Marcus Yan
- Listed as
- architect, engineer
- Firm
- Design Everest Consulting
- Based in
- Mountain View
- On San Francisco permits
- Sep 2017 to Sep 2026
213 permits since 2000 (engineer on 208 permits, architect on 5 permits): 100 completed, 81 in progress, 15 never finaled, 17 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 213.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 27, 2026 | In progress filed Sep 2026, not yet issued | 1159 Capitol Av | demolish one story adu @ rear of main houseDetails
demolish one story adu @ rear of main house | $4,000 | |
| Sep 27, 2026 | In progress filed Sep 2026, not yet issued | 1159 Capitol Av | demolish one story shed at rear of main houseDetails
demolish one story shed at rear of main house | $2,000 | |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 1159 Capitol Av | erect a new 3 story duplex with 3 dwelling, attached adu. no basement- type vDetails
erect a new 3 story duplex with 3 dwelling, attached adu. no basement- type v | $850,000 | |
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 344 Liberty St | addition to (e) unit to include a master bedroom & hime office. with associated architectural, structural & electrical works.Details
addition to (e) unit to include a master bedroom & hime office. with associated architectural, structural & electrical works. | $250,000 | |
| Sep 21, 2026 | In progress issued Oct 2026 | 224 Detroit St | Builtwell Construction Inc | revision to 202605050677: remove and configure selective interior walls on main level to create an open living, dining, and kitchen layout. kitchen remodel,remodel existig bath and incorporate into primary bedroom as on suite. remove work on first floor from scope.Details
revision to 202605050677: remove and configure selective interior walls on main level to create an open living, dining, and kitchen layout. kitchen remodel,remodel existig bath and incorporate into primary bedroom as on suite. remove work on first floor from scope. | $15,000 |
| Sep 21, 2026 | In progress filed Sep 2026, not yet issued | 400 Hearst Av | interior remodel of (e) kitchen, replacing kitchen fixtures, removal of load bearing wall between kitchen and living room, sistering of (e) roof joists above that area, installation of 1 new skylight in living room, no exterior wall changes. no changes to gross floor area.Details
interior remodel of (e) kitchen, replacing kitchen fixtures, removal of load bearing wall between kitchen and living room, sistering of (e) roof joists above that area, installation of 1 new skylight in living room, no exterior wall changes. no changes to gross floor area. | $90,000 | |
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 1159 Capitol Av | demolish one story single family dwelling,no basement. type-vDetails
demolish one story single family dwelling,no basement. type-v | $12,000 | |
| Aug 28, 2026 | In progress filed Aug 2026, not yet issued | 621 Noriega St | Go Green Landscope | construction of retaining wall for stabilization and erotion control with french drain.Details
construction of retaining wall for stabilization and erotion control with french drain. | $47,000 |
| Aug 26, 2026 | In progress filed Aug 2026, not yet issued | 475 Connecticut St | install (n) spiral staircase per mfr.convert (e) sotrage space to condition living space. expanding 1/f 1/2 bath to full with shower. install pull down stair/ladder.Details
install (n) spiral staircase per mfr.convert (e) sotrage space to condition living space. expanding 1/f 1/2 bath to full with shower. install pull down stair/ladder. | $50,000 | |
| Aug 18, 2026 | In progress issued Sep 2026 | 842 35th Av | Merlyn Construction | revision to bpa: 202507100512 - new slab under approved finished spaces at 1st floor, replacing (e) garage space. updated framing around stairwayDetails
revision to bpa: 202507100512 - new slab under approved finished spaces at 1st floor, replacing (e) garage space. updated framing around stairway | $10,000 |
| Aug 17, 2026 | In progress issued Aug 2026 | 1116 Diamond St | Reliance Home Builders | enlarge (e) sliding door opening by 1'. modify associated framing/header as required per revised plans, ref pa#202508223768.Details
enlarge (e) sliding door opening by 1'. modify associated framing/header as required per revised plans, ref pa#202508223768. | $1,000 |
| Aug 13, 2026 | In progress issued Aug 2026 | 1443 25th Av | A W Construction | convert sun room into bathroom. fill in 2 window, replace 2 windows with smaller. add electrical and plumbing.Details
convert sun room into bathroom. fill in 2 window, replace 2 windows with smaller. add electrical and plumbing. | $52,000 |
| Aug 12, 2026 | In progress issued Aug 2026 | 158 15th Av | Edri Construction Inc *See Notes* | revision to 202208251288: specify location of 3' x 3' catch basin in garage & sink in rear family room on level 1Details
revision to 202208251288: specify location of 3' x 3' catch basin in garage & sink in rear family room on level 1 | |
| Jul 30, 2026 | In progress issued Aug 2026 | 1260 Monterey Bl | Kepper | replace windows in front (south) of the house, replace front door in kind, reframe window of the south and west side of the building. close one window in studio, open stucco around the window, drywall as needed, paint new trim and moldings, replace one interior door in kind.Details
replace windows in front (south) of the house, replace front door in kind, reframe window of the south and west side of the building. close one window in studio, open stucco around the window, drywall as needed, paint new trim and moldings, replace one interior door in kind. | $85,000 |
| Jul 29, 2026 | In progress issued Sep 2026 | 2459 Francisco St | Ams Construction | revision to 202304266535, add radiant heat, move interior wall partitionsDetails
revision to 202304266535, add radiant heat, move interior wall partitions | |
| Jul 28, 2026 | In progress issued Jul 2026 | 311 Vienna St | revison to permit 202507030143 - new structural foundation details based on field conditions inspected in the field. this permit is to document as-built condition only. only changes are detail 1/s1.2, 4/s1.1, and 7/s1.0.Details
revison to permit 202507030143 - new structural foundation details based on field conditions inspected in the field. this permit is to document as-built condition only. only changes are detail 1/s1.2, 4/s1.1, and 7/s1.0. | ||
| Jul 24, 2026 | Completed final sign-off Sep 2026 | 2599 Lombard St | Neon Builder | repair stucco, fix framing, replace sliding door inkind at front right of the building. to comply with nov 202546729.Details
repair stucco, fix framing, replace sliding door inkind at front right of the building. to comply with nov 202546729. | $21,000 |
| Jun 22, 2026 | In progress issued Jul 2026 | 1357 17th Av | Hong Shink Construction | 1/f: add 1 full bath, 1 half bath, 1 bedroom and 1 family room (710 sf). 2/f: kitchen relocate, add half bath. 3/f: add master bathroom. new radiant heat, replace windows, repair (e) deck less than 50%.Details
1/f: add 1 full bath, 1 half bath, 1 bedroom and 1 family room (710 sf). 2/f: kitchen relocate, add half bath. 3/f: add master bathroom. new radiant heat, replace windows, repair (e) deck less than 50%. | $245,000 |
| Jun 16, 2026 | In progress issued Jul 2026 | 158 15th Av | Edri Construction Inc *See Notes* | revision to 202208251288: increase the size of patio & accomodating retaining walls at ground flDetails
revision to 202208251288: increase the size of patio & accomodating retaining walls at ground fl | $10,000 |
| Jun 11, 2026 | In progress issued Jun 2026 | 21 Park Hill Av | rev to pa# 2025-0407-3844: minor modification replacing wood beam with steel beam per planDetails
rev to pa# 2025-0407-3844: minor modification replacing wood beam with steel beam per plan | ||
| Jun 10, 2026 | In progress issued Aug 2026 | 102 Santa Marina St | Ly Green Construction Inc | replace (2) sliding doors at rear facade, not visible from street. remodel primary bath and walk-in closet. remove fireplace inserts, and replace cabinets in living room.Details
replace (2) sliding doors at rear facade, not visible from street. remodel primary bath and walk-in closet. remove fireplace inserts, and replace cabinets in living room. | $50,000 |
| Jun 8, 2026 | In progress filed Jun 2026, not yet issued | 371 Banks St | Edri Construction Inc *See Notes* | 1/f: remodel - seismic retofit and addition of bonus room on 1/f. new windows and doors at street and back. new stairs up to entryDetails
1/f: remodel - seismic retofit and addition of bonus room on 1/f. new windows and doors at street and back. new stairs up to entry | $250,000 |
| May 29, 2026 | In progress issued Jul 2026 | 115 Wool St | Gadi Construction Inc | new concrete slab (1st floor - living room area and 2ft master bedroom - ref permit 202603268364). new sliding door and windows. master bathroom remodel like for like.Details
new concrete slab (1st floor - living room area and 2ft master bedroom - ref permit 202603268364). new sliding door and windows. master bathroom remodel like for like. | $35,000 |
| May 11, 2026 | In progress filed May 2026, not yet issued | 1478 48th Av | Structoris Inc. | 1) convert garage storage into a new bedroom with bathroom and office. 2) resize front entry door 3) updated all electrical outlets, switches and wiring in house.Details
1) convert garage storage into a new bedroom with bathroom and office. 2) resize front entry door 3) updated all electrical outlets, switches and wiring in house. | $180,000 |
| Apr 29, 2026 | In progress issued May 2026 | 158 15th Av | Edri Construction Inc *See Notes* | modification to garage opening; revision to main permit pa#202208251288 and revision permits pa#202508052323 and pa#202602095519Details
modification to garage opening; revision to main permit pa#202208251288 and revision permits pa#202508052323 and pa#202602095519 | $50,000 |
| Apr 17, 2026 | In progress issued Apr 2026 | 315 Capp St | Bc United Construction Inc | 1st floor existing kitchen and bathroom remodel. demo wall between kitchen and family room. 2nd floor bathroom relayout, relocate laundry room, convert office to one full bath and walk in closet. replace heater and furnace. no exterior work.Details
1st floor existing kitchen and bathroom remodel. demo wall between kitchen and family room. 2nd floor bathroom relayout, relocate laundry room, convert office to one full bath and walk in closet. replace heater and furnace. no exterior work. | $75,000 |
| Apr 16, 2026 | In progress filed Apr 2026, not yet issued | 1290 Chestnut St | Giant Work Construction Corp | convert office space to residential unit at 1st floor of existing mixed use building.Details
convert office space to residential unit at 1st floor of existing mixed use building. | $90,000 |
| Apr 15, 2026 | In progress issued Apr 2026 | 100 San Marcos Av | Green Bay Remodeling Inc. | voluntary structural strengthening. install 5 footings and 3 shear wallsDetails
voluntary structural strengthening. install 5 footings and 3 shear walls | $20,000 |
| Mar 30, 2026 | In progress issued May 2026 | 1543 Cole St | Neon Builder | install new wall & a door in garage to create storage space. extend existing deck at the back of the home. remove flooring in exercise room, install schluter-ditra floor heating. install new tile flooring in exercise room.Details
install new wall & a door in garage to create storage space. extend existing deck at the back of the home. remove flooring in exercise room, install schluter-ditra floor heating. install new tile flooring in exercise room. | $89,000 |
| Mar 26, 2026 | In progress issued Apr 2026 | 115 Wool St | Gadi Construction Inc | foundation repair at existing single family residence. no change to building footing or layout.Details
foundation repair at existing single family residence. no change to building footing or layout. | $45,000 |
| Mar 11, 2026 | In progress filed Mar 2026, not yet issued | 214 States St | Edri Construction Inc *See Notes* | remodel and expand (e) 3-story residence.include vert,int mods to create 4-store bldg w/ penthouse and 1 adu unit. scope includes new retianing walls at rear yard to facilitate site access from museum wy.Details
remodel and expand (e) 3-story residence.include vert,int mods to create 4-store bldg w/ penthouse and 1 adu unit. scope includes new retianing walls at rear yard to facilitate site access from museum wy. | $874,500 |
| Mar 10, 2026 | In progress issued Apr 2026 | 212 Castro St | American Builders | renovate (e) kitchen & create new bath & laundry closet from kitchen, structural changes include relocate partition wall btwn new bath & kitchen to align with (e) mechanical shaft wall & owners partition wall below for connections (e) plumbing. upgrades incl. windows in new rooms & elec througout.Details
renovate (e) kitchen & create new bath & laundry closet from kitchen, structural changes include relocate partition wall btwn new bath & kitchen to align with (e) mechanical shaft wall & owners partition wall below for connections (e) plumbing. upgrades incl. windows in new rooms & elec througout. | $125,000 |
| Feb 17, 2026 | In progress issued Mar 2026 | 107 Mendosa Av | Green Bay Remodeling Inc. | revision to pa 202508203484 - interior demo of (e) stairs and rebuild; demo 2 windows and slider and replace with a multislider not visible from streetDetails
revision to pa 202508203484 - interior demo of (e) stairs and rebuild; demo 2 windows and slider and replace with a multislider not visible from street | $30,000 |
| Feb 11, 2026 | In progress issued May 2026 | 124 Saturn St | Hawthorne Construction | work includes addressing remaining items in nov 202294956. kitchen and bathroom remodel to existing family home also window replacementDetails
work includes addressing remaining items in nov 202294956. kitchen and bathroom remodel to existing family home also window replacement | $150,000 |
| Feb 9, 2026 | In progress issued Sep 2026 | 687 12th Av | Cma Development Inc | add (n) balcony at (e) sunroom and perform interior renmovation within (e) residence to include 3.5x bathroom and kitchen remodel .Details
add (n) balcony at (e) sunroom and perform interior renmovation within (e) residence to include 3.5x bathroom and kitchen remodel . | $200,000 |
| Feb 9, 2026 | In progress issued Feb 2026 | 158 15th Av | Edri Construction Inc *See Notes* | revision to pa 202208251288 foundation supportDetails
revision to pa 202208251288 foundation support | $50,000 |
| Jan 16, 2026 | In progress issued Sep 2026 | 2762 23rd St | Josh Tyler Young | rev 201902203381: no vertical additions will be made to the side aera. expanding will only be horizontal and vertical in the rear area.Details
rev 201902203381: no vertical additions will be made to the side aera. expanding will only be horizontal and vertical in the rear area. | |
| Jan 13, 2026 | In progress filed Jan 2026, not yet issued | 248 Dellbrook Av | to comply with nov 202542653. legalize retaining wall, stairs, deck and garden shed at rear per plan.Details
to comply with nov 202542653. legalize retaining wall, stairs, deck and garden shed at rear per plan. | $35,000 | |
| Jan 5, 2026 | Completed final sign-off Jul 2026 | 978 Teresita Bl | Cody Design Build Inc | revision to pa# 202506209076. demo floating wood floor and slab beneath it in garage. pour new slab in place of old slab. stair remodel and floor remodel on ground floor.Details
revision to pa# 202506209076. demo floating wood floor and slab beneath it in garage. pour new slab in place of old slab. stair remodel and floor remodel on ground floor. | $20,000 |
| Dec 22, 2025 | In progress filed Dec 2025, not yet issued | 457 Guerrero St | unit 146/ground flr) proposing 140 sqft deck in rear side of bdlg.(20x7 sqft). proposing stairs from deck to rear side (93.8 sqft). converting basement storage (unconditioned) into finished basement space (conditioned) 618.4 sqft. proposing patio door to the deck from the lining add bedroom.Details
unit 146/ground flr) proposing 140 sqft deck in rear side of bdlg.(20x7 sqft). proposing stairs from deck to rear side (93.8 sqft). converting basement storage (unconditioned) into finished basement space (conditioned) 618.4 sqft. proposing patio door to the deck from the lining add bedroom. | $75,000 | |
| Dec 15, 2025 | In progress issued Jun 2026 | 121 Denslowe Dr | Wl Construction Group | interior modication level1b&2b, minor upgrades at level 2. kitchen and dining remodel with removal of (2) interior walls, new casework and countertops, relocation of kitchen sink, and new finishes. demolition of (e) level 2b restrooms and construction of expanded new restrooms with new plumbing.Details
interior modication level1b&2b, minor upgrades at level 2. kitchen and dining remodel with removal of (2) interior walls, new casework and countertops, relocation of kitchen sink, and new finishes. demolition of (e) level 2b restrooms and construction of expanded new restrooms with new plumbing. | $200,000 |
| Dec 1, 2025 | In progress issued Dec 2025 | 711 Hampshire St | De Brus Construction Inc | foundation replacement and seismic stregtheningDetails
foundation replacement and seismic stregthening | $108,000 |
| Dec 1, 2025 | In progress issued Dec 2025 | 1499 Sanchez St | revision to pa # 202510167489: repair, replace & strengthen (e) sub standard framing & foundation in the garage & bedroom roof.Details
revision to pa # 202510167489: repair, replace & strengthen (e) sub standard framing & foundation in the garage & bedroom roof. | $9,500 | |
| Nov 13, 2025 | In progress issued Jul 2026 | 1260 32nd Av | J P E Construction | new state adu- 1 bedroom and 1 bath on ground floor, including rear extension. remodel of existing main unit to include third floor addition and rear extension. revision to scope of work to supercede pa#202408269463 & 202404029153.Details
new state adu- 1 bedroom and 1 bath on ground floor, including rear extension. remodel of existing main unit to include third floor addition and rear extension. revision to scope of work to supercede pa#202408269463 & 202404029153. | $525,000 |
| Nov 5, 2025 | Completed final sign-off Aug 2026 | 425 Liberty St | revision to pa # 2024-1218-7099 & 2025-0610-8358: adjustments to architectural and structural plans due to (e) conditions including minor modifications to basement/garage interior doors, stair location from main to upper fl, wc on upper fl & parapet wall.Details
revision to pa # 2024-1218-7099 & 2025-0610-8358: adjustments to architectural and structural plans due to (e) conditions including minor modifications to basement/garage interior doors, stair location from main to upper fl, wc on upper fl & parapet wall. | ||
| Oct 24, 2025 | In progress issued Jul 2026 | 167 20th Av | revision 202411084696: loft level: demo as req for new walls, windows, finishes,fixtures and flooring per new interior layout. main level, demo as req for new finishes at e walls receiving new shearwall sheathing. gr lvl: demo as req for foundation underpinning/repair,walls for new shearwallsDetails
revision 202411084696: loft level: demo as req for new walls, windows, finishes,fixtures and flooring per new interior layout. main level, demo as req for new finishes at e walls receiving new shearwall sheathing. gr lvl: demo as req for foundation underpinning/repair,walls for new shearwalls | $124,000 | |
| Oct 16, 2025 | Completed final sign-off Feb 2026 | 224 27th St | De Brus Construction Inc | updating structural plan. revision to pa# 202407307596 & 202308104178Details
updating structural plan. revision to pa# 202407307596 & 202308104178 | $30,000 |
| Oct 16, 2025 | In progress issued May 2026 | 2533 24th Av | Earth Development | new state adu - 2 beds,2 baths on g/f including rear extension. remodel of (e) main unit to inlcude 3rd floor addition and rear extension.Details
new state adu - 2 beds,2 baths on g/f including rear extension. remodel of (e) main unit to inlcude 3rd floor addition and rear extension. | $565,000 |
| Oct 16, 2025 | In progress issued Jun 2026 | 1116 Diamond St | Baca Spring Builders Llc, Reliance Home Builders | excavate 47.7 cubic yards from the lower flr to create additional 201.56 sf (n) flr area w/ finished ceiling height of 8 ft. add (1)(n) bedroom & (1) (n) bathroom in the newly excavated lower flr; remove (e) front porch staircase & reconstruct it w/ (n) side wall enclosure to cover underside of...Details
excavate 47.7 cubic yards from the lower flr to create additional 201.56 sf (n) flr area w/ finished ceiling height of 8 ft. add (1)(n) bedroom & (1) (n) bathroom in the newly excavated lower flr; remove (e) front porch staircase & reconstruct it w/ (n) side wall enclosure to cover underside of... | $45,000 |
| Oct 2, 2025 | In progress issued Oct 2025 | 631 33rd Av | Kelun Construction | revision to pa 202503313351 replace furnaces with a mini-split hvac system; relocate water heaters for both units; reconfigure interior stair in unit 633; update window & door styles on the 2nd and 3rd floor where not visible from the street; install 2 new skylights on the 3rd floor and update theDetails
revision to pa 202503313351 replace furnaces with a mini-split hvac system; relocate water heaters for both units; reconfigure interior stair in unit 633; update window & door styles on the 2nd and 3rd floor where not visible from the street; install 2 new skylights on the 3rd floor and update the | $10,000 |
| Sep 29, 2025 | In progress issued Apr 2026 | 4546 19th St | Paul Power Construction | demo interior window walls @ foyer (to be replaced w/guardrail). new roof over atrium w/12 skylights. new leveled flr @ atrium. add gas fireplace appliance @ east wall. add new electric in newly enclosed space. refinish (e) walls w/new drywall finish. extend (e) rear deck 4'-3", fully cantilevered.Details
demo interior window walls @ foyer (to be replaced w/guardrail). new roof over atrium w/12 skylights. new leveled flr @ atrium. add gas fireplace appliance @ east wall. add new electric in newly enclosed space. refinish (e) walls w/new drywall finish. extend (e) rear deck 4'-3", fully cantilevered. | $73,660 |
| Sep 24, 2025 | Completed final sign-off Jan 2026 | 1418 Newcomb Av | comply 202541073- new roof including new dormer on front of building and removal of exisiting hip & valley roof on east elevation to be replaced with flat roof.Details
comply 202541073- new roof including new dormer on front of building and removal of exisiting hip & valley roof on east elevation to be replaced with flat roof. | $17,000 | |
| Aug 20, 2025 | In progress issued Oct 2025 | 107 Mendosa Av | Green Bay Remodeling Inc. | complete remodel of kitchen, 2.5 bathrooms and a bedroom. remove all in kitchen and replace. remove all in bathrooms and replace, remodel bedroom. replace siding like for like, replace windows front, relocate laundry.Details
complete remodel of kitchen, 2.5 bathrooms and a bedroom. remove all in kitchen and replace. remove all in bathrooms and replace, remodel bedroom. replace siding like for like, replace windows front, relocate laundry. | $100,000 |
| Aug 12, 2025 | Expired or cancelled withdrawn Feb 2026 | 158 15th Av | Edri Construction Inc *See Notes* | revision to pa # 202208251288 & 202508052323: restore old foundation section a. continue foundation repair in way of underpinning rather than section replacement.Details
revision to pa # 202208251288 & 202508052323: restore old foundation section a. continue foundation repair in way of underpinning rather than section replacement. | |
| Aug 5, 2025 | In progress issued Aug 2025 | 158 15th Av | Edri Construction Inc *See Notes* | revision to pa# 202208251288: foundation replacement.Details
revision to pa# 202208251288: foundation replacement. | $119,000 |
| Jul 30, 2025 | In progress issued Sep 2025 | 2571 32nd Av | Ecowave Inc | 1/f: convert storage area into 2 new bedrooms, new bath, new bar, new laundry. reconfigure (e) staircase. 2/f: revision to 202504013506 (no plan). new hallway bath, convert (e) bedroom # 1 to master bed/bath. new pantry. enclosed center patio lightwell. enclosed lightwell at south side of bldg.Details
1/f: convert storage area into 2 new bedrooms, new bath, new bar, new laundry. reconfigure (e) staircase. 2/f: revision to 202504013506 (no plan). new hallway bath, convert (e) bedroom # 1 to master bed/bath. new pantry. enclosed center patio lightwell. enclosed lightwell at south side of bldg. | $120,000 |
| Jul 23, 2025 | In progress issued Feb 2026 | 842 35th Av | 1/f: addition of finishes space w/in footprint of (e) structure and rear deck, a new rear deck and renovations to the kitchen & bathrooms. new interior stairs connecting the 1/f & 2/f is the only exterior expansion.Details
1/f: addition of finishes space w/in footprint of (e) structure and rear deck, a new rear deck and renovations to the kitchen & bathrooms. new interior stairs connecting the 1/f & 2/f is the only exterior expansion. | $300,000 | |
| Jul 3, 2025 | Completed final sign-off Aug 2025 | 1882 26th Av | interior scope only - the removal and filling in of 2 two doors in the kitchen and opening a new opening in a wall separating the kitchen and living roomDetails
interior scope only - the removal and filling in of 2 two doors in the kitchen and opening a new opening in a wall separating the kitchen and living room | $10,000 | |
| Jul 3, 2025 | In progress issued Sep 2025 | 621 San Jose Av | A A Builders & Company | convert a portion of (e) garage into a new suite (508sq.ft) that includes a bedroom, bathroom, wetbar. relocate existing laundry area. install a new tankless w.h and a mini split for the new addition. remove (e) stairs and add new stairs. (e)main level: enclose balcony at 2/f w/ 1-hr fire rated wallDetails
convert a portion of (e) garage into a new suite (508sq.ft) that includes a bedroom, bathroom, wetbar. relocate existing laundry area. install a new tankless w.h and a mini split for the new addition. remove (e) stairs and add new stairs. (e)main level: enclose balcony at 2/f w/ 1-hr fire rated wall | $30,000 |
| Jul 2, 2025 | Completed final sign-off Aug 2025 | 1279 Church St | W C S S Dba Solid Build Construction | revision to permit 202505196799. replace 10' center footing on the west section of the building.Details
revision to permit 202505196799. replace 10' center footing on the west section of the building. | $5,000 |
| Jun 30, 2025 | In progress issued Dec 2025 | 931 Edinburgh St | G Construction Service Inc | rear horizontal addition and interior remodel. 1/f: add (2) bedrooms, (2) full bath, family room, media room and wet bar. relocate laundry. 2/f: remodel bedroom, living room, and bathroom. relocate dining and kitchen. add (1) full bath and interior stairs. replace windows and siding at rear.Details
rear horizontal addition and interior remodel. 1/f: add (2) bedrooms, (2) full bath, family room, media room and wet bar. relocate laundry. 2/f: remodel bedroom, living room, and bathroom. relocate dining and kitchen. add (1) full bath and interior stairs. replace windows and siding at rear. | $250,000 |
| Jun 24, 2025 | In progress issued Feb 2026 | 4998 Mission St | convert (e) storage space on g/f into dwelling unit.Details
convert (e) storage space on g/f into dwelling unit. | $125,000 | |
| Jun 20, 2025 | Completed final sign-off Jun 2026 | 80 Santa Rita Av | Happy Bay Construction Inc. | revision to pa# 2025-0522-7071, to revove a load bearing wall.Details
revision to pa# 2025-0522-7071, to revove a load bearing wall. | |
| Jun 20, 2025 | Completed final sign-off Jul 2026 | 978 Teresita Bl | Cody Design Build Inc | remodel (e) kitchen and bathroom on 2/f. relocate (e) half bath to full bath on 1/f. 3 windows replacement; remove (e) fireplace; relocate door in bedrooms and modify closet doors; voluntary add plywood sheathing to north ane east exterior wall from insideDetails
remodel (e) kitchen and bathroom on 2/f. relocate (e) half bath to full bath on 1/f. 3 windows replacement; remove (e) fireplace; relocate door in bedrooms and modify closet doors; voluntary add plywood sheathing to north ane east exterior wall from inside | $70,000 |
| Jun 10, 2025 | In progress issued Oct 2025 | 275 Edgehill Wy | Green Bay Remodeling Inc. | bathroom renovation on 1st level. new kitchen, dining room and bathroom on 2nd level. replacement of all windows. new bedroom on 1st floor. railing completion on deck and sliding door replacementDetails
bathroom renovation on 1st level. new kitchen, dining room and bathroom on 2nd level. replacement of all windows. new bedroom on 1st floor. railing completion on deck and sliding door replacement | $281,446 |
| May 14, 2025 | Expired or cancelled cancelled May 2025 | 2533 24th Av | new state adu- 2 bedroom and 2 bath on ground floor, including rear extension. remodel of existing main unit to include third floor addition and rear extension.Details
new state adu- 2 bedroom and 2 bath on ground floor, including rear extension. remodel of existing main unit to include third floor addition and rear extension. | $565,000 | |
| May 9, 2025 | Expired or cancelled cancelled May 2025 | 1260 32nd Av | new state adu- 1 bedroom and 1 bath on ground floor, including rear extension. remodel of existing main unit to include third floor addition and rear extension.Details
new state adu- 1 bedroom and 1 bath on ground floor, including rear extension. remodel of existing main unit to include third floor addition and rear extension. | ||
| May 1, 2025 | Expired or cancelled expired Jun 2026 | 132 Lundys Ln | reconfigure and repair deteriorated deck and stairway at rear per plan.Details
reconfigure and repair deteriorated deck and stairway at rear per plan. | $25,600 | |
| Apr 30, 2025 | In progress filed Apr 2025, not yet issued | 4169 Folsom St | remodel (e) single family house. primary scope includes addition of a batheroom and closet to the primary bedroom at the rear of the house increasing the house by 73sf. the proposed modificationa are not visible from the street. proposed is fully within (e) setbacks & we are not in need of variance.Details
remodel (e) single family house. primary scope includes addition of a batheroom and closet to the primary bedroom at the rear of the house increasing the house by 73sf. the proposed modificationa are not visible from the street. proposed is fully within (e) setbacks & we are not in need of variance. | $30,000 | |
| Apr 25, 2025 | In progress issued Jan 2026 | 21 Park Hill Av | to comply w/complaint# 202048441, 202054401, 202182518 & 202308372. consolidated pa# 202102124636, 202112073931 & 202302011200 under this application. modify hip roof at rear of building converting attic to habitable space, add roof deck and interior remodel. convert single french door to doubleDetails
to comply w/complaint# 202048441, 202054401, 202182518 & 202308372. consolidated pa# 202102124636, 202112073931 & 202302011200 under this application. modify hip roof at rear of building converting attic to habitable space, add roof deck and interior remodel. convert single french door to double | $150,000 | |
| Apr 21, 2025 | In progress issued May 2025 | 162 Guttenberg St | Joe 88 Construction Co | revision to pa 202304206150 - 1st fl, in-fill under (e) 2nd floor habitable space; 2nd fl, add stairs @ rear per planDetails
revision to pa 202304206150 - 1st fl, in-fill under (e) 2nd floor habitable space; 2nd fl, add stairs @ rear per plan | $32,000 |
| Apr 17, 2025 | In progress issued Apr 2025 | 1201 Holloway Av | revision to pa#: 202404029188. reconfigure interior layout, replace and add windows per plan.Details
revision to pa#: 202404029188. reconfigure interior layout, replace and add windows per plan. | $2,000 | |
| Apr 16, 2025 | Completed final sign-off Mar 2026 | 2868 Bush St | Paniagua Construction Inc | rebuild the exterior staircase in-kind at front. replace all electrical lighting at stair. new security gateDetails
rebuild the exterior staircase in-kind at front. replace all electrical lighting at stair. new security gate | $43,000 |
| Apr 11, 2025 | Expired or cancelled expired Jul 2026 | 109 Lowell St | Odysseus Builders | revision to pa 202502079907 revise foundation to reflect the existing site conditions to update drawings accordingly. rebuild retaining wall.Details
revision to pa 202502079907 revise foundation to reflect the existing site conditions to update drawings accordingly. rebuild retaining wall. | $20,000 |
| Apr 3, 2025 | In progress issued Apr 2025 | 79 Curtis St | revision to pa#202111021655. voluntary add shear walls per plan.Details
revision to pa#202111021655. voluntary add shear walls per plan. | $6,000 | |
| Mar 21, 2025 | Completed final sign-off Jun 2026 | 224 Bosworth St | Ho Pronamic Construction Inc | 1st fl - widen existing garage door opening; 2nd fl - relocated kitchen & dining room; 1 story horizontal expansion to created (1) bedroom; (1) full bathroom & (1) skylight; restore front facade to original look. removed stone veneerDetails
1st fl - widen existing garage door opening; 2nd fl - relocated kitchen & dining room; 1 story horizontal expansion to created (1) bedroom; (1) full bathroom & (1) skylight; restore front facade to original look. removed stone veneer | $125,000 |
| Mar 13, 2025 | Completed final sign-off Jul 2025 | 450 Naples St | Green Bay Remodeling Inc. | kitchen remodel: relocate kitchen and new electrical and plumbing at 1st level. no added square footage.Details
kitchen remodel: relocate kitchen and new electrical and plumbing at 1st level. no added square footage. | $212,000 |
| Mar 13, 2025 | Completed final sign-off May 2025 | 308 Scott St | Egoodat Inc | voluntary strengthening building at 1st fl per plan work on common area foundation onlyDetails
voluntary strengthening building at 1st fl per plan work on common area foundation only | $50,000 |
| Mar 11, 2025 | In progress filed Mar 2025, not yet issued | 1931 Ocean Av | to comply with awning amnesty " hanna leung law office"Details
to comply with awning amnesty " hanna leung law office" | ||
| Mar 5, 2025 | In progress issued Apr 2025 | 614 Carolina St | Green Bay Remodeling Inc. | front building: seismic upgrade of partial structure. install new footings holdows posts beams and shear walls as indicated on the structural dwg. reference application 202407116299Details
front building: seismic upgrade of partial structure. install new footings holdows posts beams and shear walls as indicated on the structural dwg. reference application 202407116299 | $118,000 |
| Feb 14, 2025 | In progress issued Mar 2025 | 345 Sloat Bl | Green Bay Remodeling Inc. | replace of all windows. add a bedrm in 2nd flr. 2nd flr bathrm remodel. add closet in basement bedrm of all bathrms & kitchen. full interior remodel. (n) stucco, sheating & water proofing. (n) insulation. replace roof w/ (n) water proofing. remove a vanity in basement. add bedroom in basementDetails
replace of all windows. add a bedrm in 2nd flr. 2nd flr bathrm remodel. add closet in basement bedrm of all bathrms & kitchen. full interior remodel. (n) stucco, sheating & water proofing. (n) insulation. replace roof w/ (n) water proofing. remove a vanity in basement. add bedroom in basement | $476,149 |
| Feb 4, 2025 | Completed final sign-off Mar 2026 | 475 03rd Av | Green Bay Remodeling Inc. | kitchen remodel, convert (e) bath 1 to pantry, split the (e) living room into bath, 1 (n) bedroom 1 convert (e) storage and powder room into (n) master bath (n) lighting fixure per planDetails
kitchen remodel, convert (e) bath 1 to pantry, split the (e) living room into bath, 1 (n) bedroom 1 convert (e) storage and powder room into (n) master bath (n) lighting fixure per plan | $198,941 |
| Feb 2, 2025 | Completed final sign-off Aug 2026 | 425 Liberty St | Gadi Construction Inc | remodel to an (e) single family residence: enclose front room, replace separate interior stairs with combined new stair. relocate bathroom on main level, relocate kitchen, new doors to rear from kitchen/living space, (n) skywell well, remodel (e) upstairs bathroom, add new bathroom adjacent to (e).Details
remodel to an (e) single family residence: enclose front room, replace separate interior stairs with combined new stair. relocate bathroom on main level, relocate kitchen, new doors to rear from kitchen/living space, (n) skywell well, remodel (e) upstairs bathroom, add new bathroom adjacent to (e). | $300,000 |
| Jan 31, 2025 | Completed final sign-off Apr 2025 | 360 32nd Av | Kenny J M Yu | rebuild deteriorated stairway in-kind at light court.Details
rebuild deteriorated stairway in-kind at light court. | $5,000 |
| Jan 2, 2025 | Completed final sign-off Jun 2025 | 2971 25th Av | Parkson Construction Company | interior remodel - 2/f: add one bathroom to (e) bedroom and replace window. 3/f: relocate office, bedroom and bathroom. add laundry room, media room and replace window.Details
interior remodel - 2/f: add one bathroom to (e) bedroom and replace window. 3/f: relocate office, bedroom and bathroom. add laundry room, media room and replace window. | $45,000 |
| Dec 27, 2024 | Expired or cancelled expired Sep 2026 | 15 Shields St | legalization of 149 sqft for unit a into habitable space. revision 202102094322Details
legalization of 149 sqft for unit a into habitable space. revision 202102094322 | $4,000 | |
| Dec 13, 2024 | In progress issued Dec 2024 | 357 Union St | Kaifa Construction Inc | revision to pa # 2020-1019-6891: revision to structural design scope only covers clouded dormer area to change a drop beam to a flush beam, on the roof framing plan.Details
revision to pa # 2020-1019-6891: revision to structural design scope only covers clouded dormer area to change a drop beam to a flush beam, on the roof framing plan. | $1,000 |
| Oct 25, 2024 | In progress issued Sep 2025 | 340 Baden St | A2z Remodeling Inc. | new second story deck, replace 1st flr cement patio, replace bedroom window w/door with lights outside door.Details
new second story deck, replace 1st flr cement patio, replace bedroom window w/door with lights outside door. | $42,000 |
| Oct 11, 2024 | In progress issued Oct 2024 | 4030 21st St | G-Man Construction | repair fences & gates; provide in floor radiant heating at lower level & bathroom; adding entry hall skylight. this work is separate from pa # 2024-0524-2966Details
repair fences & gates; provide in floor radiant heating at lower level & bathroom; adding entry hall skylight. this work is separate from pa # 2024-0524-2966 | $50,000 |
| Oct 8, 2024 | Completed final sign-off Sep 2025 | 911 Naples St | Modern Builder Construction Inc | 2nd flr: infilled light well. add (1) bathroom and (2) skylights. remodel bathroom and bedrooms per plansDetails
2nd flr: infilled light well. add (1) bathroom and (2) skylights. remodel bathroom and bedrooms per plans | $54,000 |
| Sep 3, 2024 | Completed final sign-off May 2026 | 225 Stanyan St | J A P Construction | remove portion of structure walls, create larger kitchen. convert (e) living room to a bedroom with bathroom.Details
remove portion of structure walls, create larger kitchen. convert (e) living room to a bedroom with bathroom. | $78,800 |
| Sep 3, 2024 | Completed final sign-off Aug 2025 | 1279 Dolores St | A G D Construction | (n) bedroom ; kitchen & bathroom remodel. replace existing non-operational furnace with mini-split.Details
(n) bedroom ; kitchen & bathroom remodel. replace existing non-operational furnace with mini-split. | $50,000 |
| Aug 28, 2024 | Completed final sign-off Oct 2025 | 855 Hampshire St | revision to 202405071532 and address nov 202426729. replace 40lf of rear foundation. replace approx 60lf of exterior wall. add closet 2nd fl and operable skylight, adjust retaining wall(between garage and habitable space., relocate family room door, reloc stair 1st flDetails
revision to 202405071532 and address nov 202426729. replace 40lf of rear foundation. replace approx 60lf of exterior wall. add closet 2nd fl and operable skylight, adjust retaining wall(between garage and habitable space., relocate family room door, reloc stair 1st fl | $40,000 | |
| Aug 26, 2024 | In progress issued Oct 2024 | 1260 32nd Av | J P E Construction | full remodel of single family house, convert g/f storage to relocate (e) bedroom & add (n) bathroom. upgrade mep systems.Details
full remodel of single family house, convert g/f storage to relocate (e) bedroom & add (n) bathroom. upgrade mep systems. | $80,000 |
| Aug 19, 2024 | In progress issued Dec 2024 | 4030 21st St | G-Man Construction | remodeling an (e) split-level home to enclose an (e) property line lightwell and adding a bathroom, adding skylights, remodeling (e) kitchen and bath; replacing some (e) doors and windows, revising closets and handrail.Details
remodeling an (e) split-level home to enclose an (e) property line lightwell and adding a bathroom, adding skylights, remodeling (e) kitchen and bath; replacing some (e) doors and windows, revising closets and handrail. | $300,000 |
| Aug 19, 2024 | Completed final sign-off Jun 2025 | 2971 25th Av | revision to pa#202407227007. revised layout at entry area. replace wall and ceiling finishes at living room.Details
revision to pa#202407227007. revised layout at entry area. replace wall and ceiling finishes at living room. | $3,000 | |
| Aug 12, 2024 | In progress issued Aug 2024 | 1647 38th Av | Kelun Construction | revision to pa # 2023-0609-9718 and 202310058087 1st fl: reconfigure laundry & kitchenette layout 2nd fl: repair/replace fire damaged wall in south east corner. replace ceiling joists at bedrooms.Details
revision to pa # 2023-0609-9718 and 202310058087 1st fl: reconfigure laundry & kitchenette layout 2nd fl: repair/replace fire damaged wall in south east corner. replace ceiling joists at bedrooms. | $5,000 |
| Aug 8, 2024 | Expired or cancelled expired Jan 2026 | 825 Cabrillo St | S K Building Construction | 1/f: remodel bedroom office. add 2 bathroom and wet bar. 2/f: add interior stairs connect to 1/f. replace all front windows with aluminum clad hung wood windows. no removal of any dwelling units. (2) units to remain. replace interior finishes.Details
1/f: remodel bedroom office. add 2 bathroom and wet bar. 2/f: add interior stairs connect to 1/f. replace all front windows with aluminum clad hung wood windows. no removal of any dwelling units. (2) units to remain. replace interior finishes. | $76,000 |
| Aug 5, 2024 | In progress issued Aug 2024 | 2148 17th Av | Bay C T Construction Inc. | new interior layout @ kitchen area (ie ope kitchen layout) new kitchen island, and relocation of interior stair. no work to the front. new furnace.Details
new interior layout @ kitchen area (ie ope kitchen layout) new kitchen island, and relocation of interior stair. no work to the front. new furnace. | $100,000 |
| Aug 2, 2024 | Completed final sign-off Feb 2026 | 303 Arlington St | Ideal Builders | voluntary seismic strengthening by installing bolts to foundation and plywood sheathing to existing walls in basement, no other work proposed or authorized. per voluntary seismic strengthening onlyDetails
voluntary seismic strengthening by installing bolts to foundation and plywood sheathing to existing walls in basement, no other work proposed or authorized. per voluntary seismic strengthening only | $7,000 |