Back to bathroom remodel contractors
Cal C A D E Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2010 to Sep 2026
- Last 24 months
- 8 permits filed
175 permits since 2000: 142 completed, 8 in progress, 11 never finaled, 14 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
49 bathroom remodel permits: 38 completed, 4 in progress, 3 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 286 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 1980 Jackson St | replace kitchen cabinets, appliances, & fixtures. enlarge opening at dining room. remodel 4 bathrooms. remove wall on 3/f to create 2 bedrooms. add laundry on 3/f.Details
replace kitchen cabinets, appliances, & fixtures. enlarge opening at dining room. remodel 4 bathrooms. remove wall on 3/f to create 2 bedrooms. add laundry on 3/f. | $50,000 |
| Jul 9, 2026 | In progress filed Jul 2026, not yet issued | 50 Walnut St | excavate lowest level & (n) foundation, replace all windows, exterior doors, replace in-kind stucco facades/soffits. new elevated deck at rear yard, bathrooms, kitchen & kitchenette, washer/dryer, radiant floor heating, skylights, tankless wh, heat/cool system, & fs throughout house.Details
excavate lowest level & (n) foundation, replace all windows, exterior doors, replace in-kind stucco facades/soffits. new elevated deck at rear yard, bathrooms, kitchen & kitchenette, washer/dryer, radiant floor heating, skylights, tankless wh, heat/cool system, & fs throughout house. | $1,095,000 |
| Sep 4, 2025 | Completed final sign-off Nov 2025 | 111 Duncan St | bathroom remodel: remove exisitng vanity, tiles, toilet, cabinets, install new with shower fixtures, in kind.Details
bathroom remodel: remove exisitng vanity, tiles, toilet, cabinets, install new with shower fixtures, in kind. | $12,000 |
| Jun 24, 2024 | In progress issued Jul 2025 | 1596 Post St | 2132 sf 3rd floor addition to existing 7125 sf 2story mixed use bldg including:3(n)beds,(2)new baths & (1)toilet,increasing bldg height from 27'3"to 38'-8.scope to create a 1048 sf garage w/(3)covered parking spaces,& 2nd fl remodeling(e)2375 sf(4)bedroom,(1)bath & (1)powder room.Details
2132 sf 3rd floor addition to existing 7125 sf 2story mixed use bldg including:3(n)beds,(2)new baths & (1)toilet,increasing bldg height from 27'3"to 38'-8.scope to create a 1048 sf garage w/(3)covered parking spaces,& 2nd fl remodeling(e)2375 sf(4)bedroom,(1)bath & (1)powder room. | $600,000 |
| Oct 2, 2023 | In progress issued Oct 2023 | 535 Laurel St | interior remodel to (2) bathrooms, new plumbing fixtures, replace floor and wall finishes, cabinetry in kind. add new high efficacy lighting, fans and occupancy sensor.Details
interior remodel to (2) bathrooms, new plumbing fixtures, replace floor and wall finishes, cabinetry in kind. add new high efficacy lighting, fans and occupancy sensor. | $20,000 |
| Apr 12, 2023 | Completed final sign-off Apr 2024 | 4079 Cesar Chavez St | remodel in kind 2 kitchens and 3 bathrooms (1kitchen + 2baths at unit 4079; 1 kitchen + 1 bath at unit 4079a).Details
remodel in kind 2 kitchens and 3 bathrooms (1kitchen + 2baths at unit 4079; 1 kitchen + 1 bath at unit 4079a). | $95,000 |
| Nov 23, 2022 | Completed final sign-off Dec 2023 | 818 Steiner St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 4 bathroom(s) in 1st fl, 2nd fl, 3rd fl with 3 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 4 bathroom(s) in 1st fl, 2nd fl, 3rd fl with 3 shower pan(s). | $190,000 |
| Jun 9, 2022 | Completed final sign-off Apr 2023 | 1921 Broderick St | remodel extg kitchen and a bathroom. change a side wood window, repair rotted siding on south side.Details
remodel extg kitchen and a bathroom. change a side wood window, repair rotted siding on south side. | $75,000 |
| Oct 10, 2019 | Expired or cancelled cancelled Nov 2024 | 4079 Cesar Chavez St | horizontal addition. remove gabled roof & provide new flat roof & new property line walls. provide horizontal rear yard addition. remodel bath units including new kitchen and bathrooms.Details
horizontal addition. remove gabled roof & provide new flat roof & new property line walls. provide horizontal rear yard addition. remodel bath units including new kitchen and bathrooms. | $500,000 |
| Sep 5, 2019 | Completed final sign-off Jun 2020 | 2682 Broadway | bathroom remodel of tile, new toilet, new sink, paint. shower pan. 40 sq ft bathroom remodelDetails
bathroom remodel of tile, new toilet, new sink, paint. shower pan. 40 sq ft bathroom remodel | $7,500 |
| Jun 10, 2019 | Completed final sign-off Aug 2019 | 1120 Thomas Av | ti, inter repair/remodel of water damaged bath/shower. add 1 accessible bathroom, acc shower. demo non structural walls as indicatedDetails
ti, inter repair/remodel of water damaged bath/shower. add 1 accessible bathroom, acc shower. demo non structural walls as indicated | $95,000 |
| May 3, 2019 | Expired or cancelled cancelled Jan 2026 | 1120 Thomas Av | ti interior repair/remodel of water damaged office/bathrooms; add 1 accessible bathroom/shower/locker @ 1st floor; remodel 2 bathrooms/office @ 2nd floorDetails
ti interior repair/remodel of water damaged office/bathrooms; add 1 accessible bathroom/shower/locker @ 1st floor; remodel 2 bathrooms/office @ 2nd floor | $95,000 |
| Jun 18, 2018 | Completed final sign-off Jul 2019 | 165 Beacon St | remodel bathroom and kitchen replace inkindDetails
remodel bathroom and kitchen replace inkind | $12,000 |
| Feb 22, 2018 | Completed final sign-off Mar 2019 | 1251 Howard St | tenant improvement - remodel (4) existing baths, ad d (n) locker rooms & showers. add (n) shop room. paint existing rooms. provide fire area separation with 3 hour drop doors (4), and 1 mag held 3 hr door, interlocked to close simultaneously.Details
tenant improvement - remodel (4) existing baths, ad d (n) locker rooms & showers. add (n) shop room. paint existing rooms. provide fire area separation with 3 hour drop doors (4), and 1 mag held 3 hr door, interlocked to close simultaneously. | $115,000 |
| May 19, 2016 | Completed final sign-off May 2019 | 100 Magellan Av | interior renovation to floors include kitchen & baths, replace existing deck, new decking material, new windows & doors to be replaced at rear, new skylight on 2nd floor.Details
interior renovation to floors include kitchen & baths, replace existing deck, new decking material, new windows & doors to be replaced at rear, new skylight on 2nd floor. | $125,000 |
| Jun 16, 2015 | Completed final sign-off Nov 2015 | 350 College Av | bathroom remodel in-kindDetails
bathroom remodel in-kind | $12,000 |
| Jun 5, 2015 | Completed final sign-off Feb 2016 | 1920 Broderick St | exploratory demo of bathroom.Details
exploratory demo of bathroom. | $2,200 |
| May 5, 2015 | Completed final sign-off Feb 2016 | 1920 Broderick St | foundation repair: excavation on 1st floor. relocate interior stair from 1st to 2nd floor. kitchen and bath remodel on 2nd and 3rd floors. new rear windows and door. upgrade all structural, mechanical and electrical services to accomodate all above mentioned alterations. no facade work visible fromDetails
foundation repair: excavation on 1st floor. relocate interior stair from 1st to 2nd floor. kitchen and bath remodel on 2nd and 3rd floors. new rear windows and door. upgrade all structural, mechanical and electrical services to accomodate all above mentioned alterations. no facade work visible from | $175,000 |
| Feb 2, 2015 | Completed final sign-off Jun 2015 | 426 Teresita Bl | replacing kitchen cabinets & tile. replacing bathroom tile. no change on walls.Details
replacing kitchen cabinets & tile. replacing bathroom tile. no change on walls. | $12,000 |
| Sep 9, 2014 | Completed final sign-off Feb 2016 | 2106 Jackson St | (e) kitchen & 3 bathrooms @ unit#2. remodel of kitchen lighting & control per cec 150 k.Details
(e) kitchen & 3 bathrooms @ unit#2. remodel of kitchen lighting & control per cec 150 k. | $36,000 |
| May 1, 2014 | Completed final sign-off Apr 2015 | 449 Douglass St | add dormer, add windows, lower deck. remove interior walls, lower floor of studio apratment. remodel 2 kitchens and 2 bathrooms per plan. no fire wall required.Details
add dormer, add windows, lower deck. remove interior walls, lower floor of studio apratment. remodel 2 kitchens and 2 bathrooms per plan. no fire wall required. | $300,000 |
| Jan 16, 2014 | Completed final sign-off Nov 2015 | 2662 15th Av | replace damaged foundation elements (resulting from a city water main breakage on 15th ave feb, 2013), remodel for recreation room, laundry, bathroom and office on lower level. new windows at rear. plumbing, & electric on seperate permit.Details
replace damaged foundation elements (resulting from a city water main breakage on 15th ave feb, 2013), remodel for recreation room, laundry, bathroom and office on lower level. new windows at rear. plumbing, & electric on seperate permit. | $90,000 |
| Nov 20, 2013 | Completed final sign-off Jun 2014 | 32 Julius St | remodel of (e) residence within existing two unit bldg. remodel bedroom, bathroom, kitchen and living space. new and replacement window (back) and doorDetails
remodel of (e) residence within existing two unit bldg. remodel bedroom, bathroom, kitchen and living space. new and replacement window (back) and door | $20,000 |
| Sep 16, 2013 | Completed final sign-off Feb 2014 | 340 Lombard St | kitchen & bathroom remodel. (e) location. plumbing & electrical under separate permitDetails
kitchen & bathroom remodel. (e) location. plumbing & electrical under separate permit | $12,000 |
| Sep 16, 2013 | Completed final sign-off Dec 2013 | 474 Arlington St | kitchen & bathroom remodel. plumbing & electrical under separate permitDetails
kitchen & bathroom remodel. plumbing & electrical under separate permit | $9,000 |
| Sep 5, 2013 | Completed final sign-off Jun 2014 | 32 Julius St | remodel (e) residence within 2 unit residential building, scope includes-remodeled laundry room, mechanical room, kitchen, bathrooms, bedrooms & living spaces. remodel shall additionally include various new & replacement windowsDetails
remodel (e) residence within 2 unit residential building, scope includes-remodeled laundry room, mechanical room, kitchen, bathrooms, bedrooms & living spaces. remodel shall additionally include various new & replacement windows | $175,000 |
| Jul 29, 2013 | Never finaled issued Jul 2013, no final | 150 Edgewood Av | bathroom remodel, upper levelDetails
bathroom remodel, upper level | $5,000 |
| Jun 6, 2013 | Completed final sign-off Jun 2014 | 32 Julius St | remodel 4 bathrooms & kitchen, plumbing & electrical separate permitDetails
remodel 4 bathrooms & kitchen, plumbing & electrical separate permit | $105,000 |
| May 24, 2013 | Completed final sign-off Aug 2015 | 4173 Cesar Chavez St | horizontal addition on all floors. project will include roof deck & excavation for a (n) patio @ the rear yard. appln for planning approval. bldg dept submittal shall be deferred under separate permit. addition will add bathrooms & replace (e) kitchen. sprinkler under separate permit.Details
horizontal addition on all floors. project will include roof deck & excavation for a (n) patio @ the rear yard. appln for planning approval. bldg dept submittal shall be deferred under separate permit. addition will add bathrooms & replace (e) kitchen. sprinkler under separate permit. | $480,308 |
| Apr 25, 2013 | Never finaled issued Apr 2013, no final | 556 Ortega St | renovation of master bedroom and master bathroom, including new plumbing & electrical work, and removal of load bearing closet wall. work scope also include new outdoor gas fireplace.Details
renovation of master bedroom and master bathroom, including new plumbing & electrical work, and removal of load bearing closet wall. work scope also include new outdoor gas fireplace. | $12,000 |
| Mar 11, 2013 | Completed final sign-off Oct 2013 | 2513 Pacific Av | interior demo of (e) kitchen, back stair from 2nd to 3rd fl, interior walls, interior remodel of kitchen, 2 bathrooms, new pantry, partial new stair (reconfigured), new handrails, guarddrails, closets, storage room and new fireplace, surround & mantel.Details
interior demo of (e) kitchen, back stair from 2nd to 3rd fl, interior walls, interior remodel of kitchen, 2 bathrooms, new pantry, partial new stair (reconfigured), new handrails, guarddrails, closets, storage room and new fireplace, surround & mantel. | $190,000 |
| Mar 8, 2013 | Completed final sign-off Oct 2013 | 2513 Pacific Av | remodel kitchen, power room, marter bathroom & top floor bathroom in (e) locations. no change in wall & openings, kitchen permanent lighting shall have a min of 50% wattage being high eff. bathroom permanent lighting shall be high eff. or controlled by manual on sensorsDetails
remodel kitchen, power room, marter bathroom & top floor bathroom in (e) locations. no change in wall & openings, kitchen permanent lighting shall have a min of 50% wattage being high eff. bathroom permanent lighting shall be high eff. or controlled by manual on sensors | $50,000 |
| Dec 26, 2012 | Completed final sign-off Aug 2013 | 507 Arkansas St | new (1) bedroom, (1) family room, (1) full bathroom & laundry room on ground floor.Details
new (1) bedroom, (1) family room, (1) full bathroom & laundry room on ground floor. | $25,000 |
| Oct 9, 2012 | Completed final sign-off Nov 2014 | 3871 Jackson St | interior remodel to (e) 3 story basement. new lighting, finishes, plumbing throughout. 2 new full bathrooms, kitchen remodel, sykylights, move garage doors forward, new front door, remove exterior stair at side property.new sprinkler sprinkler on separate permit, seismic upgrades. windows.Details
interior remodel to (e) 3 story basement. new lighting, finishes, plumbing throughout. 2 new full bathrooms, kitchen remodel, sykylights, move garage doors forward, new front door, remove exterior stair at side property.new sprinkler sprinkler on separate permit, seismic upgrades. windows. | $150,000 |
| Sep 7, 2012 | Completed final sign-off Nov 2014 | 3871 Jackson St | bathroom & kitchen remodel-replace kitchen cabinets & counter tops.Details
bathroom & kitchen remodel-replace kitchen cabinets & counter tops. | $6,000 |
| Jul 17, 2012 | Never finaled issued Jul 2012, no final | 315 Hyde St | unit#503, change kitchen cabinets, countertops, re do floor, paint, bathroom, tile floor, change vanity & paint.Details
unit#503, change kitchen cabinets, countertops, re do floor, paint, bathroom, tile floor, change vanity & paint. | $15,000 |
| May 17, 2012 | Completed final sign-off Dec 2012 | 2253 Broderick St | project proposed interior remodel located on the 3rd and 4th floors. work includes remodel e kitchen, baths, finishes, lighting throughout. includes new skylights on e roof. e wood windows in kind. visible from streetDetails
project proposed interior remodel located on the 3rd and 4th floors. work includes remodel e kitchen, baths, finishes, lighting throughout. includes new skylights on e roof. e wood windows in kind. visible from street | $58,000 |
| Apr 27, 2012 | Completed final sign-off Dec 2012 | 2253 Broderick St | kitchen and bathroom remodel @ top floor 4th flr, no structural work, no (n) lightingDetails
kitchen and bathroom remodel @ top floor 4th flr, no structural work, no (n) lighting | $9,800 |
| Mar 26, 2012 | Completed final sign-off Jun 2012 | 3196 Pacific Av | two bathroom remodel - tile, paint, no change on wall and openings.Details
two bathroom remodel - tile, paint, no change on wall and openings. | $10,000 |
| Mar 16, 2012 | Completed final sign-off May 2013 | 2060 Jackson St | interior remodel of existing residences including kitchens and baths. minor alterations to east & west lightwell w/(n) windows. reduction of rear bay windows.Details
interior remodel of existing residences including kitchens and baths. minor alterations to east & west lightwell w/(n) windows. reduction of rear bay windows. | $250,000 |
| Feb 14, 2012 | Completed final sign-off Jun 2016 | 2370 Washington St | remodel one kitchen, one bathroom in kind, new cabinets coutner tops and tileDetails
remodel one kitchen, one bathroom in kind, new cabinets coutner tops and tile | $20,000 |
| Jan 23, 2012 | Expired or cancelled cancelled Jun 2015 | 2727 Turk Bl | remodel kitchen & bath on top floor unit. no structural work on this permit. (smoke detectors & carbon monoxide detectors - required) all (n) lighting must comply with cec 150(k) 10 + 8Details
remodel kitchen & bath on top floor unit. no structural work on this permit. (smoke detectors & carbon monoxide detectors - required) all (n) lighting must comply with cec 150(k) 10 + 8 | $18,000 |
| Dec 22, 2011 | Completed final sign-off May 2017 | 350 College Av | bathroom remodel/alterations, replace water closet, tub, sinks, tile & fixtures & lights. no sf change. no moving or adding wallsDetails
bathroom remodel/alterations, replace water closet, tub, sinks, tile & fixtures & lights. no sf change. no moving or adding walls | $7,500 |
| Dec 9, 2011 | Expired or cancelled expired May 2013 | 2060 Jackson St | remodel existing kitchen, 2 bathrooms & 1 powder room in existing location. no structural work.Details
remodel existing kitchen, 2 bathrooms & 1 powder room in existing location. no structural work. | $40,000 |
| Dec 9, 2011 | Completed final sign-off May 2013 | 2062 Jackson St | remodel existing kitchen, 2 bathrooms & 1 powder room in existing location. no structural work.Details
remodel existing kitchen, 2 bathrooms & 1 powder room in existing location. no structural work. | $40,000 |
| Dec 9, 2011 | Completed final sign-off May 2013 | 2064 Jackson St | remodel existing kitchen, 2 bathrooms & 1 powder room in existing location. no structural work.Details
remodel existing kitchen, 2 bathrooms & 1 powder room in existing location. no structural work. | $40,000 |
| Jul 7, 2011 | Completed final sign-off Nov 2011 | 2939 Vallejo St | interior alterations to (e) 2nd & 3rd floor. 2nd floor: kitchen remodel, new bathroom, pantry & office. 3rd floor: remodellign (3) bathrooms & adding (1) additional bathroom. reference pa #2010.12.22.7213 & #2011.02.24.0887.Details
interior alterations to (e) 2nd & 3rd floor. 2nd floor: kitchen remodel, new bathroom, pantry & office. 3rd floor: remodellign (3) bathrooms & adding (1) additional bathroom. reference pa #2010.12.22.7213 & #2011.02.24.0887. | $20,000 |
| Jun 17, 2011 | Completed final sign-off Mar 2013 | 548 Douglass St | kitchen remodel, alterations to e bathroom, 2 e bedrooms, new stair (interior) 2nd floor to garage. add 1 new bath at 2nd fl, rebuild front entrance stair, selectrive structural repair of posts and footings, replace portions of failed foundation, add plywood shearwalls, and holddownsDetails
kitchen remodel, alterations to e bathroom, 2 e bedrooms, new stair (interior) 2nd floor to garage. add 1 new bath at 2nd fl, rebuild front entrance stair, selectrive structural repair of posts and footings, replace portions of failed foundation, add plywood shearwalls, and holddowns | $175,000 |
| Dec 30, 2010 | Completed final sign-off Nov 2011 | 2939 Vallejo St | remodel e kitchen and baths in current locations. no structural. at least 50% high eff lighting. bath: high eff lighting or occupancy sensorDetails
remodel e kitchen and baths in current locations. no structural. at least 50% high eff lighting. bath: high eff lighting or occupancy sensor | $75,000 |