Block 0343, lot 002
25 Taylor St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
59 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 21, 2014 | Never finaled issued May 2014, no final | 25 Taylor St | P 3 Construction & Remodeling Inc | expansion of existing underground electrical vault, electric under seperate permit.Details
expansion of existing underground electrical vault, electric under seperate permit. | $60,000 |
| Mar 18, 2014 | Completed final sign-off May 2018 | 25 Taylor St | Canning Electric Inc | title 24 for lighting on m, 2+3 floorsDetails
title 24 for lighting on m, 2+3 floors | $20,000 |
| Mar 10, 2014 | Never finaled issued Mar 2014, no final | 25 Taylor St | street space permit (renewal of permit # 1302256)Details
street space permit (renewal of permit # 1302256) | ||
| Mar 4, 2014 | Completed final sign-off Nov 2016 | 25 Taylor St | Canning Electric Inc | revision to appl #2013.10.29.0550: new electrical service including supply to existing fire pump. mts will be removed upon completion of new service upgrade.Details
revision to appl #2013.10.29.0550: new electrical service including supply to existing fire pump. mts will be removed upon completion of new service upgrade. | $125,000 |
| Feb 19, 2014 | Completed final sign-off Aug 2017 | 25 Taylor St | H C I Systems Inc | add new fa devices to existing fire alarm system in a new ti space. 3 smokes, 9 duct detectors, control modules, 3 strobes, 13 speaker/strobes.Details
add new fa devices to existing fire alarm system in a new ti space. 3 smokes, 9 duct detectors, control modules, 3 strobes, 13 speaker/strobes. | $8,750 |
| Jan 3, 2014 | Completed final sign-off Aug 2017 | 25 Taylor St | Madden Plumbing, Llc | add 34 new sprinkler heads due to new drop ceilings, 7 heads on mezzanine floor, 15 heads on 2/f and 12 heads on 3/f. t.i. pa# 201312063511Details
add 34 new sprinkler heads due to new drop ceilings, 7 heads on mezzanine floor, 15 heads on 2/f and 12 heads on 3/f. t.i. pa# 201312063511 | $10,000 |
| Dec 30, 2013 | Never finaled issued Jan 2014, no final | 25 Taylor St | Schmitt Heating Co Inc | mezzanine, 2nd & 3rd. install 10-indor fan coils. connect to (e) refrigerant lines on each fl. install associated ducting & grills. work in conjunction w/ pa#2013-12-06-3511. 6(n) fsd's.Details
mezzanine, 2nd & 3rd. install 10-indor fan coils. connect to (e) refrigerant lines on each fl. install associated ducting & grills. work in conjunction w/ pa#2013-12-06-3511. 6(n) fsd's. | $180,000 |
| Dec 6, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | Vanir Construction Mgmt | mezz, 2nd & 3rd floor t.i. including office, lounge, restroom framing, millwork. deferred permit for hvac, plumbing, electrical & fire life safety.Details
mezz, 2nd & 3rd floor t.i. including office, lounge, restroom framing, millwork. deferred permit for hvac, plumbing, electrical & fire life safety. | $300,000 |
| Oct 29, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | Vanir Construction Mgmt | rev. to pa# 2012.1210.5807: move manual transfer switch to basement from 1/f, modify downstream distribution per previous permit pa# 2012.1210.5807Details
rev. to pa# 2012.1210.5807: move manual transfer switch to basement from 1/f, modify downstream distribution per previous permit pa# 2012.1210.5807 | |
| Oct 8, 2013 | Never finaled issued Oct 2013, no final | 25 Taylor St | street spaceDetails
street space | ||
| Sep 24, 2013 | Expired or cancelled cancelled Jan 2026 | 25 Taylor St | install motorized card-activated turnstiles in building lobby, electrical to be permitted seperately.Details
install motorized card-activated turnstiles in building lobby, electrical to be permitted seperately. | $3,000 | |
| Sep 11, 2013 | Completed final sign-off Aug 2017 | 25 Taylor St | H C I Systems Inc | as built fire alarm- add 25 new duct detectors on 4th - 7th floors and add secondary recall to the elevator. mech pa 201306149621. elevator secondary recall is due to field conditions.Details
as built fire alarm- add 25 new duct detectors on 4th - 7th floors and add secondary recall to the elevator. mech pa 201306149621. elevator secondary recall is due to field conditions. | $7,200 |
| Aug 19, 2013 | Never finaled issued Aug 2013, no final | 25 Taylor St | street space street spaceDetails
street space street space | ||
| Jul 24, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | Vanir Construction Mgmt | addition of manual transfer (elec)switch to 1st floor change to app#201212105807Details
addition of manual transfer (elec)switch to 1st floor change to app#201212105807 | $25,000 |
| Jul 17, 2013 | Never finaled issued Jul 2013, no final | 25 Taylor St | street spaceDetails
street space | ||
| Jul 16, 2013 | Never finaled issued Jul 2013, no final | 25 Taylor St | street space permitDetails
street space permit | ||
| Jul 12, 2013 | Completed final sign-off Aug 2017 | 25 Taylor St | Madden Plumbing, Llc | install one new wet standpipe at norht stair. from bottom to top. ref app#201303301798,201302120023,201302019307,201303081797Details
install one new wet standpipe at norht stair. from bottom to top. ref app#201303301798,201302120023,201302019307,201303081797 | $8,000 |
| Jul 11, 2013 | Completed final sign-off May 2018 | 25 Taylor St | Madden Plumbing, Llc | install fire sprinklers for 1st flr lobby, 1st flr mezz, 2nd flr & 3rd flr per nfpa #13. (210) total sprinklers. t.i. 201211144236. standpipe work under separate permit.Details
install fire sprinklers for 1st flr lobby, 1st flr mezz, 2nd flr & 3rd flr per nfpa #13. (210) total sprinklers. t.i. 201211144236. standpipe work under separate permit. | $50,000 |
| Jun 14, 2013 | Expired or cancelled cancelled Jan 2026 | 25 Taylor St | mechanical field changes requested by inspector at tenant improvement fan unit. add smoke detectors at floors 4, 5, 6 & 7Details
mechanical field changes requested by inspector at tenant improvement fan unit. add smoke detectors at floors 4, 5, 6 & 7 | $5,000 | |
| Jun 14, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | Vanir Construction Mgmt | modifications for permit # 2012-1210-5807 to the mechanical and plumbing design due to field conditions. adding new fire smoke damper- relocating shaft- minor changes-Details
modifications for permit # 2012-1210-5807 to the mechanical and plumbing design due to field conditions. adding new fire smoke damper- relocating shaft- minor changes- | |
| Jun 7, 2013 | Completed final sign-off Aug 2017 | 25 Taylor St | H C I Systems Inc | add new fire alarm devices to an existing fa system in a new ti space. (ti# 201304154593). this includes 17 speaker strobes, 5 speakers, 2 duct detectors, 1 new booster power supply shall be added to 4th floor.Details
add new fire alarm devices to an existing fa system in a new ti space. (ti# 201304154593). this includes 17 speaker strobes, 5 speakers, 2 duct detectors, 1 new booster power supply shall be added to 4th floor. | $9,800 |
| Apr 23, 2013 | Completed final sign-off Jan 2019 | 25 Taylor St | Maguire Inc Dba Lahue And Associates | mezzanine & basement to 7th floors-evacuation signs. reference #201211144236 elevator lobbies have new "smoke guard". smoke containment system at elevator hoistway opening under that permit -north stair only. goes to 2nd floor. requiring egress to direct to elevator lobbby stair.Details
mezzanine & basement to 7th floors-evacuation signs. reference #201211144236 elevator lobbies have new "smoke guard". smoke containment system at elevator hoistway opening under that permit -north stair only. goes to 2nd floor. requiring egress to direct to elevator lobbby stair. | $6,000 |
| Apr 18, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | Vanir Construction Mgmt | revision to pa# 2012-1210-5807-revision to power distribution, revision to interior lighting. 1st floor power revisionsDetails
revision to pa# 2012-1210-5807-revision to power distribution, revision to interior lighting. 1st floor power revisions | $20,000 |
| Apr 15, 2013 | Never finaled filed Apr 2013, never issued | 25 Taylor St | t.i including offices, doors, ceilings, pantry, lighting, hvac distribution, plumbing, millwork, elec distribution, all work on the 4th fl. deferred permit submittal for sprinklers & life safety fire alarm system.Details
t.i including offices, doors, ceilings, pantry, lighting, hvac distribution, plumbing, millwork, elec distribution, all work on the 4th fl. deferred permit submittal for sprinklers & life safety fire alarm system. | ||
| Apr 15, 2013 | Completed final sign-off May 2018 | 25 Taylor St | H C I Systems Inc | 5th floor - add new fire alarm devices to an existing fa system in a new t.i. space (t.i. #2013.03.20.2677). this includes 16 speaker/strobes, 4 speakers, 2 duct detectors.Details
5th floor - add new fire alarm devices to an existing fa system in a new t.i. space (t.i. #2013.03.20.2677). this includes 16 speaker/strobes, 4 speakers, 2 duct detectors. | $9,800 |
| Apr 15, 2013 | Completed final sign-off May 2018 | 25 Taylor St | H C I Systems Inc | 6th floor - add new fire alarm devices to an existing fa system in a new t.i. space (t.i. #2013.02.21.0651). this includes 19 speaker/strobes, 7 speakers, 2 duct detectors.Details
6th floor - add new fire alarm devices to an existing fa system in a new t.i. space (t.i. #2013.02.21.0651). this includes 19 speaker/strobes, 7 speakers, 2 duct detectors. | $11,400 |
| Apr 15, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | Vanir Construction Mgmt | t.i including offices, doors, ceilings, pantry, lighting, hvac distribution, plumbing, millwork, elec distribution, all work on the 4th fl. deferred permit submittal for sprinklers & life safety fire alarm system.Details
t.i including offices, doors, ceilings, pantry, lighting, hvac distribution, plumbing, millwork, elec distribution, all work on the 4th fl. deferred permit submittal for sprinklers & life safety fire alarm system. | $300,000 |
| Mar 20, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | Vanir Construction Mgmt | 5th floor tenant improvements including offices, doors, ceiling, pantry, lighting, hvac distribiution, plumbing, millwork, elec distribution, all work on 5th floor. deferred permit submittal fore sprinklers, life safety fire alarm systemDetails
5th floor tenant improvements including offices, doors, ceiling, pantry, lighting, hvac distribiution, plumbing, millwork, elec distribution, all work on 5th floor. deferred permit submittal fore sprinklers, life safety fire alarm system | $300,000 |
| Mar 13, 2013 | Completed final sign-off Aug 2017 | 25 Taylor St | H C I Systems Inc | 7th floor - add new fire alarm devices to an existing fa system in a new t.i. space ( t.i. #2013.0211.9979). this includes 19 new speaker strobes, 2 speakers, 2 duct detectors, 2 control modules.Details
7th floor - add new fire alarm devices to an existing fa system in a new t.i. space ( t.i. #2013.0211.9979). this includes 19 new speaker strobes, 2 speakers, 2 duct detectors, 2 control modules. | $11,400 |
| Mar 8, 2013 | Completed final sign-off May 2018 | 25 Taylor St | Madden Plumbing, Llc | 4th floor-install 91 heads for entire floor. ti pa# 2012-1114-4236Details
4th floor-install 91 heads for entire floor. ti pa# 2012-1114-4236 | $40,000 |
| Mar 8, 2013 | Completed final sign-off Aug 2017 | 25 Taylor St | Madden Plumbing, Llc | 5th floor-install 93 heads for entire floor. ti pa# 2012-1114-4236Details
5th floor-install 93 heads for entire floor. ti pa# 2012-1114-4236 | $40,000 |
| Feb 21, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | Vanir Construction Mgmt | t.i. including offices, doors, ceiling, pantry, lighting, hvac, distribution, plumbing, millwork, elect distributor, all work on 6th floor. deferred permit submittal for sprinklers & life-safety fire alarm system.Details
t.i. including offices, doors, ceiling, pantry, lighting, hvac, distribution, plumbing, millwork, elect distributor, all work on 6th floor. deferred permit submittal for sprinklers & life-safety fire alarm system. | $350,000 |
| Feb 12, 2013 | Completed final sign-off Aug 2017 | 25 Taylor St | Madden Plumbing, Llc | 6th floor:relocate 65 extg heads and add 29 new heads. ti app#201211144236. all standpipe work under separate permit.Details
6th floor:relocate 65 extg heads and add 29 new heads. ti app#201211144236. all standpipe work under separate permit. | $20,000 |
| Feb 11, 2013 | Expired or cancelled expired Nov 2018 | 25 Taylor St | Vanir Construction Mgmt | interior tenant improvement at 7th floor to include interior partitions (non load bearing) doors, millwork, mech, ductwork & plumbing for breakroom. life safety permits separate.Details
interior tenant improvement at 7th floor to include interior partitions (non load bearing) doors, millwork, mech, ductwork & plumbing for breakroom. life safety permits separate. | $125,000 |
| Feb 5, 2013 | Completed final sign-off Aug 2017 | 25 Taylor St | H C I Systems Inc | replace the (e) fire alarm system with new in the office side of bldg. this work is done under ti pa# 200712180785 and pa# 201208036458. theater portion shall be submitted under separate permit. as built plans are requiredDetails
replace the (e) fire alarm system with new in the office side of bldg. this work is done under ti pa# 200712180785 and pa# 201208036458. theater portion shall be submitted under separate permit. as built plans are required | $74,000 |
| Feb 1, 2013 | Completed final sign-off Apr 2013 | 25 Taylor St | Madden Plumbing, Llc | add 66 new head due to new office layouts, ref. ti #201211144236Details
add 66 new head due to new office layouts, ref. ti #201211144236 | $20,000 |
| Dec 24, 2012 | Completed final sign-off Sep 2013 | 25 Taylor St | All Air Mechanical Contractors Inc. | theater was damaged & removed. 4 new inline exhaust fun were being install to replace the (e) fan w/ (n) vfd at different location & fan wil be steaked & set on vibration isolators will be connected to (e) duct w/ flex connectors.Details
theater was damaged & removed. 4 new inline exhaust fun were being install to replace the (e) fan w/ (n) vfd at different location & fan wil be steaked & set on vibration isolators will be connected to (e) duct w/ flex connectors. | $60,000 |
| Dec 10, 2012 | Expired or cancelled expired Nov 2018 | 25 Taylor St | Vanir Construction Mgmt | base bldg upgrade - mech, elec, plumbing documents, detail submitted for bldg infrastructure improvements under pa #2012.1114.4236. fire sprinkler and fire alarm under separate permit. fire alarm for theater shall be submitted under separate permitDetails
base bldg upgrade - mech, elec, plumbing documents, detail submitted for bldg infrastructure improvements under pa #2012.1114.4236. fire sprinkler and fire alarm under separate permit. fire alarm for theater shall be submitted under separate permit | $400,000 |
| Nov 14, 2012 | Expired or cancelled expired Nov 2018 | 25 Taylor St | Vanir Construction Mgmt | revision to pa# 200712180785 ri (issued). to reflect field as built modication of 1st floor lobby & restroom.Details
revision to pa# 200712180785 ri (issued). to reflect field as built modication of 1st floor lobby & restroom. | $1,000 |
| Aug 3, 2012 | Expired or cancelled expired Nov 2018 | 25 Taylor St | Vanir Construction Mgmt | to complete and finalize work approved under pa#200712180785, fire alarm and sprinkler seperate.Details
to complete and finalize work approved under pa#200712180785, fire alarm and sprinkler seperate. | $1,750,000 |
| Jul 31, 2009 | Never finaled issued Jul 2009, no final | 25 Taylor St | streetspaceDetails
streetspace | ||
| Sep 11, 2008 | Completed final sign-off Oct 2008 | 25 Taylor St | install temporary partitions at 1st floor level of theater to "close off" seating area #1 and #3 (see plan) for theatrical purposes for shows 9/15/08 to 10/20/08, show starts 9/23/08, partitions removed immediately after 10/20/08Details
install temporary partitions at 1st floor level of theater to "close off" seating area #1 and #3 (see plan) for theatrical purposes for shows 9/15/08 to 10/20/08, show starts 9/23/08, partitions removed immediately after 10/20/08 | $20,000 | |
| Dec 18, 2007 | Never finaled issued Jul 2008, no final | 25 Taylor St | base building upgrades/improvements . remodel of main lobby, new restrooms on 6 floors, path-of-travel improvements, elevator controls, stair railings, new 2 hour corridor at 2nd floor, new doors & hardware, new lighting, basement upgrades. all work being performed in preparation for future leasing.Details
base building upgrades/improvements . remodel of main lobby, new restrooms on 6 floors, path-of-travel improvements, elevator controls, stair railings, new 2 hour corridor at 2nd floor, new doors & hardware, new lighting, basement upgrades. all work being performed in preparation for future leasing. | $2,500,000 | |
| Dec 7, 2007 | Completed final sign-off Mar 2008 | 25 Taylor St | remove loose/cracked terra cotta approx. 2'-0" x 15'-0" on top south-west corner above golden gate ave. clean substrate behind terra cotta and re-install terra cotta. see photo.Details
remove loose/cracked terra cotta approx. 2'-0" x 15'-0" on top south-west corner above golden gate ave. clean substrate behind terra cotta and re-install terra cotta. see photo. | $20,000 | |
| Dec 4, 2007 | Never finaled issued Dec 2007, no final | 1 Taylor St | street space permitDetails
street space permit | ||
| Aug 29, 2007 | Never finaled issued Aug 2007, no final | 1 Taylor St | street space permitDetails
street space permit | ||
| Mar 28, 2007 | Completed final sign-off May 2007 | 25 Taylor St | install temporary partition at 1/f level to "close-off" seating area #1 & #5 (see plan) for theaterical proposes for show starting april 1, 2007 for a six week show, partition to be removed after show. no change any existing access fixtures.Details
install temporary partition at 1/f level to "close-off" seating area #1 & #5 (see plan) for theaterical proposes for show starting april 1, 2007 for a six week show, partition to be removed after show. no change any existing access fixtures. | $20,000 | |
| Nov 13, 2006 | Completed final sign-off Dec 2006 | 25 Taylor St | install temporary partition at 1st fl level to close off seating areas 1 an 5 (see plan) for theatrical purposes for show 11/14/06 to 12/14/06. provide corridor thru partitions, seating area 1 and 5Details
install temporary partition at 1st fl level to close off seating areas 1 an 5 (see plan) for theatrical purposes for show 11/14/06 to 12/14/06. provide corridor thru partitions, seating area 1 and 5 | $25,000 | |
| Nov 2, 2004 | Never finaled issued Nov 2004, no final | 1 Taylor St | street space permit.Details
street space permit. | ||
| Mar 12, 2003 | Expired or cancelled expired Dec 2005 | 25 Taylor St | renew expired permit app 200205096152-for final inspectionDetails
renew expired permit app 200205096152-for final inspection | ||
| May 9, 2002 | Never finaled issued May 2002, no final | 25 Taylor St | relocate electrical room to 1 hour roomDetails
relocate electrical room to 1 hour room | $5,000 | |
| Dec 28, 2000 | Expired or cancelled cancelled Aug 2002 | 25 Taylor St | add life safety system to entire building meeting full high rise systemDetails
add life safety system to entire building meeting full high rise system | $85,000 | |
| Dec 12, 2000 | Expired or cancelled cancelled Dec 2001 | 25 Taylor St | revision 3 include extg bsmnt fire sprklr riser clst/elec clost delete handrails stair #1/#2Details
revision 3 include extg bsmnt fire sprklr riser clst/elec clost delete handrails stair #1/#2 | ||
| Dec 7, 2000 | Expired or cancelled expired Jan 2002 | 25 Taylor St | R.M.R. Construction Company | add fire sprinkler system reference to ach permit 2000/08/22/8482Details
add fire sprinkler system reference to ach permit 2000/08/22/8482 | $128,000 |
| Nov 8, 2000 | Completed final sign-off Nov 2000 | 1 Taylor St | renewal of application 9821754 for final inspectionDetails
renewal of application 9821754 for final inspection | $1,000 | |
| Sep 13, 2000 | Completed final sign-off Dec 2000 | 25 Taylor St | apply intumescent paint 3 hr pating on existing roof beam w/o existing fireproofingDetails
apply intumescent paint 3 hr pating on existing roof beam w/o existing fireproofing | $10,000 | |
| Aug 22, 2000 | Expired or cancelled expired Oct 2002 | 25 Taylor St | handicape upgradeDetails
handicape upgrade | $700,000 | |
| Apr 29, 2000 | Expired or cancelled expired May 2001 | 25 Taylor St | t/i on 3-4/f instal new restrms remove partition wals make open space office interior demo for 6-7/fDetails
t/i on 3-4/f instal new restrms remove partition wals make open space office interior demo for 6-7/f | $30,000 | |
| Apr 5, 2000 | Completed final sign-off May 2000 | 1 Taylor St | delete from 9821754, the door wro along golden gate ave.Details
delete from 9821754, the door wro along golden gate ave. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Vanir Construction Mgmt (12), H C I Systems Inc (7), Madden Plumbing, Llc (7), Canning Electric Inc (2), All Air Mechanical Contractors Inc., Maguire Inc Dba Lahue And Associates, P 3 Construction & Remodeling Inc, R.M.R. Construction Company, Schmitt Heating Co Inc
- Architects
- Michael Zucker (8), Stuart F Buck
- Engineers
- Lilia Rasovsky (2), Marco Scanu
- Authorized agent-otherss
- Michael Zucker
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.