Block 1630, lot 023C
678 15th Ave
- City’s use
- Multi-Family Residential
- Built
- 1921
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 3,350 sq ft
- Lot
- 2,561 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 12, 2026 | In progress filed Nov 2026, not yet issued | 678 15th Av | remove 3 existing garage posts and replace with a steel beam with 2 posts at each side for controlling the floor joist load. existing 1st fl furnace to be relocated.Details
remove 3 existing garage posts and replace with a steel beam with 2 posts at each side for controlling the floor joist load. existing 1st fl furnace to be relocated. | $25,000 | |
| Oct 19, 2026 | In progress issued Oct 2026 | 680 15th Av | P 3 Construction & Remodeling Inc | to inspect work without permit to kitchen and bathroom. half-bath and laundry remodel. no changes to floor plan at upper 3rd floor unit. (680).Details
to inspect work without permit to kitchen and bathroom. half-bath and laundry remodel. no changes to floor plan at upper 3rd floor unit. (680). | $40,000 |
| Aug 27, 2026 | In progress issued Oct 2026 | 678 15th Av | Ryz Construction Inc | at 2/f unit, replace (e) rear windows with (n) sliding door w/concrete landing and steps to access rear yard.Details
at 2/f unit, replace (e) rear windows with (n) sliding door w/concrete landing and steps to access rear yard. | $2,500 |
| Jun 22, 2026 | In progress issued Jul 2026 | 678 15th Av | Ryz Construction Inc | 2nd/f unit: remodel/relocate e) kitchen & dinning, new common bathroom, remodel e) bath & new laundry. no exterior workDetails
2nd/f unit: remodel/relocate e) kitchen & dinning, new common bathroom, remodel e) bath & new laundry. no exterior work | $53,000 |
| Dec 11, 2024 | Completed final sign-off Feb 2025 | 678 15th Av | comply with compliance, upper unit, bathroom floor / shower tile replacement.Details
comply with compliance, upper unit, bathroom floor / shower tile replacement. | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ryz Construction Inc (2), P 3 Construction & Remodeling Inc
- Architects
- Xie Guan (2), Slavash Soroushian