Cal C A D E Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2010 to Sep 2026
- Last 24 months
- 8 permits filed
175 permits since 2000: 142 completed, 8 in progress, 11 never finaled, 14 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 175.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 1980 Jackson St | replace kitchen cabinets, appliances, & fixtures. enlarge opening at dining room. remodel 4 bathrooms. remove wall on 3/f to create 2 bedrooms. add laundry on 3/f.Details
replace kitchen cabinets, appliances, & fixtures. enlarge opening at dining room. remodel 4 bathrooms. remove wall on 3/f to create 2 bedrooms. add laundry on 3/f. | $50,000 |
| Jul 9, 2026 | In progress filed Jul 2026, not yet issued | 50 Walnut St | excavate lowest level & (n) foundation, replace all windows, exterior doors, replace in-kind stucco facades/soffits. new elevated deck at rear yard, bathrooms, kitchen & kitchenette, washer/dryer, radiant floor heating, skylights, tankless wh, heat/cool system, & fs throughout house.Details
excavate lowest level & (n) foundation, replace all windows, exterior doors, replace in-kind stucco facades/soffits. new elevated deck at rear yard, bathrooms, kitchen & kitchenette, washer/dryer, radiant floor heating, skylights, tankless wh, heat/cool system, & fs throughout house. | $1,095,000 |
| Mar 23, 2026 | In progress issued Aug 2026 | 1596 Post St | revision to 202405091826 & reference 202601153915 new fire rated wall detail at property line wall due to siding change approved in permit ending 3915. new gas utility & meters installed on west exterior wall. (n) fire rated door between garage and hallway. new door between office and loading dockDetails
revision to 202405091826 & reference 202601153915 new fire rated wall detail at property line wall due to siding change approved in permit ending 3915. new gas utility & meters installed on west exterior wall. (n) fire rated door between garage and hallway. new door between office and loading dock | |
| Mar 19, 2026 | In progress filed Mar 2026, not yet issued | 732 Brannan St | soft demo of interior t.i. of 2 story building including fixtures (light), dropped ceiling, hvac, non structural partial height partitions. front stair to 2nd floor to be removed. rear stair & elevator to remain. no exterior work & no structural work.Details
soft demo of interior t.i. of 2 story building including fixtures (light), dropped ceiling, hvac, non structural partial height partitions. front stair to 2nd floor to be removed. rear stair & elevator to remain. no exterior work & no structural work. | $11,200 |
| Jan 28, 2026 | Completed final sign-off May 2026 | 1890 Broadway | unit#506: sheetrock replacement on kitchen/living room wall 16'x8' 11'x8' 3'x5'. interior wall of dwellingDetails
unit#506: sheetrock replacement on kitchen/living room wall 16'x8' 11'x8' 3'x5'. interior wall of dwelling | $1,200 |
| Jan 15, 2026 | In progress issued Jan 2026 | 1596 Post St | rev 202405091826: structural field revisions; window replacement at (e) openings.Details
rev 202405091826: structural field revisions; window replacement at (e) openings. | |
| Sep 4, 2025 | Completed final sign-off Nov 2025 | 111 Duncan St | bathroom remodel: remove exisitng vanity, tiles, toilet, cabinets, install new with shower fixtures, in kind.Details
bathroom remodel: remove exisitng vanity, tiles, toilet, cabinets, install new with shower fixtures, in kind. | $12,000 |
| May 28, 2025 | In progress filed May 2025, not yet issued | 1596 Post St | demo interior of 1st fl and partial basement. vacant building. demolition per sfdbi ab-017. refer to pa# 202405091826Details
demo interior of 1st fl and partial basement. vacant building. demolition per sfdbi ab-017. refer to pa# 202405091826 | $8,000 |
| Jun 24, 2024 | In progress issued Jul 2025 | 1596 Post St | 2132 sf 3rd floor addition to existing 7125 sf 2story mixed use bldg including:3(n)beds,(2)new baths & (1)toilet,increasing bldg height from 27'3"to 38'-8.scope to create a 1048 sf garage w/(3)covered parking spaces,& 2nd fl remodeling(e)2375 sf(4)bedroom,(1)bath & (1)powder room.Details
2132 sf 3rd floor addition to existing 7125 sf 2story mixed use bldg including:3(n)beds,(2)new baths & (1)toilet,increasing bldg height from 27'3"to 38'-8.scope to create a 1048 sf garage w/(3)covered parking spaces,& 2nd fl remodeling(e)2375 sf(4)bedroom,(1)bath & (1)powder room. | $600,000 |
| May 23, 2024 | Completed final sign-off Aug 2024 | 1204 Mariner Dr | unit d: install insulation + sheetrock after fire damage to unit., install plumbing appliances in the same spots as before fire. reparir exterior siding in kind. no layout change - only remodel. maintain fire ratingDetails
unit d: install insulation + sheetrock after fire damage to unit., install plumbing appliances in the same spots as before fire. reparir exterior siding in kind. no layout change - only remodel. maintain fire rating | $25,000 |
| May 23, 2024 | Completed final sign-off Aug 2024 | 1204 Mariner Dr | unit c: install insulation + sheetrock after fire damage to unit., install plumbing appliances in the same spots as before fire. repair exterior siding in kind. no layout change - only remodel. maintain fire ratingDetails
unit c: install insulation + sheetrock after fire damage to unit., install plumbing appliances in the same spots as before fire. repair exterior siding in kind. no layout change - only remodel. maintain fire rating | $50,000 |
| Oct 2, 2023 | In progress issued Oct 2023 | 535 Laurel St | interior remodel to (2) bathrooms, new plumbing fixtures, replace floor and wall finishes, cabinetry in kind. add new high efficacy lighting, fans and occupancy sensor.Details
interior remodel to (2) bathrooms, new plumbing fixtures, replace floor and wall finishes, cabinetry in kind. add new high efficacy lighting, fans and occupancy sensor. | $20,000 |
| Sep 29, 2023 | Completed final sign-off Oct 2023 | 1145 Ozbourn Ct | unit b: to comply with nov 202306778. (e) dryer duct installation through unit to exterior. minimum 3 ft from property line. 3 ft from building openings. solid sheet metal ducts.Details
unit b: to comply with nov 202306778. (e) dryer duct installation through unit to exterior. minimum 3 ft from property line. 3 ft from building openings. solid sheet metal ducts. | $3,000 |
| Sep 26, 2023 | Completed final sign-off Nov 2025 | 250 Detroit St | remove (e) wall between kitchen & bedrm; convert (e) bedrm to kitchen; convert (e) kitchen dining rm; convert (e) dining room bedrm/office; convert (e) family rm to primary bedrm; add (n) primary bathrm; convert portion of laundry rm to closetDetails
remove (e) wall between kitchen & bedrm; convert (e) bedrm to kitchen; convert (e) kitchen dining rm; convert (e) dining room bedrm/office; convert (e) family rm to primary bedrm; add (n) primary bathrm; convert portion of laundry rm to closet | $200,000 |
| Aug 31, 2023 | Completed final sign-off Jul 2024 | 4079 Cesar Chavez St | replace windows in kind in rear with fiberglass & repair front windows with wood. replace dryrot at rear. work in both units. 4079 and 4079a.Details
replace windows in kind in rear with fiberglass & repair front windows with wood. replace dryrot at rear. work in both units. 4079 and 4079a. | $20,000 |
| Jul 13, 2023 | Completed final sign-off Oct 2024 | 732 Brannan St | voluntary accessibility upgrade to (e) 1st & 2nd fl toilet rooms. install new plumbing fixtures, grab bar & toilet rm accessories. alter e) employee break rm: new counter, cabinets, remove non structural partitions. no exterior, no catering in kitchenDetails
voluntary accessibility upgrade to (e) 1st & 2nd fl toilet rooms. install new plumbing fixtures, grab bar & toilet rm accessories. alter e) employee break rm: new counter, cabinets, remove non structural partitions. no exterior, no catering in kitchen | $130,000 |
| Jun 12, 2023 | Never finaled issued Oct 2023, no final | 151 Braghetta Ln | treasure island bldg #2: new team sports venue location in (e) historic bldg. leveling (e) concrete pad, install prefab courts for pickleball and padelball, install temp accessible restroom/accessible parking/route to area of use for customers and employees. no spectator seating. max 49 occup load.Details
treasure island bldg #2: new team sports venue location in (e) historic bldg. leveling (e) concrete pad, install prefab courts for pickleball and padelball, install temp accessible restroom/accessible parking/route to area of use for customers and employees. no spectator seating. max 49 occup load. | $39,500 |
| Apr 12, 2023 | Completed final sign-off Apr 2024 | 4079 Cesar Chavez St | remodel in kind 2 kitchens and 3 bathrooms (1kitchen + 2baths at unit 4079; 1 kitchen + 1 bath at unit 4079a).Details
remodel in kind 2 kitchens and 3 bathrooms (1kitchen + 2baths at unit 4079; 1 kitchen + 1 bath at unit 4079a). | $95,000 |
| Mar 21, 2023 | Completed final sign-off Jan 2024 | 201 08th St | repair to 2 ea (e) columns within buildingDetails
repair to 2 ea (e) columns within building | $25,000 |
| Feb 7, 2023 | Completed final sign-off Sep 2023 | 155 Beacon St | partial roof repar in kind ue to tree falling realted damage. to address complaint #202301175Details
partial roof repar in kind ue to tree falling realted damage. to address complaint #202301175 | $8,000 |
| Nov 23, 2022 | Completed final sign-off Dec 2023 | 818 Steiner St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 4 bathroom(s) in 1st fl, 2nd fl, 3rd fl with 3 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 4 bathroom(s) in 1st fl, 2nd fl, 3rd fl with 3 shower pan(s). | $190,000 |
| Aug 4, 2022 | Completed final sign-off May 2024 | 60 Clipper Cove Wy | renovate (e) storage room by adding a 2-hour fire rated wall to divide a room space of about 1500 sf into (2) rooms, server (716 sf) & storage rooms (770 sf).Details
renovate (e) storage room by adding a 2-hour fire rated wall to divide a room space of about 1500 sf into (2) rooms, server (716 sf) & storage rooms (770 sf). | $20,000 |
| Jun 9, 2022 | Completed final sign-off Apr 2023 | 1921 Broderick St | remodel extg kitchen and a bathroom. change a side wood window, repair rotted siding on south side.Details
remodel extg kitchen and a bathroom. change a side wood window, repair rotted siding on south side. | $75,000 |
| Feb 17, 2022 | Completed final sign-off Sep 2023 | 444 Natoma St | replacement in-kind of (e) south facade windows with new. no change in egress. (n) windows to comply with 209 energy code ca.Details
replacement in-kind of (e) south facade windows with new. no change in egress. (n) windows to comply with 209 energy code ca. | $95,500 |
| Oct 8, 2021 | Expired or cancelled withdrawn Apr 2024 | 1760 Fell St | repair replacement of street facing facades and stair. replace front and side windows. raise front parapet by 18" with addition of cornice. rebuilt exist. retaining wall against the sidewalk along the front property lineDetails
repair replacement of street facing facades and stair. replace front and side windows. raise front parapet by 18" with addition of cornice. rebuilt exist. retaining wall against the sidewalk along the front property line | $30,000 |
| Jul 20, 2021 | Expired or cancelled cancelled Aug 2023 | 1760 Fell St | minor exploratory demolition at fell street facade only, remove select exterior siding, document conditions and replace in kindDetails
minor exploratory demolition at fell street facade only, remove select exterior siding, document conditions and replace in kind | $500 |
| Jul 9, 2021 | Completed final sign-off Mar 2022 | 5800 Geary Bl | comply with planning enforcement case #202-010672enf, removal of clover shaped window and installing 2 new rectagle with curved top windows on 22nd ave. frontage in catergory b building without permit.Details
comply with planning enforcement case #202-010672enf, removal of clover shaped window and installing 2 new rectagle with curved top windows on 22nd ave. frontage in catergory b building without permit. | $10,000 |
| May 6, 2021 | Completed final sign-off Nov 2022 | 1120 Church St | rear bldg- remodel existing first level dining room, add new skylights, remove existing garage door and driveway on nellie st. infill exterior wall, add new window, add new curb and planter in place of removed drivewayDetails
rear bldg- remodel existing first level dining room, add new skylights, remove existing garage door and driveway on nellie st. infill exterior wall, add new window, add new curb and planter in place of removed driveway | $15,000 |
| Oct 2, 2020 | Expired or cancelled cancelled Jan 2026 | 1 Avenue Of The Palms | treasure island: aka 749 9th street t.i.: selective demo of (e) resroom s & doors. new construction of food prip area & non-cooking kitchen including matching tile & finishes.Details
treasure island: aka 749 9th street t.i.: selective demo of (e) resroom s & doors. new construction of food prip area & non-cooking kitchen including matching tile & finishes. | $150,000 |
| Jun 24, 2020 | Completed final sign-off Sep 2020 | 849 13th Ti St | bldg #62: demo of illegally built interior wall.Details
bldg #62: demo of illegally built interior wall. | $30,000 |
| Mar 5, 2020 | Never finaled issued Mar 2020, no final | 1 Avenue Of The Palms | install ada door (not visible from the street)Details
install ada door (not visible from the street) | $8,000 |
| Dec 16, 2019 | Completed final sign-off Jan 2020 | 1 Avenue Of The Palms | remove 3 windows and replace 3 roller doorsDetails
remove 3 windows and replace 3 roller doors | $10,000 |
| Oct 10, 2019 | Expired or cancelled cancelled Nov 2024 | 4079 Cesar Chavez St | horizontal addition. remove gabled roof & provide new flat roof & new property line walls. provide horizontal rear yard addition. remodel bath units including new kitchen and bathrooms.Details
horizontal addition. remove gabled roof & provide new flat roof & new property line walls. provide horizontal rear yard addition. remodel bath units including new kitchen and bathrooms. | $500,000 |
| Sep 19, 2019 | Completed final sign-off Mar 2021 | 1159 Clay St | commencement of work not started under previously approved permit application pa# 201706280528Details
commencement of work not started under previously approved permit application pa# 201706280528 | $43,000 |
| Sep 5, 2019 | Completed final sign-off Jun 2020 | 2682 Broadway | bathroom remodel of tile, new toilet, new sink, paint. shower pan. 40 sq ft bathroom remodelDetails
bathroom remodel of tile, new toilet, new sink, paint. shower pan. 40 sq ft bathroom remodel | $7,500 |
| Aug 23, 2019 | Completed final sign-off Nov 2019 | 5800 Geary Bl | ref# 2017-12-08-6001: mep and title 24.Details
ref# 2017-12-08-6001: mep and title 24. | $55,000 |
| Aug 1, 2019 | Completed final sign-off Aug 2019 | 1120 Thomas Av | revision to pa 2019-0610-2968 adding 1 sink, refrigerator, cabinetsDetails
revision to pa 2019-0610-2968 adding 1 sink, refrigerator, cabinets | $5,000 |
| Jun 10, 2019 | Completed final sign-off Aug 2019 | 1120 Thomas Av | ti, inter repair/remodel of water damaged bath/shower. add 1 accessible bathroom, acc shower. demo non structural walls as indicatedDetails
ti, inter repair/remodel of water damaged bath/shower. add 1 accessible bathroom, acc shower. demo non structural walls as indicated | $95,000 |
| May 3, 2019 | Expired or cancelled cancelled Jan 2026 | 1120 Thomas Av | ti interior repair/remodel of water damaged office/bathrooms; add 1 accessible bathroom/shower/locker @ 1st floor; remodel 2 bathrooms/office @ 2nd floorDetails
ti interior repair/remodel of water damaged office/bathrooms; add 1 accessible bathroom/shower/locker @ 1st floor; remodel 2 bathrooms/office @ 2nd floor | $95,000 |
| Jan 29, 2019 | Completed final sign-off Feb 2019 | 364 Bush St | revision to 201712065620. removal of work at basement from scopeDetails
revision to 201712065620. removal of work at basement from scope | |
| Nov 30, 2018 | Completed final sign-off Sep 2019 | 5800 Geary Bl | voluntary soft story retrofit per ab-94 in compliance with sfebc chapter 4d in accordance with 2016 cebc appendix a-4. strengthen (e) floor joistsDetails
voluntary soft story retrofit per ab-94 in compliance with sfebc chapter 4d in accordance with 2016 cebc appendix a-4. strengthen (e) floor joists | $80,000 |
| Nov 16, 2018 | Completed final sign-off Mar 2019 | 1251 Howard St | revision to pa# 201709279668, to include title 24 plansDetails
revision to pa# 201709279668, to include title 24 plans | $2,500 |
| Nov 13, 2018 | Completed final sign-off Nov 2018 | 135 Edgewood Av | structural revision to pa 2018-0302-2645, memorialize structural modifications to framing posts based on (e) site conditionsDetails
structural revision to pa 2018-0302-2645, memorialize structural modifications to framing posts based on (e) site conditions | |
| Nov 9, 2018 | Completed final sign-off Dec 2018 | 850 Union St | to obtain final inspection for work approved under pa 201104133986Details
to obtain final inspection for work approved under pa 201104133986 | |
| Nov 7, 2018 | Completed final sign-off Mar 2019 | 1700 Vallejo St | structural revision to pa #201603101749. foundation replacement.Details
structural revision to pa #201603101749. foundation replacement. | $175,000 |
| Sep 28, 2018 | Completed final sign-off Dec 2018 | 850 Union St | to obtain final inspection for work approved under pa#s: 2011-05-31-7081, & 2011-08-01-1449. all work is completeDetails
to obtain final inspection for work approved under pa#s: 2011-05-31-7081, & 2011-08-01-1449. all work is complete | |
| Sep 28, 2018 | Expired or cancelled cancelled Dec 2018 | 850 Union St | to obtain final inspection for work approved under pa#s: 2009-02-12-2024, 2011-04-13-3986 & 2009-05-05-7662. all work is completeDetails
to obtain final inspection for work approved under pa#s: 2009-02-12-2024, 2011-04-13-3986 & 2009-05-05-7662. all work is complete | |
| Sep 19, 2018 | Never finaled issued Sep 2018, no final | 364 Bush St | install 1 hour fire rated lobby and 1 hour fire rated door at bottom of stairs in basement. install early fire detection alarm in basement install 3" fire hose valve at top of the stairs and make extg fire chase accessible. all of the above is agreed as per ab005 with reference to app#201712065620Details
install 1 hour fire rated lobby and 1 hour fire rated door at bottom of stairs in basement. install early fire detection alarm in basement install 3" fire hose valve at top of the stairs and make extg fire chase accessible. all of the above is agreed as per ab005 with reference to app#201712065620 | $1,500 |
| Sep 4, 2018 | Never finaled issued Sep 2018, no final | 364 Bush St | erect a non-electrical single face sign (front/side window)Details
erect a non-electrical single face sign (front/side window) | $75 |
| Sep 4, 2018 | Never finaled issued Sep 2018, no final | 364 Bush St | erect non-electric single faced sign (door)Details
erect non-electric single faced sign (door) | $25 |
| Jul 12, 2018 | Completed final sign-off Oct 2018 | 154 28th St | remove and replace existing tile deck in back, remove and replace existing door, leading to deck. less than 50%Details
remove and replace existing tile deck in back, remove and replace existing door, leading to deck. less than 50% | $14,500 |
| Jun 18, 2018 | Completed final sign-off Jul 2019 | 165 Beacon St | remodel bathroom and kitchen replace inkindDetails
remodel bathroom and kitchen replace inkind | $12,000 |
| May 16, 2018 | Expired or cancelled withdrawn Nov 2019 | 5800 Geary Bl | mep for pa 2017-1208-6001 mech, elec, plumbing layout diagrams to be routed to dept of public healthDetails
mep for pa 2017-1208-6001 mech, elec, plumbing layout diagrams to be routed to dept of public health | |
| May 14, 2018 | Completed final sign-off Feb 2019 | 1458 Howard St | ti- new offices and storage. (e) accessible restrooms, breakrooms, stairs and ramps to remain (no change) mep/fire fdefferrred maher naDetails
ti- new offices and storage. (e) accessible restrooms, breakrooms, stairs and ramps to remain (no change) mep/fire fdefferrred maher na | $150,000 |
| Apr 25, 2018 | Completed final sign-off Mar 2019 | 1251 Howard St | revision to permit 201802221927. omit 3-hr fire doors, making building completely sprinklered to increase allowable area. remove stairs to mezzanine, from 2 showers to 1 shower. add parition wall at break room. sprinklers, fire alarm, mep separte permitDetails
revision to permit 201802221927. omit 3-hr fire doors, making building completely sprinklered to increase allowable area. remove stairs to mezzanine, from 2 showers to 1 shower. add parition wall at break room. sprinklers, fire alarm, mep separte permit | |
| Apr 13, 2018 | Never finaled issued May 2018, no final | 364 Bush St | revision to pa # 201712065620. change to restroom layout, adding walk-in refrigeration, submit mechanical, revision to structural drawings.Details
revision to pa # 201712065620. change to restroom layout, adding walk-in refrigeration, submit mechanical, revision to structural drawings. | |
| Feb 22, 2018 | Completed final sign-off Mar 2019 | 1251 Howard St | tenant improvement - remodel (4) existing baths, ad d (n) locker rooms & showers. add (n) shop room. paint existing rooms. provide fire area separation with 3 hour drop doors (4), and 1 mag held 3 hr door, interlocked to close simultaneously.Details
tenant improvement - remodel (4) existing baths, ad d (n) locker rooms & showers. add (n) shop room. paint existing rooms. provide fire area separation with 3 hour drop doors (4), and 1 mag held 3 hr door, interlocked to close simultaneously. | $115,000 |
| Dec 8, 2017 | Completed final sign-off Nov 2019 | 5800 Geary Bl | to comply with nov #201702201, kitchen and bar remodel. mep under seperate permit. nfpa 13 sprinkler system to be installed under seperate permit. sprinkler monitoring system required if no r-2 building alarm.Details
to comply with nov #201702201, kitchen and bar remodel. mep under seperate permit. nfpa 13 sprinkler system to be installed under seperate permit. sprinkler monitoring system required if no r-2 building alarm. | $175,000 |
| Dec 6, 2017 | Completed final sign-off Feb 2019 | 364 Bush St | expansion of (e) restaurant into adjoining space, construct new bar in adjoining space, new accessible restrooms, expand existing kitchen, expand basement, new fire sprinklers throughout.Details
expansion of (e) restaurant into adjoining space, construct new bar in adjoining space, new accessible restrooms, expand existing kitchen, expand basement, new fire sprinklers throughout. | $225,000 |
| Dec 5, 2017 | Completed final sign-off May 2018 | 166 Sproule Ln | plans for sidewalk excavation. ref app#201605258357Details
plans for sidewalk excavation. ref app#201605258357 | $30,000 |
| Nov 14, 2017 | Completed final sign-off Nov 2017 | 1814 Bush St | revision to 201708185306, added foundationDetails
revision to 201708185306, added foundation | $5,000 |
| Sep 27, 2017 | Completed final sign-off Mar 2019 | 1255 Howard St | interior soft demo sandblasting walls and lighting at warehouse areaDetails
interior soft demo sandblasting walls and lighting at warehouse area | $10,000 |
| Sep 15, 2017 | Completed final sign-off Mar 2020 | 3562 17th St | soft story retrofit per sfebc chapter 4d, engineering criteria:Details
soft story retrofit per sfebc chapter 4d, engineering criteria: | $50,000 |
| Aug 18, 2017 | Completed final sign-off Nov 2017 | 1814 Bush St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $35,000 |
| May 3, 2017 | Completed final sign-off Dec 2017 | 1515 California St | 1/f: tenant improvement for new commercial shop fitout optometery office.Details
1/f: tenant improvement for new commercial shop fitout optometery office. | $30,000 |
| Mar 28, 2017 | Completed final sign-off Sep 2021 | 85 Columbia Square St | comply with nov# 201633643: legalize ground floor dwelling, storage rooms & garage per ord 162-16. 2nd floor: legalize 1 dwelling and deck per ord 43-14, upgrade elec,plumb. new door at harriet and harrison. sprinklers required under separate permit. ** maher: n/a **Details
comply with nov# 201633643: legalize ground floor dwelling, storage rooms & garage per ord 162-16. 2nd floor: legalize 1 dwelling and deck per ord 43-14, upgrade elec,plumb. new door at harriet and harrison. sprinklers required under separate permit. ** maher: n/a ** | $40,000 |
| Jan 18, 2017 | Completed final sign-off May 2019 | 100 Magellan Av | revision to pa #201605197940 - architectural changes & structural frame change.Details
revision to pa #201605197940 - architectural changes & structural frame change. | |
| Nov 14, 2016 | Completed final sign-off Feb 2019 | 1458 Howard St | change of use on ground floor from industrial/warehouse to professional services office. exterior facade upgrade. ref# 2018-0514-9019.** maher: n/a **Details
change of use on ground floor from industrial/warehouse to professional services office. exterior facade upgrade. ref# 2018-0514-9019.** maher: n/a ** | $100,000 |
| Oct 13, 2016 | Expired or cancelled cancelled Jan 2026 | 85 Columbia Square St | replace kitchen in kind, 6 skylights, 2 windows in kind, install 1 door & replace window with door. n/a maher ordinanceDetails
replace kitchen in kind, 6 skylights, 2 windows in kind, install 1 door & replace window with door. n/a maher ordinance | $30,000 |
| Sep 15, 2016 | Completed final sign-off Sep 2018 | 1745 North Point St | revision to app#201604285957 to remove fire sprinkler system from approved permit. maher ord 155-13 not required.Details
revision to app#201604285957 to remove fire sprinkler system from approved permit. maher ord 155-13 not required. | |
| Aug 25, 2016 | Completed final sign-off May 2018 | 166 Sproule Ln | revision to application 2014-0626-9581 (s1) change regular foundation to a mat slab foundationDetails
revision to application 2014-0626-9581 (s1) change regular foundation to a mat slab foundation | |
| May 25, 2016 | Completed final sign-off May 2018 | 166 Sproule Ln | provide temporary shoring and underpinning to facilitate excavation and constructionof proposed new bldg per 201406269581Details
provide temporary shoring and underpinning to facilitate excavation and constructionof proposed new bldg per 201406269581 | $20,000 |
| May 25, 2016 | Completed final sign-off Mar 2021 | 156 Sproule Ln | provide temporary shoring and underpinning to facilitate the excavation and construction of the proposed new bldg per 201406269581Details
provide temporary shoring and underpinning to facilitate the excavation and construction of the proposed new bldg per 201406269581 | $10,000 |
| May 19, 2016 | Completed final sign-off May 2019 | 100 Magellan Av | interior renovation to floors include kitchen & baths, replace existing deck, new decking material, new windows & doors to be replaced at rear, new skylight on 2nd floor.Details
interior renovation to floors include kitchen & baths, replace existing deck, new decking material, new windows & doors to be replaced at rear, new skylight on 2nd floor. | $125,000 |
| Apr 28, 2016 | Completed final sign-off Sep 2018 | 1745 North Point St | interior remodel and change to lateral system: reconfigurations to all 3 floors, add bedroom. change out windows in kind rear. new framing & guardrail on existing roof deck. fire sprinkler under separate permit. maher naDetails
interior remodel and change to lateral system: reconfigurations to all 3 floors, add bedroom. change out windows in kind rear. new framing & guardrail on existing roof deck. fire sprinkler under separate permit. maher na | $250,000 |
| Mar 10, 2016 | Completed final sign-off Mar 2019 | 1700 Vallejo St | common area- soft story retrofit per sfbc 34b: 2012 iebc appendix a-4Details
common area- soft story retrofit per sfbc 34b: 2012 iebc appendix a-4 | $105,000 |
| Feb 1, 2016 | Completed final sign-off Nov 2016 | 1082 Noe St | revision to pa 2015 1218 5503: replace 2 windows - size for size, not visible from street, and install new operable skylight to flat roof.Details
revision to pa 2015 1218 5503: replace 2 windows - size for size, not visible from street, and install new operable skylight to flat roof. | $1,000 |
| Dec 18, 2015 | Completed final sign-off Oct 2016 | 1082 Noe St | replace both fixts. includes 2 showers, 1 tub, 2 sinks, new tile on walls & floors, new lights & exhaust fans. replace kitchen fixts.Details
replace both fixts. includes 2 showers, 1 tub, 2 sinks, new tile on walls & floors, new lights & exhaust fans. replace kitchen fixts. | $30,000 |
| Oct 9, 2015 | Completed final sign-off May 2016 | 1513 Golden Gate Av | kitchen remodel: replacing cabinets & tile. no change on walls.Details
kitchen remodel: replacing cabinets & tile. no change on walls. | $15,000 |
| Sep 29, 2015 | Completed final sign-off Feb 2016 | 1921 Broderick St | garage lateral upgrade. install shearwalls & grade beams at existing garage. lateral upgrade at rear already performed under pa #200506084601.Details
garage lateral upgrade. install shearwalls & grade beams at existing garage. lateral upgrade at rear already performed under pa #200506084601. | $40,000 |
| Aug 5, 2015 | Completed final sign-off Jan 2016 | 20 Joy St | commencement of work not started under previously approved permit app #200701192083Details
commencement of work not started under previously approved permit app #200701192083 | $20,000 |
| Jul 15, 2015 | Completed final sign-off Feb 2016 | 1920 Broderick St | revision appl. #2015.0505.5381. revised to s.1 from pour slab to shotcrete.Details
revision appl. #2015.0505.5381. revised to s.1 from pour slab to shotcrete. | $10,000 |
| Jun 26, 2015 | Never finaled issued Jun 2015, no final | 1922 Broderick St | grout permitDetails
grout permit | $5,000 |
| Jun 16, 2015 | Completed final sign-off Nov 2015 | 350 College Av | bathroom remodel in-kindDetails
bathroom remodel in-kind | $12,000 |
| Jun 5, 2015 | Completed final sign-off Feb 2016 | 1920 Broderick St | exploratory demo of bathroom.Details
exploratory demo of bathroom. | $2,200 |
| May 5, 2015 | Completed final sign-off Feb 2016 | 1920 Broderick St | foundation repair: excavation on 1st floor. relocate interior stair from 1st to 2nd floor. kitchen and bath remodel on 2nd and 3rd floors. new rear windows and door. upgrade all structural, mechanical and electrical services to accomodate all above mentioned alterations. no facade work visible fromDetails
foundation repair: excavation on 1st floor. relocate interior stair from 1st to 2nd floor. kitchen and bath remodel on 2nd and 3rd floors. new rear windows and door. upgrade all structural, mechanical and electrical services to accomodate all above mentioned alterations. no facade work visible from | $175,000 |
| Mar 4, 2015 | Completed final sign-off Aug 2015 | 250 Cumberland St | install new cabinets, separate electrical permit, install wine cooler. finishes only. no walls to be moved, no structural work.Details
install new cabinets, separate electrical permit, install wine cooler. finishes only. no walls to be moved, no structural work. | $30,000 |
| Feb 2, 2015 | Completed final sign-off Jun 2015 | 426 Teresita Bl | replacing kitchen cabinets & tile. replacing bathroom tile. no change on walls.Details
replacing kitchen cabinets & tile. replacing bathroom tile. no change on walls. | $12,000 |
| Nov 14, 2014 | Completed final sign-off Nov 2014 | 3871 Jackson St | to obtain final inspection for work approved under pa#200403249495. all work is complete.Details
to obtain final inspection for work approved under pa#200403249495. all work is complete. | |
| Nov 14, 2014 | Completed final sign-off Nov 2014 | 3871 Jackson St | to obtain final inspection for work approved under pa#200401143995. all work is complete.Details
to obtain final inspection for work approved under pa#200401143995. all work is complete. | |
| Oct 1, 2014 | Completed final sign-off Dec 2015 | 1612 Church St | install hot tub- exterior. move lighting. install wet bar in media room. install paneled ceiling. seperate electrical and plumbing permitsDetails
install hot tub- exterior. move lighting. install wet bar in media room. install paneled ceiling. seperate electrical and plumbing permits | $50,000 |
| Sep 9, 2014 | Completed final sign-off Feb 2016 | 2106 Jackson St | (e) kitchen & 3 bathrooms @ unit#2. remodel of kitchen lighting & control per cec 150 k.Details
(e) kitchen & 3 bathrooms @ unit#2. remodel of kitchen lighting & control per cec 150 k. | $36,000 |
| Aug 25, 2014 | Completed final sign-off Aug 2015 | 4173 Cesar Chavez St | revision to 201305247881. include detail for shotcrete wallsDetails
revision to 201305247881. include detail for shotcrete walls | |
| Jun 26, 2014 | Completed final sign-off May 2018 | 166 Sproule Ln | to erect 3 stories, 1 basement, 2 units condominium building.Details
to erect 3 stories, 1 basement, 2 units condominium building. | $1,163,000 |
| Jun 3, 2014 | Completed final sign-off Jun 2014 | 340 Lombard St | to obtain final inspection for work approved under app#201103031301. all work is complete. add new exterior stair from 2nd floor to the west side yardDetails
to obtain final inspection for work approved under app#201103031301. all work is complete. add new exterior stair from 2nd floor to the west side yard | |
| May 1, 2014 | Completed final sign-off Apr 2015 | 449 Douglass St | add dormer, add windows, lower deck. remove interior walls, lower floor of studio apratment. remodel 2 kitchens and 2 bathrooms per plan. no fire wall required.Details
add dormer, add windows, lower deck. remove interior walls, lower floor of studio apratment. remodel 2 kitchens and 2 bathrooms per plan. no fire wall required. | $300,000 |
| Apr 17, 2014 | Completed final sign-off Aug 2014 | 3816 23rd St | replace 3 windows, not street visable.Details
replace 3 windows, not street visable. | $1,500 |
| Mar 12, 2014 | Completed final sign-off Mar 2014 | 2249 Broderick St | in response to inspection notice issued to property 2/25/14. replace 3 posts in kind under overhang on south side of building to comply with nov #201453531 item #2Details
in response to inspection notice issued to property 2/25/14. replace 3 posts in kind under overhang on south side of building to comply with nov #201453531 item #2 | $1,800 |
| Feb 26, 2014 | Completed final sign-off Nov 2015 | 2662 15th Av | revision to appl #2014.01.16.6417 - mat slab footing as opposed to permiter footing.Details
revision to appl #2014.01.16.6417 - mat slab footing as opposed to permiter footing. | |
| Jan 16, 2014 | Completed final sign-off Nov 2015 | 2662 15th Av | replace damaged foundation elements (resulting from a city water main breakage on 15th ave feb, 2013), remodel for recreation room, laundry, bathroom and office on lower level. new windows at rear. plumbing, & electric on seperate permit.Details
replace damaged foundation elements (resulting from a city water main breakage on 15th ave feb, 2013), remodel for recreation room, laundry, bathroom and office on lower level. new windows at rear. plumbing, & electric on seperate permit. | $90,000 |