Vanir Construction Mgmt
- Based in
- San Francisco
- On San Francisco permits
- Aug 2012 to Apr 2015
- Last 24 months
- 0 permits filed
16 permits since 2000: 4 never finaled, 12 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 3, 2015 | Never finaled issued Apr 2015, no final | 4 Embarcadero Center | 7th floor: lighting system and controls for newly renovated office space. title 24 compliance. ref app#201503171044. n/a for the maher.Details
7th floor: lighting system and controls for newly renovated office space. title 24 compliance. ref app#201503171044. n/a for the maher. | $17,905 |
| Apr 3, 2015 | Never finaled issued Apr 2015, no final | 4 Embarcadero Center | 7th floor:hvac for newly renovated office space. ref app#201503171044. n/a for the maher.Details
7th floor:hvac for newly renovated office space. ref app#201503171044. n/a for the maher. | $11,040 |
| Mar 17, 2015 | Never finaled issued Mar 2015, no final | 4 Embarcadero Center | remodel existing break room, conference room, add closet. 7th floor. remodel restroom. l/s under separate permit. mepDetails
remodel existing break room, conference room, add closet. 7th floor. remodel restroom. l/s under separate permit. mep | $198,000 |
| Mar 17, 2014 | Never finaled issued Mar 2014, no final | 455 Market St | suite 1870 - t.i. install one non-load bearing partition, re-switching @ light fixture, new door & frame. compliance with ordinance #155-13 not requiredDetails
suite 1870 - t.i. install one non-load bearing partition, re-switching @ light fixture, new door & frame. compliance with ordinance #155-13 not required | $5,000 |
| Dec 6, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | mezz, 2nd & 3rd floor t.i. including office, lounge, restroom framing, millwork. deferred permit for hvac, plumbing, electrical & fire life safety.Details
mezz, 2nd & 3rd floor t.i. including office, lounge, restroom framing, millwork. deferred permit for hvac, plumbing, electrical & fire life safety. | $300,000 |
| Oct 29, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | rev. to pa# 2012.1210.5807: move manual transfer switch to basement from 1/f, modify downstream distribution per previous permit pa# 2012.1210.5807Details
rev. to pa# 2012.1210.5807: move manual transfer switch to basement from 1/f, modify downstream distribution per previous permit pa# 2012.1210.5807 | |
| Jul 24, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | addition of manual transfer (elec)switch to 1st floor change to app#201212105807Details
addition of manual transfer (elec)switch to 1st floor change to app#201212105807 | $25,000 |
| Jun 14, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | modifications for permit # 2012-1210-5807 to the mechanical and plumbing design due to field conditions. adding new fire smoke damper- relocating shaft- minor changes-Details
modifications for permit # 2012-1210-5807 to the mechanical and plumbing design due to field conditions. adding new fire smoke damper- relocating shaft- minor changes- | |
| Apr 18, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | revision to pa# 2012-1210-5807-revision to power distribution, revision to interior lighting. 1st floor power revisionsDetails
revision to pa# 2012-1210-5807-revision to power distribution, revision to interior lighting. 1st floor power revisions | $20,000 |
| Apr 15, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | t.i including offices, doors, ceilings, pantry, lighting, hvac distribution, plumbing, millwork, elec distribution, all work on the 4th fl. deferred permit submittal for sprinklers & life safety fire alarm system.Details
t.i including offices, doors, ceilings, pantry, lighting, hvac distribution, plumbing, millwork, elec distribution, all work on the 4th fl. deferred permit submittal for sprinklers & life safety fire alarm system. | $300,000 |
| Mar 20, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | 5th floor tenant improvements including offices, doors, ceiling, pantry, lighting, hvac distribiution, plumbing, millwork, elec distribution, all work on 5th floor. deferred permit submittal fore sprinklers, life safety fire alarm systemDetails
5th floor tenant improvements including offices, doors, ceiling, pantry, lighting, hvac distribiution, plumbing, millwork, elec distribution, all work on 5th floor. deferred permit submittal fore sprinklers, life safety fire alarm system | $300,000 |
| Feb 21, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | t.i. including offices, doors, ceiling, pantry, lighting, hvac, distribution, plumbing, millwork, elect distributor, all work on 6th floor. deferred permit submittal for sprinklers & life-safety fire alarm system.Details
t.i. including offices, doors, ceiling, pantry, lighting, hvac, distribution, plumbing, millwork, elect distributor, all work on 6th floor. deferred permit submittal for sprinklers & life-safety fire alarm system. | $350,000 |
| Feb 11, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | interior tenant improvement at 7th floor to include interior partitions (non load bearing) doors, millwork, mech, ductwork & plumbing for breakroom. life safety permits separate.Details
interior tenant improvement at 7th floor to include interior partitions (non load bearing) doors, millwork, mech, ductwork & plumbing for breakroom. life safety permits separate. | $125,000 |
| Dec 10, 2012 | Expired or cancelled expired Nov 2018 | 25 Taylor St | base bldg upgrade - mech, elec, plumbing documents, detail submitted for bldg infrastructure improvements under pa #2012.1114.4236. fire sprinkler and fire alarm under separate permit. fire alarm for theater shall be submitted under separate permitDetails
base bldg upgrade - mech, elec, plumbing documents, detail submitted for bldg infrastructure improvements under pa #2012.1114.4236. fire sprinkler and fire alarm under separate permit. fire alarm for theater shall be submitted under separate permit | $400,000 |
| Nov 14, 2012 | Expired or cancelled expired Nov 2018 | 25 Taylor St | revision to pa# 200712180785 ri (issued). to reflect field as built modication of 1st floor lobby & restroom.Details
revision to pa# 200712180785 ri (issued). to reflect field as built modication of 1st floor lobby & restroom. | $1,000 |
| Aug 3, 2012 | Expired or cancelled expired Nov 2018 | 25 Taylor St | to complete and finalize work approved under pa#200712180785, fire alarm and sprinkler seperate.Details
to complete and finalize work approved under pa#200712180785, fire alarm and sprinkler seperate. | $1,750,000 |