P 3 Construction & Remodeling Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2011 to Aug 2026
- Last 24 months
- 11 permits filed
330 permits since 2000: 273 completed, 7 in progress, 23 never finaled, 27 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Deck permits
12 deck permits: 11 completed, 1 in progress. Typically 8 days from filing to permit and 371 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2024 | Completed | 461 Roosevelt Wy | legalize and remodel street level office at rear of house. modify rear stairs to garage level. new laundry room at garage level. new kitchen cabinets at 2/f. remodel 2 baths at 3/f. replace deck rail at roof terrace. replace front windows in kind - glazing only. replace water heater and furnace. | $150,000 |
| Mar 18, 2024 | Completed | 1212 Kearny St | deck and stair repair in kind approx 300 sqft. - 50% of uss repair. | $12,500 |
| Aug 3, 2023 | Completed | 43 Jordan Av | addition of new deck and stairway to backyard from second level. new fire wall and fence along property line. new door at 2nd flr to access deck. structural upgrades at kitchen. no chnag to maximum path of travel or egress patch. | $50,000 |
| May 31, 2023 | Completed | 210 Locust St | new wine rm w/ refriguation in lower lvl/ reconfigure walls, 3 (n) french doors @ back of house. walkable skylight on 2rd fl hallway. 3rd fl: demo closet to open room. reconfigure small area of roof @ deck for new french doors. new fireplace & guardrail @ 2nd fl interior stairs | $195,000 |
| Apr 28, 2023 | Completed | 643 19th Av | converting 574sf of existing garage & storage area at ground flr to habitable space,new primary bedroom w/ bath, convert extg office to bedroom, remodel extg bath, relocate laundry, revise extg rear deck stair to rear yard. | $250,000 |
| Aug 30, 2022 | In progress | 3621 Divisadero St | legalize as built to pa# 200008117637. wall layout changes to 1st fl. remove stair to 2nd fl. create 1 office with 1-hr rated wall for separation to garage. replace approved deck with 2 juliet balconies. omit stair to 3rd fl. add rooms to playroom on 3rd fl. | $5,000 |
| Jan 13, 2020 | Completed | 530 10th Av | repair of rear deck and rear siding. deck repair less than 50% limited to deck boards. siding repair in-kind less than 50% - horizontal wood siding. | $15,000 |
| Oct 18, 2018 | Completed | 2055 Filbert St | revision to pa #201810022062. dry rot repair in-kinda work at rear decks. | $25,000 |
| Oct 2, 2018 | Completed | 2053 Filbert St | dry rot repar at rear deck in-kind, less than 50%. no other work. | $10,000 |
| Jul 8, 2015 | Completed | 321 Collingwood St | revsion to pa 2014-0923-7105. two skylights will not be installed. existing railings at rear deck and stairs to remain. structural revision to accomodate existing joint depth. wing wall on 3rd fl to remain. | |
| Mar 10, 2014 | Completed | 662 20th Av | dry rot repair on existing deck in rear. repair in-kind less than 50%. | $3,000 |
| Nov 25, 2013 | Completed | 226 11th Av | add rumpus, guest, mud rms, full bath & laundry rm @ ground fl add about 3'-8" @ breakfast nook for family rm, remodel deck & kitchn 2nd fl, add 3'-8" @ sunrm, convert to bedrm @ 3rd fl, convert(e)bedrm to study. total add 487 sqft 3 levels.(n)ground rms 691 sqft. general struct,mep upgrades as reqd | $107,000 |