Paul W. Chan
- Listed as
- engineer
- Firm
- Pctc Engineering
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Mar 2026
15 permits since 2000 (engineer on 15 permits): 9 completed, 3 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 25, 2026 | In progress issued Apr 2026 | 35 Hartford St | kitchen remodel. new windows & door on rear facade to replace (e). relocation of (e) appliances, plumbing fixturs. new cabinets & finishes. addition of prep sink.Details
kitchen remodel. new windows & door on rear facade to replace (e). relocation of (e) appliances, plumbing fixturs. new cabinets & finishes. addition of prep sink. | $150,000 | |
| Jan 15, 2026 | In progress issued Jan 2026 | 1596 Post St | Cal C A D E Construction Inc | rev 202405091826: structural field revisions; window replacement at (e) openings.Details
rev 202405091826: structural field revisions; window replacement at (e) openings. | |
| Jun 24, 2024 | In progress issued Jul 2025 | 1596 Post St | Cal C A D E Construction Inc | 2132 sf 3rd floor addition to existing 7125 sf 2story mixed use bldg including:3(n)beds,(2)new baths & (1)toilet,increasing bldg height from 27'3"to 38'-8.scope to create a 1048 sf garage w/(3)covered parking spaces,& 2nd fl remodeling(e)2375 sf(4)bedroom,(1)bath & (1)powder room.Details
2132 sf 3rd floor addition to existing 7125 sf 2story mixed use bldg including:3(n)beds,(2)new baths & (1)toilet,increasing bldg height from 27'3"to 38'-8.scope to create a 1048 sf garage w/(3)covered parking spaces,& 2nd fl remodeling(e)2375 sf(4)bedroom,(1)bath & (1)powder room. | $600,000 |
| Sep 20, 2022 | Completed final sign-off Apr 2024 | 45 Longview Ct | W C S S Dba Solid Build Construction | g/f interior remodel to add bedroom,b athroom, family room, laundry room & hall. legalization of (e) interior stairs. no changes to proposed to (e) facade. new window - street facing.Details
g/f interior remodel to add bedroom,b athroom, family room, laundry room & hall. legalization of (e) interior stairs. no changes to proposed to (e) facade. new window - street facing. | $80,000 |
| Jul 20, 2022 | Completed final sign-off May 2023 | 77 Casa Wy | remodel of top floor kitchen door openings w/spreader beams and voluntary plywood strengthening - no calculations were submitted nor reviewed. no exterior changes nor unit count. same occupancy.Details
remodel of top floor kitchen door openings w/spreader beams and voluntary plywood strengthening - no calculations were submitted nor reviewed. no exterior changes nor unit count. same occupancy. | $25,000 | |
| Jun 9, 2021 | Expired or cancelled suspend Jul 2026 | 3720 23rd St | Mario Sarmento | add a vertical addition comprised of 3 bedrooms, 2 bathrooms, roof deck and stairs. replace foundations in unconditioned basement. remodel interior of first floor.Details
add a vertical addition comprised of 3 bedrooms, 2 bathrooms, roof deck and stairs. replace foundations in unconditioned basement. remodel interior of first floor. | $350,000 |
| Apr 27, 2021 | Never finaled issued Apr 2022, no final | 2865 Green St | Upscale Construction Inc. | interior remodel to include vertical addition of new 4th floor story set back from public right of way 17'-7".rear yard extenstion of 2'-0" on 3rd and 4th floors only. vertical addition. plumbing, mechanical, elec. & finishes throughout. removal of existing elevator. sprinkler 13r throughoutDetails
interior remodel to include vertical addition of new 4th floor story set back from public right of way 17'-7".rear yard extenstion of 2'-0" on 3rd and 4th floors only. vertical addition. plumbing, mechanical, elec. & finishes throughout. removal of existing elevator. sprinkler 13r throughout | $450 |
| Feb 25, 2020 | Completed final sign-off Jun 2022 | 2650 17th Av | Quinlan Construction | remodel/addition to sfr add 220 sf below existing sunroom, add 71sf conditioned space in garage, remodel kitchen and dining rooms. new windows, doors, skylight, no change to front facade.Details
remodel/addition to sfr add 220 sf below existing sunroom, add 71sf conditioned space in garage, remodel kitchen and dining rooms. new windows, doors, skylight, no change to front facade. | $80,000 |
| Feb 12, 2020 | Completed final sign-off Apr 2021 | 333 Mississippi St | Bay Build Design Inc | interior remodel of kitchen, add one full bath & closet in upper unit, enlarge one window (not visible from street), 3 new skylights, replace 2 windows and one door to rear of building.Details
interior remodel of kitchen, add one full bath & closet in upper unit, enlarge one window (not visible from street), 3 new skylights, replace 2 windows and one door to rear of building. | $25,000 |
| Jun 19, 2019 | Completed final sign-off Oct 2019 | 198 Precita Av | Hubert Penny | interior remodeling work only. convert extg family room on main floor to make new bathroom/washer closet within extg space at extg s.f.d. no other changes to exterior nor lower floors.Details
interior remodeling work only. convert extg family room on main floor to make new bathroom/washer closet within extg space at extg s.f.d. no other changes to exterior nor lower floors. | $15,000 |
| Mar 18, 2019 | Completed final sign-off Dec 2022 | 1542 24th Av | Kuality Constructions | addition of new rear yard deck. replace (e) windows on 2nd floor.Details
addition of new rear yard deck. replace (e) windows on 2nd floor. | $50,000 |
| Mar 8, 2011 | Completed final sign-off Nov 2012 | 330 Park St | replace in-kind (e) unreienforced masonry concrete block foundation and walls at rear of residence. no additional int. work at residence or change to envelope of building, dry rot repair property line wall at rear of residence. install plywood panels along property lines, as shown.Details
replace in-kind (e) unreienforced masonry concrete block foundation and walls at rear of residence. no additional int. work at residence or change to envelope of building, dry rot repair property line wall at rear of residence. install plywood panels along property lines, as shown. | $24,500 | |
| Nov 6, 2006 | Expired or cancelled expired Apr 2008 | 830 Alabama St | Fox Structural & Termite | voluntary garage level partial seismic upgrade. replace cross-wall with only one steel @ garage frames & conc. footings as shown. no other changes. no changes to upper floors usage nor exterior.Details
voluntary garage level partial seismic upgrade. replace cross-wall with only one steel @ garage frames & conc. footings as shown. no other changes. no changes to upper floors usage nor exterior. | $35,000 |
| Jan 28, 2005 | Completed final sign-off Apr 2006 | 235 Bemis St | work at ground floor. all work is interior within the (e) footprint. add bathroom to (e) bedroom &Details
work at ground floor. all work is interior within the (e) footprint. add bathroom to (e) bedroom & | $40,000 | |
| Nov 16, 2004 | Completed final sign-off Mar 2005 | 327 San Jose Av | voluntary steel moment frame @ rear garage only.no change to (e) bldg.nor unit countsDetails
voluntary steel moment frame @ rear garage only.no change to (e) bldg.nor unit counts | $4,500 |