Joe 88 Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2013 to Apr 2025
- Last 24 months
- 2 permits filed
30 permits since 2000: 26 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2025 | In progress issued May 2025 | 162 Guttenberg St | revision to pa 202304206150 - 1st fl, in-fill under (e) 2nd floor habitable space; 2nd fl, add stairs @ rear per planDetails
revision to pa 202304206150 - 1st fl, in-fill under (e) 2nd floor habitable space; 2nd fl, add stairs @ rear per plan | $32,000 |
| Feb 21, 2025 | Completed final sign-off Dec 2025 | 343 Justin Dr | 2/f: remodel kitchen, bathroom and add one bathroom per plan.Details
2/f: remodel kitchen, bathroom and add one bathroom per plan. | $54,000 |
| May 7, 2024 | In progress issued Jun 2024 | 731 Capp St | revision to pa# 202308094084: garage- laundry stays, add (2) fixture bath. 1/f- remodel (e) bath as 3 fixture bath, combine (e) bedrooms, hallway closet and (e) w/c to a master bedroom. combine bedroom #3, (e) hallway sloet and (e) bath to a master bedroom on the 3/f.Details
revision to pa# 202308094084: garage- laundry stays, add (2) fixture bath. 1/f- remodel (e) bath as 3 fixture bath, combine (e) bedrooms, hallway closet and (e) w/c to a master bedroom. combine bedroom #3, (e) hallway sloet and (e) bath to a master bedroom on the 3/f. | |
| Aug 9, 2023 | Never finaled issued Aug 2023, no final | 731 Capp St | 1/f: demo partition wall, relocate (e) water heater, furnace, add lights; 2/f:change (e) closet to half bath at stairwell, change (e) closet to a full bath, combine (e) bedrm & bath to masterbedrm, demo (e) non-bearing wall btw kitchen & dining & remodel; 3/f: change (e) closet to full bath, combineDetails
1/f: demo partition wall, relocate (e) water heater, furnace, add lights; 2/f:change (e) closet to half bath at stairwell, change (e) closet to a full bath, combine (e) bedrm & bath to masterbedrm, demo (e) non-bearing wall btw kitchen & dining & remodel; 3/f: change (e) closet to full bath, combine | $200,000 |
| May 4, 2023 | Completed final sign-off Apr 2024 | 40 Melrose Av | 2nd fl; remodel kitchen, relocate bathroom, add powder roomDetails
2nd fl; remodel kitchen, relocate bathroom, add powder room | $70,000 |
| Apr 20, 2023 | Never finaled issued May 2023, no final | 162 Guttenberg St | 1/f: relocate washer/dryer, add bedroom, media room, family room, (2) bathrooms & kitchenette (2 burners, no oven). 2/f: remodel bedroom, bathroom, kitchen; in-fill interior stairs; add laundry & (1) bathroom.Details
1/f: relocate washer/dryer, add bedroom, media room, family room, (2) bathrooms & kitchenette (2 burners, no oven). 2/f: remodel bedroom, bathroom, kitchen; in-fill interior stairs; add laundry & (1) bathroom. | $130,000 |
| Mar 17, 2023 | Completed final sign-off May 2023 | 1280 Treat Av | comply with complaint# 202302562. remodel bathroom. replace shower and vanity at (e) locationDetails
comply with complaint# 202302562. remodel bathroom. replace shower and vanity at (e) location | $6,500 |
| Sep 1, 2022 | Completed final sign-off Oct 2022 | 3855 California St | to comly with nov 202182805. infill window at east wall of ground floorDetails
to comly with nov 202182805. infill window at east wall of ground floor | $1,500 |
| Sep 1, 2022 | Completed final sign-off Apr 2023 | 15 Merced Av | revision to permit 201804267535. reconfigure interior layouts. add 2 bathrooms and non bearing partition walls per plan.Details
revision to permit 201804267535. reconfigure interior layouts. add 2 bathrooms and non bearing partition walls per plan. | $20,000 |
| Jun 21, 2022 | Completed final sign-off Feb 2024 | 2375 27th Av | unit 1,2,3: interior remodel for unit 1,2,3. remodel bath, living/dining room, relocated kitchen, for 3 units.Details
unit 1,2,3: interior remodel for unit 1,2,3. remodel bath, living/dining room, relocated kitchen, for 3 units. | $75,000 |
| Nov 1, 2019 | Completed final sign-off Dec 2019 | 2366 29th Av | revision to pa# 2019-0425-8946 increased construction valuation to total of $100k per inspection.Details
revision to pa# 2019-0425-8946 increased construction valuation to total of $100k per inspection. | $35,000 |
| Nov 1, 2019 | Completed final sign-off Dec 2021 | 2366 29th Av | addition of dwelling unit per ord no. 95-17. (2 bdrms, media room, 3 bath, kitchen & dining)Details
addition of dwelling unit per ord no. 95-17. (2 bdrms, media room, 3 bath, kitchen & dining) | $80,000 |
| Sep 12, 2019 | Completed final sign-off Oct 2019 | 2362 29th Av | replace driveway concreteDetails
replace driveway concrete | $2,000 |
| Apr 25, 2019 | Completed final sign-off Dec 2019 | 2366 29th Av | reconfigure (e) 2nd flr layout, relocate kitchen, dining & 2 bathrooms, add 2 bathroom, office, skylite and rear deck. replace 3 windows in kind at front with fixed/casement aluminum clad wood.Details
reconfigure (e) 2nd flr layout, relocate kitchen, dining & 2 bathrooms, add 2 bathroom, office, skylite and rear deck. replace 3 windows in kind at front with fixed/casement aluminum clad wood. | $65,000 |
| Apr 26, 2018 | Completed final sign-off Apr 2023 | 15 Merced Av | addition of dwelling unit per ord no 162-16. no exterior changes. comply with planning complaints #2017-014858 enf & #2018-002800 enf.Details
addition of dwelling unit per ord no 162-16. no exterior changes. comply with planning complaints #2017-014858 enf & #2018-002800 enf. | $3,000 |
| Nov 21, 2017 | Completed final sign-off Jan 2018 | 15 Merced Av | to comply with complaint 201720692. remodel kitchen & 1 bathroom, add 3 bathrooms on 2/f. add skylights (not visible to street).Details
to comply with complaint 201720692. remodel kitchen & 1 bathroom, add 3 bathrooms on 2/f. add skylights (not visible to street). | $45,000 |
| Nov 21, 2017 | Completed final sign-off Jan 2018 | 15 Merced Av | reroofing. to comply with complaint 201705511' skylights under pa201711214579.Details
reroofing. to comply with complaint 201705511' skylights under pa201711214579. | $8,000 |
| Oct 17, 2017 | Completed final sign-off Aug 2018 | 2633 San Bruno Av | provide new tenant separation between 2nd fl acupuncture office and ground floor medical massage therapy office. maher naDetails
provide new tenant separation between 2nd fl acupuncture office and ground floor medical massage therapy office. maher na | $2,500 |
| Sep 8, 2017 | Completed final sign-off Apr 2022 | 2335 Chestnut St | commericial: to comply with sf soft-story seismic retrofit program sfebc ch. 4d per 2016 cebc appendix chapter a-4.Details
commericial: to comply with sf soft-story seismic retrofit program sfebc ch. 4d per 2016 cebc appendix chapter a-4. | $10,000 |
| Sep 8, 2017 | Completed final sign-off Jan 2021 | 2335 Chestnut St | upgrade (e) accessible entrance door and rstroom at unit 2335 on g/f.Details
upgrade (e) accessible entrance door and rstroom at unit 2335 on g/f. | $10,000 |
| Sep 8, 2017 | Completed final sign-off Mar 2020 | 2335 Chestnut St | residential: to comply with sf soft-story seismic retrofit program sfebc ch. 4d per 2016 cebc appendix chapter a-4.Details
residential: to comply with sf soft-story seismic retrofit program sfebc ch. 4d per 2016 cebc appendix chapter a-4. | $65,000 |
| Sep 8, 2017 | Completed final sign-off Jul 2019 | 3674 16th St | comply with san francisco soft story seismic retrofit program sfebc chapter 4d per 2016 cebc appendix chapter a-4.Details
comply with san francisco soft story seismic retrofit program sfebc chapter 4d per 2016 cebc appendix chapter a-4. | $65,000 |
| Sep 8, 2017 | Completed final sign-off Jul 2019 | 3674 16th St | unit #1 - remodel (e) living room, kitchen, bathroom, family roo & bedroom on 1st floor.Details
unit #1 - remodel (e) living room, kitchen, bathroom, family roo & bedroom on 1st floor. | $80,000 |
| Jun 16, 2017 | Completed final sign-off Jan 2018 | 3855 California St | replace/repair damaged plaster in dining rm, bedroom and bath in kind. unit 2 5/8 " type x sheetrockDetails
replace/repair damaged plaster in dining rm, bedroom and bath in kind. unit 2 5/8 " type x sheetrock | $38,000 |
| Jun 16, 2017 | Completed final sign-off Jan 2018 | 3855 California St | replace window with dbl pane, not visible from street. u.32Details
replace window with dbl pane, not visible from street. u.32 | $20,000 |
| May 30, 2017 | Completed final sign-off Jan 2018 | 3855 California St | #2 - replace cabinets, countertops, sink, lighting for kitchen. replace vanity, bathtub, two toilets in bathroom.Details
#2 - replace cabinets, countertops, sink, lighting for kitchen. replace vanity, bathtub, two toilets in bathroom. | $25,000 |
| Oct 22, 2015 | Completed final sign-off Mar 2016 | 735 31st Av | inkind replacement of 10 front wood windows with wood windows with same unique frame style; replace 6 rear windows (non-visible to street) with vinyl windows. max u-factor 0.32Details
inkind replacement of 10 front wood windows with wood windows with same unique frame style; replace 6 rear windows (non-visible to street) with vinyl windows. max u-factor 0.32 | $15,000 |
| Feb 25, 2015 | Completed final sign-off May 2015 | 181 Lucky St | replace cabinets, counter tops, sink, lighting for (e) kitchn on second floor, replace three (e) windows with double panel at front of building to comply violation #201526581. no structural work. no vinyl material.Details
replace cabinets, counter tops, sink, lighting for (e) kitchn on second floor, replace three (e) windows with double panel at front of building to comply violation #201526581. no structural work. no vinyl material. | $20,000 |
| Oct 23, 2014 | Completed final sign-off Apr 2016 | 120 Ellis St | install grab bars in all common area water closet. lavatories and bathing facilities to comply with ordiance. (10) bars.Details
install grab bars in all common area water closet. lavatories and bathing facilities to comply with ordiance. (10) bars. | $500 |
| Oct 2, 2013 | Completed final sign-off Jan 2014 | 7509 Geary Bl | construct one new bathroom, 2 new bedrooms and one new laundry room on g/f, replace (e) furnace and water heater.Details
construct one new bathroom, 2 new bedrooms and one new laundry room on g/f, replace (e) furnace and water heater. | $30,000 |