Cal C A D E Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2010 to Sep 2026
- Last 24 months
- 8 permits filed
175 permits since 2000: 142 completed, 8 in progress, 11 never finaled, 14 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
9 deck permits: 7 completed, 1 in progress, 1 expired or cancelled. Typically 74 days from filing to permit and 267 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 9, 2026 | In progress filed Jul 2026, not yet issued | 50 Walnut St | excavate lowest level & (n) foundation, replace all windows, exterior doors, replace in-kind stucco facades/soffits. new elevated deck at rear yard, bathrooms, kitchen & kitchenette, washer/dryer, radiant floor heating, skylights, tankless wh, heat/cool system, & fs throughout house.Details
excavate lowest level & (n) foundation, replace all windows, exterior doors, replace in-kind stucco facades/soffits. new elevated deck at rear yard, bathrooms, kitchen & kitchenette, washer/dryer, radiant floor heating, skylights, tankless wh, heat/cool system, & fs throughout house. | $1,095,000 |
| Jul 12, 2018 | Completed final sign-off Oct 2018 | 154 28th St | remove and replace existing tile deck in back, remove and replace existing door, leading to deck. less than 50%Details
remove and replace existing tile deck in back, remove and replace existing door, leading to deck. less than 50% | $14,500 |
| Mar 28, 2017 | Completed final sign-off Sep 2021 | 85 Columbia Square St | comply with nov# 201633643: legalize ground floor dwelling, storage rooms & garage per ord 162-16. 2nd floor: legalize 1 dwelling and deck per ord 43-14, upgrade elec,plumb. new door at harriet and harrison. sprinklers required under separate permit. ** maher: n/a **Details
comply with nov# 201633643: legalize ground floor dwelling, storage rooms & garage per ord 162-16. 2nd floor: legalize 1 dwelling and deck per ord 43-14, upgrade elec,plumb. new door at harriet and harrison. sprinklers required under separate permit. ** maher: n/a ** | $40,000 |
| May 19, 2016 | Completed final sign-off May 2019 | 100 Magellan Av | interior renovation to floors include kitchen & baths, replace existing deck, new decking material, new windows & doors to be replaced at rear, new skylight on 2nd floor.Details
interior renovation to floors include kitchen & baths, replace existing deck, new decking material, new windows & doors to be replaced at rear, new skylight on 2nd floor. | $125,000 |
| May 1, 2014 | Completed final sign-off Apr 2015 | 449 Douglass St | add dormer, add windows, lower deck. remove interior walls, lower floor of studio apratment. remodel 2 kitchens and 2 bathrooms per plan. no fire wall required.Details
add dormer, add windows, lower deck. remove interior walls, lower floor of studio apratment. remodel 2 kitchens and 2 bathrooms per plan. no fire wall required. | $300,000 |
| Aug 13, 2012 | Completed final sign-off Mar 2014 | 156 Sproule Ln | vertical addition. one more floor at the roof level. provide new roof deck at roof level (less than 500 sq. ft). add 2 level wood deck at the back of the building. remodel (e) 2nd & 3rd floor of the building in kind.Details
vertical addition. one more floor at the roof level. provide new roof deck at roof level (less than 500 sq. ft). add 2 level wood deck at the back of the building. remodel (e) 2nd & 3rd floor of the building in kind. | $90,000 |
| Jul 26, 2012 | Completed final sign-off May 2013 | 2060 Jackson St | revision to permit app#201203166211. rear deck addition on 1st floor level.Details
revision to permit app#201203166211. rear deck addition on 1st floor level. | $20,000 |
| Jun 20, 2012 | Completed final sign-off May 2013 | 2060 Jackson St | proj proposes addition of(n)roof deck to(e)roof deck. replace(e) wood deck material w/(n)stone tiles over pedestal system. demo (e) windscreen @(e)roof deck & replace w/(n)glass rail. build(n)metal railing &(n) bbq island. struct roof strenghtening under permit #201203166211. sprinkler#201204279289Details
proj proposes addition of(n)roof deck to(e)roof deck. replace(e) wood deck material w/(n)stone tiles over pedestal system. demo (e) windscreen @(e)roof deck & replace w/(n)glass rail. build(n)metal railing &(n) bbq island. struct roof strenghtening under permit #201203166211. sprinkler#201204279289 | $30,000 |
| May 31, 2011 | Expired or cancelled expired Dec 2018 | 850 Union St | exterior remodel of e rear elevation including new doors, windows, wood deck at +6" above gradeDetails
exterior remodel of e rear elevation including new doors, windows, wood deck at +6" above grade | $15,000 |