Back to bathroom remodel contractors
P 3 Construction & Remodeling Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2011 to Aug 2026
- Last 24 months
- 11 permits filed
330 permits since 2000: 273 completed, 5 in progress, 25 never finaled, 27 expired or cancelled.
Of the 25 never-finaled permits, 7 are 3 to 5 years old, 5 are 5 to 10 years old, 13 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
73 bathroom remodel permits: 59 completed, 2 in progress, 7 never finaled, 5 expired or cancelled. Typically 0 days from filing to permit and 250 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Aug 2026 | 212 Avila St | revision to pa#202606102927: living room-change (e) french doors to 60"x54" egress window. add 2x recessed pocket door to opening instead of swing doors. bath 2- change swing door to pocket door.Details
revision to pa#202606102927: living room-change (e) french doors to 60"x54" egress window. add 2x recessed pocket door to opening instead of swing doors. bath 2- change swing door to pocket door. | $10,000 |
| Jun 10, 2026 | In progress issued Jun 2026 | 212 Avila St | demo walls per plans and cosmetic bathroom remodel. demo/move walls to construct new room and bathroom layout.Details
demo walls per plans and cosmetic bathroom remodel. demo/move walls to construct new room and bathroom layout. | $150,000 |
| Jan 7, 2026 | Completed final sign-off Mar 2026 | 2058 32nd Av | convert existing office into a bathroom at level 1.Details
convert existing office into a bathroom at level 1. | $40,000 |
| Jun 20, 2025 | Completed final sign-off Jan 2026 | 2245 Fulton St | cosmetic remodel of (e) hall bathroom, kitchen remodel, new wall opening at kitchen, add primary bathroomDetails
cosmetic remodel of (e) hall bathroom, kitchen remodel, new wall opening at kitchen, add primary bathroom | $70,000 |
| Jun 5, 2025 | Completed final sign-off Dec 2025 | 4227 25th St | revision to pa #202504154452. relocate shower at 3rd floor bathroom and extend wall of walk in closet.Details
revision to pa #202504154452. relocate shower at 3rd floor bathroom and extend wall of walk in closet. | $10,000 |
| Apr 15, 2025 | Completed final sign-off Dec 2025 | 4227 25th St | remodel 1st fl and 3rd level bathroom in kind. replace 1st floor and 3rd floor french doors in kind in same opening at rear of house. 1st fl bath approx 48 sqft and 3rd fl bath approx 63 sqftDetails
remodel 1st fl and 3rd level bathroom in kind. replace 1st floor and 3rd floor french doors in kind in same opening at rear of house. 1st fl bath approx 48 sqft and 3rd fl bath approx 63 sqft | $45,000 |
| Mar 20, 2025 | Completed final sign-off Sep 2025 | 166 Ellsworth St | revision to pa# 202410022151: add structural detail - add footings to lower level, replace small section of foundation. new closet and smaller bath.Details
revision to pa# 202410022151: add structural detail - add footings to lower level, replace small section of foundation. new closet and smaller bath. | $10,000 |
| Nov 20, 2024 | Completed final sign-off Feb 2025 | 255 Mallorca Wy | remodel in kind kitchen. replace in kind bathroom no fixture location change half bath no fixture location changeDetails
remodel in kind kitchen. replace in kind bathroom no fixture location change half bath no fixture location change | $60,000 |
| Oct 2, 2024 | Completed final sign-off Sep 2025 | 166 Ellsworth St | build (n) partition in garage to create family room and (n) bathroomDetails
build (n) partition in garage to create family room and (n) bathroom | $65,000 |
| Jul 30, 2024 | Completed final sign-off Nov 2025 | 461 Roosevelt Wy | legalize and remodel street level office at rear of house. modify rear stairs to garage level. new laundry room at garage level. new kitchen cabinets at 2/f. remodel 2 baths at 3/f. replace deck rail at roof terrace. replace front windows in kind - glazing only. replace water heater and furnace.Details
legalize and remodel street level office at rear of house. modify rear stairs to garage level. new laundry room at garage level. new kitchen cabinets at 2/f. remodel 2 baths at 3/f. replace deck rail at roof terrace. replace front windows in kind - glazing only. replace water heater and furnace. | $150,000 |
| Jan 26, 2024 | Completed final sign-off Oct 2024 | 156 Parker Av | remodel in kind: no wall changes or opening. -kitchen. lowe level bathroom and main level bathroom.Details
remodel in kind: no wall changes or opening. -kitchen. lowe level bathroom and main level bathroom. | $40,000 |
| Jun 16, 2023 | Completed final sign-off May 2024 | 832 Clayton St | rev to pa# 2023-0512-7698; convert walk in closet on 3rd fl. to a bathroom, one toilet, one sink and shower, no tub no new wallsDetails
rev to pa# 2023-0512-7698; convert walk in closet on 3rd fl. to a bathroom, one toilet, one sink and shower, no tub no new walls | $20,000 |
| Jun 16, 2023 | Completed final sign-off Jun 2024 | 48 San Antonio Pl | remodel in kind 2 bathrooms 1st level and 2nd level. no location changes. no floor layout changes. no wall layout changes. no structural work.Details
remodel in kind 2 bathrooms 1st level and 2nd level. no location changes. no floor layout changes. no wall layout changes. no structural work. | $30,000 |
| May 17, 2023 | Completed final sign-off Sep 2024 | 43 Jordan Av | interior remodel to include new lighting fixtures at 2nd and 3rd fl. new gas insert to e fireplace unit. int remodel at 3rd fl including primary bedroom and bath, 2nd bath, new laundry rm.structural framing, roofing sep permitDetails
interior remodel to include new lighting fixtures at 2nd and 3rd fl. new gas insert to e fireplace unit. int remodel at 3rd fl including primary bedroom and bath, 2nd bath, new laundry rm.structural framing, roofing sep permit | $50,000 |
| May 12, 2023 | Completed final sign-off Jul 2023 | 66 Collins St | remodel 2nd fl one bathroom in-kind. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5. plumbing fixture counts remain same as existing.Details
remodel 2nd fl one bathroom in-kind. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5. plumbing fixture counts remain same as existing. | $20,000 |
| May 12, 2023 | Completed final sign-off May 2024 | 832 Clayton St | remodel 3rd fl one bathroom in-kind. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5. plumbing fixture counts remain same as existing.Details
remodel 3rd fl one bathroom in-kind. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5. plumbing fixture counts remain same as existing. | $20,000 |
| Apr 28, 2023 | Completed final sign-off Nov 2024 | 643 19th Av | converting 574sf of existing garage & storage area at ground flr to habitable space,new primary bedroom w/ bath, convert extg office to bedroom, remodel extg bath, relocate laundry, revise extg rear deck stair to rear yard.Details
converting 574sf of existing garage & storage area at ground flr to habitable space,new primary bedroom w/ bath, convert extg office to bedroom, remodel extg bath, relocate laundry, revise extg rear deck stair to rear yard. | $250,000 |
| Mar 22, 2023 | Completed final sign-off Sep 2024 | 43 Jordan Av | new interior remodel. bathroom relocation at 1/f, new windows and door openings facing backyard. infill of open areas under cantilevered room at 1/f. demolition of (e) trellis structure in backyard. new kitchen & pantry @ 2nd flDetails
new interior remodel. bathroom relocation at 1/f, new windows and door openings facing backyard. infill of open areas under cantilevered room at 1/f. demolition of (e) trellis structure in backyard. new kitchen & pantry @ 2nd fl | $500,000 |
| Feb 8, 2023 | Never finaled issued Feb 2023, no final | 2830 Broderick St | remodel (3) bathrooms in kind. replace fixtures only. no wall move.Details
remodel (3) bathrooms in kind. replace fixtures only. no wall move. | $35,000 |
| Nov 21, 2022 | Completed final sign-off Sep 2023 | 366 Quintara St | ground floor development of existing two story single family dwelling. convert portion of existing garage and storage into new bedroom with bathroom and walk in closet.Details
ground floor development of existing two story single family dwelling. convert portion of existing garage and storage into new bedroom with bathroom and walk in closet. | $150,000 |
| Oct 26, 2022 | Completed final sign-off Mar 2023 | 2644 Filbert St | cosmetic remodel of first floor half bath and third floor master bath.Details
cosmetic remodel of first floor half bath and third floor master bath. | $35,000 |
| Oct 26, 2022 | Completed final sign-off Feb 2023 | 466 11th Av | replace bedrooms and bathroom's windows in kind. replace front arch windows to be mahogany with 1 g low-e tempered glass. tot of 6 windows.Details
replace bedrooms and bathroom's windows in kind. replace front arch windows to be mahogany with 1 g low-e tempered glass. tot of 6 windows. | $15,000 |
| Sep 8, 2022 | Completed final sign-off Feb 2023 | 466 11th Av | cosmetic remodel of kitchen and bathroom. no wall or location changes.Details
cosmetic remodel of kitchen and bathroom. no wall or location changes. | $50,000 |
| Aug 8, 2022 | Completed final sign-off Dec 2023 | 4011 25th St | remodel 1st fl kitchen and 2nd fl bathroom. repair/ replace windows and doors and rear wall as necessary (non visible from street). construction of (n) powder room in (e) garage.Details
remodel 1st fl kitchen and 2nd fl bathroom. repair/ replace windows and doors and rear wall as necessary (non visible from street). construction of (n) powder room in (e) garage. | $37,000 |
| Apr 19, 2022 | Never finaled issued Apr 2022, no final | 517 Lombard St | cosemetic remodel of one bathroom- new tile on floors, replace (e) toilet with new.Details
cosemetic remodel of one bathroom- new tile on floors, replace (e) toilet with new. | $5,000 |
| Oct 15, 2021 | Completed final sign-off Dec 2021 | 3927 Clay St | remodel 2nd floor bathroom: replace tile, replace existing tub, replace existing plumbing fixture.Details
remodel 2nd floor bathroom: replace tile, replace existing tub, replace existing plumbing fixture. | $15,000 |
| Aug 27, 2021 | Completed final sign-off Jul 2022 | 57 Jordan Av | cosmetic remodel of 4 existing bathrooms, replace tiles, counters, and cabinets. no wall layout changes.Details
cosmetic remodel of 4 existing bathrooms, replace tiles, counters, and cabinets. no wall layout changes. | $80,000 |
| Jul 22, 2021 | Never finaled issued Jul 2021, no final | 86 Webster St | revision to 202101223156, page a2.1. move bath 2 wall, 1 ft into bath 1, remove linen closet.Details
revision to 202101223156, page a2.1. move bath 2 wall, 1 ft into bath 1, remove linen closet. | $2,500 |
| May 24, 2021 | Completed final sign-off Nov 2021 | 175 Villa Tr | apt 101: repair water damange in kitchen & bathroom 1/f. bathroom remodel in-kind. no fixturs change on 2/f. demo stone facade & replace with stucco 100sf.Details
apt 101: repair water damange in kitchen & bathroom 1/f. bathroom remodel in-kind. no fixturs change on 2/f. demo stone facade & replace with stucco 100sf. | $20,000 |
| Mar 8, 2021 | Completed final sign-off Jun 2021 | 1826 Filbert St | replace in kind: kitchen cabinet, countertop, no layour change. replace inkind: bathroom tile replacement at main floor. no change in layout. no structural, no wall modification.Details
replace in kind: kitchen cabinet, countertop, no layour change. replace inkind: bathroom tile replacement at main floor. no change in layout. no structural, no wall modification. | $50,000 |
| Jan 22, 2021 | Completed final sign-off Feb 2022 | 86 Webster St | cosmetic remodel of (e) bathroom. convert closet to 2nd bathroom. replace (e) cabinets. kitchen remodelDetails
cosmetic remodel of (e) bathroom. convert closet to 2nd bathroom. replace (e) cabinets. kitchen remodel | $40,000 |
| Oct 28, 2020 | Expired or cancelled withdrawn Jan 2021 | 86 Webster St | renovate (e) bathroom. convert utility closet to a bathroom.Details
renovate (e) bathroom. convert utility closet to a bathroom. | $50,000 |
| Jul 22, 2020 | Completed final sign-off Jun 2021 | 530 10th Av | convert existing closet into bedroom, combine guest room int game room. remodel bathDetails
convert existing closet into bedroom, combine guest room int game room. remodel bath | $50,000 |
| Mar 9, 2020 | Completed final sign-off May 2021 | 530 10th Av | master bathroom remodel, no change in fixture location, separate electrical & plumbing permits.Details
master bathroom remodel, no change in fixture location, separate electrical & plumbing permits. | $8,000 |
| Sep 16, 2019 | Completed final sign-off Dec 2019 | 1873 Stockton St | revision to app#201907297251. add one bathroom and remove kitchen wall.Details
revision to app#201907297251. add one bathroom and remove kitchen wall. | $15,500 |
| Sep 16, 2019 | Completed final sign-off Dec 2019 | 1875 Stockton St | revision to app#201907297252. add one bathroom and remove kitchen wall.Details
revision to app#201907297252. add one bathroom and remove kitchen wall. | $15,500 |
| Apr 9, 2019 | Completed final sign-off Aug 2022 | 2527 Lake St | ref pa# 201903215889; add new bathroom in upper level sunroom, pluming & electrical on differnt permitDetails
ref pa# 201903215889; add new bathroom in upper level sunroom, pluming & electrical on differnt permit | $50,000 |
| Feb 4, 2019 | Expired or cancelled cancelled May 2019 | 320 Ewing Tr | revision to permit# 2018-1120-6441. install new shoer pan@ 2nd floor guest bathroom(same bathroom under remodle under pa# 2018-1120-6441)Details
revision to permit# 2018-1120-6441. install new shoer pan@ 2nd floor guest bathroom(same bathroom under remodle under pa# 2018-1120-6441) | $850 |
| Feb 4, 2019 | Completed final sign-off Mar 2019 | 1131 Clay St | revision to permit# 2018-0918-0600. install new shoer pan@ 2nd floor guest bathroom(same bathroom under remodle under pa# 2018-0918-0600) shower to shower replacementDetails
revision to permit# 2018-0918-0600. install new shoer pan@ 2nd floor guest bathroom(same bathroom under remodle under pa# 2018-0918-0600) shower to shower replacement | $850 |
| Nov 20, 2018 | Completed final sign-off Nov 2018 | 3501 Clay St | revision to app#201811135617 to add a seperate full bath at 3rd floor.Details
revision to app#201811135617 to add a seperate full bath at 3rd floor. | $25,000 |
| Nov 20, 2018 | Completed final sign-off Jun 2019 | 320 Ewing Tr | remodel extg kitchen: new cabinets, counters and appliance. remodel extg bathroom:new finishes. no changes to floor plan.Details
remodel extg kitchen: new cabinets, counters and appliance. remodel extg bathroom:new finishes. no changes to floor plan. | $50,000 |
| Sep 18, 2018 | Completed final sign-off Mar 2019 | 1131 Clay St | cosmetic remodel of bathroom, fixtures to rmain in smae locaitns. no new walll openings. plumbing & elec. under sepaarte permite.Details
cosmetic remodel of bathroom, fixtures to rmain in smae locaitns. no new walll openings. plumbing & elec. under sepaarte permite. | $5,000 |
| Sep 18, 2018 | Completed final sign-off Feb 2020 | 210 Post St | revision to pa 2018-0322-4364. 2nd floor only: 1 ada bathroom &1 gender neutral non-ada. 11th floor only: women's bathroom ada-toilet.Details
revision to pa 2018-0322-4364. 2nd floor only: 1 ada bathroom &1 gender neutral non-ada. 11th floor only: women's bathroom ada-toilet. | $33,000 |
| Sep 11, 2018 | Completed final sign-off Jan 2019 | 2011 Vallejo St | unit 2 -water damage reapir sheetrock; unit 4 -bathroom tile floor repair in kindDetails
unit 2 -water damage reapir sheetrock; unit 4 -bathroom tile floor repair in kind | $10,000 |
| Jul 31, 2018 | Completed final sign-off May 2019 | 4141 23rd St | revision to 201112160822 change single skylight on original plans to 3 seperate. addition of 2 new skylights over hall bath. revision to 201112160822 orig plans has elevator but it was not installedDetails
revision to 201112160822 change single skylight on original plans to 3 seperate. addition of 2 new skylights over hall bath. revision to 201112160822 orig plans has elevator but it was not installed | $1,600 |
| Mar 22, 2018 | Never finaled issued Jul 2018, no final | 210 Post St | revision to 201609228486, change from 2 ada baths on each floor to 1 on each floorDetails
revision to 201609228486, change from 2 ada baths on each floor to 1 on each floor | |
| Mar 1, 2018 | Expired or cancelled cancelled Apr 2018 | 4141 23rd St | revision to 201112160822 change single skylight on original plans to 3 separate. addition of 2 new skylights over hall bathDetails
revision to 201112160822 change single skylight on original plans to 3 separate. addition of 2 new skylights over hall bath | $1,600 |
| Apr 10, 2017 | Completed final sign-off Mar 2018 | 47 Prospect Av | addition of (1) one full bathroom above the garage. addition of staircase to connect 1/f to entertainment room below. plumbing & electrical under sep permits.Details
addition of (1) one full bathroom above the garage. addition of staircase to connect 1/f to entertainment room below. plumbing & electrical under sep permits. | $45,000 |
| Mar 29, 2017 | Completed final sign-off May 2018 | 1826 Filbert St | relocate office, add (1) half bath, family, closet & laundry @ 1st floor.Details
relocate office, add (1) half bath, family, closet & laundry @ 1st floor. | $140,000 |
| Sep 22, 2016 | Completed final sign-off Feb 2020 | 210 Post St | replace extg toilet fixtures, partitions, and sinks. barrier removal at bathrooms on floors 2 to 11.Details
replace extg toilet fixtures, partitions, and sinks. barrier removal at bathrooms on floors 2 to 11. | $50,000 |
| Jul 14, 2016 | Completed final sign-off Sep 2017 | 1570 11th Av | in-fill under floor 2 sunroom to create area for floor 1 family room, 2 bedrooms and 1 bathroom. on floor 2, combine one bedroom with sun room to create master suite and add 1 bathroom.Details
in-fill under floor 2 sunroom to create area for floor 1 family room, 2 bedrooms and 1 bathroom. on floor 2, combine one bedroom with sun room to create master suite and add 1 bathroom. | $75,000 |
| Oct 16, 2015 | Completed final sign-off Feb 2017 | 604 Mission St | 6/f: new partition walls, new ada bathroom, 2 hour smoke partitions @ elevator lobby. new tenant entry door. mechanical, electric and plumbing under sparate application. life safety permits separateDetails
6/f: new partition walls, new ada bathroom, 2 hour smoke partitions @ elevator lobby. new tenant entry door. mechanical, electric and plumbing under sparate application. life safety permits separate | $200,000 |
| Aug 28, 2015 | Completed final sign-off Apr 2017 | 4317 24th St | remodel kitchen. remodel 2 extg bathrooms. add one half bath room. add 6 new skylights. plumbing and electrical under seperate application.Details
remodel kitchen. remodel 2 extg bathrooms. add one half bath room. add 6 new skylights. plumbing and electrical under seperate application. | $200,000 |
| Apr 23, 2015 | Completed final sign-off Feb 2017 | 604 Mission St | 2nd flr: revision to 2014 0630 0041 (e) bathroom to remain, new partitions at lobby. install new furred gyp. bd. ceiling.Details
2nd flr: revision to 2014 0630 0041 (e) bathroom to remain, new partitions at lobby. install new furred gyp. bd. ceiling. | $5,000 |
| Dec 10, 2014 | Never finaled issued May 2022, no final | 4334 25th St | vertical addition add 2 bedrooms, 2 baths @ 3rd floor. general interior remodel including kitchen & baths. foundation upgrade. window replacement throughout.Details
vertical addition add 2 bedrooms, 2 baths @ 3rd floor. general interior remodel including kitchen & baths. foundation upgrade. window replacement throughout. | $450,000 |
| Nov 4, 2014 | Completed final sign-off Jul 2015 | 165 Parker Av | install (n) kitchen @ 1st floor, demo (e) kitchen @ 2nd floor, cosmetic remodel of (2) bathrooms, new half bath, new laundry, create new bedroom & add new bath @ 2nd floor, plumbing & electric under separate application.Details
install (n) kitchen @ 1st floor, demo (e) kitchen @ 2nd floor, cosmetic remodel of (2) bathrooms, new half bath, new laundry, create new bedroom & add new bath @ 2nd floor, plumbing & electric under separate application. | $200,000 |
| May 20, 2014 | Never finaled issued Mar 2015, no final | 1340 Utah St | work on front bldg. convert storage area @ 1st fl to bedroom & bath. enclose lightwell & construct stairway to (n) rooms @ 1st fl.Details
work on front bldg. convert storage area @ 1st fl to bedroom & bath. enclose lightwell & construct stairway to (n) rooms @ 1st fl. | $62,000 |
| Mar 26, 2014 | Completed final sign-off Aug 2014 | 200 Amber Dr | cosmetic remodel of 1 kitchen, 2 bathrooms and 1 powder room; electrical and plumbing works under separate permits; to comply with cec150(k) 8 & 10Details
cosmetic remodel of 1 kitchen, 2 bathrooms and 1 powder room; electrical and plumbing works under separate permits; to comply with cec150(k) 8 & 10 | $200,000 |
| Feb 18, 2014 | Completed final sign-off Feb 2016 | 944 Market St | remodel tenant space. demolish existing interior partitions, baths. build new interior partitions, bathrooms, coffee area. mech, plumbing, elec separate permitDetails
remodel tenant space. demolish existing interior partitions, baths. build new interior partitions, bathrooms, coffee area. mech, plumbing, elec separate permit | $200,000 |
| Nov 25, 2013 | Completed final sign-off Oct 2017 | 226 11th Av | add rumpus, guest, mud rms, full bath & laundry rm @ ground fl add about 3'-8" @ breakfast nook for family rm, remodel deck & kitchn 2nd fl, add 3'-8" @ sunrm, convert to bedrm @ 3rd fl, convert(e)bedrm to study. total add 487 sqft 3 levels.(n)ground rms 691 sqft. general struct,mep upgrades as reqdDetails
add rumpus, guest, mud rms, full bath & laundry rm @ ground fl add about 3'-8" @ breakfast nook for family rm, remodel deck & kitchn 2nd fl, add 3'-8" @ sunrm, convert to bedrm @ 3rd fl, convert(e)bedrm to study. total add 487 sqft 3 levels.(n)ground rms 691 sqft. general struct,mep upgrades as reqd | $107,000 |
| Jul 11, 2013 | Completed final sign-off Jun 2015 | 410 Douglass St | remodel of 1 ktichen and 2 baths, addition of 1 new bathroom (full); replace 1 skylight at kitchen of same size and location.Details
remodel of 1 ktichen and 2 baths, addition of 1 new bathroom (full); replace 1 skylight at kitchen of same size and location. | $110,000 |
| May 28, 2013 | Completed final sign-off Apr 2016 | 840 Powell St | cosmetic remodel of 1 bathroom, replace 4 windows @ rear of property, not visable from street, no structural changes.Details
cosmetic remodel of 1 bathroom, replace 4 windows @ rear of property, not visable from street, no structural changes. | $20,000 |
| Apr 11, 2013 | Completed final sign-off Jul 2014 | 327 Cherry St | cosmetic remodel of 1 kitchen, 2 bathrooms, plumbing and electric under separate applicationDetails
cosmetic remodel of 1 kitchen, 2 bathrooms, plumbing and electric under separate application | $110,000 |
| Feb 8, 2013 | Completed final sign-off Aug 2013 | 485 Marina Bl | cosmetic remodel of (1) kitchen & (1) bathroom, replace in kind, plumbing & electric under separate permit.Details
cosmetic remodel of (1) kitchen & (1) bathroom, replace in kind, plumbing & electric under separate permit. | $50,000 |
| Jan 22, 2013 | Expired or cancelled expired Jul 2014 | 1824 Jackson St | unit h - cosmetic remodel of (1) kitchen & (2) bathrooms, replace window in lightwell, plumbing & electric under separate application, no work visable from street, no change on walls & openings.Details
unit h - cosmetic remodel of (1) kitchen & (2) bathrooms, replace window in lightwell, plumbing & electric under separate application, no work visable from street, no change on walls & openings. | $75,000 |
| Jan 17, 2013 | Completed final sign-off Jun 2013 | 999 Green St | cosmetic remodel of (1) kitchen and (2) bathroom, plumbing and electric under separate application. no change on walls.Details
cosmetic remodel of (1) kitchen and (2) bathroom, plumbing and electric under separate application. no change on walls. | $30,000 |
| May 14, 2012 | Expired or cancelled expired Oct 2014 | 2100 Vallejo St | demo sheetrock per electric and plumbing upgrade, cosmetic remodel of kitchen and three (3) bathrooms, electric and plumbing under separate permit application. no change on walls and openings.Details
demo sheetrock per electric and plumbing upgrade, cosmetic remodel of kitchen and three (3) bathrooms, electric and plumbing under separate permit application. no change on walls and openings. | $50,000 |
| Apr 3, 2012 | Completed final sign-off Aug 2012 | 540 Stockton St | #4- cosmetic remodel of 1 kitchen and 1 bathroom, plumbing & electric permit under seperate application, new cabinets in same locations, no new wall & ceiling work.Details
#4- cosmetic remodel of 1 kitchen and 1 bathroom, plumbing & electric permit under seperate application, new cabinets in same locations, no new wall & ceiling work. | $30,000 |
| Dec 22, 2011 | Never finaled issued Dec 2011, no final | 1155 Washington St | to comply with nov 201177777 -cosmetic remodel of (1) kitchen (3) bathrooms. replace all windows. change some openings, indows, (2) new skylights, hydronic heating system. new roof deck.Details
to comply with nov 201177777 -cosmetic remodel of (1) kitchen (3) bathrooms. replace all windows. change some openings, indows, (2) new skylights, hydronic heating system. new roof deck. | $600,000 |
| Sep 15, 2011 | Completed final sign-off Nov 2011 | 540 Stockton St | unit #1: cosmetic remodel of kitchen and one bathroom, plumbing and electric permits under separate application, lighting to comply with cec 150(k), no change to exhaust systemDetails
unit #1: cosmetic remodel of kitchen and one bathroom, plumbing and electric permits under separate application, lighting to comply with cec 150(k), no change to exhaust system | $30,000 |
| Jun 14, 2011 | Completed final sign-off Aug 2012 | 530 Douglass St | replace existing bathroom window with new frosted window. demo and re-frame existing gas fireplace for new insert for top unit. replace existing bath tub with new bath tub. electrical & plumbing permits under separate application. fireplace insert under separte applicaiton.Details
replace existing bathroom window with new frosted window. demo and re-frame existing gas fireplace for new insert for top unit. replace existing bath tub with new bath tub. electrical & plumbing permits under separate application. fireplace insert under separte applicaiton. | $10,000 |
| Mar 1, 2011 | Completed final sign-off Jun 2014 | 3501 Clay St | add lvls to existing wood floor joists above rainy day room. redesign, confirm legality of gr level rooms. add footing and new support. demolish unreinforced brick chimney. remodel mudroom, 1/2 bath, full bath, bedroom, rainy day room. repair dry rot. plumb/elec sep permitDetails
add lvls to existing wood floor joists above rainy day room. redesign, confirm legality of gr level rooms. add footing and new support. demolish unreinforced brick chimney. remodel mudroom, 1/2 bath, full bath, bedroom, rainy day room. repair dry rot. plumb/elec sep permit | $100,000 |
| Feb 1, 2011 | Completed final sign-off Jun 2014 | 3501 Clay St | demo some walls finishesfor electric and plumbing upgrade. electric and plumbing permits under separate application. repair walls with drywall, lighting changes to comply with (ec 150k) cosmetic remodel (1) kitchen and (5) baths. all work @ 2 & 3 floor. no removal of walls,Details
demo some walls finishesfor electric and plumbing upgrade. electric and plumbing permits under separate application. repair walls with drywall, lighting changes to comply with (ec 150k) cosmetic remodel (1) kitchen and (5) baths. all work @ 2 & 3 floor. no removal of walls, | $200,000 |