P 3 Construction & Remodeling Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2011 to Aug 2026
- Last 24 months
- 11 permits filed
330 permits since 2000: 273 completed, 5 in progress, 25 never finaled, 27 expired or cancelled.
Of the 25 never-finaled permits, 7 are 3 to 5 years old, 5 are 5 to 10 years old, 13 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 330.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Sep 2026 | 2961 Pacific Av | convert existing storage area to home office and media room.Details
convert existing storage area to home office and media room. | $50,000 |
| Aug 28, 2026 | In progress issued Aug 2026 | 212 Avila St | revision to pa#202606102927: living room-change (e) french doors to 60"x54" egress window. add 2x recessed pocket door to opening instead of swing doors. bath 2- change swing door to pocket door.Details
revision to pa#202606102927: living room-change (e) french doors to 60"x54" egress window. add 2x recessed pocket door to opening instead of swing doors. bath 2- change swing door to pocket door. | $10,000 |
| Jun 10, 2026 | In progress issued Jun 2026 | 212 Avila St | demo walls per plans and cosmetic bathroom remodel. demo/move walls to construct new room and bathroom layout.Details
demo walls per plans and cosmetic bathroom remodel. demo/move walls to construct new room and bathroom layout. | $150,000 |
| Jan 7, 2026 | Completed final sign-off Mar 2026 | 2058 32nd Av | convert existing office into a bathroom at level 1.Details
convert existing office into a bathroom at level 1. | $40,000 |
| Jul 3, 2025 | Completed final sign-off Oct 2025 | 3719 Fillmore St | kitchen remodel in kind ( no change or opening.)Details
kitchen remodel in kind ( no change or opening.) | $35,000 |
| Jun 20, 2025 | Completed final sign-off Jan 2026 | 2245 Fulton St | cosmetic remodel of (e) hall bathroom, kitchen remodel, new wall opening at kitchen, add primary bathroomDetails
cosmetic remodel of (e) hall bathroom, kitchen remodel, new wall opening at kitchen, add primary bathroom | $70,000 |
| Jun 5, 2025 | Completed final sign-off Dec 2025 | 4227 25th St | revision to pa #202504154452. relocate shower at 3rd floor bathroom and extend wall of walk in closet.Details
revision to pa #202504154452. relocate shower at 3rd floor bathroom and extend wall of walk in closet. | $10,000 |
| Apr 15, 2025 | Completed final sign-off Dec 2025 | 4227 25th St | remodel 1st fl and 3rd level bathroom in kind. replace 1st floor and 3rd floor french doors in kind in same opening at rear of house. 1st fl bath approx 48 sqft and 3rd fl bath approx 63 sqftDetails
remodel 1st fl and 3rd level bathroom in kind. replace 1st floor and 3rd floor french doors in kind in same opening at rear of house. 1st fl bath approx 48 sqft and 3rd fl bath approx 63 sqft | $45,000 |
| Mar 20, 2025 | Completed final sign-off Sep 2025 | 166 Ellsworth St | revision to pa# 202410022151: add structural detail - add footings to lower level, replace small section of foundation. new closet and smaller bath.Details
revision to pa# 202410022151: add structural detail - add footings to lower level, replace small section of foundation. new closet and smaller bath. | $10,000 |
| Nov 20, 2024 | Completed final sign-off Feb 2025 | 255 Mallorca Wy | remodel in kind kitchen. replace in kind bathroom no fixture location change half bath no fixture location changeDetails
remodel in kind kitchen. replace in kind bathroom no fixture location change half bath no fixture location change | $60,000 |
| Oct 17, 2024 | In progress issued Oct 2024 | 335 Casitas Av | rev 202407307523 & 202011199292- structural revision for voluntarily replace portions of (e) damaged conc footing w/ (n) conc footing at grid lineDetails
rev 202407307523 & 202011199292- structural revision for voluntarily replace portions of (e) damaged conc footing w/ (n) conc footing at grid line | |
| Oct 2, 2024 | Completed final sign-off Sep 2025 | 166 Ellsworth St | build (n) partition in garage to create family room and (n) bathroomDetails
build (n) partition in garage to create family room and (n) bathroom | $65,000 |
| Sep 25, 2024 | Completed final sign-off Oct 2024 | 156 Parker Av | rev 202401264734- per inspector to reflect expanded level 1 closetDetails
rev 202401264734- per inspector to reflect expanded level 1 closet | |
| Jul 30, 2024 | Completed final sign-off Nov 2025 | 461 Roosevelt Wy | legalize and remodel street level office at rear of house. modify rear stairs to garage level. new laundry room at garage level. new kitchen cabinets at 2/f. remodel 2 baths at 3/f. replace deck rail at roof terrace. replace front windows in kind - glazing only. replace water heater and furnace.Details
legalize and remodel street level office at rear of house. modify rear stairs to garage level. new laundry room at garage level. new kitchen cabinets at 2/f. remodel 2 baths at 3/f. replace deck rail at roof terrace. replace front windows in kind - glazing only. replace water heater and furnace. | $150,000 |
| Jul 30, 2024 | In progress issued Sep 2024 | 335 Casitas Av | structural revision to pa# 202011199292: voluntarily replace (e) damaged concrete footing with new concrete footing at grid line-b.Details
structural revision to pa# 202011199292: voluntarily replace (e) damaged concrete footing with new concrete footing at grid line-b. | |
| Jul 30, 2024 | Completed final sign-off Feb 2025 | 47 Tamalpais Tr | rev to pa# 2024-0708-5930; correction notice issued to expand area of dry rot repair due to extensive termite damage at front facade.Details
rev to pa# 2024-0708-5930; correction notice issued to expand area of dry rot repair due to extensive termite damage at front facade. | |
| Jul 8, 2024 | Completed final sign-off Feb 2025 | 47 Tamalpais Tr | dry rot repair in kind at front of house. less than 50%Details
dry rot repair in kind at front of house. less than 50% | $12,000 |
| Jun 5, 2024 | Completed final sign-off Feb 2025 | 3637 21st St | replace in kind (35) windows at front and back of house. weighted average u-factor 0.30. in kind w/wood casement windows.Details
replace in kind (35) windows at front and back of house. weighted average u-factor 0.30. in kind w/wood casement windows. | $35,000 |
| Jun 5, 2024 | Completed final sign-off Jun 2025 | 3927 Clay St | replace in kind (5) windows. (1) french door at front exterior (main and upper). weighed average u-factor 0.3. wood windows w/divided light patternsDetails
replace in kind (5) windows. (1) french door at front exterior (main and upper). weighed average u-factor 0.3. wood windows w/divided light patterns | $20,000 |
| Jun 5, 2024 | Completed final sign-off Feb 2025 | 3637 21st St | revision to 202406053755. change to in-kind w/aluminum casement. add full shingle replacement in kind. u=.30 maxDetails
revision to 202406053755. change to in-kind w/aluminum casement. add full shingle replacement in kind. u=.30 max | |
| Apr 12, 2024 | Completed final sign-off Oct 2024 | 156 Parker Av | revision to pa# 2024-0126-4734 add two (n) skylights in dining room. expand (e) pantry & closet. remodel bedroom to accommodate pantry and closet expansionDetails
revision to pa# 2024-0126-4734 add two (n) skylights in dining room. expand (e) pantry & closet. remodel bedroom to accommodate pantry and closet expansion | $10,000 |
| Mar 18, 2024 | Completed final sign-off Apr 2024 | 1212 Kearny St | deck and stair repair in kind approx 300 sqft. - 50% of uss repair.Details
deck and stair repair in kind approx 300 sqft. - 50% of uss repair. | $12,500 |
| Feb 12, 2024 | Completed final sign-off Jun 2024 | 48 San Antonio Pl | replace (4) 38 x 61 windows from vinyl to wood at front of house. no change in openings.Details
replace (4) 38 x 61 windows from vinyl to wood at front of house. no change in openings. | $10,000 |
| Jan 26, 2024 | Completed final sign-off Oct 2024 | 156 Parker Av | remodel in kind: no wall changes or opening. -kitchen. lowe level bathroom and main level bathroom.Details
remodel in kind: no wall changes or opening. -kitchen. lowe level bathroom and main level bathroom. | $40,000 |
| Nov 13, 2023 | Completed final sign-off Sep 2024 | 43 Jordan Av | interior remocel and seismic retroit of ground level as build drawings to combine work scope of 2023*0322-4164, 2023-0421-6195,2023-0517-7991 & 2023-0803-3673Details
interior remocel and seismic retroit of ground level as build drawings to combine work scope of 2023*0322-4164, 2023-0421-6195,2023-0517-7991 & 2023-0803-3673 | |
| Aug 22, 2023 | Completed final sign-off Mar 2025 | 832 Clayton St | partial conversion of (e) basement/garage/laundry into new family rm & laundryDetails
partial conversion of (e) basement/garage/laundry into new family rm & laundry | $28,000 |
| Aug 3, 2023 | Completed final sign-off Sep 2024 | 43 Jordan Av | addition of new deck and stairway to backyard from second level. new fire wall and fence along property line. new door at 2nd flr to access deck. structural upgrades at kitchen. no chnag to maximum path of travel or egress patch.Details
addition of new deck and stairway to backyard from second level. new fire wall and fence along property line. new door at 2nd flr to access deck. structural upgrades at kitchen. no chnag to maximum path of travel or egress patch. | $50,000 |
| Jul 28, 2023 | Completed final sign-off Jun 2024 | 48 San Antonio Pl | demo existing master bedroom closet & rebuild new walk-in closet, demo existing fireplace in master bedroom, demo & replace kitchen cabinets in-kind, no appliance or wall relocation. all work on 3rd and 4th floorDetails
demo existing master bedroom closet & rebuild new walk-in closet, demo existing fireplace in master bedroom, demo & replace kitchen cabinets in-kind, no appliance or wall relocation. all work on 3rd and 4th floor | $24,000 |
| Jul 7, 2023 | Completed final sign-off Jul 2023 | 345 Ewing Tr | to obtain fiinal inspection for work approved under pa# 201607192700. all work is completeDetails
to obtain fiinal inspection for work approved under pa# 201607192700. all work is complete | |
| Jun 16, 2023 | Completed final sign-off May 2024 | 832 Clayton St | rev to pa# 2023-0512-7698; convert walk in closet on 3rd fl. to a bathroom, one toilet, one sink and shower, no tub no new wallsDetails
rev to pa# 2023-0512-7698; convert walk in closet on 3rd fl. to a bathroom, one toilet, one sink and shower, no tub no new walls | $20,000 |
| Jun 16, 2023 | Completed final sign-off Jun 2024 | 48 San Antonio Pl | remodel in kind 2 bathrooms 1st level and 2nd level. no location changes. no floor layout changes. no wall layout changes. no structural work.Details
remodel in kind 2 bathrooms 1st level and 2nd level. no location changes. no floor layout changes. no wall layout changes. no structural work. | $30,000 |
| May 31, 2023 | Completed final sign-off Jul 2025 | 210 Locust St | new wine rm w/ refriguation in lower lvl/ reconfigure walls, 3 (n) french doors @ back of house. walkable skylight on 2rd fl hallway. 3rd fl: demo closet to open room. reconfigure small area of roof @ deck for new french doors. new fireplace & guardrail @ 2nd fl interior stairsDetails
new wine rm w/ refriguation in lower lvl/ reconfigure walls, 3 (n) french doors @ back of house. walkable skylight on 2rd fl hallway. 3rd fl: demo closet to open room. reconfigure small area of roof @ deck for new french doors. new fireplace & guardrail @ 2nd fl interior stairs | $195,000 |
| May 17, 2023 | Completed final sign-off Sep 2024 | 43 Jordan Av | interior remodel to include new lighting fixtures at 2nd and 3rd fl. new gas insert to e fireplace unit. int remodel at 3rd fl including primary bedroom and bath, 2nd bath, new laundry rm.structural framing, roofing sep permitDetails
interior remodel to include new lighting fixtures at 2nd and 3rd fl. new gas insert to e fireplace unit. int remodel at 3rd fl including primary bedroom and bath, 2nd bath, new laundry rm.structural framing, roofing sep permit | $50,000 |
| May 12, 2023 | Completed final sign-off Jul 2023 | 66 Collins St | remodel 2nd fl one bathroom in-kind. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5. plumbing fixture counts remain same as existing.Details
remodel 2nd fl one bathroom in-kind. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5. plumbing fixture counts remain same as existing. | $20,000 |
| May 12, 2023 | Completed final sign-off May 2024 | 832 Clayton St | remodel 3rd fl one bathroom in-kind. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5. plumbing fixture counts remain same as existing.Details
remodel 3rd fl one bathroom in-kind. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5. plumbing fixture counts remain same as existing. | $20,000 |
| Apr 28, 2023 | Completed final sign-off Nov 2024 | 643 19th Av | converting 574sf of existing garage & storage area at ground flr to habitable space,new primary bedroom w/ bath, convert extg office to bedroom, remodel extg bath, relocate laundry, revise extg rear deck stair to rear yard.Details
converting 574sf of existing garage & storage area at ground flr to habitable space,new primary bedroom w/ bath, convert extg office to bedroom, remodel extg bath, relocate laundry, revise extg rear deck stair to rear yard. | $250,000 |
| Apr 21, 2023 | Completed final sign-off Sep 2024 | 43 Jordan Av | voluntary structural upgrade at garage. no change to maximum path of travel of egress path. upgrade at garage.Details
voluntary structural upgrade at garage. no change to maximum path of travel of egress path. upgrade at garage. | $50,000 |
| Apr 20, 2023 | Never finaled issued Apr 2023, no final | 165 Parker Av | replace and repair 6 windows in kind- at back exteriorDetails
replace and repair 6 windows in kind- at back exterior | $15,000 |
| Mar 30, 2023 | Completed final sign-off Nov 2023 | 105 Gladeview Wy | revision to pa#: 202303033003, open wall between dining room and kitchenDetails
revision to pa#: 202303033003, open wall between dining room and kitchen | $25,000 |
| Mar 22, 2023 | Completed final sign-off Sep 2024 | 43 Jordan Av | new interior remodel. bathroom relocation at 1/f, new windows and door openings facing backyard. infill of open areas under cantilevered room at 1/f. demolition of (e) trellis structure in backyard. new kitchen & pantry @ 2nd flDetails
new interior remodel. bathroom relocation at 1/f, new windows and door openings facing backyard. infill of open areas under cantilevered room at 1/f. demolition of (e) trellis structure in backyard. new kitchen & pantry @ 2nd fl | $500,000 |
| Mar 3, 2023 | Completed final sign-off Nov 2023 | 105 Gladeview Wy | kitchen renovation in kindDetails
kitchen renovation in kind | $25,000 |
| Feb 8, 2023 | Never finaled issued Feb 2023, no final | 2830 Broderick St | remodel (3) bathrooms in kind. replace fixtures only. no wall move.Details
remodel (3) bathrooms in kind. replace fixtures only. no wall move. | $35,000 |
| Jan 27, 2023 | Completed final sign-off Feb 2023 | 466 11th Av | revision to 202210265208, to document windows replaced in kind, 4 total. no window replacement in bedroomDetails
revision to 202210265208, to document windows replaced in kind, 4 total. no window replacement in bedroom | |
| Jan 12, 2023 | Completed final sign-off Mar 2023 | 2644 Filbert St | remove wall between kitchen, dining room, & living area.Details
remove wall between kitchen, dining room, & living area. | $35,000 |
| Dec 7, 2022 | Completed final sign-off Feb 2023 | 466 11th Av | install positive load transfer to foundation to support extg beam in kitchen and roof.Details
install positive load transfer to foundation to support extg beam in kitchen and roof. | $25,000 |
| Nov 21, 2022 | Completed final sign-off Sep 2023 | 366 Quintara St | ground floor development of existing two story single family dwelling. convert portion of existing garage and storage into new bedroom with bathroom and walk in closet.Details
ground floor development of existing two story single family dwelling. convert portion of existing garage and storage into new bedroom with bathroom and walk in closet. | $150,000 |
| Oct 26, 2022 | Completed final sign-off Feb 2023 | 466 11th Av | replace bedrooms and bathroom's windows in kind. replace front arch windows to be mahogany with 1 g low-e tempered glass. tot of 6 windows.Details
replace bedrooms and bathroom's windows in kind. replace front arch windows to be mahogany with 1 g low-e tempered glass. tot of 6 windows. | $15,000 |
| Oct 26, 2022 | Completed final sign-off Mar 2023 | 2644 Filbert St | cosmetic remodel of first floor half bath and third floor master bath.Details
cosmetic remodel of first floor half bath and third floor master bath. | $35,000 |
| Oct 19, 2022 | Completed final sign-off Jul 2023 | 1125 Clayton St | front left side replace approx 140 sqft of cedar shingles in kind- right side not visible from the street install james hardie lap siding (smooth finish)Details
front left side replace approx 140 sqft of cedar shingles in kind- right side not visible from the street install james hardie lap siding (smooth finish) | $47,727 |
| Sep 8, 2022 | Completed final sign-off Feb 2023 | 466 11th Av | cosmetic remodel of kitchen and bathroom. no wall or location changes.Details
cosmetic remodel of kitchen and bathroom. no wall or location changes. | $50,000 |
| Aug 30, 2022 | Never finaled filed Aug 2022, never issued | 3621 Divisadero St | legalize as built to pa# 200008117637. wall layout changes to 1st fl. remove stair to 2nd fl. create 1 office with 1-hr rated wall for separation to garage. replace approved deck with 2 juliet balconies. omit stair to 3rd fl. add rooms to playroom on 3rd fl.Details
legalize as built to pa# 200008117637. wall layout changes to 1st fl. remove stair to 2nd fl. create 1 office with 1-hr rated wall for separation to garage. replace approved deck with 2 juliet balconies. omit stair to 3rd fl. add rooms to playroom on 3rd fl. | $5,000 |
| Aug 17, 2022 | Completed final sign-off Jan 2023 | 3876 Sacramento St | cosmetic remodel of existing powder room. replace tiles + fixtures (e).Details
cosmetic remodel of existing powder room. replace tiles + fixtures (e). | $15,000 |
| Aug 8, 2022 | Completed final sign-off Dec 2023 | 4011 25th St | remodel 1st fl kitchen and 2nd fl bathroom. repair/ replace windows and doors and rear wall as necessary (non visible from street). construction of (n) powder room in (e) garage.Details
remodel 1st fl kitchen and 2nd fl bathroom. repair/ replace windows and doors and rear wall as necessary (non visible from street). construction of (n) powder room in (e) garage. | $37,000 |
| Jul 26, 2022 | Completed final sign-off Oct 2022 | 3621 Divisadero St | revision to pa 2022-0608-5840 legalize (e) 1 hr rated window @ lightwell and infill interior window frame w/wood framing and 5/8" type x gyp bd. to comply with nov 202289028Details
revision to pa 2022-0608-5840 legalize (e) 1 hr rated window @ lightwell and infill interior window frame w/wood framing and 5/8" type x gyp bd. to comply with nov 202289028 | $3,500 |
| Jun 8, 2022 | Never finaled issued Jun 2022, no final | 3621 Divisadero St | to partially comply with nov# 202289028. remove unpermitted window. repair exposed siding at north wall 2nd level.Details
to partially comply with nov# 202289028. remove unpermitted window. repair exposed siding at north wall 2nd level. | $3,500 |
| Apr 28, 2022 | Never finaled issued Apr 2022, no final | 3621 Divisadero St | obtain final inspection for work approved under pa# 200008117637. all work is complete.Details
obtain final inspection for work approved under pa# 200008117637. all work is complete. | |
| Apr 19, 2022 | Never finaled issued Apr 2022, no final | 517 Lombard St | cosemetic remodel of one bathroom- new tile on floors, replace (e) toilet with new.Details
cosemetic remodel of one bathroom- new tile on floors, replace (e) toilet with new. | $5,000 |
| Feb 28, 2022 | Completed final sign-off Jul 2022 | 57 Jordan Av | fence repair in-kind at backyard. 90 lf. due to dryrotDetails
fence repair in-kind at backyard. 90 lf. due to dryrot | $8,000 |
| Feb 10, 2022 | Completed final sign-off Jan 2024 | 1896 Pacific Av | unit 604: demo opening of 81" x 60" at breakfast nook wall and install counter.Details
unit 604: demo opening of 81" x 60" at breakfast nook wall and install counter. | $10,000 |
| Oct 15, 2021 | Completed final sign-off Feb 2022 | 803 Central Av | kitchen remodel in kind: replace cabinets: replace appliance: no wall moveDetails
kitchen remodel in kind: replace cabinets: replace appliance: no wall move | $35,000 |
| Oct 15, 2021 | Completed final sign-off Dec 2021 | 3927 Clay St | remodel 2nd floor bathroom: replace tile, replace existing tub, replace existing plumbing fixture.Details
remodel 2nd floor bathroom: replace tile, replace existing tub, replace existing plumbing fixture. | $15,000 |
| Sep 30, 2021 | Expired or cancelled cancelled Jan 2026 | 1877 Stockton St | demo workshop area (700 sqft) level concrete floor for future storage use.Details
demo workshop area (700 sqft) level concrete floor for future storage use. | $5,000 |
| Sep 30, 2021 | Completed final sign-off Jul 2022 | 57 Jordan Av | revision to pa 202108277268: remove wainscoting in entry & dining room. sheetrock repair as needed. add base & trim as needed.Details
revision to pa 202108277268: remove wainscoting in entry & dining room. sheetrock repair as needed. add base & trim as needed. | $12,000 |
| Aug 27, 2021 | Completed final sign-off Jul 2022 | 57 Jordan Av | cosmetic remodel of 4 existing bathrooms, replace tiles, counters, and cabinets. no wall layout changes.Details
cosmetic remodel of 4 existing bathrooms, replace tiles, counters, and cabinets. no wall layout changes. | $80,000 |
| Aug 9, 2021 | Completed final sign-off Nov 2021 | 175 Villa Tr | unit 101: revision to 202105240887: repair siding @ 2nd floor front exterior due to water intrusion. replace w/ stucco 250sqftDetails
unit 101: revision to 202105240887: repair siding @ 2nd floor front exterior due to water intrusion. replace w/ stucco 250sqft | $10,000 |
| Jul 22, 2021 | Never finaled issued Jul 2021, no final | 86 Webster St | revision to 202101223156, page a2.1. move bath 2 wall, 1 ft into bath 1, remove linen closet.Details
revision to 202101223156, page a2.1. move bath 2 wall, 1 ft into bath 1, remove linen closet. | $2,500 |
| Jun 23, 2021 | Completed final sign-off Oct 2021 | 1310 Minnesota St | unit 13: demo & repair less than 50 sf of stucco for waterproofing & flashing. not visible from street.Details
unit 13: demo & repair less than 50 sf of stucco for waterproofing & flashing. not visible from street. | $10,000 |
| Jun 23, 2021 | Completed final sign-off Oct 2021 | 1310 Minnesota St | unit 21: demo & repair less than 50 sf of stucco for waterproofing & add flashing. not visible from street.Details
unit 21: demo & repair less than 50 sf of stucco for waterproofing & add flashing. not visible from street. | $10,000 |
| May 24, 2021 | Completed final sign-off Nov 2021 | 177 Villa Tr | apt 201: kitchen remodel in kind. no walls changed.Details
apt 201: kitchen remodel in kind. no walls changed. | $20,000 |
| May 24, 2021 | Completed final sign-off Nov 2021 | 175 Villa Tr | apt 101: repair water damange in kitchen & bathroom 1/f. bathroom remodel in-kind. no fixturs change on 2/f. demo stone facade & replace with stucco 100sf.Details
apt 101: repair water damange in kitchen & bathroom 1/f. bathroom remodel in-kind. no fixturs change on 2/f. demo stone facade & replace with stucco 100sf. | $20,000 |
| Apr 23, 2021 | Completed final sign-off May 2021 | 530 10th Av | demo stucco for dry-rot repair in kind @exterior front of house (less than %50) approx 25 sq ft areaDetails
demo stucco for dry-rot repair in kind @exterior front of house (less than %50) approx 25 sq ft area | $10,000 |
| Mar 8, 2021 | Completed final sign-off Jun 2021 | 1826 Filbert St | replace in kind: kitchen cabinet, countertop, no layour change. replace inkind: bathroom tile replacement at main floor. no change in layout. no structural, no wall modification.Details
replace in kind: kitchen cabinet, countertop, no layour change. replace inkind: bathroom tile replacement at main floor. no change in layout. no structural, no wall modification. | $50,000 |
| Mar 8, 2021 | Completed final sign-off Aug 2021 | 177 Townsend St | #426: replace in kind: kitchen cabinets & countertops. no wall modification. no structural.Details
#426: replace in kind: kitchen cabinets & countertops. no wall modification. no structural. | $20,000 |
| Feb 1, 2021 | Completed final sign-off May 2022 | 3804 Clay St | rev to pa201912230409: revised scope includes a new fixed window and revised fixed skylight locations at new attic dormer roof.Details
rev to pa201912230409: revised scope includes a new fixed window and revised fixed skylight locations at new attic dormer roof. | |
| Jan 22, 2021 | Completed final sign-off May 2022 | 3804 Clay St | replace extg wood windows at front and side with in kind wood windows. 23 windows.Details
replace extg wood windows at front and side with in kind wood windows. 23 windows. | $40,000 |
| Jan 22, 2021 | Completed final sign-off Feb 2022 | 86 Webster St | cosmetic remodel of (e) bathroom. convert closet to 2nd bathroom. replace (e) cabinets. kitchen remodelDetails
cosmetic remodel of (e) bathroom. convert closet to 2nd bathroom. replace (e) cabinets. kitchen remodel | $40,000 |
| Oct 28, 2020 | Expired or cancelled withdrawn Jan 2021 | 86 Webster St | renovate (e) bathroom. convert utility closet to a bathroom.Details
renovate (e) bathroom. convert utility closet to a bathroom. | $50,000 |
| Oct 6, 2020 | Completed final sign-off May 2022 | 3804 Clay St | revision to pa #2019-1223-0409: footing to mat slab foundation.Details
revision to pa #2019-1223-0409: footing to mat slab foundation. | |
| Jul 22, 2020 | Completed final sign-off Jun 2021 | 530 10th Av | convert existing closet into bedroom, combine guest room int game room. remodel bathDetails
convert existing closet into bedroom, combine guest room int game room. remodel bath | $50,000 |
| Jul 7, 2020 | Completed final sign-off May 2022 | 3804 Clay St | demo 1000 sq ft of sheetrock to upgrade electrical separate electrical permit. 2 rooms.Details
demo 1000 sq ft of sheetrock to upgrade electrical separate electrical permit. 2 rooms. | $2,500 |
| May 27, 2020 | Completed final sign-off Oct 2020 | 47 Tamalpais Tr | in-kind dry rot repair of light wellDetails
in-kind dry rot repair of light well | $3,000 |
| Mar 9, 2020 | Completed final sign-off Aug 2020 | 512 Cole St | replace 10 kitchen cabinets in-kind.Details
replace 10 kitchen cabinets in-kind. | $3,500 |
| Mar 9, 2020 | Completed final sign-off May 2021 | 530 10th Av | master bathroom remodel, no change in fixture location, separate electrical & plumbing permits.Details
master bathroom remodel, no change in fixture location, separate electrical & plumbing permits. | $8,000 |
| Jan 13, 2020 | Completed final sign-off Jul 2020 | 530 10th Av | repair of rear deck and rear siding. deck repair less than 50% limited to deck boards. siding repair in-kind less than 50% - horizontal wood siding.Details
repair of rear deck and rear siding. deck repair less than 50% limited to deck boards. siding repair in-kind less than 50% - horizontal wood siding. | $15,000 |
| Dec 23, 2019 | Completed final sign-off May 2022 | 3804 Clay St | full interior remodel at all fls. conversion of (e) storage space in basement to conditioned habitable space, removal of an (e) dormer at the 3rd fl, and addition of a new roof dormer over new stairs at 3rd fl, new windows, doors & finishes at the rear of facade of the bldg. maher ord. 155-13 - dphDetails
full interior remodel at all fls. conversion of (e) storage space in basement to conditioned habitable space, removal of an (e) dormer at the 3rd fl, and addition of a new roof dormer over new stairs at 3rd fl, new windows, doors & finishes at the rear of facade of the bldg. maher ord. 155-13 - dph | $730,000 |
| Sep 16, 2019 | Completed final sign-off Dec 2019 | 1873 Stockton St | revision to app#201907297251. add one bathroom and remove kitchen wall.Details
revision to app#201907297251. add one bathroom and remove kitchen wall. | $15,500 |
| Sep 16, 2019 | Completed final sign-off Dec 2019 | 1875 Stockton St | revision to app#201907297252. add one bathroom and remove kitchen wall.Details
revision to app#201907297252. add one bathroom and remove kitchen wall. | $15,500 |
| Sep 16, 2019 | Completed final sign-off Nov 2020 | 4064 Cesar Chavez St | revision to app#201906204058: sheet s2.3-balcony framing at gridline 3/c has been revised. sheet s2.4- framing at gridline 3 has been revised. loading for new 4x10 continueus roof beam is same as for roof joist.Details
revision to app#201906204058: sheet s2.3-balcony framing at gridline 3/c has been revised. sheet s2.4- framing at gridline 3 has been revised. loading for new 4x10 continueus roof beam is same as for roof joist. | $10,000 |
| Sep 16, 2019 | Completed final sign-off Nov 2020 | 4064 Cesar Chavez St | mechanical: install a new furnace unit to serve entire 3 story house. install exhaust fan for restrooms and laundry room.Details
mechanical: install a new furnace unit to serve entire 3 story house. install exhaust fan for restrooms and laundry room. | $8,000 |
| Aug 26, 2019 | Completed final sign-off Oct 2019 | 1087 Mississippi St | remove & replace 750 sqft of siding in kind @ south of building not visible from street. siding is and will be hardy boardDetails
remove & replace 750 sqft of siding in kind @ south of building not visible from street. siding is and will be hardy board | $10,000 |
| Aug 26, 2019 | Completed final sign-off Sep 2019 | 2020 Hyde St | revision to 2019-0502-9624, at rear of building to include dry rot repair in kind.Details
revision to 2019-0502-9624, at rear of building to include dry rot repair in kind. | $10,000 |
| Aug 12, 2019 | Completed final sign-off Jan 2020 | 519 Lombard St | in kind remodel. cosmetic remodel of a small kitchen. plumbing & electrical under sep application.Details
in kind remodel. cosmetic remodel of a small kitchen. plumbing & electrical under sep application. | $7,000 |
| Aug 12, 2019 | Completed final sign-off Jan 2020 | 517 Lombard St | in kind remodel. cosmetic remodel of a small kitchen. plumbing & electrical under sep application.Details
in kind remodel. cosmetic remodel of a small kitchen. plumbing & electrical under sep application. | $7,000 |
| Aug 12, 2019 | Completed final sign-off Jan 2020 | 515 Lombard St | in kind remodel. cosmetic remodel of a small kitchen. plumbing & electrical under sep application.Details
in kind remodel. cosmetic remodel of a small kitchen. plumbing & electrical under sep application. | $7,000 |
| Jul 29, 2019 | Completed final sign-off Dec 2019 | 1875 Stockton St | cosmetic remodel of a kitchen. plumbing & electric under separate applicationDetails
cosmetic remodel of a kitchen. plumbing & electric under separate application | $12,000 |
| Jul 29, 2019 | Completed final sign-off Jan 2020 | 513 Lombard St | cosmetic remodel of kitchen - 2 new cabinets. plumbing & electrical under separate applicationsDetails
cosmetic remodel of kitchen - 2 new cabinets. plumbing & electrical under separate applications | $5,000 |
| Jul 29, 2019 | Completed final sign-off Dec 2019 | 1873 Stockton St | cosmetic remodel of a kitchen. plumbing & electrical under separate permitDetails
cosmetic remodel of a kitchen. plumbing & electrical under separate permit | $12,000 |
| Jun 20, 2019 | Completed final sign-off Nov 2020 | 4064 Cesar Chavez St | revision to pa# 201608296288. various structural revision on sheets s2.1. s2.2, s2.3 and s2.4.Details
revision to pa# 201608296288. various structural revision on sheets s2.1. s2.2, s2.3 and s2.4. | $10,000 |
| Jun 18, 2019 | Expired or cancelled cancelled Jan 2026 | 4064 Cesar Chavez St | revision to pa 201608296288. additional detail on 2' x 2'6" footing at gridline 10/e for cracked foundation replacement.Details
revision to pa 201608296288. additional detail on 2' x 2'6" footing at gridline 10/e for cracked foundation replacement. | $3,500 |
| Jun 11, 2019 | Never finaled issued Jun 2019, no final | 1340 Utah St | commencement of work not started under previouslyapproved permit application pa # 201405206193Details
commencement of work not started under previouslyapproved permit application pa # 201405206193 | $62,000 |