkler heads per tenant improvement 35 relos.

Open the permit page

$7,000
Nov 6, 2007Completed
final sign-off Apr 2008
4 Embarcadero CenterAyoob & Peery Plumbing Co Inc25th floor: relocate fire sprinkler heads per tenant improvement, 15 relos.
Details
Permit
200711067422
Status
complete
Filed
Nov 6, 2007
Permit issued
Nov 6, 2007
Final sign-off
Apr 3, 2008
Declared cost
$3,500
Address
4 Embarcadero Center

25th floor: relocate fire sprinkler heads per tenant improvement, 15 relos.

Open the permit page

$3,500
Oct 24, 2007Completed
final sign-off Mar 2008
4 Embarcadero Centerrevision to app #200709172868. revise kitchen layout & associated mech. & elec. no change in floor space. no structural work.
Details
Permit
200710246348
Status
complete
Filed
Oct 24, 2007
Permit issued
Oct 26, 2007
Final sign-off
Mar 14, 2008
Address
4 Embarcadero Center

revision to app #200709172868. revise kitchen layout & associated mech. & elec. no change in floor space. no structural work.

Open the permit page

Oct 5, 2007Completed
final sign-off Apr 2008
4 Embarcadero Centernon structural demo and tenant improvement of office use on 25th floor including drywall, ceiling, lighting, toilet /sink/shower, finishes. no increase in floor space.no change in use. no exterior work.
Details
Permit
200710054744
Status
complete
Filed
Oct 5, 2007
Permit issued
Oct 5, 2007
Final sign-off
Apr 3, 2008
Declared cost
$200,000
Address
4 Embarcadero Center

non structural demo and tenant improvement of office use on 25th floor including drywall, ceiling, lighting, toilet /sink/shower, finishes. no increase in floor space.no change in use. no exterior work.

Open the permit page

$200,000
Sep 17, 2007Completed
final sign-off Mar 2008
4 Embarcadero Center(street level).interior non structural remodel of (e) restuarant demo. drywall partitions millwork finishes, electrical, mechanical, plumbing. no increase in floor area.
Details
Permit
200709172868
Status
complete
Filed
Sep 17, 2007
Permit issued
Oct 3, 2007
Final sign-off
Mar 14, 2008
Declared cost
$200,000
Address
4 Embarcadero Center

(street level).interior non structural remodel of (e) restuarant demo. drywall partitions millwork finishes, electrical, mechanical, plumbing. no increase in floor area.

Open the permit page

$200,000
Aug 8, 2007Completed
final sign-off Feb 2008
4 Embarcadero CenterHathaway Dinwiddie Co.7th floor-oti-2, minor modification to an existing fire alarm system to support oti#1 2007-0606-3207 and 2 speakers and 2 strobes work on 7th floor.
Details
Permit
200708089157
Status
complete
Filed
Aug 8, 2007
Permit issued
Aug 10, 2007
Final sign-off
Feb 5, 2008
Declared cost
$1,200
Address
4 Embarcadero Center

7th floor-oti-2, minor modification to an existing fire alarm system to support oti#1 2007-0606-3207 and 2 speakers and 2 strobes work on 7th floor.

Open the permit page

$1,200
Jan 16, 2007Completed
final sign-off Mar 2007
4 Embarcadero CenterC B F Inclife safety modifications at 4 embarcadero, 31st floor #3150- sandler foundation install approx 3 l/s devices. 1 smoke det,2 strobe lights
Details
Permit
200701161683
Status
complete
Filed
Jan 16, 2007
Permit issued
Jan 16, 2007
Final sign-off
Mar 13, 2007
Declared cost
$2,500
Address
4 Embarcadero Center

life safety modifications at 4 embarcadero, 31st floor #3150- sandler foundation install approx 3 l/s devices. 1 smoke det,2 strobe lights

Open the permit page

$2,500
Nov 13, 2006Completed
final sign-off Jun 2007
4 Embarcadero Centerinstall camera/door release/intercom system for toilet room access
Details
Permit
200611137467
Status
complete
Filed
Nov 13, 2006
Permit issued
Nov 13, 2006
Final sign-off
Jun 1, 2007
Declared cost
$10,000
Address
4 Embarcadero Center

install camera/door release/intercom system for toilet room access

Open the permit page

$10,000
Oct 6, 2006Completed
final sign-off May 2007
100 Drumm StPrincipal Builders Inc.oti-2 34th floor el, me, ls, sp
Details
Permit
200610064363
Status
complete
Filed
Oct 6, 2006
Permit issued
Oct 24, 2006
Final sign-off
May 3, 2007
Declared cost
$750,000
Address
100 Drumm St

oti-2 34th floor el, me, ls, sp

Open the permit page

$750,000
Oct 5, 2006Never finaled
issued Oct 2006, no final
4 Embarcadero Centerstreet space permit only.
Details
Permit
M44143
Status
issued
Filed
Oct 5, 2006
Permit issued
Oct 5, 2006
Address
4 Embarcadero Center

street space permit only.

Open the permit page

Sep 8, 2006Completed
final sign-off May 2007
100 Drumm StPrincipal Builders Inc.oti-1, 34th fl, el, ls, sp,me
Details
Permit
200609081693
Status
complete
Filed
Sep 8, 2006
Permit issued
Oct 5, 2006
Final sign-off
May 3, 2007
Declared cost
$750,000
Address
100 Drumm St

oti-1, 34th fl, el, ls, sp,me

Open the permit page

$750,000
Aug 18, 2006Expired or cancelled
withdrawn Jun 2007
4 Embarcadero Centercut architectural opening in 13th floor slab. provide glass railing and glass smoke stop. in fill abandond internal stair 13th fl slab. refer to: 12th floor app#200608169647 & 13th fl app#200608169650.
Details
Permit
200608189834
Status
withdrawn
Filed
Aug 18, 2006
Declared cost
$524,641
Address
4 Embarcadero Center

cut architectural opening in 13th floor slab. provide glass railing and glass smoke stop. in fill abandond internal stair 13th fl slab. refer to: 12th floor app#200608169647 & 13th fl app#200608169650.

Open the permit page

$524,641
Aug 15, 2006Completed
final sign-off Sep 2006
4 Embarcadero CenterGci, Incoti-2 31st fl-el,me.
Details
Permit
200608159522
Status
complete
Filed
Aug 15, 2006
Permit issued
Aug 15, 2006
Final sign-off
Sep 25, 2006
Declared cost
$105,000
Address
4 Embarcadero Center

oti-2 31st fl-el,me.

Open the permit page

$105,000
Aug 14, 2006Expired or cancelled
expired Apr 2008
4 Embarcadero CenterWard Alan Emery Construction Inc.t.i. (architectural only). non-structural drywall partitions, acoustic ceiling, doors ,cabinetry and finishes.
Details
Permit
200608149395
Status
expired
Filed
Aug 14, 2006
Permit issued
Aug 14, 2006
Declared cost
$234,000
Address
4 Embarcadero Center

t.i. (architectural only). non-structural drywall partitions, acoustic ceiling, doors ,cabinetry and finishes.

Open the permit page

$234,000
Aug 1, 2006Completed
final sign-off Aug 2006
4 Embarcadero CenterBcci Construction Companyrenew pa#200508119984,#200508019076,#200505263537 for final inspection.
Details
Permit
200608018233
Status
complete
Filed
Aug 1, 2006
Permit issued
Aug 1, 2006
Final sign-off
Aug 15, 2006
Address
4 Embarcadero Center

renew pa#200508119984,#200508019076,#200505263537 for final inspection.

Open the permit page

Jul 28, 2006Completed
final sign-off Feb 2007
4 Embarcadero CenterAyoob & Peery Plumbing Co Increlocated (e) sprinkler system in the restaurant total 54
Details
Permit
200607287976
Status
complete
Filed
Jul 28, 2006
Permit issued
Jul 28, 2006
Final sign-off
Feb 26, 2007
Declared cost
$20,000
Address
4 Embarcadero Center

relocated (e) sprinkler system in the restaurant total 54

Open the permit page

$20,000
Jun 1, 2006Completed
final sign-off Aug 2006
4 Embarcadero CenterBcci Construction Companyoti-1r, 24th floor el
Details
Permit
200606012997
Status
complete
Filed
Jun 1, 2006
Permit issued
Jun 1, 2006
Final sign-off
Aug 15, 2006
Declared cost
$5,000
Address
4 Embarcadero Center

oti-1r, 24th floor el

Open the permit page

$5,000
May 23, 2006Completed
final sign-off Nov 2006
4 Embarcadero CenterFire Safety Supply Incinstall fire supression in kitchen hood and smog hog. (on 1st floor) heads only
Details
Permit
200605232225
Status
complete
Filed
May 23, 2006
Permit issued
May 23, 2006
Final sign-off
Nov 16, 2006
Declared cost
$4,000
Address
4 Embarcadero Center

install fire supression in kitchen hood and smog hog. (on 1st floor) heads only

Open the permit page

$4,000
Feb 28, 2006Never finaled
issued Feb 2006, no final
4 Embarcadero Centerbarrier removal only. drywall, plumb, elec, painting. replace door closers in stairwell, verify that new door closers do not "hold open" stairwell doors. no increase in office space
Details
Permit
200602285572
Status
issued
Filed
Feb 28, 2006
Permit issued
Feb 28, 2006
Declared cost
$75,000
Address
4 Embarcadero Center

barrier removal only. drywall, plumb, elec, painting. replace door closers in stairwell, verify that new door closers do not "hold open" stairwell doors. no increase in office space

Open the permit page

$75,000
Feb 10, 2006Completed
final sign-off Feb 2006
4 Embarcadero CenterTurner Construction Corenewal for fi9nal 200111273987 and 200110231463
Details
Permit
200602104330
Status
complete
Filed
Feb 10, 2006
Permit issued
Feb 10, 2006
Final sign-off
Feb 13, 2006
Address
4 Embarcadero Center

renewal for fi9nal 200111273987 and 200110231463

Open the permit page

Feb 6, 2006Completed
final sign-off Feb 2007
4 Embarcadero CenterBcci Construction Companyoti-1 32 floor el me ls sp work includes demolition of walls and some affected ceiling system. power & communication outlets.new walls,down & electrical works.
Details
Permit
200602063840
Status
complete
Filed
Feb 6, 2006
Permit issued
Mar 16, 2006
Final sign-off
Feb 12, 2007
Declared cost
$450,000
Address
4 Embarcadero Center

oti-1 32 floor el me ls sp work includes demolition of walls and some affected ceiling system. power & communication outlets.new walls,down & electrical works.

Open the permit page

$450,000
Jan 19, 2006Expired or cancelled
expired Dec 2006
4 Embarcadero CenterPeacock Construction Incto renew for final only. pa# 2004/10/01/5784.
Details
Permit
200601192579
Status
expired
Filed
Jan 19, 2006
Permit issued
Jan 19, 2006
Address
4 Embarcadero Center

to renew for final only. pa# 2004/10/01/5784.

Open the permit page

Nov 29, 2005Completed
final sign-off Nov 2006
4 Embarcadero CenterField Construction Inc.interior improvements within a portion of (e) 1/f envelope of bldg. work includes 812 sf of interior improvement & 406 sf of exterior improvement.restroom facilities are already in place as part of embarcadero center.alterations to interior space are to be limited to removal of (e)interior walls &
Details
Permit
200511299073
Status
complete
Filed
Nov 29, 2005
Permit issued
Apr 7, 2006
Final sign-off
Nov 16, 2006
Declared cost
$170,000
Address
4 Embarcadero Center

interior improvements within a portion of (e) 1/f envelope of bldg. work includes 812 sf of interior improvement & 406 sf of exterior improvement.restroom facilities are already in place as part of embarcadero center.alterations to interior space are to be limited to removal of (e)interior walls &

Open the permit page

$170,000
Nov 17, 2005Completed
final sign-off Nov 2006
4 Embarcadero CenterBcci Construction Companyoti-2, 6th/fl-me,el.
Details
Permit
200511178410
Status
complete
Filed
Nov 17, 2005
Permit issued
Dec 8, 2005
Final sign-off
Nov 28, 2006
Declared cost
$85,000
Address
4 Embarcadero Center

oti-2, 6th/fl-me,el.

Open the permit page

$85,000
Nov 15, 2005Completed
final sign-off Aug 2006
4 Embarcadero CenterTurner Construction Cooti-3 7th/fl-ls.
Details
Permit
200511158124
Status
complete
Filed
Nov 15, 2005
Permit issued
Nov 30, 2005
Final sign-off
Aug 7, 2006
Declared cost
$16,000
Address
4 Embarcadero Center

oti-3 7th/fl-ls.

Open the permit page

$16,000
Oct 26, 2005Completed
final sign-off Aug 2006
4 Embarcadero CenterR L H Fire Protection Incfire spkr upgrade (t/i) for trammell crow 7th flr of 4 embarcadero ctr 73 spkr hd total. 4 adds & 69 relocate.7,
Details
Permit
200510266549
Status
complete
Filed
Oct 26, 2005
Permit issued
Oct 26, 2005
Final sign-off
Aug 7, 2006
Declared cost
$9,100
Address
4 Embarcadero Center

fire spkr upgrade (t/i) for trammell crow 7th flr of 4 embarcadero ctr 73 spkr hd total. 4 adds & 69 relocate.7,

Open the permit page

$9,100
Oct 24, 2005Completed
final sign-off Nov 2006
4 Embarcadero CenterBcci Construction Companyoti-1, 6th floor, el, me, ls, sp.
Details
Permit
200510246309
Status
complete
Filed
Oct 24, 2005
Permit issued
Nov 10, 2005
Final sign-off
Nov 28, 2006
Declared cost
$100,000
Address
4 Embarcadero Center

oti-1, 6th floor, el, me, ls, sp.

Open the permit page

$100,000
Oct 11, 2005Completed
final sign-off Dec 2005
4 Embarcadero Centerdemolitions only. all fixtures, finishes, equipments,hvac, ceiling & grid.
Details
Permit
200510115213
Status
complete
Filed
Oct 11, 2005
Permit issued
Oct 11, 2005
Final sign-off
Dec 8, 2005
Declared cost
$50,000
Address
4 Embarcadero Center

demolitions only. all fixtures, finishes, equipments,hvac, ceiling & grid.

Open the permit page

$50,000
Oct 11, 2005Completed
final sign-off Dec 2005
4 Embarcadero Centerdemolition only. all fixtures, equipment, finishes, hvac, ceiling & grip.
Details
Permit
200510115212
Status
complete
Filed
Oct 11, 2005
Permit issued
Oct 11, 2005
Final sign-off
Dec 8, 2005
Declared cost
$50,000
Address
4 Embarcadero Center

demolition only. all fixtures, equipment, finishes, hvac, ceiling & grip.

Open the permit page

$50,000
Sep 19, 2005Completed
final sign-off Aug 2006
4 Embarcadero CenterTurner Construction Cooti-1, 7th floor, el, me, ls, sp.
Details
Permit
200509193234
Status
complete
Filed
Sep 19, 2005
Permit issued
Oct 13, 2005
Final sign-off
Aug 7, 2006
Declared cost
$300,000
Address
4 Embarcadero Center

oti-1, 7th floor, el, me, ls, sp.

Open the permit page

$300,000

Find contractors for work like this