Block 1856, lot 029
1570 11th Ave
- City’s use
- Single Family Residential
- Built
- 1925
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,223 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 11, 2021 | Completed final sign-off Jul 2021 | 1570 11th Av | Skylight Tools Inc | (reduce scope permit str): revision to app#202009305603. revising structural scope after confirmation of site condition. the load bearing walls identified in the extg permit were found to be non-load bearing, reducing the structural scope.please refer to the revised str. plans for more detail.Details
(reduce scope permit str): revision to app#202009305603. revising structural scope after confirmation of site condition. the load bearing walls identified in the extg permit were found to be non-load bearing, reducing the structural scope.please refer to the revised str. plans for more detail. | |
| Sep 30, 2020 | Completed final sign-off Jul 2021 | 1570 11th Av | Skylight Tools Inc | kitchen & bath remodel: combine power & bathroom. kitchen: reconfig non-structural wals, windening doorway in structural wall. 1 (e) window to be filled and (1) window replace. replace sink/dw. r/r fridge & range. bathroom:change location of fixtures, replace vanity & toilet,replace tub in same areaDetails
kitchen & bath remodel: combine power & bathroom. kitchen: reconfig non-structural wals, windening doorway in structural wall. 1 (e) window to be filled and (1) window replace. replace sink/dw. r/r fridge & range. bathroom:change location of fixtures, replace vanity & toilet,replace tub in same area | $80,000 |
| Jul 2, 2020 | Never finaled issued Jul 2020, no final | 1570 11th Av | replacement of all five damaged sashes in windows facing 11th ave. new shashes will have the same dimensions, same look, same number & shape of lites,replace same location. front of house - the arch will be recreated - the true divided lites will be recreated - all wood same materialDetails
replacement of all five damaged sashes in windows facing 11th ave. new shashes will have the same dimensions, same look, same number & shape of lites,replace same location. front of house - the arch will be recreated - the true divided lites will be recreated - all wood same material | $4,500 | |
| Jul 14, 2016 | Completed final sign-off Sep 2017 | 1570 11th Av | P 3 Construction & Remodeling Inc | in-fill under floor 2 sunroom to create area for floor 1 family room, 2 bedrooms and 1 bathroom. on floor 2, combine one bedroom with sun room to create master suite and add 1 bathroom.Details
in-fill under floor 2 sunroom to create area for floor 1 family room, 2 bedrooms and 1 bathroom. on floor 2, combine one bedroom with sun room to create master suite and add 1 bathroom. | $75,000 |
| Aug 5, 2013 | Completed final sign-off Aug 2013 | 1570 11th Av | S'top Home Service Roofing Co. Inc. | re-roofingDetails
re-roofing | $6,880 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Skylight Tools Inc (2), P 3 Construction & Remodeling Inc, S'top Home Service Roofing Co. Inc.
- Engineers
- Marcus Yan, Tony Samra
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.