Elad Vaknin
- Listed as
- authorized agent-others, contractor, designer
- Firm
- W C S S Dba Solid Build Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to Oct 2026
102 permits since 2000 (contractor on 102 permits, authorized agent-others on 12 permits, designer on 1 permit): 83 completed, 3 in progress, 8 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 102.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress issued Oct 2026 | 631 Haight St | W C S S Dba Solid Build Construction | installation of insulation resilient channels and drywall layers for sound mitigation. cover all outlets and protusions w/ fire rates coverings. cover all outlets protusions with fire-rated coverings. commercial area only.Details
installation of insulation resilient channels and drywall layers for sound mitigation. cover all outlets and protusions w/ fire rates coverings. cover all outlets protusions with fire-rated coverings. commercial area only. | $12,000 |
| Sep 14, 2026 | In progress issued Sep 2026 | 433 Hoffman Av | W C S S Dba Solid Build Construction | install of insulation resilient channels and two layer of drywall on the wall and ceiling in primary bedroomDetails
install of insulation resilient channels and two layer of drywall on the wall and ceiling in primary bedroom | $6,000 |
| Dec 11, 2025 | In progress issued Dec 2025 | 4721 Lincoln Wy | W C S S Dba Solid Build Construction | 1st fl: remodel e powder to full bath, relocate e stair. 2nd fl: remodel kitchen, relocate laundry,new flooring, new skylight. exterior: new deck/patio at rear yard at grade, replace front windows in kind, new siding doors and windows at rearDetails
1st fl: remodel e powder to full bath, relocate e stair. 2nd fl: remodel kitchen, relocate laundry,new flooring, new skylight. exterior: new deck/patio at rear yard at grade, replace front windows in kind, new siding doors and windows at rear | $438,000 |
| Dec 2, 2025 | Completed final sign-off Jan 2026 | 3447 Fillmore St | W C S S Dba Solid Build Construction | installation of 2 layers of insulation sound isolation channels, light covers and 2 layers of 5/8" drywall in the hallway, living room, kitchen for sound mitigation between units.Details
installation of 2 layers of insulation sound isolation channels, light covers and 2 layers of 5/8" drywall in the hallway, living room, kitchen for sound mitigation between units. | $12,500 |
| Oct 15, 2025 | Completed final sign-off Dec 2025 | 4044 18th St | W C S S Dba Solid Build Construction | at dividing wall shared with hall and bedroom - clips/channels insulation and 2 layers of drywall - additional scope of work for permit 202510087008Details
at dividing wall shared with hall and bedroom - clips/channels insulation and 2 layers of drywall - additional scope of work for permit 202510087008 | $2,300 |
| Oct 8, 2025 | Completed final sign-off Dec 2025 | 4044 18th St | W C S S Dba Solid Build Construction | installation of secondary studs, 2 layers of insulation, mass loaded vinyl , 2 layers of drywall for sound mitigation. (wall between two bedrooms), between two bedroom wall.Details
installation of secondary studs, 2 layers of insulation, mass loaded vinyl , 2 layers of drywall for sound mitigation. (wall between two bedrooms), between two bedroom wall. | $8,000 |
| Sep 9, 2025 | Completed final sign-off Feb 2026 | 520 Vicente St | W C S S Dba Solid Build Construction | at the ceiling in garage level of the house -installation of 2 layers of rockwool insulation between the joists, resilent channels, and two layers of drywall. all work is interior.Details
at the ceiling in garage level of the house -installation of 2 layers of rockwool insulation between the joists, resilent channels, and two layers of drywall. all work is interior. | $12,500 |
| Jul 23, 2025 | Completed final sign-off Sep 2025 | 1870 Funston Av | W C S S Dba Solid Build Construction | revision to pa# 202507080329. dry rot repairs, new sheathinh insulation at front and side facade approx. 20'x2' areaDetails
revision to pa# 202507080329. dry rot repairs, new sheathinh insulation at front and side facade approx. 20'x2' area | $3,500 |
| Jul 8, 2025 | Completed final sign-off Sep 2025 | 1870 Funston Av | W C S S Dba Solid Build Construction | stucco replacement : street visible, front of home.Details
stucco replacement : street visible, front of home. | $5,000 |
| Jul 8, 2025 | Completed final sign-off Aug 2025 | 4163 26th St | W C S S Dba Solid Build Construction | installation of insulation, mlu and two layers of 5/8" drywall on internal walls in upstairs office. replace (e) door with solid core door. interior only.Details
installation of insulation, mlu and two layers of 5/8" drywall on internal walls in upstairs office. replace (e) door with solid core door. interior only. | $3,500 |
| Jul 2, 2025 | Completed final sign-off Aug 2025 | 1279 Church St | W C S S Dba Solid Build Construction | revision to permit 202505196799. replace 10' center footing on the west section of the building.Details
revision to permit 202505196799. replace 10' center footing on the west section of the building. | $5,000 |
| May 29, 2025 | Completed final sign-off Aug 2026 | 5160 Diamond Heights Bl | W C S S Dba Solid Build Construction | enlarge kitchen by removing designated non load bearing interior partitions. convert existing swing doors to pocket doors or surface mounted sliding doors. reconfigure the bathroom layout with new plumbing fixtures and finishes. structural modifications to raise headers.Details
enlarge kitchen by removing designated non load bearing interior partitions. convert existing swing doors to pocket doors or surface mounted sliding doors. reconfigure the bathroom layout with new plumbing fixtures and finishes. structural modifications to raise headers. | $112,000 |
| May 28, 2025 | Completed final sign-off Aug 2025 | 1201 Ortega St | W C S S Dba Solid Build Construction | in kind replacement of existing wood windows sashes existing frames to remain. (street visible), on north, east, and west elevationDetails
in kind replacement of existing wood windows sashes existing frames to remain. (street visible), on north, east, and west elevation | $30,000 |
| May 19, 2025 | Completed final sign-off Aug 2025 | 1279 Church St | W C S S Dba Solid Build Construction | replacement in kind of (e) west wall foudnation with (n) concrete foundationDetails
replacement in kind of (e) west wall foudnation with (n) concrete foundation | $25,000 |
| Mar 12, 2025 | Completed final sign-off May 2025 | 521 Gough St | W C S S Dba Solid Build Construction | install sound barrier on corner office walls. includes insulation mass loaded and 2 layers of drywall . entry door will be changed. not visible from street.Details
install sound barrier on corner office walls. includes insulation mass loaded and 2 layers of drywall . entry door will be changed. not visible from street. | $4,800 |
| Jan 21, 2025 | Completed final sign-off Feb 2025 | 627 46th Av | W C S S Dba Solid Build Construction | installation of insulation, staggered studs mass loaded vinyl and 2 layers of 5/8" drywall on bedroom wall and bedroom closet.Details
installation of insulation, staggered studs mass loaded vinyl and 2 layers of 5/8" drywall on bedroom wall and bedroom closet. | $3,000 |
| Nov 13, 2024 | Completed final sign-off Jan 2025 | 717 Castro St | W C S S Dba Solid Build Construction | revision to permit# 202410223472: adding drywall and green glue between the joist.Details
revision to permit# 202410223472: adding drywall and green glue between the joist. | $3,500 |
| Oct 22, 2024 | Completed final sign-off Jan 2025 | 717 Castro St | W C S S Dba Solid Build Construction | instalation of 2 layers of sound proofing insulation in between the joists fire rated light covers channel sound isolation system and 2 layers of drywallDetails
instalation of 2 layers of sound proofing insulation in between the joists fire rated light covers channel sound isolation system and 2 layers of drywall | $18,000 |
| Jun 7, 2024 | Completed final sign-off Aug 2024 | 820 Ashbury St | W C S S Dba Solid Build Construction | unit #5: installation of 2 layers of insulation in between the joists. install clip isolation system with 25g furring channel. install 2 layers of drywall with acoustical sealan around the perimeter.Details
unit #5: installation of 2 layers of insulation in between the joists. install clip isolation system with 25g furring channel. install 2 layers of drywall with acoustical sealan around the perimeter. | $9,500 |
| Feb 15, 2024 | Completed final sign-off Mar 2024 | 2905 Van Ness Av | W C S S Dba Solid Build Construction | unit #501: installation of insulation between the joists, install resilent channel system, install two layers of 5/8 drywall. #501 bedroomDetails
unit #501: installation of insulation between the joists, install resilent channel system, install two layers of 5/8 drywall. #501 bedroom | $2,500 |
| Nov 21, 2023 | Completed final sign-off Aug 2024 | 2086 24th Av | W C S S Dba Solid Build Construction | revision to permit# 202309287642: remove wall, replace window like to like and remove kitchen door. no exterior work. not visible from the street.Details
revision to permit# 202309287642: remove wall, replace window like to like and remove kitchen door. no exterior work. not visible from the street. | $3,000 |
| Oct 25, 2023 | Completed final sign-off Sep 2024 | 1834 Mason St | W C S S Dba Solid Build Construction | (1) bathroom remodel in kind - replacing (e) shower, tub, vanity, and lights. like for like. no change to floor layout. no change to wall layout. no structural work.Details
(1) bathroom remodel in kind - replacing (e) shower, tub, vanity, and lights. like for like. no change to floor layout. no change to wall layout. no structural work. | $13,500 |
| Sep 28, 2023 | Completed final sign-off Aug 2024 | 2086 24th Av | W C S S Dba Solid Build Construction | bathroom remodeling: changing tub to shower, title walls and floors, installing recessed lighting, fan, new faucets, kitchen remodeling: installing new cabinets, install recessed ligts, new sink, replacing 3 retrofited windows and upgrade electrical wiresDetails
bathroom remodeling: changing tub to shower, title walls and floors, installing recessed lighting, fan, new faucets, kitchen remodeling: installing new cabinets, install recessed ligts, new sink, replacing 3 retrofited windows and upgrade electrical wires | $24,500 |
| Aug 17, 2023 | Never finaled issued Aug 2023, no final | 468 Castro St | W C S S Dba Solid Build Construction | install frame around ducting and install sound mitigation blankets around framing using cement board siding.Details
install frame around ducting and install sound mitigation blankets around framing using cement board siding. | $1,500 |
| Jul 26, 2023 | Completed final sign-off Aug 2023 | 2750 Jackson St | W C S S Dba Solid Build Construction | infill door between music room and office. add sound insulation.Details
infill door between music room and office. add sound insulation. | $8,000 |
| Jul 21, 2023 | Completed final sign-off Aug 2023 | 1925 Gough St | W C S S Dba Solid Build Construction | installation of 2 layers of insulation, sound mitigating channels and two layers of type x 5/8" drywall ul570 for sound mitgation. min stc 50Details
installation of 2 layers of insulation, sound mitigating channels and two layers of type x 5/8" drywall ul570 for sound mitgation. min stc 50 | $8,500 |
| Jul 13, 2023 | Completed final sign-off Jan 2024 | 2343 39th Av | W C S S Dba Solid Build Construction | remodel 2 bathrooms & kitchen, like to like. install kitchen cabinets, faucet for bathroom and kithen, skin code for walls & ceiling.Details
remodel 2 bathrooms & kitchen, like to like. install kitchen cabinets, faucet for bathroom and kithen, skin code for walls & ceiling. | $25,000 |
| Jun 22, 2023 | Completed final sign-off Jun 2023 | 1242 Pierce St | W C S S Dba Solid Build Construction | to obtain final inspection for work approved under pa#201710050554. all work is complete.Details
to obtain final inspection for work approved under pa#201710050554. all work is complete. | |
| Jun 7, 2023 | Completed final sign-off Dec 2023 | 1851 Noriega St | W C S S Dba Solid Build Construction | restore walls after water damage. double layer of 5/8" drywall in women's bathroom. double layer at 5/8" drywall in wall adjacent to kitchen. double layer at 5/8" drywall in wall adjacent to storage. all interior.Details
restore walls after water damage. double layer of 5/8" drywall in women's bathroom. double layer at 5/8" drywall in wall adjacent to kitchen. double layer at 5/8" drywall in wall adjacent to storage. all interior. | $7,200 |
| Jun 7, 2023 | Completed final sign-off Sep 2023 | 331 Liberty St | W C S S Dba Solid Build Construction | sound proof ceiling. drywall with green glue. insulation. install clips & chanels. install drywall & green glue.in-kind. drywall at ceiling shall be installed like for likeDetails
sound proof ceiling. drywall with green glue. insulation. install clips & chanels. install drywall & green glue.in-kind. drywall at ceiling shall be installed like for like | $12,200 |
| Mar 13, 2023 | Completed final sign-off Nov 2023 | 1201 Ortega St | W C S S Dba Solid Build Construction | new fixed rated transparant wall. installation in (e) office.Details
new fixed rated transparant wall. installation in (e) office. | $5,500 |
| Mar 13, 2023 | Expired or cancelled cancelled Jan 2026 | 1935 19th Av | W C S S Dba Solid Build Construction | new deck 280 sqft.Details
new deck 280 sqft. | $12,500 |
| Feb 22, 2023 | Expired or cancelled cancelled Jan 2026 | 1201 Ortega St | W C S S Dba Solid Build Construction | new 280 sqft.deckDetails
new 280 sqft.deck | $12,500 |
| Jan 31, 2023 | Completed final sign-off Feb 2023 | 8 Buchanan St | W C S S Dba Solid Build Construction | installation of insulation resilient channes and 2 layers of drywall for sound mitigation for interior no plywood removal. #902Details
installation of insulation resilient channes and 2 layers of drywall for sound mitigation for interior no plywood removal. #902 | $2,200 |
| Dec 29, 2022 | Completed final sign-off Oct 2023 | 101 Crestmont Dr | W C S S Dba Solid Build Construction | kitchen & 2 bathrooms remodel, replace kitchen counter top, cabinets and appliances.Details
kitchen & 2 bathrooms remodel, replace kitchen counter top, cabinets and appliances. | $19,500 |
| Dec 22, 2022 | Completed final sign-off May 2023 | 4721 Lincoln Wy | The Sustainable Cbo Inc Dba Oliver Macki, W C S S Dba Solid Build Construction | remodel existing bathroom. no change to wallsDetails
remodel existing bathroom. no change to walls | $11,300 |
| Dec 1, 2022 | Completed final sign-off Apr 2024 | 45 Longview Ct | W C S S Dba Solid Build Construction | legalize existing deck replace stair and handrail like for like. remove (e) windscreen and replace w/ railing. remove unpermitted pergolaDetails
legalize existing deck replace stair and handrail like for like. remove (e) windscreen and replace w/ railing. remove unpermitted pergola | $5,000 |
| Sep 20, 2022 | Completed final sign-off Apr 2024 | 45 Longview Ct | W C S S Dba Solid Build Construction | g/f interior remodel to add bedroom,b athroom, family room, laundry room & hall. legalization of (e) interior stairs. no changes to proposed to (e) facade. new window - street facing.Details
g/f interior remodel to add bedroom,b athroom, family room, laundry room & hall. legalization of (e) interior stairs. no changes to proposed to (e) facade. new window - street facing. | $80,000 |
| Sep 1, 2022 | Completed final sign-off Apr 2023 | 923 Filbert St | W C S S Dba Solid Build Construction | installation of two layhers of rockwool insulation in between the joists. installation of a vesilient channel system. installation of two layers of 5/8" drywall on the ceilings; per sfebc 503.11.1, 5/8" type x w/ sd cooler nails at 4 inches on center.Details
installation of two layhers of rockwool insulation in between the joists. installation of a vesilient channel system. installation of two layers of 5/8" drywall on the ceilings; per sfebc 503.11.1, 5/8" type x w/ sd cooler nails at 4 inches on center. | $8,500 |
| Aug 9, 2022 | Completed final sign-off Dec 2022 | 1834 Mason St | W C S S Dba Solid Build Construction | installation of insulation, resilent channels, two layers of drywall.Details
installation of insulation, resilent channels, two layers of drywall. | $5,500 |
| Aug 1, 2022 | Completed final sign-off Oct 2023 | 101 Crestmont Dr | W C S S Dba Solid Build Construction | ground floor: conversion of (e) gym and game room into a new bathroom & bedroomDetails
ground floor: conversion of (e) gym and game room into a new bathroom & bedroom | $20,000 |
| Jul 7, 2022 | Expired or cancelled withdrawn Oct 2023 | 1201 Ortega St | W C S S Dba Solid Build Construction | opening in concrete wall. install sliding glass window.Details
opening in concrete wall. install sliding glass window. | $6,000 |
| Jul 1, 2022 | Completed final sign-off Jan 2023 | 2055 16th Av | W C S S Dba Solid Build Construction | replace existing deck and stairs like-for-like.Details
replace existing deck and stairs like-for-like. | $5,000 |
| May 19, 2022 | Completed final sign-off Jan 2025 | 2250 Vicente St | W C S S Dba Solid Build Construction | replacing 9 street facing windows with same dimension, same operating type at same location of exsting ones. u=0.3max.Details
replacing 9 street facing windows with same dimension, same operating type at same location of exsting ones. u=0.3max. | $4,500 |
| May 2, 2022 | Completed final sign-off Jul 2022 | 1201 Ortega St | W C S S Dba Solid Build Construction | installation of glass divider + door for a faculty meeting room in the library.Details
installation of glass divider + door for a faculty meeting room in the library. | $12,000 |
| May 2, 2022 | Completed final sign-off Aug 2022 | 755 Ashbury St | W C S S Dba Solid Build Construction | remove extg door and create a rough opening for a 42" door and casement. install a rock climbing wall on this interior of building.Details
remove extg door and create a rough opening for a 42" door and casement. install a rock climbing wall on this interior of building. | $16,000 |
| Feb 10, 2022 | Completed final sign-off Apr 2022 | 1736 Hayes St | W C S S Dba Solid Build Construction | installation of insulation, recessed channels, and two layers of 5/8" drywall for sound mitigation in the living room and dining room common areas. maintain 1-hour assemblyDetails
installation of insulation, recessed channels, and two layers of 5/8" drywall for sound mitigation in the living room and dining room common areas. maintain 1-hour assembly | $6,500 |
| Jan 13, 2022 | Completed final sign-off Mar 2022 | 2230 Pacific Av | W C S S Dba Solid Build Construction | # 103: like for like bathroom upgrade.Details
# 103: like for like bathroom upgrade. | $9,000 |
| Aug 25, 2021 | Completed final sign-off Feb 2022 | 180 Landers St | W C S S Dba Solid Build Construction | #1. installation of insulation between the studs and joists, install resilient channel on studs, and joists install two layers of drywall, all ceiling except four guest 8 room plus bathrooms and 2 walls in living roomDetails
#1. installation of insulation between the studs and joists, install resilient channel on studs, and joists install two layers of drywall, all ceiling except four guest 8 room plus bathrooms and 2 walls in living room | $15,000 |
| Aug 16, 2021 | Completed final sign-off Nov 2021 | 845 Lake St | W C S S Dba Solid Build Construction | bathroom remodel like for like.Details
bathroom remodel like for like. | $4,000 |
| Aug 13, 2021 | Completed final sign-off Nov 2021 | 1135 Divisadero St | W C S S Dba Solid Build Construction | #3. installation of washer and dryer. add new dedicated outlet. run new plumbing and vent. convert (e) closet to laundryDetails
#3. installation of washer and dryer. add new dedicated outlet. run new plumbing and vent. convert (e) closet to laundry | $6,500 |
| Aug 13, 2021 | Completed final sign-off Aug 2021 | 71 Forest View Dr | W C S S Dba Solid Build Construction | to obtain final inspection for work performed under pa# 20000119482. all work is complete.Details
to obtain final inspection for work performed under pa# 20000119482. all work is complete. | |
| May 25, 2021 | Completed final sign-off Jun 2021 | 770 Guerrero St | W C S S Dba Solid Build Construction | replace existing lath & plaster finish on one side of bedroom wall and installation of besilient channel, insulation and two 5/8 type x layers of drywall on the dividing wall between top level. two bedroom sized approx 14'x9' wall runs in bldg front to rear direction for 14 ft. for sounding proofingDetails
replace existing lath & plaster finish on one side of bedroom wall and installation of besilient channel, insulation and two 5/8 type x layers of drywall on the dividing wall between top level. two bedroom sized approx 14'x9' wall runs in bldg front to rear direction for 14 ft. for sounding proofing | $4,000 |
| Jan 20, 2021 | Completed final sign-off Jun 2021 | 71 Forest View Dr | W C S S Dba Solid Build Construction | upstairs restroom to be demoed in order to update original worn out and eroded plumbing and electrical kitchen to be partial demoed to replace electr and plumbing for safethy. subsquent & reparsto wall ceilings, floors, all like for like. rewire house 200ampDetails
upstairs restroom to be demoed in order to update original worn out and eroded plumbing and electrical kitchen to be partial demoed to replace electr and plumbing for safethy. subsquent & reparsto wall ceilings, floors, all like for like. rewire house 200amp | $10,000 |
| Dec 24, 2020 | Completed final sign-off Sep 2021 | 757 12th Av | W C S S Dba Solid Build Construction | remodel kitchen, pantry, 2nd floor bahtroom & window in kind. remodel 3rd floor bathroom, remove non-load bearing wall, remove existing water closet door, remove bathtub. remove sink in bedroom closet.Details
remodel kitchen, pantry, 2nd floor bahtroom & window in kind. remodel 3rd floor bathroom, remove non-load bearing wall, remove existing water closet door, remove bathtub. remove sink in bedroom closet. | $49,000 |
| Oct 9, 2020 | Never finaled filed Oct 2020, never issued | 757 12th Av | W C S S Dba Solid Build Construction | remodel kitchen, pantry, 2nd floor bahtroom & window in kind. remodel 3rd floor bathroom, remove non-load bearing wall, remove existing water closet door, remove bathtub. remove sink in bedroom closet.Details
remodel kitchen, pantry, 2nd floor bahtroom & window in kind. remodel 3rd floor bathroom, remove non-load bearing wall, remove existing water closet door, remove bathtub. remove sink in bedroom closet. | $16,000 |
| Sep 9, 2020 | Expired or cancelled withdrawn Nov 2021 | 1201 Ortega St | W C S S Dba Solid Build Construction | enclose an office in existing hallway. install new wall door & mini split condenser.Details
enclose an office in existing hallway. install new wall door & mini split condenser. | $20,000 |
| Sep 8, 2020 | Never finaled issued Sep 2020, no final | 1201 Ortega St | W C S S Dba Solid Build Construction | install new aluminum frame glass wall with door and window in reception area and it room to minimize covid 19 exposure. temp to be removed after (covid restrictions)Details
install new aluminum frame glass wall with door and window in reception area and it room to minimize covid 19 exposure. temp to be removed after (covid restrictions) | $15,000 |
| Aug 26, 2020 | Completed final sign-off Nov 2020 | 1177 California St | W C S S Dba Solid Build Construction | installation of insulation, resilient channels and 2 layers of drywall on walls + ceiling, 450 sq ft totalDetails
installation of insulation, resilient channels and 2 layers of drywall on walls + ceiling, 450 sq ft total | $4,500 |
| Aug 18, 2020 | Completed final sign-off Mar 2021 | 1001 Pine St | W C S S Dba Solid Build Construction | unit #1203: bathroom remodeling in kind(~6'x5') - converting tub to shower, tiling walls and floor, adding light outlet, adding receptacle.Details
unit #1203: bathroom remodeling in kind(~6'x5') - converting tub to shower, tiling walls and floor, adding light outlet, adding receptacle. | $11,500 |
| Jun 22, 2020 | Completed final sign-off Dec 2020 | 2068 Grove St | W C S S Dba Solid Build Construction | install insulation, resilient clips/ channels, and two layers of drywall on the ceilings on the first floor. remodel 1.5 bathrooms in kind. upgrade the electrical and install 30 new recessed lights. 1/2 bath is 3'6"x5'. full bath is 5'10"x6'7"Details
install insulation, resilient clips/ channels, and two layers of drywall on the ceilings on the first floor. remodel 1.5 bathrooms in kind. upgrade the electrical and install 30 new recessed lights. 1/2 bath is 3'6"x5'. full bath is 5'10"x6'7" | $20,000 |
| Jun 19, 2020 | Expired or cancelled cancelled Jan 2026 | 321 27th St | W C S S Dba Solid Build Construction | install insulation between the studs in the garage. install resilient clips and channels. install 2 layers of drywall.Details
install insulation between the studs in the garage. install resilient clips and channels. install 2 layers of drywall. | $4,500 |
| Jun 15, 2020 | Completed final sign-off Aug 2020 | 40 22nd Av | W C S S Dba Solid Build Construction | sound mitigation of 1st fl guest rm on right side of house. removal of existing drywall. install insulation, rc channels, rc clips/channels and two layers of drywall. size of room is 14'10"x 14'5"Details
sound mitigation of 1st fl guest rm on right side of house. removal of existing drywall. install insulation, rc channels, rc clips/channels and two layers of drywall. size of room is 14'10"x 14'5" | $6,000 |
| Jun 13, 2020 | Completed final sign-off Nov 2020 | 1792 Page St | W C S S Dba Solid Build Construction | removal of existing lath & plaster on ceilings of throughout house. install insulation, resilient clips/cahnnels, and two layers of drywall.Details
removal of existing lath & plaster on ceilings of throughout house. install insulation, resilient clips/cahnnels, and two layers of drywall. | $7,500 |
| May 12, 2020 | Completed final sign-off Dec 2020 | 1001 Pine St | W C S S Dba Solid Build Construction | unit 1206. bathroom remodel - replace sink, faucet, light, outlet, tile floor. kitchen - add electrical outlets. all work in-kindDetails
unit 1206. bathroom remodel - replace sink, faucet, light, outlet, tile floor. kitchen - add electrical outlets. all work in-kind | $7,500 |
| Mar 6, 2020 | Completed final sign-off Dec 2020 | 1 Daniel Burnham Ct | W C S S Dba Solid Build Construction | (#302) bathroom: replace tub, drywall & baseboard, fan and switch. kitchen: sink replacement, install tile floor, & install 2 gfi outlets. install wood floor to living room, bedroom, & hallway. all work in kindDetails
(#302) bathroom: replace tub, drywall & baseboard, fan and switch. kitchen: sink replacement, install tile floor, & install 2 gfi outlets. install wood floor to living room, bedroom, & hallway. all work in kind | $9,750 |
| Mar 4, 2020 | Completed final sign-off Dec 2020 | 1 Daniel Burnham Ct | W C S S Dba Solid Build Construction | tile flooring, replace sink, dry wall and baseboard repair, living room, paint.Details
tile flooring, replace sink, dry wall and baseboard repair, living room, paint. | $4,200 |
| Nov 27, 2019 | Completed final sign-off Feb 2020 | 3869 19th St | W C S S Dba Solid Build Construction | bathroom remodel in-kind. replace tile, floor, lights, showerDetails
bathroom remodel in-kind. replace tile, floor, lights, shower | $11,250 |
| Jul 24, 2019 | Completed final sign-off Dec 2022 | 1201 Ortega St | W C S S Dba Solid Build Construction | remodel existing libary to create a podcast recording studio.Details
remodel existing libary to create a podcast recording studio. | $12,000 |
| May 10, 2019 | Completed final sign-off Aug 2019 | 1301 40th Av | W C S S Dba Solid Build Construction | revision to pa 2017-0915-8354 (soft story) - memorialize structural modifications to approved plans based on existing site conditionsDetails
revision to pa 2017-0915-8354 (soft story) - memorialize structural modifications to approved plans based on existing site conditions | |
| Mar 20, 2019 | Completed final sign-off Mar 2019 | 2250 Vicente St | W C S S Dba Solid Build Construction | replace three garage doors w/in (e) openings along 34th avenue. no other work.Details
replace three garage doors w/in (e) openings along 34th avenue. no other work. | $1,950 |
| Mar 12, 2019 | Completed final sign-off Mar 2020 | 2250 Vicente St | W C S S Dba Solid Build Construction | (1) (e) commercial parking to remain & to add access to material handling equipment storage. (2) (n) ada compliance bathroom. (3) (n) ada compliance break room. no work on residential unis. only on retail space.Details
(1) (e) commercial parking to remain & to add access to material handling equipment storage. (2) (n) ada compliance bathroom. (3) (n) ada compliance break room. no work on residential unis. only on retail space. | $31,000 |
| Dec 7, 2018 | Completed final sign-off Dec 2018 | 1600 York St | W C S S Dba Solid Build Construction | remove existing drywall in office (8x10) install resilent channels + 2 layers of drywall sound proofing install insulation.Details
remove existing drywall in office (8x10) install resilent channels + 2 layers of drywall sound proofing install insulation. | $3,500 |
| Dec 7, 2018 | Completed final sign-off Dec 2018 | 1602 York St | W C S S Dba Solid Build Construction | remove existing drywall on 8x10 walls in the bedroom installtion of insulation resilent channelts + 2 layers of drywall - sound proofing.Details
remove existing drywall on 8x10 walls in the bedroom installtion of insulation resilent channelts + 2 layers of drywall - sound proofing. | $3,500 |
| Dec 4, 2018 | Never finaled issued Dec 2018, no final | 3932 23rd St | W C S S Dba Solid Build Construction | new stucco on front of house and paint 1 hallwayDetails
new stucco on front of house and paint 1 hallway | $7,900 |
| Nov 29, 2018 | Expired or cancelled withdrawn Dec 2018 | 2250 Vicente St | W C S S Dba Solid Build Construction | demo 1 office and expand bathroom. add kitchentte area, relocate office add electrical outlets and change lighting to ledDetails
demo 1 office and expand bathroom. add kitchentte area, relocate office add electrical outlets and change lighting to led | $15,000 |
| Oct 5, 2018 | Completed final sign-off Nov 2018 | 765 05th Av | W C S S Dba Solid Build Construction | revision to pa#201809211114 to change address from 763 to 765 5th ave.Details
revision to pa#201809211114 to change address from 763 to 765 5th ave. | |
| Sep 21, 2018 | Completed final sign-off Jun 2019 | 1 Glenview Dr | W C S S Dba Solid Build Construction | 1.soundproof four walls with insulation and resilient channels with green glue and gypsum board - interior only. 2. replace exterior windows street facing with aluminum clad windows - 3 windows - marvin or pella. 3. replace exterior windows not street facing with vinyl windows - 6 windowsDetails
1.soundproof four walls with insulation and resilient channels with green glue and gypsum board - interior only. 2. replace exterior windows street facing with aluminum clad windows - 3 windows - marvin or pella. 3. replace exterior windows not street facing with vinyl windows - 6 windows | $12,000 |
| Sep 21, 2018 | Never finaled issued Sep 2018, no final | 763 05th Av | W C S S Dba Solid Build Construction | soundproof ceiling with resiliant channles and green glue/double gypsum board at 2 bedrooms, living room, kitchen, hallways. maint 1hr fire rating between units. add 7 recessed lights, change faucet in kitchen.Details
soundproof ceiling with resiliant channles and green glue/double gypsum board at 2 bedrooms, living room, kitchen, hallways. maint 1hr fire rating between units. add 7 recessed lights, change faucet in kitchen. | $12,000 |
| May 30, 2018 | Never finaled issued May 2018, no final | 2627 Pacheco St | W C S S Dba Solid Build Construction | revision to pa#201805290332. paint entire roof. cool roof compliant.Details
revision to pa#201805290332. paint entire roof. cool roof compliant. | $3,500 |
| May 29, 2018 | Never finaled issued May 2018, no final | 2627 Pacheco St | W C S S Dba Solid Build Construction | change 3 skylights & 2 windows, same sizes, same locations. not visible from street. max u factor 0.32Details
change 3 skylights & 2 windows, same sizes, same locations. not visible from street. max u factor 0.32 | $3,000 |
| Dec 4, 2017 | Completed final sign-off May 2018 | 2152 Market St | W C S S Dba Solid Build Construction | remove existing drywall/lathe/plaster. install new gypsum board with resilient channel & green gloe. kitchen, bathroom & hallway ceilings. all products are 1 hour fire rated.Details
remove existing drywall/lathe/plaster. install new gypsum board with resilient channel & green gloe. kitchen, bathroom & hallway ceilings. all products are 1 hour fire rated. | $20,206 |
| Sep 15, 2017 | Completed final sign-off Aug 2019 | 1301 40th Av | W C S S Dba Solid Build Construction | soft sotry retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4Details
soft sotry retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4 | $88,000 |
| May 11, 2017 | Completed final sign-off Aug 2017 | 853 Corbett Av | W C S S Dba Solid Build Construction | add soundproofing to ceilings. resilient channel. green glue and new gypsum board to be used.Details
add soundproofing to ceilings. resilient channel. green glue and new gypsum board to be used. | $15,000 |
| Nov 4, 2016 | Completed final sign-off Jan 2017 | 2470 Bush St | W C S S Dba Solid Build Construction | sound proof ceiling, add resilient channel and double gypsum board, whole unit, except bathroom, maintain 1 hr. separation between units.Details
sound proof ceiling, add resilient channel and double gypsum board, whole unit, except bathroom, maintain 1 hr. separation between units. | $25,000 |
| Jan 26, 2016 | Completed final sign-off Feb 2016 | 835 Kansas St | W C S S Dba Solid Build Construction | revision to 201601227784: wall needs to be extended to fill the whole space after removal of handrail. space is approx. 9'x10'Details
revision to 201601227784: wall needs to be extended to fill the whole space after removal of handrail. space is approx. 9'x10' | |
| Jan 22, 2016 | Completed final sign-off Feb 2016 | 835 Kansas St | W C S S Dba Solid Build Construction | disposal/demo of (e), gate from - replacing with drywall tap & mud paint; to use as a closet/only storage right now; replace (e) guard w/partial height stud wall same height, same location @ (e) mezzanine.Details
disposal/demo of (e), gate from - replacing with drywall tap & mud paint; to use as a closet/only storage right now; replace (e) guard w/partial height stud wall same height, same location @ (e) mezzanine. | $1,700 |
| Oct 30, 2015 | Completed final sign-off Feb 2016 | 346 01st St | W C S S Dba Solid Build Construction | unit 203, convert an (e) closet with existing washer/dryer into a 1/2 bathroom, sprinkler permit under separate pemitDetails
unit 203, convert an (e) closet with existing washer/dryer into a 1/2 bathroom, sprinkler permit under separate pemit | $6,500 |
| Oct 13, 2015 | Expired or cancelled cancelled Jan 2026 | 346 01st St | W C S S Dba Solid Build Construction | install tiles tub fixtures, valves shower head, and faucet.Details
install tiles tub fixtures, valves shower head, and faucet. | $11,000 |
| Oct 8, 2015 | Completed final sign-off Oct 2015 | 1541 Filbert St | W C S S Dba Solid Build Construction | unit #1: remove (e)ceiling at bedrm & hallway of approx 530 sq.ft. install recilient channels, insulation,double layer of dry wall, installation of 1-hr light covers (5/8" sht rock,type"x"),w/in some area of the unit.Details
unit #1: remove (e)ceiling at bedrm & hallway of approx 530 sq.ft. install recilient channels, insulation,double layer of dry wall, installation of 1-hr light covers (5/8" sht rock,type"x"),w/in some area of the unit. | $9,800 |
| Aug 31, 2015 | Expired or cancelled expired Mar 2019 | 146 Swiss Av | W C S S Dba Solid Build Construction | revision to app#201505267150. install (2) new windows on the back south facade. window are not visible from the street.Details
revision to app#201505267150. install (2) new windows on the back south facade. window are not visible from the street. | $1,150 |
| Jul 3, 2015 | Completed final sign-off Jul 2015 | 825 Cole St | W C S S Dba Solid Build Construction | remodel (e) dry wall ceiling in approximately 650 sq ft. two layers of type x - 5/8 gypsum, one hour fire rated light covers.Details
remodel (e) dry wall ceiling in approximately 650 sq ft. two layers of type x - 5/8 gypsum, one hour fire rated light covers. | $2,750 |
| Jun 1, 2015 | Completed final sign-off Jul 2015 | 368 Dolores St | W C S S Dba Solid Build Construction | construct new ceiling with gypsum board. soundproof with resilient channel and insulation at first floor bedroom approx. 200 sq. ft.Details
construct new ceiling with gypsum board. soundproof with resilient channel and insulation at first floor bedroom approx. 200 sq. ft. | $3,000 |
| May 27, 2015 | Completed final sign-off Oct 2015 | 1631 Filbert St | W C S S Dba Solid Build Construction | front bldg - relocate stove from n.wall to w. wall, relocate sink form w. wall to n. wall, add 7 outlets, tile floor, add granite countertop + cabinets + hood + uent, power upgrade from 100 amps to 400 amps.Details
front bldg - relocate stove from n.wall to w. wall, relocate sink form w. wall to n. wall, add 7 outlets, tile floor, add granite countertop + cabinets + hood + uent, power upgrade from 100 amps to 400 amps. | $30,000 |
| May 26, 2015 | Completed final sign-off Mar 2019 | 146 Swiss Av | W C S S Dba Solid Build Construction | removing extg 1st floor bathroom plumbing fixtures and transform space to new storage area. adding a new bathroom of 1st floor with new window to sideyard. new sliding in rear facade to replace extg windows.Details
removing extg 1st floor bathroom plumbing fixtures and transform space to new storage area. adding a new bathroom of 1st floor with new window to sideyard. new sliding in rear facade to replace extg windows. | $12,000 |
| May 20, 2015 | Never finaled issued May 2015, no final | 1201 California St | W C S S Dba Solid Build Construction | demolition of (e) drywall. install insulation between the studs. install clips and channels on studs. install layer of drywall with acoustical selant. install an additional layer of drywall with green glue. dry wall shall be 3/8" type "x" approx 200 sq.ft.Details
demolition of (e) drywall. install insulation between the studs. install clips and channels on studs. install layer of drywall with acoustical selant. install an additional layer of drywall with green glue. dry wall shall be 3/8" type "x" approx 200 sq.ft. | $7,000 |
| Mar 19, 2015 | Completed final sign-off May 2015 | 135 07th Av | W C S S Dba Solid Build Construction | to comply with violaton notices # 201534901 - demo (e0 drywall on ceiling. install insulation, recileint channels, and two (n) layers of 5/8" gypboard type x. 1 hr fire assembly. unit on 2nd floor. total 200 s.f. includes hallways, kitchen and bedroomDetails
to comply with violaton notices # 201534901 - demo (e0 drywall on ceiling. install insulation, recileint channels, and two (n) layers of 5/8" gypboard type x. 1 hr fire assembly. unit on 2nd floor. total 200 s.f. includes hallways, kitchen and bedroom | $3,500 |
| Sep 4, 2014 | Completed final sign-off Oct 2014 | 2017 19th St | W C S S Dba Solid Build Construction | remove existing ceilings, drywall, 680 sf approx. installation of resilient channels, insulation and double layers of drywall on ceiling lower unitDetails
remove existing ceilings, drywall, 680 sf approx. installation of resilient channels, insulation and double layers of drywall on ceiling lower unit | $10,040 |
| Sep 4, 2014 | Completed final sign-off Oct 2014 | 28 Parker Av | W C S S Dba Solid Build Construction | unit 102: remove existing ceilings drywall approx 670 sqft. installation of recilient channels, insulation, double layer of dry wall, installation of 1 hr light coversDetails
unit 102: remove existing ceilings drywall approx 670 sqft. installation of recilient channels, insulation, double layer of dry wall, installation of 1 hr light covers | $9,950 |
| Sep 4, 2014 | Completed final sign-off Oct 2014 | 574 26th Av | W C S S Dba Solid Build Construction | unit 1: remove existing cieling drywall, 450 sf approx. installation of resilient channels, insulation and double layers of drywall on ceiling. installation of 1 hour light coversDetails
unit 1: remove existing cieling drywall, 450 sf approx. installation of resilient channels, insulation and double layers of drywall on ceiling. installation of 1 hour light covers | $9,545 |